Loading...
8.2. SR 06-20-2016 Request for Action To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General BusinessJune 20, 2016Justin Femrite, P.E., City Engineer Item Description Reviewed by Line Avenue Traffic Operations Study Cal Portner, City Administrator Reviewed by Action Requested Accept, by motion, Line Avenue Traffic Operations Study and provide direction for implementation of study recommendations. Background/Discussion The Line Avenue Traffic Operations Study has been completed by the traffic engineering firm Spack Consulting. The purpose of this study was to determine if any modifications should be made along Line Avenue st between Main Street/181 Avenue and Twin Lakes Road. The study included looking at potential impacts to surrounding intersections if Line Avenue was converted to a cul-de-sac between Main Street/181st Avenue and Twin Lakes Road. Staff will present the results of the study and discuss the recommendations made by the traffic engineer. Financial Impact There is no financial impact associated with this item. Attachments  Line Avenue Traffic Operations Study Sack THE TRAFFIC STUDY COMPANY Traffic Operations Stud Line Avenue Elk River, Minnesota I hereby certify that this report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. BiyaTT J. Ficelf; P.E., P.T.O.E. License No. 42802 Date: June 15, 2016 Executive Summary Background. The purpose of this study is to determine if any modifications should be made along Line Avenue between Main Street/181St Avenue and Twin Lakes Road. This includes looking at potential impacts to surrounding intersections if Line Avenue was converted to a cul-de-sac between Main Street/181 st Avenue and Twin Lakes Road. The potential cul-de-sac options are: • At Twin Lakes Road (Alternative A) • Between 5t" Street and 3rd Street (Alternative B) • Between 3rd Street and Main Street (Alternative C) In addition, the 5th Street intersections with Dodge Avenue and Line Avenue were examined to determine potential impacts if re -aligned to better recognize the east -west dominant movement. Results.- The esults.The traffic impacts of a cul-de-sac on Line Avenue between Main Street/181St Street and Twin Lakes Road as well as the potential to recognize the dominant east -west movement on 5t" Street were analyzed. The principle findings are: • The study intersections all have satisfactory overall operations today, except the eastbound left turn movement on Line Avenue at Twin Lakes Road/Line Avenue during the p.m. peak. • The existing volumes for the intersection of Twin Lakes Road/181St Avenue do not satisfy any signal warrants. • With the shifts in existing volumes, the three alternatives for a cul-de-sac on Line Avenue have overall acceptable operations, except for the Twin Lakes Road/Line Avenue intersection during the p.m. peak hour under Alternatives B and C. • The potential mitigation of a southbound left turn lane/eastbound right turn or a single -lane roundabout at the Twin Lakes Road/Line Avenue intersection improves the operations under any scenario. • Alternative A represents the most impact to cut -through traffic on Line Avenue and least impact to other routes with origins and destinations within the study area. • Alternative C represents the least impact to cut -through traffic on Line Avenue and most impact other routes with origins and destinations within the study area. • Although Warrants 2 and 3 are satisfied using shifted volumes at the intersection of Twin Lakes Road/181St Avenue under any Line Avenue alternative, traffic operations suggest a traffic signal is not justified. It is likely that additional development and traffic growth in the area will increase delays and satisfy the criteria for Warrant 1 in the near future. • Warrants for a traffic signal or all -way stop control at the 5t" Street intersections with Dodge Avenue and with Line Avenue are not satisfied with existing volumes and unlikely to be satisfied with shifted volumes under any Line Avenue alternative. Traffic Operations Study i Line Avenue in Elk River • Changing the geometry and repositioning the side -street stop control to recognize the east -west flow on 5t" Street would have acceptable operations with existing traffic or with shifted traffic under any Line Avenue alternative. • A roundabout is an option only with existing traffic at the Line Avenue/5t" Street intersection. Recommendations. Based on these conclusions, the following is recommended: • Keep Line Avenue connected between Main Street/181 st Avenue and Twin Lakes Road based on satisfactory traffic operations today. • Change Line Avenue to place a cul-de-sac between the intersections of 5t" Street and Twin Lakes Road if addition reasons beyond traffic operations suggest a change is necessary. • Consider the potential mitigation of a southbound left turn lane on Twin Lakes Road at the Line Avenue intersection, which will improve safety in any scenario. • Consider the potential mitigation of an eastbound right turn lane on Line Avenue at the Twin Lakes Road intersection, which will improve traffic operations if Line Avenue corridor does not change or if the corridor has a cul-de-sac placed south of the 5th Street intersection. • Revise the 5th Street intersection with Dodge Avenue to recognize the dominant flow of traffic between the north leg and the east leg. This is recommended under any alternative, including if Line Avenue is not changed. • Revise the 5th Street intersection with Line Avenue to a roundabout if no changes occur on the Line Avenue corridor. If Line Avenue is changed with a cul-de-sac placed south of the 5t" Street intersection, revise the 5t" Street intersection with Line Avenue to recognize the dominant flow of traffic between the west leg and north leg. • Monitor the Twin Lakes Road/181St Avenue intersection for increased traffic volumes and decreasing operations in the near future, when a traffic signal may be warranted. Traffic Operations Study ii Line Avenue in Elk River TABLE OF CONTENTS 1. Introduction................................................................................1 2. Analysis of Existing Conditions...............................................2 3. Line Avenue Alternative Options & Analysis ...........................5 4. Fifth Street Intersection Improvements.................................10 5. Conclusions and Recommendations.....................................12 6. Appendix..................................................................................14 LIST OF TABLES Table 1 — Existing Peak Hour Level of Service'......................................4 Table 2 — Line Avenue Alternatives AM Peak Hour Level of Service' ...6 Table 3 — Line Avenue Alternatives PM Peak Hour Level of Service' ...6 Table 4 — Line Avenue/Twin Lakes Road Mitigated Level of Service' ... 7 Table 5 — Travel Time Changes with Line Ave Alternatives' .................8 Table 6 — Line Avenue Alternatives Comparison...................................9 Table 7 — 5t" Street Alternatives Level of Service'................................10 Table 8 — 5t" Street Roundabout Level of Service'...............................11 Traffic Operations Study iii Line Avenue in Elk River 1. Introduction a. Purpose of Study Line Avenue is a roadway corridor in Elk River, Minnesota, that is currently being utilized by many drivers as a route from Main Street/181St Avenue to/from Twin Lakes Road. The purpose of this study is to determine if any modifications should be made along Line Avenue between Main Street/181St Avenue and Twin Lakes Road. This includes looking at potential impacts to surrounding intersections if Line Avenue was converted to a cul-de-sac between Main Street/181St Avenue and Twin Lakes Road. The potential cul- de-sac options are: • At Twin Lakes Road • Between 5t" Street and 3rd Street • Between 3rd Street and Main Street These options are compared against the existing conditions. In addition to the potential changes on Line Avenue, 5t" Street has two intersections that appear misaligned with the existing travel patterns. The 5t" Street intersections with Dodge Avenue and Line Avenue were examined to determine potential impacts if re -aligned to better recognize the east -west dominant movement. b. Study Objectives The objectives of this study are: i. Document how the study intersections currently operate. ii. Forecast the changes in traffic volumes at the study intersections that would be expected if changes to the Line Avenue connectivity are made. iii. Determine how the study intersections will operate with the forecasted volumes. iv. Determine how travel times will be impacted with the potential change to the Line Avenue connectivity. V. Review the 5t" Street intersections with Dodge Avenue and Line Avenue for potential improvements to encourage east -west flow. vi. Recommend the preferred option and potential improvements, if needed. The following intersections are analyzed in this study: 1. Dodge Avenue/5t" Street 2. Line Avenue/5t" Street 3. Twin Lakes Road/Line Avenue 4. Line Avenue/3rd Street/183rd Circle 5. Line Avenue/Zane Street/Main Street 6. Twin Lakes Road/181 st Avenue Traffic Operations Study 1 Line Avenue in Elk River 2. Analysis of Existing Conditions a. Transportation Network Characteristics The primary study corridor is Line Avenue Northwest, an approximate 1/2 - mile corridor connecting Main Street to Twin Lakes Road. Also known as Elk River Municipal State Aid Street (MSAS) 136 (from Main Street to 5th Street), Line Avenue is a two-lane, undivided road with a 30 mph speed limit. This road was previously considered a Collector road, but has been updated to a local road with a focus on access as opposed to mobility. South of the Main Street intersection, Line Avenue becomes Zane Street. East of the Twin Lakes Road intersection, Line Avenue becomes 185th Avenue. The appeal of Line Avenue for motorists is as a "short-cut" from Main Street to Twin Lakes Road and vice versa. The Line Avenue route is approximately 1/2 -mile compared to about 1 mile if staying on Main Street and Twin Lakes Road. Figure 1 in the Appendix shows the location of this study corridor. Twin Lakes Road Northwest is also known as Sherburne County State Aid Highway (CSAH) 13 north of 181St Avenue and as MSAS 133 south of 181St Avenue. The CSAH 13 section is a Minor Arterial and the MSAS 133 section is a Collector roadway. North of the intersection with Line Avenue, Twin Lakes Road transitions from a two-lane facility to a divided four -lane facility. This four -lane section continues south through the intersection with 181st Avenue. Turn lanes are provided at intersections in the study section. The posted speed limit is 40 mph in this area. Main Street Northwest transitions to 181St Avenue to the east of the intersection with Line Avenue. Both Main Street and 181St Avenue are also known as CSAH 12. A Minor Arterial, the corridor provides a four -lane divided section in the study area. Turn lanes are provided at the intersections and the posted speed limit is 35 mph from the Line Avenue intersection to the west and 40 mph from the Line Avenue intersection to the east. Dodge Avenue Northwest, also known as MSAS 118, provides for a three - lane undivided facility. The three lanes are divided into two southbound lanes and one northbound lane. The speed limit is 30 mph. 5th Street is also MSAS 117 and connects Highway 169 to Line Avenue in this area. This local roadway is a two lane, undivided road with a 30 mph speed limit. 3rd Street Northwest is a local, two lane undivided road with 30 mph speed limit. East of Line Avenue, 3rd Street is known as 183rd Circle. Existing traffic control and travel lanes for the study intersections is shown in Figure 2 in the Appendix. Traffic Operations Study 2 Line Avenue in Elk River There are sidewalks/trails on the south side of Main Street/181St Avenue as well as on the east sides of Twin Lakes Road and Dodge Avenue. Additional trails and sidewalks are planned for Line Avenue and 3rd Street as well as a connection between 3rd Street and 5t" Street to the west of Line Avenue. b. Traffic Volumes Intersection video was collected at each study intersection under weekday conditions in late April 2016. Using these videos, 48 hour turning movement counts were obtained at the study intersections. The data from the two days was averaged and a seasonal adjustment factor was applied to give a better representation of the traffic going through the intersections on a "typical day" by smoothing out any irregularities. The a.m. and p.m. peak hours were generally found to be from 7.00 to 8.00 a.m. and 4.30 to 5.30 p.m. These peak hours varied slightly depending upon the location and day. The turning movement count data for each study intersection and each day is contained in 15 -minute intervals in the Appendix. c. Level of Service LOS A An intersection capacity analysis was conducted for the _ existing intersections per the Highway Capacity Manual, iIWie 2010. Intersections are assigned a "Level of Service" letter grade for the peak hour of traffic based on the number of lanes at the intersection, traffic volumes, and traffic control. Level of Service A (LOS A) represents light traffic flow (free LOS c flow conditions) while LOS F represents heavy traffic flow (over capacity conditions). LOS D is considered acceptable at intersections. Individual movements are also assigned LOS grades. At busy intersections, one or more individual movements may operate at a lower LOS when the overall LOS D=Acceptable_ Intersection is operating acceptably at LOS C or D. This situation often occurs for movements with relatively low volumes and a relatively high overall traffic signal cycle length. The pictures on the left represent some of the LOS Y'.► grades (from a signal controlled intersection in San Jose, CA). These LOS grades represent the overall intersection LOS F = Unacceptable operation, not individual movements. A summary of the LOS results for the existing operations is shown in Table 1. These are based on the existing traffic Source: City of control and lane configurations as shown in Figure 2. The San Jose, CA LOS calculations were completed with the VISTROTM software package, which uses the methodology detailed in the Highway Capacity Manual 2010. Signal timings were determined upon observation. The full LOS calculations are provided in the Appendix. Traffic Operations Study 3 Line Avenue in Elk River Table 1 — Existing Peak Hour Level of Service' Intersection A.M. Peak P.M. Peak Dodge Ave/5th St A (b) A (b) Line Ave/5th St A b A c Twin Lakes Rd/Line Ave A c C e Line Ave/3rd St A (b) A (c) Line Ave/Main St B (c) C (c) Twin Lakes Rd/181St Ave B (b) B (b) 'The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. As shown in Table 1, all of the study intersections currently operate at LOS C or better. All movements are also at LOS C or better with the exception of the eastbound approach on Line Avenue at the Twin Lakes Road intersection in the p.m. peak hour. Less than ideal operations at side -street intersections are not unusual during the peak periods across the Metro. The 95th percentile queue for this movement is about 200 feet, or eight to ten vehicles. Field observations confirmed the long queue during this period, but also noted that the vehicles are able to keep moving due to the relatively low conflicting volume on Twin Lakes Road. Based on these results, Line Avenue is currently operating acceptably and does not need improvements. d. Warrant Analysis - Twin Lakes Road & 181St Avenue As shown in Figure 2 in the Appendix, the Twin Lakes Road/181St Avenue intersection is under all -way stop control, but appears to be set-up for a future signal system given the number of approach lanes provided. The turning movement counts show that there are significant enough volumes at this intersection that upgrading it to a signalized intersection could be considered. Using the turning movement counts, the volume signal warrants (Warrants 1- 3) were reviewed for the Twin Lakes Road/181St Avenue intersection using the methodology from the Minnesota Manual on Uniform Traffic Control Devices. Satisfying one or more warrants indicates that a traffic signal may be appropriate for an intersection. With the existing turning movement volumes, the Twin Lakes Road/181St Avenue intersection does not satisfy any of the volume warrants. Given the satisfactory traffic operations during the peak periods and the failure to satisfy a volume warrant, this review of the existing conditions indicates all -way stop remains an appropriate traffic control at this intersection. Results of the warrant analysis are shown in the Appendix. Traffic Operations Study 4 Line Avenue in Elk River 3. Line Avenue Alternative Options & Analysis a. Line Avenue Alternative Options The potential conversion of Line Avenue to a cul-de-sac between Main Street and Twin Lakes Road could occur at three different locations: • Alternative A - disconnect Line Avenue between the intersections with Twin Lakes Road and 5t" Street • Alternative B — disconnect Line Avenue between the intersections with 5t" Street and 3rd Street. • Alternative C — disconnect Line Avenue between the intersections with 3rd Street and Main Street/181 st Avenue. b. Traffic Volume Adjustments To be able to analyze the study intersections with the different Line Avenue alternatives, the existing volumes were shifted around to correspond to the different layouts. The following assumptions were made in order to complete these shifts for the different alternatives: • Standard trip generation rates apply to houses and businesses that have access directly, or indirectly through public roads, to Line Avenue. • Existing volumes at the end points of the study network will roughly balance with these shifts. For example, Twin Lakes Road has an existing a.m. peak hour volume of 503 vehicles on the southbound approach. For any alternative, this southbound approach will continue to have about 503 vehicles, although the percentages to the turning movements will change. • Drivers will select the closest replacement route based on the roadway network, not based on delays or perceived delays. The final volumes can be seen in the capacity analysis section of the Appendix for each scenario. c. Line Avenue Alternatives Level of Service Analysis The forecasted turning movement volumes for the different alternative scenarios were used to re -analyze the study intersections. As before, the LOS calculations were done in accordance with the 2010 Highway Capacity Manual using VISTROTM software. A summary of the LOS results for the alternative Line Avenue layouts for each peak hour is shown in Tables 2 and 3. The complete LOS calculations, which include queue lengths and grades for all individual movements, are included in the Appendix. Traffic Operations Study 5 Line Avenue in Elk River Table 2 — Line Avenue Alternatives AM Peak Hour Level of Service' 'The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. Table 3 — Line Avenue Alternatives PM Peak Hour Level of Service' Intersection Existing A.M. Peak Hour Alt. C Intersection Existing Alt. A Alt. B Alt. C Dodge Ave/5th St A b A b A bLine Ave/5th St A (b)FR ) A (a) A (a) Twin Lakes Rd/Line Ave A (c) ) A (c) A (c) Line Ave/3�d St A (b)) C d A (a) A (a) Line Ave/Main St B c B c B c A b Twin Lakes Rd/181St Ave B (b) C (d) B (c) C (c) 'The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. Table 3 — Line Avenue Alternatives PM Peak Hour Level of Service' Intersection Existing P.M. Peak Alt. A Hour Alt. B Alt. C Dodge Ave/5th St A (b) A (b) A (c) A (c) Line Ave/5th St A c A a A a A b Twin Lakes Rd/Line Ave C e A c D F Line Ave/3rd St A (c) A (b) A (b) A (a) Line Ave/Main St C c C d B c A b Twin Lakes Rd/181St Ave B b C d B c B b 'The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. As shown in the tables, all intersections and movements operate at LOS D or better with the exception of the Twin Lakes Road/Line Avenue intersection in some of the p.m. peak hour scenarios. As in the existing scenario, these poor LOS results are due to the eastbound movements on Line Avenue at Twin Lakes Road. These eastbound approach average delays per vehicle and 95th percentile queues in the p.m. peak hour are as follows: • Existing: 36 seconds, 8 vehicles • Alternative A: n/a • Alternative B: 99 seconds, 11 vehicles • Alternative C: 234 seconds, 21 vehicles These results indicate that intersection improvement modifications may be needed at the Twin Lakes Road/Line Avenue intersection, even in the existing scenario. As a first step, the traffic signal and all -way stop control warrants were examined. This review showed that the existing traffic is relatively far from satisfying any of the warrants. Therefore, a traffic signal or conversion to all -way stop were not considered. Next, geometric improvements were considered, including additional approach lanes or a change to a roundabout. The addition of an eastbound right turn lane on Line Avenue and a southbound left turn on Twin Lakes Road would have the most impact. Due to the large queues and delays on the Traffic Operations Study 6 Line Avenue in Elk River eastbound approach resulting from the left turns, allowing right turning traffic to pass through would lower overall approach delay and queues. A southbound left turn lane could also be included where there is currently a wide median, preventing through vehicles from waiting behind a left turning vehicle. A single -lane roundabout could be considered a safety device that would slow traffic and physically prevent right angle crashes. The forecasted turning movement volumes for the different alternative scenarios were used to re -analyze the Twin Lakes Road/Line Avenue intersection in the p.m. peak hour with these two different alternatives. As before, the LOS calculations were done in accordance with the 2010 Highway Capacity Manual using VISTROTM software. A summary of the LOS results for the alternative Line Avenue layouts for each peak hour is shown in Table 4. The complete LOS calculations, which include queue lengths and grades for all individual movements, are included in the Appendix. Table 4 — Line Avenue/Twin Lakes Road Mitigated Level of Service' (in parentheses) is the Level of Service for the worst operating movement. As shown in Table 4, the LOS results improve from the previous results, especially with the conversion of the intersection to a roundabout. The overall intersection operates acceptably with the added lanes in all scenarios, but the eastbound approach, in particular the left turn/through lane, is still at operating at LOS F in Alternatives B & C. d. Travel Time Changes In addition to operations at the study intersections, the alternatives were evaluated through the impacts to travel times. The change in travel times were estimated using the average delay results from the capacity analyses and estimating the travel time between intersections based on the speed limit and distance. The study area was divided into zones and existing routes between zones determined. Figure 3 in the Appendix shows these different zones in the study network. Travel times were calculated between each of these zones for each alternative scenario. The travel times were then grouped into routes that represent a "cut -through" movement on Line Avenue and other movements that have origins or destinations within the study network. The total travel Traffic Operations Study 7 Line Avenue in Elk River times for all routes in each group were summed together to provide an easy comparison of alternatives. The resulting travel times are shown in Figure 3 in the Appendix. A summary of comparisons is shown in Table 5. Table 5 — Travel Time Changes with Line Ave Alternatives' 'The percentages shown are for all routes in each category relative to the existing travel times. As shown in Table 5, and intuitively for this type of change, the travel times across the system will increase with the loss of a direct connection between Main Street and Twin Lakes Road. However, the magnitude of the impact and who receives the most impact changes based upon the alternative. In general, Alternative A represents the most impact to cut -through traffic on Line Avenue and least impact to other routes with origins and destinations within the study area. Alternative C represents the least impact to cut -through traffic on Line Avenue and most impact other routes. e. Warrant Analysis - Twin Lakes Road & 181St Avenue As presented earlier, the existing traffic at the Twin Lakes Road/181St Avenue intersection does not satisfy the volume Traffic Signal Warrants. With any of the alternatives for Line Avenue, the projected shift in traffic volumes generally results in an increase at the Twin Lakes Road/181St Avenue intersection. Because of these estimated increases in traffic, the possibility arises of a traffic signal being needed. To fully evaluate the volume signal warrants (Warrants 1-3), the changes applied to the Twin Lakes Road/181St Avenue intersection for each of the alternatives was applied to the full 24-hour period. Using these volumes, two warrants, Warrant 2 Four -Hour Volumes and Warrant 3 Peak Hour Volumes, were satisfied for all three alternatives. Up to six of the required eight hours met the criteria for Warrant 1, Eight -Hour Volumes. Although two warrants are met, traffic operations at the intersection are still satisfactory with acceptable LOS for the overall intersection and individual movements. These results suggest a traffic signal, while warranted, may not yet be justified. However, it is likely that added growth from additional development in the general area would push traffic volumes to satisfy the Warrant 1 as well as increase delays to indicate need. It is likely that a traffic signal will be needed at the Line Avenue/Twin Lakes Road intersection within a few years. Traffic volumes and operations should continue to be monitored into the future, regardless of an alternative for Line Avenue. The results of the warrant analyses are shown in the Appendix. Traffic Operations Study 8 Line Avenue in Elk River f. Line Avenue Alternatives Comparison Based upon the analyses completed in the above sections, the three alternatives for Line Avenue were compared according to LOS, travel time impacts, likely mitigation needs, and traffic signal need at Twin Lakes Road/181 st Avenue. Table 6 shows this overview of the various analyses. Table 6 — Line Avenue Alternatives Comparison As shown in Table 6, the existing network operates acceptably and the alternatives are not necessary based purely on the intersection operations. Of the three alternatives, Alternative A has the least overall impact on the study network. If other reasons suggest that changes to the Line Avenue corridor are needed, Alternative A is recommended. Regardless of the scenario, a southbound left turn lane on Twin Lakes Road at the Line Avenue intersection would increase safety. An eastbound right turn lane on Line Avenue at that same intersection would also benefit operations for all scenarios except Alternative A, when a cul-de-sac would be placed on Line Avenue at Twin Lakes Road. Traffic Operations Study 9 Line Avenue in Elk River Time Impact Scenario •- MitigationTravel Signal Needs Warranted routes - Existing All acceptable __ __ At Twin Lakes No Rd/Line Ave Alternative A All acceptable 59%-21% 35%-25% None No Issues at Twin At Twin Lakes Alternative B 50%-16% Lakes Rd/Line Ave 44%-52% Rd/Line Ave No Alternative C Issues at Twin 47%-12% 45%-118% At Twin Lakes No Lakes Rd/Line Ave Rd/Line Ave As shown in Table 6, the existing network operates acceptably and the alternatives are not necessary based purely on the intersection operations. Of the three alternatives, Alternative A has the least overall impact on the study network. If other reasons suggest that changes to the Line Avenue corridor are needed, Alternative A is recommended. Regardless of the scenario, a southbound left turn lane on Twin Lakes Road at the Line Avenue intersection would increase safety. An eastbound right turn lane on Line Avenue at that same intersection would also benefit operations for all scenarios except Alternative A, when a cul-de-sac would be placed on Line Avenue at Twin Lakes Road. Traffic Operations Study 9 Line Avenue in Elk River 4. Fifth Street Intersection Improvements From Dodge Avenue to Twin Lakes Road, 5t" Street has a dominant east -west movement. Despite this prevailing movement, traffic is stopped at the intersection with Dodge Avenue and with Line Avenue. By making changes to these two intersections, the dominant movement could be better recognized and the east -west flow would improve. Traffic control warrants for the two 5th Street intersections were examined using existing volumes. If warranted, a change to all -way stop control or traffic signal control may provide the necessary recognition of the east -west movement. However, the volumes were relatively far from satisfying the traffic signal or all -way stop control warrants and this change is not warranted. It is unlikely that the changes associated with the Line Avenue alternatives would increase volumes enough to satisfy any warrants either. Therefore, traffic signal control or all -way stop control is not justified at the 5t" Street intersections with Dodge Avenue and with Line Avenue under any alternative, including existing. Geometric and traffic control changes to 5th Street to Dodge Avenue (and vice versa) and 5t" Street to the north segment of Line Avenue (and vice versa) movements would create this major street without stop signs. The west leg of 5th Street at Dodge Avenue and the south leg of Line Avenue at 5t" Street would create a `T' under stop control at the new roads. With these new geometric changes in place, capacity analyses were run on the Dodge Avenue/5t" Street and Line Avenue/5t" Street intersections. It is important to note that for Alternative A, where Line Avenue ends before Twin Lakes Road, the northern leg of Line Avenue would tee into a new continuous connection between 5t" Street and the southern leg of Line Avenue. As before, the LOS calculations were done in accordance with the 2010 Highway Capacity Manual using VISTROTM software. A summary of the LOS results for the 5th Street improvement layouts for each peak hour is shown in Table 7. The complete LOS calculations, which include queue lengths and grades for all individual movements, are included in the Appendix. Table 7 — 5t" Street Alternatives Level of Service' 'The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. As shown in Table 7, the two 5t" Street intersections are forecast to operate acceptably with the proposed changes with or without any alternative for Line Traffic Operations Study 10 Line Avenue in Elk River Avenue. In some cases, these results are better than those of the existing conditions. A single -lane roundabout could be considered a safety device that would slow traffic and physically prevent right angle crashes. In this case, the 5th Street intersection with Dodge Avenue has a high imbalance of traffic flow. Due to this difference in flow, a roundabout would not likely operate as desired, potentially creating safety issues rather than solving them. Under any alternatives for Line Avenue, this same imbalance of traffic would occur. Due to this safety concern, a roundabout was only considered for the Line Avenue/5t" Street intersection under existing conditions and traffic. Table 8 shows the results of this roundabout analysis. As before, the LOS calculations were done in accordance with the 2010 Highway Capacity Manual using VISTROTM software. Full results are provided in the Appendix. Table 8 — 5t" Street Roundabout Level of Service' 'The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. As shown in the table, a roundabout would be a good option to improve east -west flow if a Line Avenue alternative is not implemented. Traffic Operations Study 11 Line Avenue in Elk River 5. Conclusions and Recommendations The traffic impacts of the creating a cul-de-sac of Line Avenue between Main Street/181St Street and Twin Lakes Road as well as the potential to recognize the dominant east -west movement on 5th Street were analyzed. The principle findings based upon this evaluation and analysis are: • The study intersections all have satisfactory overall operations today. The eastbound left turn movement on Line Avenue at the intersection with Twin Lakes Road/Line Avenue has an individual movement LOS E during the p.m. peak hour. • The existing volumes for the intersection of Twin Lakes Road/181St Avenue do not satisfy any signal warrants. • Three alternatives for Line Avenue include Alternative A, disconnection between the intersections with Twin Lakes Road and 5t" Street, Alternative B, disconnection between the intersections with 5th Street and 3rd Street, and Alternative C, disconnection between the intersections with 3rd Street and Main Street/181 st Avenue. • With the shifts in existing volumes, the three alternatives have overall acceptable operations, except for the Twin Lakes Road/Line Avenue intersection during the p.m. peak hour under Alternatives B and C. • The potential mitigation of a southbound left turn lane/eastbound right turn or a single -lane roundabout at the Twin Lakes Road/Line Avenue intersection improves the operations under any scenario. However, although better than without mitigation, the eastbound left turn/through movements have LOS F operations during the p.m. peak hour under Alternatives B and C. • Alternative A represents the most impact to cut -through traffic on Line Avenue and least impact to other routes with origins and destinations within the study area. • Alternative C represents the least impact to cut -through traffic on Line Avenue and most impact other routes with origins and destinations within the study area. • Although Warrants 2 and 3 are satisfied using shifted volumes at the intersection of Twin Lakes Road/181St Avenue under any Line Avenue alternative, traffic operations suggest a traffic signal is not justified. It is likely that additional development and traffic growth in the area will increase delays and satisfy the criteria for Warrant 1 in the near future. • Warrants for a traffic signal or all -way stop control at the 5t" Street intersections with Dodge Avenue and with Line Avenue are not satisfied with existing volumes and unlikely to be satisfied with shifted volumes under any Line Avenue alternative. • Changing the geometry and repositioning the side -street stop control to recognize the east -west flow on 5t" Street would have acceptable operations with existing traffic or with shifted traffic under any Line Avenue alternative. • A roundabout is an option only with existing traffic at the Line Avenue/5t" Street intersection. At the other 5t" Street intersection and under the Line Traffic Operations Study 12 Line Avenue in Elk River Avenue alternatives, the traffic flow is too imbalanced to proper roundabout operations. Based on these conclusions, the following is recommended: • Keep Line Avenue connected between Main Street/181St Avenue and Twin Lakes Road. The operations at the intersections are currently acceptable and no other compelling traffic reason exists for this change. • Change Line Avenue to place a cul-de-sac between the intersections of 5t" Street and Twin Lakes Road if other reasons beyond traffic operations suggest a change is needed. This change represents the least impact to travel patterns while maintaining satisfactory operations without any other m itigation. • Consider potential mitigation of a southbound left turn lane at the Twin Lakes Road/Line Avenue intersection, which will improve safety under existing conditions and under any alternative for Line Avenue. The proper median width already exists for this change and overall safety would increase, in addition to a slight operations improvement. • Consider potential mitigation of an eastbound right turn lane at the Twin Lakes Road/Line Avenue intersection, which will improve traffic operations if the Line Avenue corridor does not change or if the corridor has a cul-de-sac placed south of the 5t" Street intersection. • Revise the 5t" Street intersection with Dodge Avenue to recognize the dominant flow of traffic between the north leg and the east leg. This includes reconstruction to create a through movement between the two legs and allowing for through movements without stopping by repositioning the stop sign to the other leg. This is recommended under any alternative, including if Line Avenue is not changed. • Revise the 5t" Street intersection with Line Avenue to a roundabout if no alternative for Line Avenue is selected. Besides maintaining acceptable operations and recognizing the east -west flow, a roundabout would also slow traffic through this intersection. If Line Avenue is changed with a cul-de-sac placed south of the 5t" Street intersection, revise the 5t" Street intersection with Line Avenue to recognize the dominant flow of traffic between the west leg and north leg. This includes reconstruction to create a through movement between the two legs and allowing for through movements without stopping by repositioning the stop sign to the other leg. • Monitor the Twin Lakes Road/181St Avenue intersection for increased traffic volumes and decreasing operations. Future growth in the area along with changes to Line Avenue traffic are likely to warrant a traffic signal in the near future. Traffic Operations Study 13 Line Avenue in Elk River 6. Appendix A. Figures 1-3 B. Traffic Counts C. Warrant Analyses D. Capacity Analysis Backup • AM Existing • PM Existing • AM Alternative A • PM Alternative A • AM Alternative B • PM Alternative B • AM Alternative C • PM Alternative C • AM Existing — 5t" St Improvements • AM Alternative A — 5t" St Improvements • AM Alternative B — 5t" St Improvements • AM Alternative C — 5t" St Improvements • PM Existing — 5t" St Improvements & Added Lanes at Twin Lakes Pkwy/Line Ave • PM Alternative A — 5t" St Improvements & Added Lanes at Twin Lakes Pkwy/Line Ave • PM Alternative B — 5t" St Improvements & Added Lanes at Twin Lakes Pkwy/Line Ave • PM Alternative C — 5t" St Improvements & Added Lanes at Twin Lakes Pkwy/Line Ave • PM Existing — Roundabout at Twin Lakes Pkwy/Line Ave • PM Alternative A — Roundabout at Twin Lakes Pkwy/Line Ave • PM Alternative B — Roundabout at Twin Lakes Pkwy/Line Ave • PM Alternative C — Roundabout at Twin Lakes Pkwy/Line Ave • AM Existing — Roundabout at Line Ave/5th St • PM Existing — Roundabout at Line Ave/5th St Traffic Operations Study 14 Line Avenue in Elk River Appendix A - Figures 1-3 PMack Figure 1 Location Maps TRAFFIC STUDY COMPANY ...n �... 51F—Iib ' ,.—P, North No Scale .r TI VGk G!0'fs . ■ 49 �.+ � FamiBy Canatanca .r • a-'�}' `.� f wilj ,.__+ Hum L4ke. B 4 SIS rich 3l AMcI,aH 0 ',a4 rinsrrx•. iv r Cyan Ra tis Hanas�er � 7 - Dwk FYn rssk . .. RRrk I{� ciinglon5 Grarx+Ge+dy — L DL$e0 ng, } lake rnr a J - B—klyn Park- �II, Mapre ave cia. - Study Area Traffic Impact Study Al Line Avenue Operations Appendix A - Figures 1-3 TRAFFIC STUDY COMPANY Figure 2 Spack Existing Roadway Configuration 40 Ilk g r� +r , 7/ -/ � -"' r Traffic Impact Study A2 Line Avenue Operations Drive-Jn YJ 5 St NW Pack MTHETRAFFIC STUDY COMPANY 164 o, superamerica Gfiipotle Mexican Grill yl Appendix A - Figures 1-3 b 7 AVE! NW z•{te 5th% Main St KVJ O "0 83ret fO } 4 --a Wal marl Supercepler d 64 V1 wa ryera Bread Caribou Coffee p �x Noodles & Company n 2 Existing AM Alt. A Alt. B Alt. C 100% 125% 152% 218% v r 273 433 408.6 400.1 All Other Routes 5080 6833 7331 7373 4 N Main St KVJ O "0 83ret fO } 4 --a Wal marl Supercepler d 64 V1 wa ryera Bread Caribou Coffee p �x Noodles & Company n A3 w t,, I Figure 3 Travel Time Zones r- y I 4 182nd Ave NW m r a i 81st Ln 2 • cY fst�O PM Travel Times (seconds) Existing Alt. A Alt. B Alt. C Cut -Through Routes 344 416 398.3 384 All Other Routes 5695 7113 8670 12425 Travel Times Percent of Existing Travel Times (seconds) Existing AM Alt. A Alt. B Alt. C 100% 125% 152% 218% Cut -Through Routes 273 433 408.6 400.1 All Other Routes 5080 6833 7331 7373 Travel Times Percent of Existing Existing AM Alt. A Alt. B Alt. C Cut -Through Routes 100% 159% 150% 147% All Other Routes 100% 135% 144% 145% Traffic Impact Study A3 w t,, I Figure 3 Travel Time Zones r- y I 4 182nd Ave NW m r a i 81st Ln 2 • cY fst�O PM Travel Times (seconds) Existing Alt. A Alt. B Alt. C Cut -Through Routes 344 416 398.3 384 All Other Routes 5695 7113 8670 12425 Travel Times Percent of Existing PM Existing Alt. A Alt. B Alt. C Cut -Through Routes 100% 121% 116% 112% All Other Routes 100% 125% 152% 218% Line Avenue Operations T a C) M 0 Z Z U U- U) u) LL I. Y U) O ltO N W M� r r 0 r r O r M r r N M I� r l� W Z V c o O M w l,- N N won= � Q g r N r c o N M MU� 0w Y N O ltO N W M� r r 0 r r O r M r r N M I� r l� c D N M V V c o O M w l,- N N O r N r c o N M MU� ,� W a O F C ip r r N O V r O r r M r r O Cl N r Cl r O N r r Cl r M N V V N 7 N r o H Q cn O O r O r r 0 0 0 r O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 O O a N a 6 00000 00000 00000 00000 00000 00000 r00or o0 o of Lo N i r r r O M 0 0 c4 r r O O N` O r O r -000- 00or r r O O N r r N r co -(D w � N J C 00000 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ip O O O Cl O O Cl Cl O O O O O O O O O O O Cl Cl O O O O o 0 r r N r r M O cD co r H Q cn O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 O r r 0 N M r a N a 0 L O O O O O O O O O O O O O O O O O O O O O O O O O o O r r N r O r O N -0 J 2) of �� t i� 7 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0 0 r O r 0 0 azo '.' 00000 0 0 0 0 0 00000 O O O O O co O O O O O O co O O 0 0 0 0 0 r 0 J i0o00o 00000 00000 00000 00000 00000 00000 00 H ip N O Cl r M r 0 0 Cl r Cl Cl O O O O O r M V O M cD M N 04 'It N LO V cD V H r N r r M m M M r Q U) 00000 00000 00000 00000 00000 00000 rrOON 00 a m a- - -0 r O O r N r Cl 0 0 r O O O O O O O O M M O r M r to r N cD M M to N O V r N U D 'It N 0 L l!i L r 0 0 0 r O O O O O O O O O O O O r O r O N M N I- r N cD N r cD "t U O� O ~ r N r r 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O Coco 0 O O N J E O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O i p M M V It 0 0 c D Cl O cD r r O r O O r O O r r N N V M 11, N I- r N m C R o r r M r M H Q cq O O O O O 0 0 0 0 0 Cl O O O O O O O O Cl O Cl Cl O O Cl Cl O Cl Cl 0 0 0 0 0 O r a N a 00000 00000 00000 00000 00000 0 r 0 0 r 00 CD��oo0rr Qa N Q rn� C)cD0r OrOOr 00000 00000 00000 00000 00o0o or 0 0 0 � � H NM V OM - MOO V OOOrr OrOOr cD cD rN N V MI - N I-ONMM aDM r r r J E O O O O O O O O O O `0 O O O O O O O O O O O O O O O O O O O O O O O O O a)2222 co 2222 co 222 m 222 m 222 m 2222 m 222 m 22 E Q Q Q Q O <<<<t QQQQO <<<<t QQQQO <<<<-6 QQQQO << O O cD F cD cD O cD F O O LO F O cD O cD F O O A F O cD O cD F O cD O LO F O LO OrM V OrM V Or M7t OrM V Or(M7t O..M V Or M15: Or N N N N N N N N M M M CM It It V V cD UD CD S Co co cD cD I- I- r r r r O O O O O O O O Cl O O O O Cl Cl O O Cl O Cl Cl O Cl Cl O O U) T a C) M 0 Z Z U I. Y U) 11, N M W Lo Cl W r Cl m W m V Lo 1- 1- M N Cl rrr W Z (M W Lo L M m Cl W r r won= � Q g �O, LoLDLoWN mLo V'tIt W (o Lo WN W1�mm cM, mr a) W 1 -WI- co 0w Y 11, N M W Lo Cl W r Cl m W m V Lo 1- 1- M N Cl rrr M O L I r (M W Lo L M m Cl W r r F 1- (D �O, LoLDLoWN mLo V'tIt W (o Lo WN W1�mm cM, mr a) W 1 -WI- co OOrp� C i p V V m I 0 Cl W N V V V W V O V W W N W m L D r M I r N O N W r O V MOI p N r r N� r r r r r M r r r r W N N N r W r N r r W N r r N W H Q fn O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O r r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a N n- it it 0 0 0 o o o r r N o O r M 0 0 0 0 0 O O O O O O r O o r coo-- O N O N V O L � Lo N L rrm M1"MrN Nr'r W V LD MrM W rM V V NN V NO NMr Lor ML W W LU � M M S W O I- N O r O N m It m 1I- M m I I r V Jr M r r r r r r r r r r r r C O O O O O O O O 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O ip N O W O r N m N N V O M m r r O O N MIt N M N r N O r O O O r r M M r M 0 H Q fn 0 0 It O O N W W N N Cl rU� O O O O O M N o M W r 0 Cl 0 r Cl O Cl O Cl r r Cl O N a N a 0 L r O N O r O O r O r O N M r r O O N o N O o N O r O r N 0 0 0 0 0 r r O Mu� J 2) of �� t i 7 O O O O O O M M O O O O O O O O O O O o N o N o r O o r o o o r r O o r O r azo r o N 0 0 0 0 0 O r 0 o r 0 0 0 0 0 O O O O O 0 0 0 0 0 o O O o O r r O o N N J i00o 00o00 00000 00o00 00000 00000 0o000 00000 H i p p M W M Co V W r W NNN(MO u� V 11, W Lo MN rNC N W W MNNNO m u D M MNMMN MN N N MV MNN 1 r V 1- MrM V m L D 1- m r N N V M uDV W H Q u) 0 0 0 o O r Cl r Cl O O O O O O O O O O O Cl O O O O O O O O 0 r O r r r O O N a N a -o W Co W r: c w L D r r m W uD W N r� N 1: uD W N It Co W Itr� W W W W O B D I� !_ 0 CO N N r N r N 11- N N r r 11- N r N N Co N r N N m N M N r 0 N r N CO m M N Lo M V L l!i N i r W O 1- W ('M O W m W 1' W W W W W 'D 't W I- o o o 1- (D u-) M r- m W O O W O W Co N r N N N r CO N r CO r CO 0 0 0 O O o O O O O O O O O O O r r r 0 0 0 r O O O O O o o o r r cc r O r N J C O O O O O O O O O O O O O O O O O O O O O O O O O O O O O r O O r O O O O O i p W N M u� r 1 uD W O W V I I uD O m r g O r W W M I,- O N r 0 a W m 1 W N O M I,- N p N N 0 N r r N 1- r r r W N M r M 0 M M M M M (M M V V 1: (M N N (M N CO U D V M W H Q fn o O r O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Cl O O a N a 0 0 0 O O O O O O O O r r r O O r N N r r r uD N V N N O N r N r Co r N r N W Q m 1T N Q Im L j O O r 0 0 0 0 0 N O O co N co co O co O r O O r N r 0 0 0 r O O r O r r O M O V 0 O O � � H W N r LO r 1 U D W W W V W V t O m O M I O B D V W W O m m N 1,- W W r O W mU� N N N O N r r N 11- M r r r W N CO r CO O N CO (M (M N CO V V M D M N N M N M a Co Co J E O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O a)22 a 222 2 m 2222 a 222 2 m 222 2 m 2222 o 2222 o 2222 o F=aao aaaao aaaao aaaao aaaao aaaao aaaao aaaao OuD� O nOuD� OOuD� O nO�� OoLn� OOLn� p npm� O nOuD� F— M V O r M V O r (M V O r M 7t O r M 7 O r M V O r M V O r M V 1- r 0 0 W Co W W O O O O Mo) m m O O O O O O O O r r r r r r N N N N r r r O O O O N N N N O O O O Co T a C) M 0 Z Z U I. Y U) NCO CO c0 M Cl r r co CO CO M co I- CO Cl V Cl m m V 1- CO W Z O O V m CV CO N won= � Q g V M M r r r r M M N V r r r r CM M r m r r m c0 c0 I� M O r O N V M N N 0w Y @ NCO CO c0 M Cl r r co CO CO M co I- CO Cl V Cl m m V 1- CO CO Cfl N I- CO O O V m CV CO N FM r r NV r r r r V M M r r r r M M N V r r r r CM M r m r r m c0 c0 I� M O r O N V M N N N M r r C ip ON Cfl V N OMCOr [p CO r1�N mmMI�CO V O W m1� N cO COMr r 001 c0 ISM p N N N r c0 r N N N c0 N N r N c0 r r N r I- N r � r r r r m r r N H Q Cn O O O O O O O Cl O Cl O O O O Cl O O Cl O O O O O O Cl 0 0 0 0 0 0 0 0 0 0 O O a N n- it it O r O O r r r r r V r O r O N O N r O M O r O O r r r r N CO —coo— r 0 O L � lfi N i r- a) V r M COOO(D rr MCO CO I-�O, r cpr cp co CO V M COm V OO CON rr V V ON O COM LU MNN OIC ONm V r rCO rtOM Cp CO V rm COr to M 11, 11, 11, 11, (D 11, Cfl Cfl O Lo rO r r r r V r r r r C O r r r r C O r r r V r r M N J C O O O O O O O O O O O O O O O O O O O O O O O O O Cl O O Cl Cl O O O O O O O ip co CN V r CD W V CO CO Cl N m co V r N 0 r M r N r V V r M NN N r r CO M O N N N H Q Cn r O N m N CO V N r N V N Cl N c0 N r O Cl M O M O N CO N M O r Cfl O O O r r r 0 a N a 0 L O O O r r r N O N CO r 0 0 0 r r r Cl r M r 0 0 0 r r r O r M O r 0 o r —o J 2) of �� t iI= 7 N r N r CO O N N N CO O O O O O Cl N O r M Cl O r O r Cl O Cl r r N O O O N O O azo O r O O r o 0 0 r r O O O O O O O r O r O O O O O r O r O N O r r O N r 0 N J iOOoOo 00000 oOOOO oOoOO 00000 00000 0OOoO 00 H ip V MI-COm CM I- (N I- a) OOr cpm MCO 1-N c0 �c0� CON CO V CON c0 CO 1- r CO CO CO CO p H CO CO V cO� 11, C0 Cfl CON (oil, CON CO V V M1: MNMNN rr NNI- r r Cl) Q mOOOOO 00000 00000 OOOrr 00000 O0000 00000 00 a m a MCO CO V Cp N COO COMcO co MCO CO CO CO ID r O OCO r MCO I� r N CO I� coIS V M !_ 0 V V CO CO 1- CO CO CO CO N CO CO CO CO N V M CO N M N N M N m r r r r CO r N L l!p L m w r r m m m r Nr m m w Vr OV r Or Nr CO r CO CO CO 1N -4 CO r Or CO M N V N r r N r r M r V r Cm) r Nm r 0 0 0 r N N r 0 un O M O r V r r O O N O O O O O O O O O O 0 0 0 0 0 O O N J C r 0 0 0 r O O O O O O O O O O O O O Cl Cl O Cl Cl O O Cl O O O O O O O O Co Cl O ip p CO W r w CO M V M CO Mmm I� V V M MCO Cfl N CO Cfl V V M CO V Mr M mCO r V O V M mmM mm c0 CO M V MCO CON r M r M N m N CO I� m 0 r r r O V CO r H Q Cn O O O O O O O O O O O O O O O O O O O O r 0 0 0 r O O O O O O O Cl Cl O Cl Cl a N a - O r r r M r M r N 1, r r O N V O M Cl N CO M O Cl T V r O O r N O N N O V 0 0 Q m N Q Im L j D N O O N V N r r O V r r O O N r r O N V O N r O CO CO r O V N r 0 o N co N O O O � � H MI-OCO CO N m I - I - CO a) c) CO V CD N I -m Lo 1- CO I -N I -r OCON N m r ML) I- (D V V C O M V M c 0 V M M MCO M V co uO C O V uO V C') I M M V MCO M r M N m r r r V r J E O O O O O O O O O O O O O O O O O O O O O O O O O O O (D O O O O O O O O O a)2222 co 2222 mu 222 m 222 m 222 m 2222 cu 2222 co 22 0-0-0-0-o aaaao aaaao aaaao aaaao aaaao aaaao as OLoOu�F OO�� OLpO�� O c, Lo O nO�� OLO�� o�ou O r M V O r M V O r M V O r M V O r M V O r cM V O r M V O r Cl) CM CMM 0 Cl Cl Cl V V V V O O O Cl CO CO CO CO O O O O COCOCOCO O O O O 1-r 1-r O O O O co co c0 co O O Cl O mm mm O O O O OO r r co T I. Y U) OO COO ��N 001'- 0 C) 7 W Z won= � Q ON I O 0w Y OO COO ��N 001'- 0 C) 7 c D M N ON I O c LO LO ip U�I- N N V OVO (O I'- mm Q Ln 000 00000 Cl) Cl) N I- (M a N 66 M a cM9 -O I O N 000-- (O O CO N O QI MMOM r9 M In O of L �2 Lo N `4 Lo Ln rN0—V V Nc01-- MI` N W i t M Cl)0 r-- N m6 ol N N U-1 r N O N LO N M N N N O N N V- M M N M J M O) C O O O O O O O O 0000000 i p N O L O 0 0 0 O CO CO S— M F LO N S O M Q CO NOM Coo— —Mlt — OOO 'O M0- N O N a LO 'O 0 0— O O O O O Ih c`') Ih I,- O O O J O O_ 1 M M O M O of N �� t i co 0 7 000 00000 MM LL) N O I- V N — (O M d Z H "-' 00 r 00000 MNN M 000 J M O O i000 00000 0000000 H cu N V (o McOOMN O N LO II- LO CO Lo H M N N M h N O) N Q U) O O O 0 0 0 0 0 I— m LO V N (O a N 00 co a I� -0 Cl) : Cl) M O— 1- I— N CO I— CO eM a T I N M I --'t N L � l!i Ca')' L LO OMONLO V CO M V NO N 0 O M — LO N V O O O 0 0 0 0 0 co I-- co M O O O 0 0 0 J E O O O O O O O O N— O N O O O O O ip O LO LO r LO N O ILO CO V H co co N co O N m Q Ln C O O 0 0 0 0 0 04-0-0-0 a N O LO LO a Q)- 0 0 0 0 0 0 0 0 M Lo > Q 1 N D CD M N Q CY) L 0 j O 7 0 0 04 0 0— 0 V CO V 000 V O N O OLOM r LOQ OM NM Ih lh LO LO (D N O V LO I— co � J N O)M?, m E O O O O O O O O 0000000 a)22 u 2222 mu Lao o++ w N �aa0 aaaao o�_LL�� ~Moro o�c�a -00- C)C) mQ o 0 U) Q C) O N � N r r LO O O O } O M ZU+. LL () (n al btn tit a Out In Total �0 00 2359 2370 4729 i��o O O 2321 2315 4636 C Oo 4 OJ O 1798 494 16 2 5 p 43 10 0 0 2 Oo 1841 504 16 2 7O Right Thlru Left UTrn Peds c' 1—'i N O Q D_ a- FOD--CqTCS1 mo F� O OOOF� NU) —, ('m _m N � � J rc`70�' C NN+ O) ?NDN ��� �� N N W ON J 4— O �� N Yj +—k C O Z N N N chVr 7 "' �� r O UN N O W N 1 0 0 0 In (p L uj-Ln ua4 n141 140121 sPad 00 0 0 8Z9 VL£ L£ £ O otim 0 0 OZ L L L O 0 809 LOC O£ Z O oO �o 0 O 4 bSSL 9L6 8L9 o p0 Lb 6Z ZL OJ �, £LSL Lb6 99S p I6101 ul Tn0 1S LITS U) L In pZf Z won=� w Q m ry 0w btn tit a Out In Total �0 00 2359 2370 4729 i��o O O 2321 2315 4636 C Oo 4 OJ O 1798 494 16 2 5 p 43 10 0 0 2 Oo 1841 504 16 2 7O Right Thlru Left UTrn Peds c' 1—'i N O Q D_ a- FOD--CqTCS1 mo F� O OOOF� NU) —, ('m _m N � � J rc`70�' C NN+ O) ?NDN ��� �� N N W ON J 4— O �� N Yj +—k C O Z N N N chVr 7 "' �� r O UN N O W N 1 0 0 0 In (p L uj-Ln ua4 n141 140121 sPad 00 0 0 8Z9 VL£ L£ £ O otim 0 0 OZ L L L O 0 809 LOC O£ Z O oO �o 0 O 4 bSSL 9L6 8L9 o p0 Lb 6Z ZL OJ �, £LSL Lb6 99S p I6101 ul Tn0 1S LITS N 04 04 1- O OV I- Cl) V O Cl) LO OW m M MILto WM McD F N m V V ED r V N V V O Orr M McDM ED H r N O r N N N N r N N N N NM � Q U) 0000000 r000rN0 0000000 �x� W N O r N O � a i -O it OOO OOO 00-0—NO r r r r It P,: 00 GL O o N 0 0' O lf) @ i r (0 0) Ln L V N N V N CO O LO 0 0 co co LO O N LU -r- MM r�� rr MMS N M CD M M LO LO r C j LO V O) N O) Cor r r r O M r-- C,) O N LO V N r r r r M O L O oi LO J O O O O C 0 0 0 0 0 0 0 0000000 0000000 C) EO m Cl O O O O Z U O O/�L m H LDr N 000 O M—N 0(D V O EDN V cD LO V O LO N I— � e'cu U— vJ v) a Q U) Mr OO V ODM,) M-00 V hcM,� LO V NrN NM 000 � co c0 a "O r Cl r Cl N L t O 00-0— h O r N O N L O N L O J C 3 NO C6 r LO N C5 04 N 0 o0 cc OL 0 0 0 0 0 0 00 00-0-11-0 O N N N LD N O dZ O r O N Lt) O 0000000 OOOrrNO N O O LO J O N U 0000000 00000000 00000000 O o ct LDV M(Dco 5 H LDM V MO M N NN O MM V MM r c`')I�NI�O N I� 0000 N N N 0 mI w 0 0 0 0 0 0 0 0000000 0000000 '0 N O O O O O O -C Q� V NMN NNO W V co I- N N m N LOMm Nco 0 L 0 0 LO LO LO M 00 0 r�W rMI` NcoM O In N iLD O I- W O W I- LO I-- CD LO M h 0 0 N N V rr V C6 N co N C6 r CN r CO V L6 LO r CO. 0 0 0 0 0 0 00000000 0 0 0 0 0 00 N N r 0 LO O J 0 O O N r 0 E 0 0 0 0 0 0 0000000 00000000 0 0 O O W Ln CO N LD co lh O N LO LO Cl) O 0 5 M LO co N H r LM N N 0 M m eM LO V r [D NV V M cM cD N M M Q O O U) 'O r O r O O r r O Y 0000000 co Y 0000000 co N O r Cl!LO O 0 O O 0 O a LLQ LLa 0 @ aQ00000000 a-LotrN V NO)LOLo o Z aOr co rN Nc`')o a 0 O O LO Lo VO V LO N 9< d' r V .-- � L6 L6 im L 0 j 2 LO O V@ O r O O r r p O C r r O O N N 00 O C N r r O V V 00 O cn� O to N 0 r LO 0 N LO O� Qm am g c c +-+ [O aOMCON Q rL0 O O V V [DOV Mh 0 ON O r I --LO 0' V CO Or LM NNO r0)I� LD 0' MM V V Ln r M V Co Co MLO CO 04 N r O pMj N pMjO a N E N E N L E 0 0 0 0 0 0 0s 0 0 0 0 0 0 0 C O O O O O O o 0X z WO ?� C C)C O N O O ") O O � O T C T C w Q L @w2222 LL MIL 2222 m 2222 a La mLL 0 7-aLL � t �Q�O�on QQQQ3oa Qo<MMME6M QommmmEo= O i 1— O M V O �«oo�o3FLL 3 O O M O o�o«O3�LL 3 3 0 M O g 0 0 0 0 Q V 2 2 04 04 N> V CL O A _= p Q e r Q O Q 2 2 0 0 0 0' Q (6 Q Y baa co co co co 0 co co 0 0 W as as T C) E Cu CD V CD M CO 0 z O) Nr Nr z v �, rNO CD m Ca CoC CO V MCO W U- U) U) LL o Clyy ?�I r r N C o N N M M C D U C� i--1 C m O r r r M O O N r co r r r O M O Cl r Cl r O r r Cl N O r r N V M M 11, (o O) Lo r r _Lf") W `~zzw 0 w m CD V CD M 1: Mr MN O) Nr Nr Cfl OONON rNO CD W "tM O)N CO V MCO W M IACD o r r N C o N N M M C D C m O r r r M O O N r co r r r O M O Cl r Cl r O r r Cl N O r r N V M M 11, (o O) Lo r r o H Q Cn O O O O O O O O O O r 0 0 0 r O O O O O O O O O O O O O O O O O O O O O O N a -a -FfOOOOO 00000 00000 00000 00000 00000 OOrOr 00 c � _ D E :2 LO ca i O O r O r O Orr N O r r O N O O O O O O r O O r O O O O O N N N co O] r co w� O r O r N O O r Cl r O O O Cl O O O r O r O O r O r O r r N 7 r r M m CO J E O o 0 o 0 0 0 0 0 0 0 0 0 0 0 coo" 0 0 0 0 0 0 0 0 0 0 co"' O O m Cl Cl r O r O O O O O O O O O O O O O O O O O O O O O N M N r O O 04 't CD r r H Q Cn O O r O r O O O O O O Cl Cl Cl Cl Cl O O Cl Cl O Cl Cl Cl O O N r Cl M O O O Cl) Cl) O O N a -O 7 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O N r M O O O O O r r J � 0� i Cl Cl 0 0 0 O O O O O Cl Cl Cl Cl Cl O Cl Cl Cl O O O O O O O O O r r O O r O r O O d2 O o 0 o 0 O o o 0 0 O O O O O o o o 0 0 O O O O O o o o o 0 o0 --N O O J ioOOOO oOOOO 'co" OOOOo 00000 00000 00000 00 F ip Lo - N O C0 r O O O r cc -c- OOrOr - c w t M M CD I- I- N� 1� H N r r r N COD N M Co O O Cl O O Cl O O O Cl O O O O O Cl O O O O Cl O O O O O r O O r r r O O N 00 N a -O CD O N O 1" r 0 0 0 r O O O O O O Cl r Cl r r O M N CD N N M uD N N CD N M C r r r N N in O jr L � Ll7 2D i Or OO r OOOOO OOr Or OOOOO OOCDN 1,- r M't N 0 M 7 CD u -N 7O 0 0 0 0 0 O O O O O O O Cl Cl Cl O Cl Cl O Cl O O O O O O O O O O O O Cl Cl O Cl Cl J i 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD 0 CD CD CD CD CD 0 0 0 O O Z p O N r N Lo N r r r C n r O O r N O O O O O O r O N M r C O r O) uD N C D N C D N o r N r r r N H Q Co 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O cc N a ococc OooOO o00O0 OoOOO OooOO OooOO 00 a)a-�fO0000 Q _rn N Q 0) 70 O O O N N O O O O Cl Cl O O r r O O O O O O O O O O O o O r r O O O O O O O 0 O O i U) L O N r O Co N r r r uD Cl Cl Cl Cl O O O O O O O r O N M r CD O CO m u7 N O 04 Cn J r r N E 0 0 0 0 0 0 0 0 0 0 r 0 0 0 r 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O 2 m 2222 mu 222 m 222 m 2222 mu 222 m 222 m 22 E Q Q Q Q O<<<<t QQQQO <<<<t Q Q Q Q O <<<<t Q Q Q Q O Q Q O Lo O Lo F O C D O C o F O C D O Lo F O u7 O Lo F O C D O C o F O C D O C o F O C D O C o F O C o O r M V O r M V O r M V O r M 7t O r M O r M 7t O r M V O r N NN N N N N N MM MM V V I u7 Lou? u7 CD(DCDCD I- I- L r r r r O O O O O O O O O O O O O O O O O O O O O O O O O O U) T Cn Y U 7 CO U a N C d c a 0 0 C) E cu mm CO 0 z M CO I� Mr z v �, M ID W N m ca coc MmN ID U— U) U) LL Clyy ?�I Cfl�Cfl CON r (D(D0ON I� CD CD CD N mmOOM OCOOmM w OOM wmmmM U F C� i--1 C ?�I m r I' -A r m1: wCO I� mON C/ J m a0� MMw COr r w to to MN � _Lf") W r rrr `~zzw rrrr r NN1- NrNr CD rr NN1- rrrr LO 0 w Cn Y U 7 CO U a N C d c a 0 0 -ja mm MISCO Mm M CO I� Mr v mm1l- M ID W N CO CO UON COM MmN ID Cl II- m OI - M r OM Cfl�Cfl CON r (D(D0ON I� CD CD CD N mmOOM OCOOmM w OOM wmmmM F C m r I' -A r m1: wCO I� mON CO OMN V m a0� MMw COr r w to to MN � o r rrr to r rNrCO rrrr r NN1- NrNr CD rr NN1- rrrr LO H Q Cn O O O O O O O O O O O O O O O O O O O O O O O 00000 0 0 0 0 0 0 0 0 0 0 N a -O X 0 0 0 O r co O r r 0 0 0 r O O co O O r r 0 p N 00000 O O O N N N r O r C � _ U) O L � Lo 2. i V M r M M LO r N 't cM CD M CD N N N M m U� r V CO V M N UO LO V UO W I- cD N V V W V N w� I� V M NN I� N (D "t MrOr NNm CO� CO M O CD OI' -CD 7� OI�I-mm N r r t r r r r r r r r r r a r r r J i 0 0 D 00000 00000 00000 0 0 0 0 0 0 0 0 0 0 00000 000 00 m N N CO N N M M O N r r N C 0 N I- O r O N V M N r M r N M m M N It M N r M N r I- H Q Cq r r N N O N NCD N O O r M r CO 0 0 cD N N r r m N O O r M r N r 0 V N a a r 0 CO O N r r Cl O r r N O O O O O O r N O CO O r N O M r O O r N O O O O O J L ir �� i 0 0 0 O O O O O O r O O r r r O r M O O O O0 O O O r r p r r r M O O r r N d2 O r r 00000 0 0 0 0 0 O r O O r O r O r N r 0 0 r N 0 0 0 0 0 O r O O r J iOoo 00000 00000 00000 00000 00000 00000 00000 F ip Nr CONCO U� co O N M11 N U�OCON M COMMCDO CO CO co Om (D CO 1, (DU� r ON mao p m 1- m r N N V O M N N co r N co N N O co V V M c 0 M M co 7 7 M N c o V V co co V M H Cl) OOO 00000 00000 00000 OOr Clr 00000 00000 00000 N a -6OCOM MCOO (Dr Cl V W ON OMCO V � COM V COO I- W Cor N ID V V V CO cD CD I'- MN C: �LO V V rrN M 0 N rr M CO 0404 r CO MMNM NNNMr NNMMr NNMMN in O Q L � Ln N i ONr- N V CO m� O CO �C0N �r c01- N N O CO CON m1� N mM ON COr N ��N ` r r r r ~ r O r O O O O O O O O r r O Cl O Cl Cl r Cl Cl 0 r 00000 O O O r r O O O r r J E 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O r r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ip OaoU� V OI�CO COMM I�mOOO W romr O W V r I'- mmaO CO W M V r Mr p M N m M r N N m N N N M Om r M M r N CO M V V V C M d' V C O N CO M (M M M LO M V O H Q Cn O O O O O O O O O O O O O Cl r O Cl r O O r O r O O O O O O O O O O O O O O O 70N a Q) 70 r Cl r O r 0 r N O r O O r r r r N� O r N N UO 7 M O M O O r r r M 0 7 0 r UO Q 7 1) (D Q O) -r- -0 5 OOO OOOrr N Or C) CO rONOM rOOrN Or NOM 0 0 r N CM rOrpN O O i U) L w maoa Un C, COM N CON N r Ur I'- W 1- I'- I'- CO CO CO V Omr V a, LO CON N N OON V U N N m cM r N N m h1 h1 Nm 0 M r N N O N co M M M V M M V �O N MMM M M CO M V C O J E O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 2 mu 222 m 222 m 2222 mu 222 m 2222 mu 222 m 2222 mu EQQ o QQQQ o QQQQ o QQQQ oQQQQ o mama o mama o mama o O Lo F O O LO F-- O O LO F-- O O LO F O 0 LO F-- O O LO � O 0 LO F-- O O LO M'!t O r (M 15: O r (M 7t O r M V O r M 7t O r M V O r (M 7t O r M V i I- I- O O W CO CO c0 Cl O O O mm mm O O O O OOOO r r r r r r NMNN r r r O O O O NMNN O O O O m T LMI C) E Cu mCO CD (0 0 z r a) z v �, r Cl Lo I—M m Ca CaC N CON N I- m COM 4-1 O Clyy ?�I M N M N m r r r r CD D N N r C D r r r r N O N O r C D r r r r W I- (D c0 O CD D Cfl V M r N M M N N r r N U C� i--1 C ?�I m o W Or r N M r ICON N N N M M C, Lo Nr O N N N N C/ J MMCOM a O N r r r W V W C O OCON COO Lo Lo N _Lf") W `~zzw 0 w LMI m mCO CD (D CD r(D COO r a) CD CDN Mr r Cl Lo I—M COr MN N CON N I- m COM O m O r N r r r M N M N m r r r r CD D N N r C D r r r r N O N O r C D r r r r W I- (D c0 O CD D Cfl V M r N M M N N r r N C m o W Or r N M r ICON N N N M M C, Lo Nr O N N N N MCO OOaO m N N N N MMCOM a O N r r r W V W C O OCON COO Lo Lo N H Q to Cl Cl Cl O Cl Cl O N O N Cl Cl Cl Cl Cl O O O O O O O O O O O O O O O O O O O O O O N 0- -0 -O Ff Cl O r Cl r Cl Cl Cl r r r N r M 1- O O O O O r r O Cl N r Cl r Cl N O O O O O O r C CD _ O L � LC) N i I­cO Mr r N CO N c00)M r a) OD W V N m� m LO IACD It CO Nr LOCO CO V r�� MM w , V V CD C11O04M O u2 u�CDLO ICOO �D� MCOmmM LO M CO LO rNr N CO Nr �N1: r r CD r r r r r r r r r J E0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O r O r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O m N M V O m W N r r N LO N N W I- M r r r ID O N r M CD N V r r W r N N 0 Lo r 0 H Q Cf) r r N 0 V W N O r r r 0 (D r r O r O N O O r r N O V O O It O r O O r O O N a a r r O O N Cl Cl Cl Cl Cl r Cl r r M r r O O N O N O O N r O r O N O r r O N O O J L of �� i O r r O N O O r O r O O r r N -coo- O O O N N -coo- OOrOr O O dZ cc -c- O O O O O O r O O r O O O r r O O O O O O O O r r O o 0 r r 0 N J cooOO o00OO 00000 00000 00000 OoOOo OooOO 00 F i p p N m m MuO Itu r I- W O CD m CD CO CD ISN r O CD I- W I- CO CD V r N M O CD V V �m r M CD O V MNNNO M I: p aO N rCN 1,- O CO N O CD r rr� O CD CD H N CA OOOrr 00000 00000 00000 00000 00000 00000 00 N a -O 001 m CO N r I— (D M CDr COr W OCO r N r OCD N OM COM V CD (D 11, N N V � N V M V V V uD C D C D� uD V C O M m M M N M N N N r N CD r r r N in O Q L � Ll7 N iMmr M CO CON N CD CD Cn V M V O COO CD V V CD MOON CD Mr ss � r� r r M r N O O r O r r O N O M O r r N It O O O O O r 0 0 0 r O O O O O r O r r M O O J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD CD 0 CD CD 0 0 0 0 0 0 0 0 0 O O ip NNrO N CD V CO ma CD V CD O CD I—MN V CD I-mrar MMOr M r[p Cpr� ISM p V N M C NMN O r r r r C O r H Q Cn O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N a � r O O N Co r r O C M C n Mc O C n W M N O N I- r N V M O O O N O N O O O O O O O Q 7 Im (D Q L O)70 jiNr Or' C) CO OOr Or Or OrN rOOrN MOOOM r rO CD r0 0 O O U) L w mCDN W CO M V CO CD Co V CD CD 11, It O N r r CD 11,11, Om CD M aOr OD ON Cnr OD CDM U CO N M't V M M V C O L O C O V M M CO M CD 'tCO 1: N N N V r N N N N m r r r r r J EO O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 02222 m 2222 mu 2222 mu 2222 mu 2222 mu 2222 m 222 m 22 aaaao aaaao aaaao aaaao aaaao aaaao aaaao as cLLocm Oc Oc OouD O nc� O nOLD Oc Ou� O r CO V O r M V O r M V O r M V O r M V O r M V O r M15: O r i MMMCl) O O O O V V V It O O O O uD CO CD Cn O O O O CD CD CD CD O O O O I—I—I—I— O O O Cl Co W aO W O O O O mmmm O O O O OO r r m 6) T U) Y U 7 w CO U a N C d Un Q 0 0 E cu C) (0 0 z m z v �, m ca coc p U- vJ vJ a_ N Clyy ?�I M N F c rr�l V � W U m N M C� M O P' ) i -i N r H O oo O^ N N r r W Q v J U) W OOO OO M Cl) r `~zzw O O O 0 w U) Y U 7 w CO U a N C d Un Q 0 0 @ooh 00 00 m LO(ovv p r N f M N F c � � W r m N M U n M UO N M M O P' ) co 0) N r H O oo O^ N N r r W Q U) OOO OOO OO M Cl) r Cl) OO O O O 0 a -O O O r r 0 0 0 r 0 Un Un Un N r M C:t_T NNON M M _ U) O W L � LC) 2. i N N O N N r N I O N W f- r M W W (,M.) M Un (N,.) W W O Or't 0 r rUn OUn W N M000 - J n r N ((D (gyp W 1 '00 0 0 0 0 r 0r O r 0 0 0 O O m O r N It o 0 0 0 F Nn `O N r to Q Un OOO Cl) OOOCl) N N U')r Mr N 00 c'') x 00 00 r a Un m C) r O O O r M 0 0 J-0t N O M 0 0 of N � i iO O O O O O O O N co V N��rco W V M 0 d Z H O O r 0 0 0 0 0 In � M Un 0 0 0 J -o,,,- 0 i000 00000 0000000 F i p V N c 0 Up Cl M M r O N U-) N U-1 00 Cl) O Cl Cl O Cl Cl O O Un N r U) O O O O O 0 a -6 't N N LO O r N 00 (D rr N M C corer mr- Un(V (n O � r MnO Q L L) c i 0 0 V O O N r M r N r W U- N M CE 0 0 0 O O O O O � M 0 r r M J C)C)Nr U') L O O` Cl O O O O r O O r 0 0 0 � O m V V co Up U[)MNO Un 00N co MN o N N co W V ~ M N N Q U) O O O O O O O O N r O r O r O O U') U') a Q)70 :E 000 00000 U - NN 0 OUnr 0 Un QC O O_) M r r N Q 0) L j i O r N O O O r U) r CO V 00 V r N l]� N O W N w V M O U O M r U n N N 04 O V Lo� W V 1 0 0 0 Cl O O O O r O O r 0 0 0 � O �aap aaaao of 22 oup req � ocpocn� or hes H `�° oUU m m � � HH Lr 0 0 r rrr r � QH O e mQ ^ T U) LO Q C) O N � N -Ln O O O ca } O co 0 z v �, ca co LL (n (n a_ bth bt Out In Total '` 2343 2265 Z o587 2375 2320 0 c o � O G OJti 1734 499 16 1 5 p p 52 12 1 0 0 /7 1786 511 17 1 5 O Right Thru Left UTrn Peds e N' NO OD N g N d a--- �O I� N Oo c m d'w � (O 0L 0 N N p N J Q V N O O� L p p + W W ('7 N C N N O N W O J �Z 0 N N p 0 c in v v O F in O LO 0_ LO ��� �� (haw r> O� r --V F �J N N r> ON N O (0 f- 1 0 0 0 (0 (O L � ,� O winl;al1 nJ41 140!21 sPad o L OL9 OEC 9Z E O 0tia / 0 8L E L 0 O /Oro L Z99 LZE SZ E O o �c o p 4 EZ9L OEOL E65 � 5E ZZ EL OJ'` / 88SL BOOL 089 �p 18101 ul 1no 1s 419 U) L In pZj Z `~ w Q m ry 0 w bth bt Out In Total '` 2343 2265 Z o587 2375 2320 0 c o � O G OJti 1734 499 16 1 5 p p 52 12 1 0 0 /7 1786 511 17 1 5 O Right Thru Left UTrn Peds e N' NO OD N g N d a--- �O I� N Oo c m d'w � (O 0L 0 N N p N J Q V N O O� L p p + W W ('7 N C N N O N W O J �Z 0 N N p 0 c in v v O F in O LO 0_ LO ��� �� (haw r> O� r --V F �J N N r> ON N O (0 f- 1 0 0 0 (0 (O L � ,� O winl;al1 nJ41 140!21 sPad o L OL9 OEC 9Z E O 0tia / 0 8L E L 0 O /Oro L Z99 LZE SZ E O o �c o p 4 EZ9L OEOL E65 � 5E ZZ EL OJ'` / 88SL BOOL 089 �p 18101 ul 1no 1s 419 T vJ LO W Q C) O N_ I N r r E ca O c0 0 z z v �, m ca coc U- U) U) LL COO �O [MON W co N Cot U) (D co �(O f� M I� W 000 (O (O� f-- Cn t W Cn co r � I- Cl C) ;!P') M O f- O N O O co O NNNaO co NN c`')Nm f-- 00 fl - 0 0 0 0 0 0 00 0000000 0 O N O O O N NCO N 0000000 r O O O r N O O r r N N 00 0 COO N Cn M V M M M Unm "T LO c`')M(00 N aOdWMCX) r N r N r C n r Cfl M W M M co co 7 co Nq V N Wao W �f-N Cn ON OC - (Ow C fl 00 r r r W� r r � (9 0000000 0000000 0000000 O O O r N N N r "t co N m`' 0 Nr r CO I- O) 0 W LO LO V Orr N V r0 Nrr N (O OO N Ori f-0000 r o U') U') P- ^ CO ^ v r r O O N (0 0 r N 0 0 M U) U) O O O r r 0 W N O Cn N � M �' Cn r N 0 Cl Cl 0 0 Cl 00 0 0 0 0 0 0 00 O r O O r COO O ) r N O O r Cl r M r O r r M 0 0 0 0 0 00 N N 0 C) f� O OOO0000 0000000) 0000) 000 O O McON !P N co co (D (O c00(00 W co V _W O) N W 0 0 0 0 0 0 00 O r O O r (O 0 0 0 0 0 0 00 0 ) COO N O MO c0 M V V O M V a0 f� N N N V w M N C n V r M, r I- c `' ) M N N C 0 N ri r 0C n O (n 0 N O N W r n mON NDN Ow w MLO NLO V I��m r COO r co r r mCOr- r_: U) v NW O r O O r C, 0 0 0 0 0 0 00 O N O O N fl- O N O CD O N 0 0 0 0 Cl 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 O 0 O NOa0 Cn 00 Wr 00 Ul V Cn W(OV Cn (D N NMNMrN mmV V 00 (O (O M V Cn U, C70 WN CR O O 0 0 0 Cl Cl Cl 00 O r 0 0 r O C @ 0 0 0 0 0 0 00 Cl d O N d O Y a d m yQoroorrno L 5� ON a{r NN V COr 0 V �Cn m d rOc' mf-- COO (Om MCO VV @ no A@ 0 0 0 0 0 0 00 O C O O r O r r0 O r r O N r 00 rn O iY 6 O COO N i� � o m Q m d m g d �[0 N CF) 00 LO r� c O Or - (O 00 V COV _ c 0 OM V CO M COV _ CNNNMr� O' MMM V CO (,.dao )' M V CO CO ao CO V j r O) O( r W W nj N ) r 0') W 6 y U -°' N EN co EN N 0 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O l 00 W— co O W— C)fn 0 N TW X222 NW ���� (0W ���� o NW COW ia <<<< Et= Q oaaaa E M: Q oaaaa E o= �Oo�0o �Fa �Fa 3 3rrr 7 7r cMV O 0 {000 7 7 M V O O W� N> 2 2 LO Q L 2 0 0 0 0 � p Q r r@ O' a 0' 2 2 0 0 0 Q @ a Y 1 co m F o Y Y 03 C13 Y Y C13 C13 ~� is as (D T E Ca m n u 7 M O Z zv} N co Lo It N CQ � �� Ca O r LL U) U) LL CA F N U (Lo D V r N O V V V M Lo C� i --I C vl r M r O O N r O M Cl Cl O O _X� G W `~ w N I� r a0 N> Of zzY 6 ._ J W m n u 7 7 N N 7 N co Lo It N V I m Lo m O r F N m N N (Lo D V r N O V V V M Lo C m r M r O O N r O M Cl Cl O O Cl O N N r to N V M M N I� r a0 r, - 6 r mM r N m r M H Q Cn O O O O O O O O O O O O O O O O O O O O O O O O O O O O r r O O O O O O O N a -O -,:f r NN r co OOOOO OOOOO ON N O V N c)N MO V MN N r r CDOCDr my U) O L � Ln�i00000 00000 00000 00000 00000 00000 00000 00 W O r N O Co O N r O Co O O O O O O O O r r Cl r r Cl N O 7 LD N r O m CD N O N r J E 0 cc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O m tLo-N N MOON CD N V rrOD NN rNI- ONOON mmCnOM NN'tNO rm H r r't N N M N O N Cl) Q Cn O Cl O O O Cl Cl Cl O O O Cl Cl Cl Cl Cl O O O O O O O O O O O O Cl O O O O O O O O N a a OOOOO 00000 00000 00000 00000 00000 00000 00 c > . Q o (D M MCDrN r MOON o N7rrN NN r I- Or OOr a) OD M a) a)1- ClOD Co rM J Z~ r r M r w r O O O r O O O O O O O O O O O O O O O O r O O r O r N r V CD N M V V CO J E coOoO coo" 'co" 'c"' OOOOo oc"' 00000 00 F X00000 00000 00000 00000 00000 00000 00000 00 CA OOOOO 00000 00000 00000 00000 00000 00000 00 N a a�OOOOO 00000 00000 00000 00000 00000 00000 00 c 0 jr c,200000 N 00000 00000 00000 00000 00000 00000 00 H X00000 00000 00000 00000 00000 00000 00000 00 J E 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O Z Nr ON CD r Or NIt rr Mr Cfl Cn CD N CO CD CO N I -N Cfl II- Cl) CO V d'M o H r r r C D Co Co I- V m 'D m m m M O Q CA O O O O O O O O O O O O O O Cl O O O O O O O O O O O O O O O O O O r r O O N a a OOOr r r OOOr o o c c OOONN ONI- NN CO rM uD a) V CO V r N V N > c Q Q N L j i Nr C) OOr NM rr Mr CD u'3 0 N7 CD V OECD V MCO V CDmCO Cl) M CD Mm J rrr� MM CD V O W CO I -O COI- CD 0 0 0 CD O O O O O O O O O O O O Cl Cl Cl Cl Cl O Cl Cl O O Cl Cl O O O O O O O O N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O 2 76 2222 mu 222 6) 222 6) 2222 mu 222 6) 222 6) 22 E Q Q Q QO Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q O Ct7 O m F O CD O CD F O CD O Cn F O CD O CD F O CD O CD F O CD O CD F O C17 O Cn F O CD O r M V O r M V O r M V O r M 7t O r M15: O r M 7t O r M V O r N NN N NN N N MM MM V V� It CD Cn CD CD CDCDCDCD 1- 1- L r r r r O O O O O O O O O O O O O O O O O O O O O O O O O O m Cn Y U 7 CO U a N C d c a 0 0 Tl r r I N M m Cm0 N I m O O O N 4 1, � m O rM � M N m O Fr r C 0 r r r r I O r r W M r r r r a) > (.0 r r r r a) C) J (.0 I N E ca M O Z zv} NNIS � � CQ � — :� I- NN V / �+/� �(CO 'tMIOIOI'- maor,tN COO V Lo I- I- V mmm A M N Cl N r r N U o o N N N N m N M N N O N M M M C� O N M M N N i--1 H Q vl Cn O O _X� G W `~ w > O O O O O N> Of zzY 0 O r O O r ._ J W Cn Y U 7 CO U a N C d c a 0 0 @ r r m IM V O N M m Cm0 O m 0 W m O O O N M 7 O 1, � m O rM � M N m O Fr r C 0 r r r r I O r r r r M r r r r r r r r r r r r r r r C p m NNIS m WIOrO I- NN V IO MMI' - Low 'tMIOIOI'- maor,tN COO V Lo I- I- V mmm A M N Cl N r r N C O M N r r o o N N N N m N M N N O N M M M M N N N M O N M M N N H Q Cn O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 O r O O r N a -O mMIO NCO MIO N IO 1� N Cfl mOmCO CO MOS COM OCO 1: MCO mM� (D (o Or Cfl r r IO r r r N r r CO r r r r m r N r r C0 N N r N aO r r r Cl) I- N r N N l O L � LOca2OOO 00000 00000 00000 00000 00000 00000 00000 W M m N CD m Co u) I-- Lo N M CM CO 1� M r a) :$ m N r(o m 1� 0 u7 CD m m co N r M r N r M r r r r M r r N J EO O O 0 0 0 0 0 0 0 0 0 0 r 0 0 0 r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m MmN co I - CO V IO COON I CO mMm mo m 1-r N Cfl Cfl I -o W MCO N r ON CO r � N CO p M V V NN M M M't V r M NMNMN MMM CO CO 71 V V N V V'tLOr r m r N H Q Cn O Cl O O O O O O O O Cl Cl O Cl Cl O O Cl O Cl Cl O O 0 0 0 0 0 0 0 0 0 0 r 0 0 0 r N a a-�fOOO 00000 00000 00000 00000 00000 00000 00000 c Q o 2 N M N mm CO O CO MI-- It N LO r- CO N CO COO M MN m CON OCD Cfl MI- 1- IO CON m I- M V O V J O N (M O M N N N O N N M CO r N r N r N N r (M O M V N N N N M N M r v M CO IO CO Z F w CO aO ISN rCp I- m V 0) NNOr CO Cfl CO m CO M W ONM U r r Cl) r N r r r r r r C O r r r uO r N N N a O r r r Lo N r M N m J 1000 00000 00000 00000 00000 00000 oOOrr 00000 F X000 00000 00000 00000 00000 00000 00000 00000 co OOO 00000 00000 00000 00000 00000 o00oo 00000 N a a-,Z!OOO 00000 00000 00000 00000 00000 o o o o o o o o o o c L 0 jr c,2OOO N 00000 00000 00000 00000 00000 00000 00000 H X000 00000 00000 00000 00000 00000 00000 00000 J E O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75 m CO N r O C0 V r CO N CO m CD O m rD O c r r r M O m It V I� r 1� r M M w O M V p 00 V a0 O CD CDr (D 't V M W 'tION m V CO V I� V MMN M COMMMM (M(M 1-IOm Q U O O O O O O O O O Cl O O O O O O O O O O O O O O O O Cl Cl O Cl O O O O O O O O N a IO M M IO CO N I� N M O r m m N W m r m r r r r 0 r W r r r m IO r 01O m r N V ID N 0) NN r rrr rCO r r M r M It r N rrM rNr IO 7 _ Q Q N -r- 5 j iV Mm CON V I --m CO IO COO V N O V O m V OOM Mr MMO CO CD CDr CO V I- CD m co J W CO m W IO V N IO MMN CO M V N M M N M V M M M MNN r N N N N m N N M M L Cl) 0 0 0 O O O O O O O O O O O O O O O O O O Cl O 0 0 0 0 0 O O O O O O O O O O N J EO O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D 022 mu 222 m 222 m 2222 mu 222 m 2222 mu 222 m 2222 mu E<<-6 QQQQ o QQQQ o QQQQ oQQQQ o mama o mama o mama -5 O Lo I-- OHO IDS (D 'D Low (D (D Lo F-- OIn OLo� (D 'D Low OIn OLo� OOID� F- M 7t O r M15: O r M 7t O r M V O r M O r M V O r M O r M V i I- 1- O O W CO CO c0 Cl O O O mmmm Cl Cl O O OOOO r r r r r r NNNN r r r O O O O NNNN O O O O m LMI Tl G) V r W I N I 4 C/ J O r0 N m r N N N N ON N Mm CA N N N N W COON N ON 1 r r r r a) > (.0 r COO CDN M a) C) F J (.0 I N N N "t Co E Ca M O Z zv} CQ � �� Ca LL U) CA m CO I- ID ID 1- r CO O I- U �r N COM NCO Co m Co I'm V CO C� O V i--1 p C C C C V C mm M M C C t C o C 0 V C O V C 1: C C C N C C r N N o r LO r H vl Q _X� G W `~ w > N> Of zzY ._ J W LMI @ G) V r W O V CO oo O r0 N m r N N N N ON N Mm CA N N N N C, CMO CA N r r r COON N ON 1 r r r r mmOmm C o r COO CDN M N MN N F m CO I- ID ID 1- r CO O I- a) CO ONNN �r N COM NCO Co m Co I'm V CO Co ��CO I' -o O V p C C C C V C mm M M C C t C o C 0 V C O V C 1: C C C N C C r N N o r LO r H Q Cn O O O O O O O O O O O o 0 0 o O O O O O O O O O O O O O O O O O O O O O O CU a rO G) G) V CA cR ICr -4 ON ICN I� aO NCA CA r V r 0 G) r O O O I- W I- m Co r 03O r r r r r r r rr I,:-, r N r r r r r r r O r r r r uO N L � LOca2OoOOO 00000 O0000 OOOoo O000O 00000 00000 00 W m OOr O o0 ocDG)a) ISN r CO CoV V CO Cpr �r N CD Co W cow u7 Co �Cfl CA Cflr COM r N N N Co r r r r C D N r N N CD N N N r m N N r 1- r r C o N J EO O o 0 o 0 0 0 0 0 O o 0 0 o O O O o 0 O o 0 0 0 0 0 0 0 0 O o 0 0 0 O o m Co r CO Co m N I -w mCo OI- I -w CI- MCO CA Co V CA O oo CO CO COM V COOCo V mC o F CA CA m O M G) O r r m N N r 0-t r r r m O W m mI- 0 0 0 O It N V C o C O V N C C C r r r r Q Cn r Cl o O r o 0 Cl 0 o N Cl o Cl N o 0 0 0 o O O o 0 0 o r O Cl r r Cl o o r o 0 CU a a OoOOO OOoOO OoOoo OOOoO OoOOO OoOoO 00000 00 C > z . Q o N mom m NO CD r CON CA CO CA N M r Mm MOO1-O r Co V CA V N COCA COr J Z CO V 1- 1- N W 1 -CO rM CA m I-rM Co V Co r- CO Co V V NIS M V �CCo NCNrm rr w �NCDr m CO Co r ComCO Cfl t W V N N m M V CAM W C W Nr� mM oNm MN U C C O N N r C N N NN M M M M M N N N m r r r r uo r r r J iOoOOO o0000 OoOoO OOOoO 00000 OOOoO OOooO o0 F �OOoOO 00000 OOoOO 00000 OOoOO 00000 OOoOO 00 CA oOOoo 00000 00000 OooOo 00000 00000 00000 00 N a a�OOoOO 00000 00000 00000 00000 00000 OOoOo 0O c 0 jr c,2OoOOO N OOoOO OoOOo OOOoO OoOoO O000O OoOoO 00 H OOoOO 00000 OoOOO 00000 OoOOO OOOoO OoOOO 00 J E 0 0 0 0 0 O o 0 0 0 O O o 0 o O O O O o O O o 0 0 0 0 0 0 0 O O o 0 CD 0 0 ip CO Cfl CO Cfl N r NCO COG) ON N Co 1,- Co V MN d' N CO d' Co a) M W COM r COOT G) oom p H V CO CO CO N G) Co Cfl I -M Cor r 1- (D (DCO CON m CO MMM 7' CO r N r N CO N r r Co Q Cn O Cl O O O o 0 0 0 o O Cl O Cl Cl 0 Cl 0 0 0 O o r r N O O O O O r o 0 0 r O O CU a aCA Co V Co(Dr V CO CO'tCO Co r0CI-C oOC V r U -) 'DI -CO Co Cfl NMC V o V 04 r M M N N N N N C M N O r r r C o N r r r C o N 0) Q Q N L CD CD CD CO MCD m1-CD COG) CO CD C) NCO OCO mrOI- V MM77 co C17 J U M M V M V Co V V C O m N V CO V Co V C'r M N N N C rr N Co rrr t U) O O o 0 CD 0 0 0 CD o O O O O O O O O O o O O o 0 Cl Cl Cl Cl Cl Cl Cl O O O O cc CU J EO O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O D Iv 2 22 2 m 2 22 2 mu 2222 mu 222 m 2222 mu 222 m 222 m 22 aaaao aaaao aaaao aaaao aaaao aaaao aaaao as o nc O ncuD OOID o noun O ncuD O nolo OOID O n O r M V O r C V O r C V O r M V O r C V O r C V O r C15: O r i CCl) Cl) CV O o O O V V O O O O CO CO CO Cn O O O O CDCD CDCD O O O O r r r r O o o O Co Co CO Co O O O O G)mG)m O O O O OO r r m T Uo Y U 7 CO U a N C d Un Q 7 0 E ca NMS M O Z zv} N � � CQ � —I1 cq // /:�'� ��+//�� U/��(0 LLuJ ul LL CA 0 Ul O^ N N F U M W M C� i -i m r N r r r 0 � U) M N V M H N Cl) O W 00 vl _X� G W `~ w > : Of zz ^a' W " ._ J W Uo Y U 7 CO U a N C d Un Q 7 0 @ NMS N W W 00V N (O N(O cq O 0 Ul O^ N N F M W M C m r N r r r 0 � U) M N V M H N Cl) O W 00 co r N r M Q U) O O O O O Cl O Cl N r O r O r O CD O LO U') a -O OMc) Mrr C) LO 00r c`) M N M 00 O J ir LO a O L Q (o 2. 2 (D 00000 0000000 W H r M 7 0 0 r U n (O f N N N J 00 V M 00 n N N N N V M 1 0 0 0 0 0 0 0 0r O r r 0 0 0 O O m M N r O N r O cA r- r r r 0 M Hr rLO r rr co W U)- ^ N M Cl) Cl) Q Un 0 Cl 0 0 0 0 0 0 (p N r V P- N M _0 N O O Cl) a (00 a o00 00000 0000000 > Z rn Q o 2 N O M�U� (Dc00)UnN MO(D� V J O P r �rUn Of�NW O M Z H N N w Clr UO V N r OUl- LO V f -M J mm— p r r N i0oo 00000 rOOr000 F o �OoO 00000 O 00000 co O Cl Cl Cl Cl O O O 0 0 0 O O O O N a a�000 00000 0000000 c � �2o00 N 00000 0000000 H X000 00000 0000000 J 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ip ONUn MU[)c0 rU() 00 V O � N CO F r M ^ M- O N c r) Cl) M T M M Q U) O O O O O O O O r O O O V O N O O a C t NMM 000 rr U� V CD CO V V M M > O M N r W N M Q Q N L j i It a) (D MUn ID C) V r- LO c`M U- V co J 0 N �MMM 00 U) H NnNN 0 0 0 O O O O O O O O O O O O N J 1 0 0 0 O O O O O 0 0 0 0 0 0 0 m 2222 -Fu ma o ++ n n E0- aaaao of ���� F OA nq F opo n� or hes H `�° 00C) m m 2 P Lr 0 0 r rrr r � QH O e m mQ ^ 7-4, Q � m o J � � N N (N"tLO E ca M O Z Z U LL () U) a_ Out In Total O p 0 0 0 �0 t O 0 0 0 O O G OJtip 0 4000-400 p p 0 9=09 0 0 0 Right Thru Let UTrn Peds O 1—i O V V W y V N 0 a a a I - W D_ m�ncow Nock m N� OOO F� N� CDc �N(rOF > F.-,-, N N O O O L p p P' ) V I- O I� > Q C N N + W ? O W W I- N Q �(`�')� c`r') J ~Z (O (O N j ~FN N N�� C N N p J vv OF � u1 u10 (DM r- L� NOS O N (hln d' (O N N F J V20'd' Cl) -IT V L it 0� ulfll;a� nI41 140!21 sPad O L 998 0 8901 Z O 0tia / 0 bZ 0 6 1 O /Oro 1 Zb8 0 6901 L O N �c o p 4 0 LE61 EEOZ � 58 bE L5 OJ'` / 988E E06L Z96L �p 18101 1Sul 419 1no Ti 10 r- I O) O N O n M I r oo f- ,t co m co co m r r 0 m r V W N N N �c) co m m V N N r In M M M f- co O N I- M fl- In rMMNO co NN c`MM! O MMM V V f - r co co Cl Cl Cl Cl 0 Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 O O m�mMcn V V (00(0n mNO W r W W M_O rrrUn N rNNrf��(O rrrN(O� 00000000 0000000 0000000 0 0 0 O O M m N co 0 O) N V V a o (O W f N W f - r r W rr V LOW rNr N r- co V 0 M . n 0 0 Cl Cl 0 Cl 00 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 0 0 r m M m V (0 fl- 0 0o W W O f- V N r O cn NMM V V r U') Nr r- V N N co �NNr f r r r oo V Nr m Cl Cl Cl 0 Cl Cl Cl 0 0 0 0 0 0 O N O O N V C) O 0 O N O 0 0 0 Cl 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 O O �rNmmaom W0w(O N mC) W cn N w It cn r M N M O m cM m V N V t f-- a0 0) f- MO r r c0 r�f� co 11 V M7 OMNO W f�N N W f� W Mcn(O cnN V r r M c,. j c n r r N N f-- Lo d) V co co co V C) co Nr 11 co r 1) Co. o0O0000 00000000 00000000 0 0 00000 00000 00 00000 00 0 0 0 0000000 OOOOOOOO 00000000 0 0 0000000 00 000000 00000000 0 0 0000000 00000000 00000000 0 0 0000000 00000000 00000000 0 0 0000000 0000 000O 0000000 0CD 0 0 vMmmN r00) V m co ONNN V N �OOOV r m V V c`')co' ao -) co r- LO Jnr- O) r - N W O O 0 0 0 0 0 0 0 0 0 0 0 0 00 00 @ 0 0 0 0 0 0 0 0 ) o ) o Y a d m y LO_ L V nMM a V NN N�Lj co r OJr c0 dr r r- 'It MN _ V V cnV V d"tN NN Cl) C14 U-) 00 5 0 N Co U r W U') 0 r M n O r) V @ @ r no 7 m @ 0)WN r _ m 0 QOM r m r V 0 W W W Wr-W cO I� W CO 7 N M g Nr�r-W(D I- O MM M N m r f� Do O In N V Cl)M It W (O f- C N f N r gm Qm am g d m0000000 t c 000000000 c 000000000 j 0 0 0 O O L) 0 0 O nj 0 O O y U -°' N EN cN EN N 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O! l D 00 W � O W- C) (D 0 C) N N N NW ���� N W ���� U co- N NW N W aaaa oa Q oaaaa E o= Q oaaaa E o= 2 Roo'_noM� Lno{o �Fa noo �Fa 3 3 o~ 7 7 0 M 0 3 3 V O M 0 r r r r N> 2 2 LO _= 0 0 0 0 F p Q r r@ Q a 0OL 2 2 0 0 0 @ a Y 1 co c0 D o F Y Y N c0 0 \ ~is �as Y Y N c0 ~� as T N Y U 7 CO U a N C d c a 0 0 E ca co mN O M O Z zv} M 't 't �� CQ � — :� O� � Lo LL / �+/) ^(0 CA V O� r N r U 1- Lo m (D N O r r c D M V C� F i--1 C vl r N O I- r Cl r Cl N O Cl r O _X� G W `~ w > Lo n m Q zzY o ._ J W N Y U 7 CO U a N C d c a 0 0 N co mN O m (D V MECO M 't 't I -N V 1-0 O� � Lo 7 [o OMS a) u V O� r N r M r N N 1- Lo m (D N O r r c D M V F C m r N O I- r Cl r Cl N O Cl r O r O M r r Lo Mu� M N M co C o a O M Lo n m c O o r r r N 0 N H Q N O O O O O O O O O O O O O O Cl Cl O O O O O O O O O O r O O r O O O O Cl O O N a -O -�f r M r 0 Lo O O r O r O O r O r O M r r o N (M r r 1" LoV c p c o M O m r M M CO M r M r O L � LO 00000 00000 00000 OOOOo c)00000 00000 Oo W O r r O N r O O O r 0 0 0 0 0 0 0 0 0 0 r N N r cD r M N L r Lo o CO m CO O N r J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O m N V V 0 0 V r N r N M N O I- Lo N r 0 CO N r r N cD m I- I- N Lo cD N CO M m r� o r M r N N Cl) m N Cl) H Q N O Cl O Cl O Cl Cl Cl Cl O O Cl Cl Cl Cl Cl O O O O O O O O O O O Cl Cl O O O O O O O O N a a OOOOO 00000 00000 00000 00000 00000 00000 00 c > . Q o N S— M r M N 0(D N M r N CO N M N O I- cD N r 0 CO N r r N cD CO (D 11- N m m J 0~ M r r N N0) r N r r N 0 7 N r O O M O O O O O O O O O O O O O O O r r O O N N V CD co N cD N J i00000 00000 O000O 00000 00000 O000O OOooO 00 F X00000 00000 00000 00000 00000 00000 00000 00 cA OOOOO 00000 00000 00000 00000 00000 00000 00 N a a�OOOOO 00000 00000 00000 00000 00000 00000 00 c 0 jr c,2OOOOO N 00000 00000 00000 00000 00000 00000 00 H X00000 00000 00000 00000 00000 00000 00000 00 J E cD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O �p u�r (D c, N r Or mun r r r r -t N I- N Or cD co Or a) co u�Co cD Co O 1 -OCD M1 - p H N N Lo N V cDMI: I-oomOM mao Q y O O O O O O O O O O O O O Cl Cl O O O O O O O O Cl O O O O O O O O r O r O O N a MON O cD r 0 0 0 r 0 0 0 0 0 O O O Cl O r Cl It M aO O 7 V N O m wm M m M r c, > Q Q N -r- 5 j i04 CD I- OOrM V rrrr'It N 1—N CD 1` 7 W cD CO CD mmr cD� mN11,11, V r J 0 r r N MCD MF CD I- CO COM I- (D 0 0 0 0 0 O O O O O O O O O O O O Cl Cl Cl Cl Cl O Cl O O O O O O O O O O O O O N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O 2 co 2222 mu 222 m 222 m 2222 mu 222 m 222 m 22 E Q Q Q QO Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q O u7 O m F O cD O cD F O cD O L F O O L F O cD O cD F O cD O cD F O cD O L F O cD O r M V O r M V O r M V O r M 7t O r M15: O r M 7t O r M V O r N NN N NN N N MM MM V V It cD Lo cD Lo cDCDCDCD r r L r r r r O O O O O O O O O O O O O O Cl Cl Cl O Cl Cl Cl Cl O O O O m N Y U 7 CO U a N C d c a 0 0 Tl OO I OCOMM N I N m W mr r cON mr cOr OIC /4 O N CO If) r r M C O r r r r N r O r l f) r rrr W 0 N N r � r rrr a) > (.0 r IC) r m r r � r r r a) C) FN J ti I N E ca M O Z zv} � � CQ � — :� / �+/� ^(0 m r Mm C, co U IC)ml'- I[) M r C)M� I'- MmO C� w ID �� mro i--1 p M N m M N N N O N N N M O r N N coN m N M N N M N r M M N M N CN 't (M N CM H vl Q _X� G W `~ w > N> Of zzY ._ J W N Y U 7 CO U a N C d c a 0 0 �p OO If) MIT COr OCOMM N N MLo N m W mr r cON mr cOr OIC CO cO IS N Lo O N CO If) r r M C O r r r r N r O r l f) r rrr O m 0 0 � r r r 0 N N r � r rrr 1t r O r N � r rrr IC) r m r r � r r r M r IC) r r r r r l f) FN m r Mm C, co ID OIDON IC)ml'- I[) M r C)M� I'- MmO Or m W w ID �� mro p M N m M N N N O N N N M O r N N coN m N M N N M N r M M N M N CN 't (M N CM H Q N O O O O O O O O O O O O O O O O O O O O O O O Cl O r C) r O O O O O O O O O O N a -Q N�mm (Orlf)r m rCO Lo Loa) O V I- (D NC)I: MN I:M Ct4 r C 0 r r r r Lao, r r N r C 0 r r r r I o r r N N 1- N N N r m N N r N C O r N r r 1 O L � �ncai000 00000 00000 00000 00000 00000 00000 00000 W M I- M N m IC) r N W N r M m IC) N cO A M m IC) CO N r M u� O m 00 r N If) m N ON � Lo N r r r r V J E O O O 0 0 0 0 0 O O O O C) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m Wr- �co V rlo N mrm W C)MItr mC)NI- W Nm V ON CO N Loo CO V OIC)I-cO o H04 M V V V NM �'t mm MMM 'tMM t IC) V IC)'t V CO IoM V IC)CO V Mt V CO Lo CO Loom Q N O O O O O O O O O O Cl Cl O Cl Cl O O Cl O O O O O 0 0 0 0 0 O O O O O Cl Cl O Cl O N a a 000 00000 00000 00000 00000 00000 00000 00000 c > . Q o (D M MC)r mNN mm O CON N O CO COr M CO I'- O W OIC) N mw V M Or CON m 0) (0 CO 0) 04 J O N O MNN NC) N N N N m NrN cnm Nco N cnr co r NMr MNNNm M V M V I Z F w Lo I- c) I()'tN IC)CO N Mm V W N I-MIt m N c) It M CD (o mm cOr mr m u771� N 7 '12 U r r� r r M r r r r r r r I O N N r r 1- N r r r c p r r r N c O r rrr J i000 00000 00000 00000 00000 00000 00000 00000 F �oo0 00000 00000 00000 C)rOC)r 00000 00000 00000 co C)C)0 00000 00000 00000 C)r C)C)r o0000 00000 00000 N a a�000 00000 00000 00000 00000 00000 00000 00000 c rn 0 jr c,2 N "D 00000 00000 00000 00000 00000 00000 00000 H oo0 00000 00000 00000 00000 00000 00000 00000 J E C) 0 0 C) 0 0 0 0 O C) C) O C) C) C) ` O C) O C) C) 0 0 0 0 0 0 0 O O O O C) C) O O O C) ip IC)OIC) maoO CO Io m r mr M 11, MN M IC) r (D (D CDuC Lo 11, IC) OCOmCOO COOMmO p F MMV r r �Iflmm� IC) 't'tC) N M't'tM N IC)M c0 M'tco V m 'tNMM� M V IC) V aO Q y O r r O O Cl O O O O O O O O O O O O O O O O O O Cl r O r O O O O O O O O O O N a IO M I- M V O V r Cl M IC) V N LO) 2 w LO cl O l� m r 1- r- "t v m cn cD lf) If) M CO N aO N �cM LO) 2 rrr NCO N r rLo r M rrrr Lo rrrr r r� rrrr Lo 7 _ Q Q N L j iC)CO I- ID V O V V CO CO V Mr 04 ODIC) 11, LO 11 V NMC) (0mC)0 LO M1-LO1-N J 0 O I- M Co Lo Lo V N co M It M I [) M M M N N M M M N N M M N M N N r M N m N N M M N w O O O O O O O O O O O O O O Cl O Cl Cl O O O O O O O O O O O O O O O O O O O O N J i O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 mu 222 m 222 m 2222 mu 222 m 2222 mu 222 m 2222 mu E<< -6<<<<t QQQQ o QQQQ o QQQQ o mama o mama o mama o OInF O r>OIn� O nOln� O nOIgF O nOlr>F O nOln� O nOlr>F O c, Lo F- M 7t O r M15: O r M 7t O r M V O r M O r M V O r M O r M V i I- r O O 00 00 CO cO Cl O O O m m m m Cl Cl O O O O O O r r r r r r NN N N r r r O O O O N N N N O O O O m LMI Tl MOr M 0)N I O(Dr Nm V N r m N I r N 0)000 � r O M co U0 N m m m m ID Cl I� OUo V (0 (0 10 V /4 (/ J F rrr N I- N N N N 0) N N N r W (D r rrr a) > (.0 r M a) C) J ti I N N N "t co E ca M O Z zv} VNN V � � CQ � — :� 101011,1oN / �+/� �((0 O 11, N(O�m W V W 100(0 wm ISO p M N M V M M M V V U r M t M M 0) M N N M r N r N r C� r i--1 H Q vl N O O O O _X� G W `~ w > Cl O O O O N> Of zzY O O O ._ J W LMI �p MOr M 0)N M M 0)r r N N r N� O(Dr Nm V N r m 0)0) (0000) (D 0) W" r N 0)000 � r O M co U0 N m m m m ID Cl I� OUo V (0 (0 10 V (Dm r M M F rrr N I- N N N N 0) N N N r c0 r r r r (D r rrr M N m VNN V N w1D 1(>m 101011,1oN W W (D W O 11, N(O�m W V W 100(0 wm ISO p M N M V M M M V V 10 10 M M V r M t M M 0) M N N M r N r N r r r r r H Q N O O O O O O O O O O O O O O O O O O O Cl O O O O Cl O O Cl O O O O O O O O O N a 70 (00(01- 0) 0) r O O1- I- ON MN 0)M M0) r O10 M10 W 0) C r r r N (D r N N N 1- N N N N 0) r N r r (D r rrr 10 N r N O L � LOca2000OO 00000 00000 00000 00000 OOOOO oOOoo 00 W W N(D I" M 101"10 uoN Co U-) Ln NO 0) LO N LO r ONrr Or(D N 10 mr(D 7O r(D r r r r (D r r N N W N r r N co r N N N 0) N r r N r rrr 10 N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O m m N O N M co 10 N O M N Co CO r 0) m r O I- I- I- r co Co N I- I- 10 r W M N r 10 00 0 F 0) W mN M r �OM� r r Oc0� r 0)r 00)(o 0(0101-N 10 MMM(O N MN Mr N r Q N O O O O O O O O O O O O O Cl Cl O O O Cl O O O O O O O N O O N O O O Cl Cl O O N a a- �fOOOOO 00000 00000 00000 00000 00000 00000 OO c > . Q o N M OO10M C0 N 0)1--'t N (010(D N0) r N MM O V CO 1010 O(DN O00 It O0)M O N 7 J 0 10(D(D0) co co 1-1-cOM 1-0)(D(D� 1010 V 10N 10 V V 0)N V N MMN N Mr N m N r w 0)N100)10 (O Lo (D (D MN 0)0 W V W V V I:I: co r M N 0)10 Lor t co co W W M7 r N r r r r 0) r r r 10 r M J i00000 00000 000OO 000OO OOOoo oOOOo 000Oo OO F �OOOOO OrOOr OOOrr OOOOO OOOOO OOOOO OOOOO OO co OOOOO Or c) C) OOOrr OOOOO OOOOO OOOOO OOOOO OO N a a�OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO OO c 91 0 of �200000 N 00000 00000 00000 OOOOO 00000 00000 1 H OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO OO J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0(D cD 0 cD 0 0 0 0 0 cD(D 0 0 0 O O Z Oc0 m W (D 10It (Dr MM(D 1011, mOOMN Mmmc) Om a) Lo W V N (DO r o H V 10 (O CO N I- 0) I- 'D CN � I- I- (D (D N 10 1- 10 V N V N N N N r't N m r r r 10 r Q N 0 0 0 0 0 O O O O O O O O r r O O O O Cl O Cl O Cl O r Cl 0 0 r O O O O O O O N a a 7 (D 04 M 00 V (D MN N ION X 010 (0r N tom 0)10 MCO MCO V M't N M r N r r N r I N N N N 0) N Cl) N h 1 0 r (V r r 1 r M r N 0) Q Q N -r- 5 j i(D OI- V 1O CN (D N 1O Or'It 0)'It 1O V 1O I�r 'tOr(D NI -r(0(0 cO Mm J U N V V V 10 LO V V V W LO V V M V c M N 10 M N N r OD r N N CD r r M U) 0 0 0 0 0 O O O O O O O O O Cl Cl Cl Cl Cl O O O O O Cl Cl Cl Cl Cl Cl O Cl Cl Cl O Cl Cl N J E O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O Iv 2222 co 2222 mu 2222 mu 222 m 2222 mu 222 m 222m 22 Eaaaao aaaao aaaao aaaao aaaao aaaao aaaao as O nO1D� O c, Lo c,Lpc, D o nouD O nc,u � O nO1D� O1(>O1D O1n O r M V O r M V O r M V O r M V O r M V O r M V O r M O r i MMMM O O Cl Cl V V O Cl Cl O 10101010 O O O O ID ID ID ID Cl Cl Cl Cl I - I - I - I- O O O O c0 c0 C000 O O O O 0)0)0)0) O O O O OO r r m 6) T U) Y U 7 w CO U a N C d U Q 0 0 E ca M O Z zv} m co CQ � �� ca V LL U) U) LL CA r N m O rr�l V F U O W M C� i -i m M M co Lo Lo r M p p N r fl- M H N O m o o vl _X� G W `~ w > : Of zz ^a' W " ._ J W U) Y U 7 w CO U a N C d U Q 0 0 � �Nm m co M(O V V o r N m O F O W M co c m M M co Lo Lo r M p p N r fl- M H N O m o o M r r N r M Q co O O O O O O O O N r O r O r O O LO u) a -O r r N V Cl N O (D c`') N M M f� V c `' ) N r r _ O { N L Q (ncc.)2000 00000 0000000 W -r- N N r r u 7 N r m f M N M N f Q) J N W N ppN V pop^o M 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m r- c) O mr 1- 1- V r- In In VN (O H -co r co (D Mc)(O MM M M T M M Q co O O O O O O O O N r O N O O O � � O a a o00 00000 0000000 > rn Q o 2 N i �W� �OcO VN M^ V co V CO J O r m co u-) N Z F N N N M r N N r e r r M m (p co r Lo m r J op N rp r r N i000 00000 0000000 F ip H O O O O O O O O M O M O O O O co O Cl Cl O O O O O M o o co O O O � O O a a 000 00000 o000000 c (Dio00 N 00000 0000000 H X000 00000 0000000 J 1 0 0 0 0 0 0 0 0 0 0 0 0 0 (D (D m lLo l M V c O r V r- M Lo u) u) H N co V M M N (`D Q co O O O O O O O O In r r N O m O N O O O a c t Cl) O ID N O N O It c'' ) r te u3 r p p M M > O M N O M W co Q Q N L c j i It s- - -t r 0 (O I- c`M N V V (O Jin L V H ^^Nu)Nr N N 0 0 0 O O O O O O O O O O O O N J 1 0 0 0 O O O O O 0 0 0 0 0 (D 0 @ N o o t t N N E0 -m F OuF hq Opo n� or hes H `�° 00C) m m 2 P Lr 0 0 r rrr r � QH O e m mQ ^ T1 - ti N 4 a% 7-4, a) Q CID a) O � N J ti E ca � N M O Z Z U LL U) 0 a_ L z a ~ " <ry LJ Out In Total O [13 0 3 O O G OJtip 0 0 0 0 3 p p 0 0 0 0 0 O 0 0 0 0 3 Right Thru Let UTrn Peds O 1—i C-4 U) W NNON N g N M oo r 0_ Q O_ 0_ co O co cDoc �w m OMD 1'- —CDC, —CD F� N� 000 rNrF > O O O L p p 0 D W u, N I� > Q C N N + W ? N OD OD c'') O Q �Z r r ~F N D N c� � c, C N N N _ J N VO 7 7 O F U O J O m m M N r L� N S O O OD W N N F �J NP') O h�o7 0� 00 In ODcq M ')... i 000 W Cl)h W F wi� ,� O ll iia-1nI41 140!21 sPad O 0 bZ8 0 EO L L Z O 0tia O 0 ZZ 0 bL L O /Oro 0 Z08 0 620L L O o �c o p 4 8L6£ 6Z6L 686E O 98 LE 6b OJ'` / ZE8E Z69L Ob6L 10 18101 ul lno is 419 Tl - N '4 vJ Ti a) > co a) C) J ti � N N N "t co E ca M O Z LL U) 0 a_ V OO�O m W (Or V C) (D co r N N r I' W r �co �co m N N N N �co N W ^OM �LO�LOO 00 NMN M N c` co V U3 m 0O r COV W Cl Cl Cl Cl 0 Cl 000 0 0 0 00 0 0 0 0 0 0 00 0 O O MIt co OM c0 c0 W LOLO O 00 MO OOfl- O fl- M O r(N rc0 UjU rN N 00 00 N NNN W O in Co. V Co. 0000000 0OOO 000 0000000 Cl 0 0 0 O M I- N O N N m LO M r Mf- m LO LO OO LO M r- O r r V N co N N N r m CO V 0 N 0 0 Cl Cl 0 0 00 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 0 0 Un 00 1- V N O N fl- N W N CD V N 00 M Ma't W in V V in0 F02 m r rNt (O W co Cl Cl Cl 0 Cl Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 Cl O 0 O 0 0 Cl Cl Cl 0 Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 O 0 O MMOM Wc0 0000N 000 W fl- V (O LONm V N N M M N r j l- 0' ) N c'' ) c `' ) N N c'' ) f l- co f l- m co f l- r l- r r M m co^ 0 O c0 Ln l� �nMNN O V fl- O N M U) (O(OM Or fl- rr "OCM Nrr N r-- r, N V mNMSO N 0 co 00 r N f-. 0000000 00000000 0000000 0CD 0 0 00000 Cl r 000 o 00000 r 00 Cl 0 N O Cl Cl Cl 0 Cl Cl 00 r 0 0 0 r 00 CD 0 0 0 0 0 0 00 0 r ccf N O 0 Cl Cl 0 Cl Cl Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O O 0 Cl Cl Cl Cl Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 O O Cl Cl O O Cl Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O O O 0 Cl Cl Cl 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 00 Cl O O I-U�O mr aO r (p (p W W V MMM r M O 00 I -M m in LOM CO W O f- Mn n 00 00 M N m O O O r Cl r 0 0 0 0 0 0 c) 0 0 0 0 0 0 00 oCl O q N O O Y (L Q (L2 10(n y�OLnMM �r^mrf- o �M r rr -,I- CO (n(I W V MNf- d"TNNNMO^M V CO S�NM�nrNN� U-) N U') C) r M _ r no 7 I-Oc0 c0 -(O m l - (M 0 _ LOMN rl-N OO r (O N O _ m(O m jc6 c0 O1 �C MP- O �MMN MNO� 0 �� V V 00 nN m 00 C r^ r M gm Qm am g d t mOOOOOOO c 000000000 c 000000000 j 0 0 0 0 O 0 0 O nj 0 O O (D y U -°' N EN EN N 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O c J- 00 W D O W(D 0 N co g An j,.0 NW ���� N W ���2E U coLL N NW N N W aaaa E oa Q o¢QQa E o0 Q oaaaa E o= RL2Clvoo~ (no(no �Fa o(no� 3 3rrr 7 3r cn O O 7 7c`') V O O W> Q O O r > O- O O > Q L2OOOO �pQ 22 rr� NQ 220000 0 ca co O o F Y Y (0 (0 O \ Y Y N (0 O ~� a) is as (D T N 1 N Co Co " 0 M Or-) Z Z U +. co LL (n () a_ I. Q �Jx W N0N Gd cZc G `man w J of W N Y U 7 CU U a N C d U Q 7 0 N I- I-:coLo cD V MN O u� co m01 -O CD cD a2N � m cD a)m N I - I - N W cD0 N cM N MI- cDCDOmM O�cDCD� mN F C m M cD co N V M N N a0 N M N CO N N M a0 O N O M m N O N IW I'- I'- N O N w H Q cA O O O O O O O O O O O O O O Cl Cl O O O O O O O O O O O O O O O O O O Cl O Cl m a O O O O O O— 0 0— O O O Cl Cl O Cl O O O 0 0— 0— O M W M M Lo M V (o m 1) Q O ry N � �N00 - 00- 00000 00000 00000 00000 - 000- 00 0 O Jw� M Lo M N M M— r N I- N M— N CD N N M CD O N O O N CD M O NN N m m N M N J 100000 O000O 00000 OO000 00000 00000 o0000 00 m N M O N I� O O N O O O N N N O O O N M 7 u7 Lo a0 IM O m m o N H Q rn00000 00000 00000 00000 00000 000o0 00000 - a a �a�00000 00000 00000 00000 00000 OOOOo ooCD 00 N C rn c0 J O i N M 0 cD 0 0 0 O O O N N N O V Cl Cl N M M CO V M O I- r N N W Z F w coo— � OoO OOo00 o o00 000�� ONOM � uo 7 cDu� (D CD J i00000 O000O O000O Ooo00 OOOOo o 000 00000 00 F ip 0 0 CD O O O O O O Cl O Cl Cl 0 Cl Cl O O N O Cl) cD u� I- O O W m cD H Q cA O Cl Cl Cl Cl Cl O O O O O O O O O O O Cl O O O O O O O O O O O O N V O N CD — N N a 00000 00000 00000 00000 00000 00000 OOo 00 �70 > j rn a0� m W N i 000 O O O O O O O O O O 00 0 OO N O— —— M M N O N I- I- 't r t 0 0 0 0 0 O O O O O O O O O O O Cl Cl O Cl Cl O Cl O O O O O N N O � O � N � O J E cD cD 0 cD cD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 O O ip N NOO V Cl MLn MMao u�I- IDM I -O0 co OD CD CD M I- 04 04 CN d' V Co 1'-N c,4 d'N Q cA O O O o 0 O O O O O O O Cl Cl Cl O Cl O O O O O O O O O O O O O O— O— N O O N a a of -� N— o o co O o r N co M— cD �� N� I� V M cD a0 O v m cD O m c0 cD N UD N ���u� MM CD m cD mmm N, �w Y c c0 J j i 0 0 0 O O N O O O N N O N M O M M rmN N NNmO N N VN M U) ~ 0 0 0 0 0 O O O O O O O O O Cl 0 0 0 O O O O O O O O O O O Cl Cl Cl O O O m J E 0 0 0 0 0 O o O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 2 m 2222 mu 222 m 222 m 2222 mu 222 m 222 m 22 E Q Q Q QO Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q O u7 O Lo F O O L F O� O L F O O L F O O L F O O L F O O L F O L O— M V O M V O M V O M O M O M O M V O N NN N N N N N MM MM V VIt LoLoLoLo OO co co r 1- c) O O O O O O O O Cl Cl Cl Cl Cl O O O O O O O O O m U) Tl I N I 4 Q J 06 N0 L.1_ Cu J (.0 TIQ N I N CO CO "t N E Ca o M or) Z zv} m m Ca CaC LL CO (/) a_ I. Q �Jx W N0N Gd cZc G `man w J of W �p 1- 0) (o NNW WmOW V O r W� Wm(o MM W O 1,- m mWNMO W W Orr NI�mNO N ( r m W NN(or0 O m O m O (o(o OOO m r M W W m Fr N W r r r r (o r r r r M r r r r r r r co r r r r( o i p W m 0 (o N Cl W r W Cl v m W m M W OM N w V N (o (o m M M O r (o m o M V W (o (N M M M M (N N I N r M N N M M V M I- M M M (o (o (o I W V H N Q (A O O O O O O O O O O O O O O O Cl O O O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O m a G) W N V O N CO m CO r N r 1- r (o M N r M N (O N M V W W It N (o r N (D 7 t M W O C N C 0) M N N Q O F N -Q C N Mr(o MNr OW r OOrN Or Or N O()rN W rONOM N W Nrr V rr NOca Jw� i V O M V M m 1,- M M 1,- W N O ( o M O M r 1 r M N M 7 o M o I- W I r N W W N W m ( o U J N V N N N N N (M N M N N r CO N N m N M N V N M U) Co Co V N M M M N V (o W (o N N 1000 00000 00000 00000 00000 0coo o oo000 00000 m MNM mmmmlo W N(ovm M�I� V W W(oM m(o WmV NM N(o NOm r(oN 'D 't o N M 0 r r r(D r r r r (o r r r r (o r r r r(D r r r r N N W N N CO N O H Q (A O O N 0 0 0 Cl Cl 0 0 Cl Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cc 0 0 0 0 0 0 0 0 a a -O X 0 0 0 r O r r M O O O O O O O O r r cc -c- 0 0 0 0 0 N r o o M o r o r N N J i33 Y (0 J WO CO M mem W W WIC Wry mrmV M I�mmr W C 0 04 1- rr r r rrr(o rrr r r rM rrr(o rrrNl Z F m W V W M (o r r r M W W N r M m r M M W O N W r m r M M W M (o M M M N r N J 1000 00000 00000 00000 00000 00000 00000 OOOrr F ip (o(oN r'tMNO W NNOO V Or 0(o rMr c, Lo NNr O(o rr MO(o Nr MN W H Q (A O O CO O O O O O O O O O O r 0 0 0 r O O O O O 0 0 0 0 0 o o 0 o o 0 0 0 0 0 N a 'O r r N O O O O O r 0 0 0 r r 0 0 0 r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N > j rn a0� W W N i M M I- rr(Mr CO V NOO W NOrOM rNr0 V rN0oM rrM0(o rrMr W r r M O M O r r O N O M O Cl O O O O r O O r r O r O N O O O O O r O O r N J 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E0 i p M M V V V M r N O W N N O M W V M W O N W W W M W M Co O � N (o N M m m It I- m pMNCN F M CD r (D W WW'tN (o(oM(om V(oWVN (oV VMW V V(M'tW MV1-WN Q (A O O Cl O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 O O O O O O O O O O N a a Of a 1- W O I- I- r W r (o t 04 N W (o (o r m M y W 11- N 11- (0 1- M N m m 1- W W V M m N N O) a) 1 -Co IoN (o V V MIS MV N V V MMV (M (o MMNNN MNNNr NM(oV W C (D (0 J 7 !- 0 i Lo (oM M N I: I�N(or M r N N r (or Or W N N N r 1- (o rmNI 1 r r r r WOr r N r W WMWMW (o r r r r MMW(oI (o r r r MV r W W r r N r W U r O r O O O O O O r O O r O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 o r o o r m J i O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D a)22 mu 222 m 2222 mu 2222 mu 2222 mu 2222 mu 2222 mu 2222 mu E<<-6 QQQQ o QQQQ o QQQQ o QQQQ o mama o mama o mama -5 OLr) � O o0(o� (D n0(o� (D n0(o� O n0(o� (D no(o� O n0(o� O (D Lo M'!t O r M15: O r M 7t O r M V O r M 7t O r M V O r M O r M V i I- r O O W W Co Co O O O O m m m m O O O O O O O O r r r r r r N N N N r r r O O O O N N N N O O O O m U) Tl I N I 4 Q J 06 N0 L.1_ Cu J (.0 TIQ N I N CO CO "t CO E Ca o M or) Z zv} m m Ca CaC LL CO (/) a_ I. Q �Jx W N0N Gd cZc G `man w J of W m O1" V O N CD m I" M CO m CD 1-0 CO 1- V r 1-I� r 1-N O V CDN r mCDN CD aO CON O V CD r N r N (D Cn V M V I- CN N N CN M N V MMCD m N N N N mm r V m r r r r COr N Or C O r r r r CAr OCA C D r r CA mmmMN M MM N F m o m ID m l Cfl Cfl CO 0) r C D M C D O N O W mO M M UO m r W OOmOO M m UO ID 0 mCO W m Cl D O D O V V I- LO V i m V � M M M V N N H M r r Cl) r r r V M N N Q Cn O O O O O O O O O O O O O O O Cl O O O O O O O O O O r O O r O O O O O O O CD a a coO CD CO M m V CD CO CD V MCO CDm (D [I- CO Mr Lor CA Cfl CO MN MCO V r N N N r M N C 0)r N N N N Q O F N -Q CA MCM ON CO V V M V Cn NMN CMO V CM CD Lf) r- V NCDM LO V CD r or NCO N 04 rr Jca i w� O m O N m CD O M 1l, m r N m m CO cO N N m m O CD M N N CD r cO m r Cp N cO N CU CD un Co m m I,Com V mmm ml,, 11,Lo11,COm cD V CD MO V V CD V CD NMNrO rr J N CO M N N E coo oO c000c coo OO 00000 00000 OO000 000 o' 00 m N mCDN CO I- COON V CO OmN CO r;OD CO COr CO V I� OI- V r CD V CD CO I- a) CO I- M V o H N CD V V CO V ID I - CON CO I -CO CDN MM N N N 04 N 1- N r N Q rnOOOOO 00000 00000 OOrOr OOOrr 00000 00000 00 a a a r M N N CA r 0 0 CD CO N M O O CD O N r N CO O O CD r r O r O O r r O CD 0 r O O J cc N J CO LO It LO MOV mCDCD IS N CA CA N CO O V CO V M V m V MO V I� I�Mr CO V p� r V CO N r M C D C D V CA C O V V V CA N N r N CN 04 m N r r r m r r V N Z F Lo r m C D 0 M C D c 0 W N N m N O M V W 'D N O 'D O N V N O r N r V r O N N C O O O N r r V r r r C D r r r r C D N J ir000r 00000 00000 00000 00000 OooOo 00000 00 F i p O N r M (D O N N V N M N uO N N (D V 'D O C O M r V O C O V N O N a O O r r O N O r H Q Cn O O O N N Cl r O r CV O O CV O N O O O O O O O O O O V O O O V O O O O O O O CU a 76 O r O O r O O O O O O O O O O O r r o N O O O O Cl O O O O O O O O O O O O N > j Q O Q m Cb N i O r r r M o r N Co ' D N r Co N Co u 7 N V o r N r M O C r O N D O M O O r O r O r CD 0 0 CD Cl O O O O O r r O O N r r r O M r O r Cl N Cl r Cl Cl r Cl r Cl Cl r Cl Cl J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD 0 0 CD CD 0 0 0 0 0 0 0 0 0 O O i p a O M N N C D O C D N r( O I N M N V O O 'D r 1 O V 'D M M M V O m C O a O m O N m N M p F CO I- (D I- (D Om I -W N r V CO 1' -I -CD M Co 1- (D COMr N cD V CO V N CO NCM MNr Nr Nrr rr Q Cn O Cl O O O O O O O O O O O Cl Cl O Cl O O O O O O O O O o 0 C 0 O O O O O O O N a a Of a CO COV MM V CD 't NCD ID r CO r ID M V CDmr CD m N1- OOCO V CCI m V NCDO CO CO N :E 0)M V V CO W I- 'D CD COQ MCO uD Cn V V rCp V MNMM rNr N1- rrr CD C Y CON (0 J j !- U� i mCDrCAm r N r r mOCAmM r N M r r COmm m N N r r rm rNm 1� r r r r CA ml�rtn C O r r o V NCDr V r r mCD CArm Cl) V CD N U r O r r M O O O O O Cl Cl Cl N N Cl Cl Cl Cl Cl r Cl 0 0 r m o o r O O O O O O O m J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 2 m 2222 mu 2222 mu 222 m 2222 mu 222 m 222 m 22 aaaao aaaao aaaao aaaao aaaao aaaao aaaao as cILocm CD nOIDF- OLpOIDF- O nolDF- CD nOIDF- O nOID CD CD Lo O n O r Cl) V O r M V O r M V O r M V O r M V O r M V O r M V O r i MCl) Cl) Cl) O O Cl Cl V V V V Cl O O O CD CO CD Cn O O O O CD CD cD CD O O Cl Cl I - I - r I- O O O O Co Co CIO Co O O O O mm mm O O O O OO r r m U) T N � N co co " I. Q �Jx W N0N Gd cZc G `man w J of LU NMN c0 c0000) oo (O (ON O V F c n W M W M m Voo 0) 0) c0 W u-)ul oo V N H r �N,) � (O (O o') M W r M M Q to o00 0000o r OOOOr O � O a Oo ror oN c`') N c`) r-- oO(ON O O c r) W N o0 W N Q O ry N � N i o r (M O r r O N V 00 V O r� V (`') Jca wt �2c`')r c2 c" w V O I� WIC c0 c0 oOr rD c`')oM N r r� u N MOON N N (D c) co co O)r cl)) (D 00000 000(D000 D m NNr V Mrr0) V NO V oo (D F (D G) It oo LO oo Q to o 0 0 0 0 0 0 0 V m O m u r In 'O N n N a a �a Ooo O0000 oovvr- t (o M co N O co r-_ N Y 0 c0 J O O r c) co Mr rm n (OM Lo(O O ZL ^ N r N M O O O O o M rl- In m N O W J M r c `') V N Lo N co W 1 0 0 0 O O O O O N r O N 0 0 0 F � O ip o O r O O r o r N O) r M O) r X00 r F r W Q cA 0 0 0 0 0 0 0 0 N (O N r In r In N O Nu-) V Q) m °' a 000 000Oo cornroo 000 Quern vo O of s � M oo N i O o r O o r c) V N r N r N m O o o O o 0 0 0 00 c'') c`') o0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Eo c0u r co (D (D oo r- N F r ul Lo V V Q cA O o o O Cl 0 Cl Cl N O O O O N O N O a a Of a :E LOm0 MLO LO NC'' CO r-N�oO r Y 0 M M M O c0 J 7 i M r N r O Cl M o o(D N aONNNO)� O) m W �U) cE Cl Cl 0 0 0 0 0 0 r N r O M r N J r O (D r C) m 1 0 0 0 O O O O O 0 0 0 0 0 (D (D D a)22m 2222 -Fu ma o ++u) n �aao ouF hq oc) LO or hes H `�° 00C) m m 2 2 Lr 00 r rrr r � 0 O e mQ r^ ti N � N co M"tU-) OO � O M o CIO Z zv} � �O7 � + c0 LL (n U) a_ 185th Ave Out In Total 1767 1159 3396 O O 183 162 345 V OJti O 0t OO O 8 102 28 /�p 0 G 8 0 0 22 Right Thru LeUTrn Peds O 1—jftO lf1 O N N u Fm corn ch �n w �vch l� 000 a� a 0_ C, LO L -Pad 0 Och ch v �n rn m rn�o 0 6 r,�oo F OD OD l F� N VF, t ch b 9 L 0 9ZOE OEl L8Z 0 N Or ch Y CN �- J— V 0�� � C N N + ?ch J ~o co (o N U ~F� W V coc y — J (00 7171 Z N N N i 3 rnrnm vv OF C 3 chow cqNIT Oc�c O N O u) N N N � tE N o N')re 1 lf1 u kali] n�l 14012 -Pad 0 l£lE b£l E6Z l 0 E01, b 9 L 0 9ZOE OEl L8Z 0 89 ZL 6 99£ ZZ99C 1,9ZbllL669 Sbb£ 18101 ullno any aul-1 1M N � N co co "t (.0 M Q Z zv} U- U) U) a_ co_01-OO�NMN n V O) N �d7n co r N r NCO m r r O r In V co V 00 f- r� W N N N N W m 1-00cO 0)O cO O(Om 00 M (O U') coU')O co N N VM VCO W 0')V MLOf: ^ 000 WOM W 0 0 Cl Cl 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O Omm WMN coCON V W N(ON m V (D (D N� W W O O O r O M rUO r 1- r N r O V M O V V c `' ) V LO M a 0 M N� r M co O m A O M m m M N V O M r LO NU-) (O O M (O N N co N O cO N V CO LO V (p ^ d 7 f- 0 O O) M mm r 00 00 M. 0 0 0 Cl Cl 0 00 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 O O O)MM NM UO M W 00 W W LO r- LOON V rNN MO c,rr V V V Mfl-(OI OR (O N 00 r r O O N M O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r c, O O O O 0 0 0 0 0 0 00 r O O O r N O r O O U) M U) Op ON N co N 'R� 'D c, w W (O W fl- O(OLO CO O M (ON r rr NI-c0� r N CO LO V a0 (O �(O r�OO cD 00) cO Mr r com CD N 00m r- M �(O 00 N co co r M r (0 0 LO (V M 0 0 0 Cl 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 O O 0) co UO UO � r O N N Ul N O N N V0 0 0 0 O O C) r N O O M N M 0 0 0 0 0 0 00 O O r r N N O O Cl Cl r r N 00 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C, O O O O 1-'t (`i (`i 1: 00 1- r O r N V O O O r N M (O U') O r cOC, 00 0 n O r O r r M N 0 O O r O r 0 0 0 0 0 0 0 0 0 r r N LO O N O 0 0 Cl 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 O O 1-MMV 0) 000O co co f: 00 OLON0O O � V W O Wf-00 V f - r cO m N n M 00 O O Cl 0 Cl 0 Cl Cl 00 W 0 0 0 0 0 0 0 N 0 0 0 0 0 0 00 O 0 D 2 O d 2E O Y Q d 10O O _ i< wt00 O0C))V 00 aMOp f�f��f� V 00 �O V LO "t NLOM M� W r to')oM Cl)VN d�nO�M�MO 5 O r r � r r n M U') O N O no 7 O M LO c 0 M V M O O rM O (O O r O O O O Q) M f P- 7 NM�MN�N� O�Nr— r (p In OWN Mrr W �f- O Qm N d m N 5 N C C CO O O r O r N 0 p 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 2 O 0 O p O ;_, p j 0 N O L) O N N O y U N O fN -°) EN EN N 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O 1!00 LL D O LL — O l N O N N 0mLL @W2222E�mLL COW�����m� aaaa oa Q o¢Qaa E o= : oaaaa E o= 2 �o`_no� o~ o no{ 3Ha OunO�n �Hd 3 3rrrr� 7 7cMV O O 7 7OrM V O ==0000@Q ==�r�N� Q 220000' Y 1 O o Y Y r N Q Y Y m Q t0 t0 F (0 c0 O \ N (0 O is as (D ~� T N � N CO CO " O M Or-) Z Z U +. Cu LL (n () a_ I. Q �Jx W N0N Gd cZc G `man w J of W I'ml' V r LO LO N V V V rM m01 -I -M r �NOr� M r MMCO �O W c0Lo V cOmmOco a) N MCOr O c01� F C m r co Cl ao co M r N m r M N 0 c0 �o N r 0 w M M M M N m m O CO m H r V N N A g N Cl) r Q N O O O O O O O O O O O O O O O Cl O O O O O O O O O O O O O O O O O O O O O m a 70 -Ff O O O O O O O O O O O O O O O O O O O O O N It r r M Cl) W N N Lo Lo N V I� Q O _2) ry N � C N O O O O O O O O O O O r O O r O O O O O O O O O O r O O r N O r O O r O r ca Jw� i r�t Co o Co M M r N m r N N 0 Lo Lo N r 0 Co M r N N w 11, w I� V O m M r NO N N N N J io coo 0 00000 00000 O0000 00000 00000 oo000 00 m O O V O It N r O O M O O r O r r r N r Lo M O O O M r N Lo V H Q rn00000 00000 00000 00000 00000 00000 00000 00 a) a a -O 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O r O O r N O r N C33 J Y (0 J 0 0 M O M r r O O N O O r O r r r N r LO M O O O M r N 7 7 r I r map W N O Z i F r M r cc—c— r O o O r O O o 0 0 o o o 0 0 O O O O O cc—c— N N M M O N W J i00000 O000O O000O Ooo00 OOOOo 0o00o 00000 00 F ip O O O O O O O O O O Cl Cl O Cl Cl O Cl Cl Cl O r o r r M r N r r cp M e m c0 M H Q U) O O O O Cl Cl O O O Cl O O O O O Cl O O O O Cl O O O O O O O O O O N r O M r 0 N a 76 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O N O O O N O O N > Q O Q L Q L�5M W N i 0000 0 0 0000 00000 00 000 r Orr M r r r r t M 7 N U-)7 "r 0 0 0 0 0 O O O O O O O O O Cl O Cl O O O O O O O O O r O O r O O O O O r N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O ip cD Lo c, V c, m Mr r rtp MI- V c00 I -m cO I -m 'tMN MN c0 V MM cO IS O p F N N N c0 Cl) m ap I - N mm� M't r r Q U O O O o 0 O O O O O O O O O O O O O O O O O O O Cl O O O O O O O r O r cc N a a Ir a u�N07 r OOorr Mr r r cp Nc0 N c0 c0 un commr mNI�O� cpr rml� cD N N :E rrtn N V CO MIS I - W cN, Co I-- Y (0 J i cor00� OrrON 00000 rr N07 rr �wI� �r �I- r r Cl) W CD m 0404 It ID N N M V r M CoM � ~ ~ 0 0 0 0 0 O O O O O O O O O O O O O O O r 0 0 0 r O O Cl Cl O Cl Cl O Cl Cl O Cl m J E 0 0 0 0 0 O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 2 m 2222 mu 222 m 2222 mu 2222 mu 2222 mu 222 m 22 E Q Q Q QO Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q O u7 O u7 F O O L F O� O L F O O L F O O L F O O L F O O L F O O r Co V O r M V O r M V O r M 7t O r M O r M 7t O r M V O r N N N N N N N N Cl) M M Cl) V V I Lo Lo Lo Lo O O m (D I- I- L r r r r O O O O O O O O O O O O O O O O O O O O O O O O O O m U) Tl I N I 4 Q J 06 N0 L.1_ Cu J (.0 TIQ N I N CO CO "t N E Ca o M or) Z zv} m m Ca Ca LL CO (/) a_ I. Q �Jx W N0N Gd cZc G `man w J of W @ "m cMO9)N MI- O(,2m COO mmOM M O� N m' O MOO O WON N V MMcwO FN N I r r r r C 0 r r r r CO r r r r r t r r r r r r r LO m LO 1- COmCON NaOrN I�r Nmm 11, Cl WCD r V o H M M M C O N N M C O M CO N M N M N M M N M V V M LO V N 7L aMMMa V r1 N Q Cn O N N O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 O r O O r m a 70 'Ff LO N N M LO 1: M M r N m 't N 1- N C O N N V V N r M u 7 M (D 00 LO N 7 0:) 1` Ln 7 N C 2) N N Q O ry N -a N 0 0 r M N N r CD N r M r I- r 0 0 0 r N N r 0 LO O O r O r r M r 0 LO r N O r'It ca Jw� i w U OCCD MMr N V 01- CONN M (ND Nw V C4 N N N N Cfl NmCO I� O Mr N M M MCD CD V r MMM m Or NIDw M V N CO CON I�r OO MN MMr CO M om u7 u7 Ln r J N iOoo 00000 0OoOO 00000 00000 OrOor OOoOO cc coo m MN CO N NCO rCM M CA COMO OOmcO Cn COO V r r mO1� Mm CA CO M CMm Cpr CD M CO p M V 0 r r r N (D N r r (D r N r Lo r N N r r r N r r (D r r r CA r N N CO m H Q Cn O N N Cl Cl O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O N a a Of a r O N O O r O r r O r O N r O r r M r r O O N 0 0 00 0 r O r N 7 O O r N M CA J 33 Y (0 J ONN I- mm 'It ID O CDN CON CA Cn CAr N r N N MCO V CR !p OIC Or m V V OO CDN C p� N N (D r r� r r � r r� r r r r� r r r r C 0 r r m M ID r r r N l- Z F w N w c un M r I A ID C O N M C D un r u0 c V O M I E N V ID Lo N N M N M N Lo m Lo r U r r r N N N J 1000 OOOOo moor 00000 moor 00000 00000 00000 F i p v m N N C O V C O C O N N r r r O N N Lo O M N N 1- r N O Cl M O O O N N r r r N C C) H Q Cq r r Cl) O N O O N O O r O r O O O N N O O O O O O O O O O O O O O O O O O O O N a O r r O r O r N O O O O O O O O O O O r O O r 0 0 0 o 0 O O O O O O O O O O N-6 >j Q O _s jr L Q M L�% i r CD N r N 7 Co O 7 N r 0 1— O O N O N O N r N N r N O O M O O O N N r O r r M N r CO r r O O N N O O r M r 0 0 0 r O O r O r 0 0 0 0 0 0 0 0 0 0 O r O r N J E 0(D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (D 0 0 0 ip N CD CO W u) (D rO 't CO V V r m OD CD CO V V OM MCDr COC[) CDr ON m 1-r ap 1,- M p I� NM CD 1�r 1- I- CD CD UC UN V Cn UnM m CO CO CO V Cl V V d' CO W V V Un r V Cn CD CON H Cy, Q Cn O r r Cl Cl O Cl O O O O O O O O O Cl Cl O Cl O O O O O O O O O O O O O O O O O O N a a Of O CDr N r N V CD m N I -I -N W V CON M W O M N W MM MCOr N CO CON CO C n S � O M r O C O C O N C P V V M a o M M't N V M V V N V M M M t V M N CO N r C M M"t V C O Y Q (a J i t CNCN V V NNCOCr" MrN 1- O rOrON Cl !PNr O r CrOr Nj CD (D U r O r O O O r r r 0 0 0 r O O O O O O Cl Cl Cl O 0 0 0 0 0 O O O O O r 0 0 0 r m J i O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 @ @ @ @ @ @ @ @ EQQ o QQQQ o QQQQ o QQQQ o QQQQ o aaaa o aaaa o aaaa o O CnF OHO IDS OCO O COF (D (D Lo F OCP O Lo F-- OIO O Lo F-- OIn OLo� OOID� M� O r M� O r M 7t O r M V O r M 7t O r M V O r M 7t O r M V i I- r O O CD CD Co CA O O O O m m m m O O O O O O O O r r r r r r N N N N r r r O O O O N N N N O O O O m U) I N I 4 Q J 06 N0 L.1_ Cu J (.0 Q N I N CO CO "t CO E Ca o M or) Z zv} m m Ca Ca LL CO (/) a_ I. Q �Jx W N0N Gd cZc G `man w J of W m omCnN (D co MCD LoI'- MN oCno W Lo W Lo mo Lo Cfl m (D Cl mm W CON Cl W OM(D N N M �M (D I- N N N N It (D V N ON m N N N N r W V m (D V OMm C D 9 Om I- V I- Cfl COQ V co N MM N F m p (D CAS CD I— W (D r N r M m m O OCD CAr� O OI - CA Cl (D O11, W r c0 CD CAm oI—CD In I- In CD CA W Cn W r 00 CD CD MIt V COO CDw CA MMN N M� N N H M V M N N Q Cn O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O m a a CD CD CO M m CD IS N O S m I— CD � M M I'- I'- W CD W M M CD O CD In V N m M O M N W O M N C 1) N M N N Q O ry N � Cl) oNM COC) 't CN Lf) CO 't CO M CO CD I— CD V MM CD V MMMM NM'It 0m 'It NONN 0- ca Jw� i w c MIS W In Cn�N CD CD mO� NmIn m CD W �O CD Ln W Om W CD CA W M V M MIS CU J OIl- Il- OO c0 CA CA M CD mm(0 Il- M CD CD CO CD M In In CD In I- N CO V MM MCn N N N N N O N coOOO ococc O0000 OO�o- OooOO 00000 O000O o0 D m V TON CD Cn CD S CA SCD I- 'tCD SCA V a) cIt o�cO l�� 001- V � NCO o H mM't V Cn 't In CDrm I CO CO It MMNN� 04 04 CA 04 (D M Q Cn 0000 o N o0oN O -oN o0 CD00 -Ooo - 00000 OOo00 00 CU a a -O O O M O M o O N Co u7 N- O O Co O O O Co Co coo-- M- - N 1- N- o o M o O N Ci33 J Y (0 J LO Mmm NCnmr Cn C) LO r r CA I� m MIS Cn L OCo V o CAmmMCO Cn C p Z m N M N M M N M V V C n I� C n V V M I N r N 1� C n N F v m m 1- O M m N M C n M V (D I C n N- V N N M- 11- O O -- N N - - - CN M J EcoOoo Occ) oO 00000 Ooo�� 00000 00000 00OOo 00 F D ip V MSN O CD MCn Cnm SCD NNS I- Lo V OCD M V M - M - NIS cm o - H Q U) o 0 0-- O o 0 CD 0 0 0 0 0 0 Cl o 0 0 0 � Cl 0 Cl 0 Cl Cl Cl 0 Cl 0 0 0 0 0 0 N a 00000 � Ooo� 00000 -o-oN o -oo Ooo - 00000 00 N-6 >j 3) Q O of L Q L�5m i CO N r M M'It M M - CD m V M CO o o N M M O CA o N V Cl o N Cl o o N N o- N CC O o -- N N N O o V O o o - - o- O- N O o- o- 0 0 J Eo o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD 0 0 CD 0 0 D ip CD II- CDm W CMN O V MNo mm V CD W r c COM Inr ole m MCO V m CnO p H SCD I- I- N W mI­I­m W I-I-I- CD CD un V N V MCONM N V M�� N���CD Q Cn O o 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 Cl 0 O O O O O o 0 N a a Of a Mm CD a) m CA I— V O Mme oM mm MOcO MCD CnN O In m CD CD 77 NN N Cn 0) Cnm In V�un N�NN CA ����un �M M N Y (0 J j i MCA CA CA ����m r MN CAm C'4�N�I� Co CnN N1: In In Cn Lo OM � COO In un V MCA M V un V MNN m V (D Lo m CMN OD m V OCOm W V Co �� 04 CD Cl o N N o � o o � 0 0 0 0 Cl Cl Cl Cl Cl 0 � Cl o Cl � Cl 0 Cl 0 0 O o o 0 0 m J EO O O o o O O O o 0 O O O O O O O O O O 0 0 0 0 0 cc cc 0 0 0 0 0 0 O o D 02222 m 2 22 2 mu 2222 mu 2222 mu 2222 mu 2222 m 222 m 22 aaaao aaaao aaaao aaaao aaaao aaaao aaaao as cIU)cm O nOlnF- oLpolnF- O nolnF- o nOlnF- o nOln OOInF- o n O- Co V O M V o M V O M V o M V O M V O M S o i MCl) Cl) MV o o O o V V It O O O O In Cn In In o 0 o O CDCDCDCD O O O O I—I­I­I­ o 0 0 o Co Co Co Co O O o o mmmm O O o O OO m U) T I. Q �Jx W N0N Gd cZc G `man w J of LU @ N r 0 N I- V co f- N O oo F W W C W ip 6 r,rN rco c0 a co LO O co (,M W (O O) V V Lf) M M M Q to O O O O O O O O M r O N f- r M m O M a (M O 70 O O c M r r N O V 0 0) N O 00 O N oo cl) Cl (D r oM Q O ry N � N i 0 0 r O O O O O In M O M V J w �MrNf� r N O) r rco u; �cO oc) cnrevMP- N r 0 M (p ^_ M LO N V J OM oo M N O) r 1 0 0 0 0 0 0 0 0 N r O N O O O 0 0 m 00 N NN Cl ID V oO In MO) f -- H O O O W Q to O O O O O O O Cl r- r r (O f- r M -o N O O Lo Nt a W a -O 0 0 0 0 0 0 0 0 "t r- Lo r N M oo N L W O Y 0 c0 J � �r- r'It r N r O V In NU3 O) f- (O M ZL N^ N^( cD O r OM r Or ON to to co f- co co fl - J MN c`MMNN f- N W i 000 OOOOO m O N f -r m F O (O co (O M ip O O r O O O O O (O o0 r N u3 oo r W Q cA O O O O O O O O M V r N m r f - r f- O r N f- N -6 0 0 0 0 0 0 0 0 r N r 0 0) r r (O O r O O) Q� jr W L Q _ L�5U oo N i 0 0- O O O O O m (O N (O Lo cr) Lo 0 0 0 O O O O O co oo m m 0 0 0 J M oo O co O 1 0 0 0 O O O O O 0 0 0 0 0 0 0 m l 0 1 M Y O N co u') N r r W H N M V MLo W N V V Q cA O O O O O O O O N O O O O N O N O a a Ira:Er0"t Orr rM VV(O Nu3Nu-) cn NO n(MONOWr� N N Y �O c0 J j i (O LO c' M M V r r f- m V N u3 u3 u3 U)r M O O co cE 0 0 0 O O O O O O N r o0 O N O N r 0 0 oo N J 1 0 0 0 O O O O O 0 0 0 0 0 0 0 t+ w w �aao aaaao of 22 o�F hq oc) LO or hes H `�° 00C) m m � � Lr 0 0 r rrr r � QH O e mQ r^ O Q O J G�z a man � C6 ry H W 185th Ave Out In Total O O 178 176 354 /7 t O O O G 11 O 10 116 33 0 12 p 00 11 119 33 0 13 Right Thru Left UTrn Peds O in O N N W N O r u Fu)�n o OOO a� a 0_ Nr -Pad V O v c mo bZL OLE E F� N tL V ullno c'')F P')rCZ L Z bE6Z LZL OOE Z Y O _N N A� J— V V O L C N N + ? J �O r r N U 4-- Z N N N i CND O C Y _ J N f� 3 N U) I- vv OF U) C 3 r- m ~ mac`') V r I15 Of� VV) L� NCN7N F �J Cl)��0 F �(ON 15O Od Nd O NN O V iN� trn Cl) N� in 8£ L9 O 09£ u l;ol l n�l 14012 -Pad Z L90£ bZL OLE E 0 LZLE ullno OL L Z bE6Z LZL OOE Z 8£ L9 O 09£ bZ£blb9 Essoc 65£E 18101 ullno any oui-1 (n cu J co TIQ N I N co co "t (.0 o M or) Z zv} ''a-^^-� ca LL v '^^ J vJ a_ i�:4It C,r ^r m—'t O M(0(OV O V N N r I- W r � W N N N N O C) I-LOrO I- O W f--0 M N nOOm W co co co c0 1: m V V 0i V F 00 W r r O N O c0 co r r r O) O Cl N O N N N 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O O I- LO N I- r 0 N V V fl- fl- N fl- N O m f-- co (O O N cj� rpO r N11O r 0 r OOMV Nm Nr OOM OO^ LOMLoM(000 OO M r co r M co mOMMr (O(O'IT (D (D WM LO V (OM M(O N Mco OV'O 0')M 0') V V W 0000)O)OO 0j r 0 r W coM M W 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O O O rMN N00 M O V f� W O co (D (D V O N M r 0 N N r r co M (O f f Lo (D co W N O) Cl Cl N O N O) N 0000 0 0 00 O O r O r� LO O 0 r r O O N 0) O r o o O r N 0 N co N r c0 co f-- c u3 0 N (O NNN r�Lom NNM V co u)OLOO(ON u3 r 110 rr r r �(,.�� V LOuV Q)V co (O r f� . N NCO LOV wI- f—N V LO NM W Q)NM��M(^O r r m r LO r r r N M O Cl O O O O O 0 0 0 0 0 0 00 0 0 0 0 0 0 0 O O M V O, N c0 c, CONN r W r- LOLOr(O f: MO 0 CD Cl r r O N Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O o O Cl r O r ID 0 r 0 0 0 r u3 0 0 0 0 0 0 0 0 L6 N LO O N N O rr(O r OC,r NrN r MLO(Mr(O;r It W M f rl- LOr co u) N N r r ID M C, O r O O r N N r N O O M ( O M 0 Cl 0 0 Cl 0 Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 0 O O ONc0 c0 c0 t V C)m mNrNr O (O LO LO V V W co f� f�aO f� (D N r r W M C) O O O O r O r N 0 @ 0 0 0 0 0 0 00 @ 0 0 0 0 0 0 00 oN a� 0 a� 0 a LO(D LO I- (c) CO � r N Mw N LoO)m V c'' 2 rl-0) QI-- N OI I-- I - V d V V N(M V V d u3Nr V V W r r M I- u r r^ 00 u-) 0 ( p V V I� N N O i6M V N rr V?� O 04 04 r (D 00 r N 0000 �M M wNO �r rr V LO O WNr LOLOL LO N N Q O c0 a C0 a) c c m O r O O r N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c O� O.. o oma. 0 O N 0 L) O N 0 O U N 0 N °' EN EN N 0 0 0 0 0 Cl 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 c O O — O D N � 0 N Q) C) w m LL W (D m W FU W 2E 2E(D m W aaaa E oa Q o<<< E o= Q oaaaa E o= o� Lno�no �Fa o no� �Fa 3rrr W> 7 3r cMV O O ( 3 3`') V- O = 0 O O o@ Q 2 2 r N Q 2 2 0 0 0 0' OL 0 Y F oY Y r@ Q Y Y @ Q 030 03 03as ~� as ~� CO 00 r v J CO 06 a) > CO r a) Q N J CO I N r I. U U CO 00 r vJ M z 065 `~" 0) L- > N> Of zz14WY ._ J W O M 0 Z Z U cO F(D V N N N Lo O I-�m c0 In m 1� CA LL U) U) a_ 4�-. yj ?�I F U C� i--1 I. U U CO 00 r vJ M z 065 `~" 0) L- > N> Of zz14WY ._ J W N com cO F(D V N N N Lo O I-�m c0 In m 1� LoN D 1� m Cl) N N r a0 M V F N — m 0 0 Cl 0 0 O Cl O O O O O O O O 0 0 0 0 0 Co N In M Lo O Lo m M I- — m r m 0 � H a to 00000 00000 00000 00000 00000 00000 00000 O� Q) 0- -O 70 Cl 0 0 Cl Cl O Cl Cl O O O O O O O 0 0 0 O O M N Lo M In m Lo m N I- m m m I- C � _ O Mca i o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O 0 0 0 0 0 —000— O N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O mU� O N V M N r N V N— m N N— M CO O N 04 LO O O V M 1- O M m r m W O H Q to O O O O O O O O O O O O Cl Cl Cl Cl O O O O 0 0 0 0 0 0 O O O O O N a 70�f0�00 00�0� 000 00000 00000 00000 00000 Oa ._ QOM -0 a� i 7 It LO— N N M— O— In N I N O N N N— CO W O N O M m O M N V CO N LO N r LO M J O V NMN m N M Z F 0 0 0 0 0 0 -- O O O O O O O O O O 0 0 0 O O N N V w M N J i00000 0000o Ooo00 00000 00000 00000 00000 O- F �0-00- 000 000 00000 00000 00000 00000 O- to 00000 00000 00000 00000 00000 00000 00000 00 N a Na 00000 00000 00000 00000 00000 00000 00000 00 75 Srn CU0jr -a a)i00000 00000 000 00000 00000 00000 00000 00 t H 0�00� 000 00000 00000 00000 00000 00000 O� J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O E0 ip N M N N m O O O M M M— cO m r- V V O c0 M F O In r m I- I- O NV� W m "t m p F N N l n M M I I- O m w N l n m m M Q M O O O O O O O O O O O O O O Cl O O O O O O O O O O O O O O O O O O O O N a c0000 o00o0 O000O Oo000 Ooo00 00000 OOo�� O � X70 z) rn Q02 (D _r_ O j i N CO N N m O O O M M CO � c0 In I- V V Cl c0 M c0 Cl In r m r r O N V Q I- W N M J L N N Lo M M 11- I n N I- O m w M m m X00000 c0000 00000 00000 00000 00000 OOOOo N J E0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cc 0 0 0 0 0 0 0 0 O O O O O O O O O O O O D 0 2 22 2 m 2 22 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 E<<<<<<<< QQQQo <<<< QQQQo <<<< QQQQo QQ O nc lm O CD Lo O CD Lo OOL� O nOln� O CD Lo O CD Lo Oln F O M V O M V O M V O M O M O M O M V O N N N N NN N N M M M M V V LO Lo Lo Lo m m m m r r L O O O O O O O O O O O O O O O O O O O O O O O O O O m co 00 r co 06 a) > co r a) Q N J CO I N I. O U U co 00 r �T. vJ co Z 065 `~" OO > N> Of zzY ._ J W CA Y U 7 CO U a N C d Cn Q 7 0 O O O } O ID O M 0 Z m O O r M zv+. a� N W ID O 10 O O N CO CA LL v/ 0 LL 4�-. yj ?�I F ID O r r m v M O r I D r r r r� m N O m Mt r r r CO r � r r� _M O O r M r r r r� ID N ID r r r r r r U O ID M I� O M r r r r C p C� i--1 I. O U U co 00 r �T. vJ co Z 065 `~" OO > N> Of zzY ._ J W CA Y U 7 CO U a N C d Cn Q 7 0 �p ID O m O CO W M m O O r M 0 O ID CO N W ID O 10 O O N CO O M m M M m M MCO m M F ID O r r m v M O r I D r r r r� m N O m Mt r r r CO r � r r� _M O O r M r r r r� ID N ID r r r r r r 0 N O O M I D r r r r� O ID M I� O M r r r r C p m W ID MIOm IDN 't W MmN I' N W O mCOON N mIDMm mr mN� N OMr Hr ccs M r M r r r r r r r � a Cn O O r O O O O O O O O r r Cl O Cl O O O O O O O O O O O O O O N O N O O O O O CD 0- -O 70 CO COO MIOm IDN It I -r l -m OOI'-OM CO COON CO rm V MIS OOI�r� NIOMrr M N r r M r r M r r r r r r r r r r I D O a Q M N i O O O O O O O O O O r r N O r O O r O O O O O O O O O O r 0 0 o— O O O O O w� O O N O O O O O O r r O N r r r O M r 0 0 0 r r O r O N N r O r�t O r 0 0 r J E O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m V MIO CO Nr am CO M CO m CO M1 -c00 c0 CDr O COLo mmO Lo McoIt m cor CD V r o 't Or IOMM tO M 't V Mc0 Ma MIOO V V LoON 't r IO IDN IO IO Co COIF mmc ID a m000 00000 00000 00000 OOrOr OO000 oorc) 00000 N a -6 m V 1, m LO It V N r CO r'It m r r r LO OD r M Lo M r r 0 It ID co I- N Lo I N M N (o M .— r N N O (Z' N L i N m m V LO 00 r O W O N c 0 10 LO CD I- M LO m M 10 N N 1- W m CO N O N m M N C M N CO O J Z M V M V N N M M M M V M V N CM N Cl) N CO N M 10 c0 't 10 V CO m V V V V I r c0 W 1,- N w MOW MNID CO CO r N1 -MM rr m 00 c0 rrN CO CO CD r CO N1- W a)a) NID CO F CO N r M r r M r r M r r r r J i00r 00000 o0000 00000 OOrOr 00000 00000 00000 F ip rrCM NIOrNO 'tNNMr V V N V V IDV co'tF CO CDr CO Mrrr mrl-Nm H U) O O O O O O O O Cl O O O O O O O O O O O O O O O O O O O O O O O O r O O r N N a O -004 r N Cl O M— r r r N O r r M O O r"t Cl) Cl) r r Co — o o— N N O N 0 7 E3c:r CU0jr -a clcni000 00000 00000 00000 r000r 00000 00000 ooror H O O r r M r N I- M r r N I- N r M 0 r M M r M M O M m U') co r O m (D r r N N J E O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m N OW M(Dr NCO MOON r OCMm V O N IDN CO 10 MCO O (D LO IM m mr (D LO CON r p H Om cc I'- mm ON r ID M't N IO 10 M lO m 't ID ID V m 1010't V m 7 MMIO I� 'D 'D Q CO O O N O O O O O O O O O O O O O Cl Cl O Cl O O O O O O O O O O O O O O O O O O N a 70 M O O O N O r M O r O r N r O O r N O Cl Cl O O O r O O r r r r r- It O N O O N 7 1M Q 0 (D -r- j iID Or ID NO m1- N r 00 COr mM r O10 Cl (Dr N MOM CO 0) CD 00010 MM CON V J m m 1- m CD ID N I- ID M V N V IO M IO m "t ID ID V m ID ID V V W M M M ID O V V O CD N L Cl) M O 10 M N r N CO N r r r 10 r N O O CO N O N Cl r N O M CO Its O O O ID M O N O 10 N J E O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O Iv 22 a 222 2 m 222 2 m 2222 u 222 2 m 2222 u 222 2 m 2222 u EQQo QQQQ o QQQQ o QQQQ o QQQQ o mama o mama o mama o O 10 F CD D ID ( F CD ID O F CD O 10 F (D O IO F CD CD In F (D O IO F (D O ID F F- M 7t O r M15: O r M 7t O r M V O r M 7t O r M V O r M O r M V i I- 1- O O W CO CO c0 Cl O O O mmmm Cl Cl O O OOOO r r r r r r NNNN r r r O O O O NNNN O O O O m CO 00 r v J CO 06 a) > CO r a) Q N J CO I N ,:I- CO I. U U CO 00 r �T. vJ CO z 065 `~" 0) > N> Of zzY ._ J W LMI O W OM CO W com M 0 Z Om CO CDN N mr mOr Z U m CO mN c011, CD V Or W un (Dr CD mO w CO CA LL v/ 0 LL J�-.y1 ?�I FI� r r r r I- N r r N W r N r N W N r r r O r r r r U N C� i--1 I. U U CO 00 r �T. vJ CO z 065 `~" 0) > N> Of zzY ._ J W LMI m W OM CO W com m N ON MI" M N mmN Om CO CDN N mr mOr I— Lo CDN OCn cD V m CO mN c011, CD V Or W un (Dr CD mO w CO co mr Cnr CD cD CD CDN O (DN O MN FI� r r r r I- N r r N W r N r N W N r r r O r r r r M N o N�� � r Cn cD O r r wt CO N w Il- r M cD Cn cD V r r O un CD O r m M IS cD N r N CD r r r Cp 0 0 F a m00000 00000 00000 00000 00000 moor 00000 0O a -Q COONI� 1CD- CDN7Or I,- N Co CDM CD CD CD r 1- M o o Co r I�(D N CD Cn r r r CO 00 �rrrr r r r� r CO N r N O -0 Q M in i o 0 0 0 o O O O O O O O O O O O O O O O O O O O O —coo— o 0 0 0 o O O W N r O O M N M N O O O r N r O O M V N O O O N 0 0 0 0 0 O O O O O O O J E 0 0 0 0 0 0 0 0 0 0 coo" 0000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 `c m r OCOO W OO Cn Cn I- ONS Mr Cp MCD MaOr N V r COmm mroMCD un N V o F MOON r r r M r ON M1` r r r r MMN Nr r r r r r I� 0) 0) C D r W un I�'t M CD CD O CD V N r MMMT N N N r Q u) r 0 0 0 r O O O O O O Cl O Cl Cl O Cl O O O N O O O N r 0 0 0 r O Cl O Cl Cl O O N a -d (D C D N I Co N It N r r N r M 1, r Clrr M Cl r Cl Cl r N N O O V r 0 0 0 r r 0 C > 7 .— O (Z' N L i 7 r V MCOO V V V V O V M V V CD Lo a) OOO MMN 1,- CD CD 1,- r MM CD CD OCD Cn Or J mO m M LO Cl CD CO CO r CD CD M M N V CD Cn V C) M Cl) M r NZ FCO r CD 0 0 1� O r N 7 1l- O N Cn CD N I: N r CD cD 1- V m CO CO N CO r C') r M CO M O m r CO U r r r r r r r r r r r r C D r r r N J 100000 oroor 00000 00000 moor 00000 00000 00 F i p O C O It M NN Nm V C r� O N N M I V M r 0 0 0 N N O N (D r r O (D O N H N r r Mo r N r CA O O O O O O O O O O O O O O O 00-04M O O O O O O O O O O —coo— O O N a -6 M r O r Lo N r N Ln O r N C D M N N N r 0 Ln N O O O N O r O O r r 0 0 0 r O r i i7 CU0jr -a M N i O O CV O N O O O O O O O O O O O O O O O cc—c— r 0 0 0 r r 0 0 0 r O O � � t w r rN N W O r0 -C4 -N CnrN CO OOr m N MOO un r r ON V r r r OM O r N r r J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O E0 �p r ut m W M CD CDS m N CD m N m COr m O r MCD CD CD mwN r O r O CDr ! O o H Ct7 ut Cn ut N I- OCD I- N m V mCD ISM N 'D (D CD MN N Ct7 V MMO N N N N Mr N N N O r Q Cn O O O O O O O O O O N O O O N O Cl O O O O O O O O O O O O O O O O Cl Cl O O N a 7 N N r 0 Cf7 r r r O M r O r O N N O r O M O O O O O O O O O O O r r O N O O >7 � <0 (D j i W Oc01� M CD V MN V mmLOOM V r COr O MCn CD CD m1I- N r m OmCD CD V CD J o V CD CD CD N r OCD I� N MCD�rN Om CDMN CD V MMcO N N N MO N N r m r r M O r ut O O O N N O O O N N N O O r M O Cl O Cl O O r O Cl r O Cl Cl Cl O Cl O N J O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 cc 0 cc co 0 O O EO D Iv 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 22 aaaao aaaao aaaao aaaao aaaao aaaao aaaao as O nOCD O ncuD OOCD o no Lo O nc,u� O nOCD OOCD O n O r M V O r M V O r M V O r M V O r M V O r M V O r M15: O.. i MMMMV O O O O V V O O O O CD ut CD Cn O O O O 0000 O O O O I—I—I—I— O O O O Co Co Co Co O O O O mmmm O O O O OO r r m co 00 T. co 06 a) Q co r a) Q N J co � N I. L U co 00 ''T^. vJ M z 065 `~ w 0)L- > ^a:' Of 14WW " zz ._ J W UA Y U 7 CO U a N C d Un Q 7 0 O NNO M 0 Z p N OO W N CA U- U)0 a_ 44-�.yU ?�I M ON F U 0000 W M C� M r i --I N LO � r f M I. L U co 00 ''T^. vJ M z 065 `~ w 0)L- > ^a:' Of 14WW " zz ._ J W UA Y U 7 CO U a N C d Un Q 7 0 @ NNO M g)N Oc00 p N OO W N O r M ON F W00 0000 W M m M r O O N O N LO � r f M H p(p0^r N U9 W a Un O O O O O O O O to 00 r M p N p CD0- O O p V -O 70 M r I O O N O N 00 CO p r r W r O _3 ij W U') 0.) a Q M 0 0 0 O O O O O Un 00 r I p r p w 0 O O W N 0 0 0 O O O O O V Un V V p p p c') Lo p c') O J 1 0 0 0 O O O O O O p O p p p p m U0 V U0 rMN CPQ V rpm V (M H r rco rrr V Wp M W M Cl) N V V Q UA O O O O O O O O W N r r- 00 N N N CD p n N a n N -d O O r O O O O O M r- 00 00 0) ul r M r{ M QO N N L iM M l� O N r I� O O f r-- p 00 p N J Z rr Un rrr V NV OCD(ON r CS H M M Cl) 0') N r I- r r r N LO O O M Lo p� V J LoNr r V W i0oo OOOOO Irpvopp F o i p r O M O O r Cl r W U n p r W W H N N (p M N W UA O O O O O O O O (p M r Un M r d N p M p d 00 -6 O O O r O O O O O 00 r-- r-- pNpp� Un (p M V i ZA V CU o jr -a M cn i 0 0 0 0 0 0 0 0 00 u) r W p p p W t M O p r O N O O r O r U- N p N m U') V J { M (D W 1 0 0 0 O O O O O p p p p p p p ip V NUfl r (D 00 O r N p r (pr H r Cl) N 00 N (6 M c) W r M M Q Un O O O O O O O O I r p N p N p N p a a C -r- O O O O O r O It P- N M V 00 0 7 Z) i� r p W W Q Q (D� j M N c0 I-- Ufl I-- 0 0 M Un Un M f- V CO J O Cl)r N 0.)Wn p(pNM U) s r- a)mco Cl) r O O O O O O O Cl (p M r r W J r C:, U-) cc) r m 1 0 0 0 O O O O O O p p p p p p @ m o o t t N N E0-aaaao of ���� OAF nq O�Ocn� orches H `�° 00C) m m 2 2 Lr 00 r rrr r � 0 O e m mQ ^ N 4 U i U M 00 CO 06 a) Q (.0 a) O � N J (.0 183rd Circle Out In Total � N p 215 220 435 p 7 9 16 i c p 222 229 451 O CU 0 c6 CU z Jti p 65 8 142 0 5 4 p o z U +� pp 68 8 147 0 6 � CO Right Thru Left UTrn Peds O ca 0- 4-j N N V W y f N W N g N Ovv o (D o vn r' co �n cD O m T I 0 V N I S O O O� N u c `') (O N- C, W 0 F� N V t L 1� (O OD OD F ct �� OOOOO N W ? J d 7 O F J (OONr L N V VF O W NN c`7 c`7F J r" V a� will 4 n�l 140!21 sPad O 0 b£ 9 lL9 9 p 0tia O 0 0 l 16 Z O Oro 0 b£ b 099 £ p o p 4 O z Sl9 LbS 5Z bl LL OJ'` 1 L£—LL 109 9£9 �p 18101 U 1no is PIC U i U M 00 U) M Z 0 (3) - �ry C:Y zz ._ J LJ Ti a) o z 065 5 Of J W I� BOO W Om cn000 � cn W W M OQ)a00 O c0 10 r r IN N W W IF, O r OOOOMN r ONN Q)M (O OaON W W N O r r r W r r M W r Cl 0 Cl r Cl 0000000 0000000 M O O ICO co MV @O ONr ONf�ln Of-NaO f- V N ap r r r W P- r r co co f� W 0 Cl Cl 0 Cl Cl Cl 0 0 0 0 0 00 0 0 0 0 0 0 0 0 O O O N O O O N V r O o O r O N r CO (V 0 O r o 0 N r (O O U3 0 0 0 Cl Cl Cl 00 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O O O Osco COM (D 000 W O) 00 a cn r- C) (D N co c0 cn Cl N Cl cn CO V f- V f- M M M N N N t� r r r r cn (� Cl 0 Cl 0 0 Cl C,r O O O r 0 0 0 0 0 0 00 O 0 ccf O 't m� (A I M\ CO cn r r V a r 00 N r N r (O r r 0 r c n � ccf rl- MNM V CO COO MLON fl- fl r In V M V U) M co M V cO r r ClMcn V (O W r M r N N 0 f r r r rt (O M C(. r 00 N m C, m w m I- Na0 (pr fc-`M cn ONcn 00 M O r r r f r r r r c n LCR W co r Cl Cl 0 r Cl r O O O r� 0 0 0 0 0 0 0 00 O 0 N O r r r N N M V (O (O N O) LO V c n O) O ;: N M n (O Cl Cl Cl 0 Cl Cl Cl 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O O Cl r r r M Cl Cl O r M M f- 00 LO r N (O V CO I� CO r CO M in V in 0 0 0 Cl 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 O O r OOr NOO co c`') co co N N 0 V V Ncn cnn O Cl r c h OU n ri0^ (Or 0 0 Cl 0 Cl 0 0 0 0 0 0 0 00 O O O O O O Cl O O O O NOmM It (N (D c`')(fln V V N(Dm V M FM 1- 1- M U3 V cn LOO m N N r- V (O cn O) V N 00 O O or 0 Cl 0 r 0 0 0 0 co 0 0 c) O N O O N W O O c C) N O O N _ Y 11 a 11 (L 0 yQ O LO r M(0001�1� r aM 000 r r �ccf a V Or Or N 00 00 5 LO N V U3r o U3 p O c n no 7 M cO 0 O CO N a 0 a (O N M _ r 00 r N C(O aO O A@ (A m m I- cn MO(A N O In In In � O^ N V O f- CO (O cn CO M N 7 ur m O)o N (T o Q d m g d CO r M O Cl) I- O) c Cl) p O N a r N U) V c Un � O N 0 0 a N M O r OC) N O a N j 0 N N N 0 V -°' EN EN N 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O c l D 00 W N � O W— C) N a) 0 C) T W LL N W W N W N N N N N N W aaaa oa Q oaaaa E o= Q oaaaa E o= ���voo~ acnes{ �Fa Vn0U30 �Fa 33 7 7 c`) O O 3 3 V O M O r r r W� 2 2 04 N> L 2 0 00 0 �p Q r r@ a 0 0 0 0'O_ @ a Y 1 c0 c0 O o F Y Y N c0 O \ Y -Ie N c0 O ~� is as (D co 00 r co 06 a) > co r a) Q N J ti I N r I. U U co 00 r vJ M z 065 `~" 0) L- > N> Of zz14WY ._ J W CA Y U 7 CO U a N C d c a 0 0 O CD co C)D M 0 Z N Z U O�MCDC) In mco0 CA LL v/ VJ LL 4�-. yj ?�I FN N M ��NNI- 7 m IfiN U �N C� i --I I. U U co 00 r vJ M z 065 `~" 0) L- > N> Of zz14WY ._ J W CA Y U 7 CO U a N C d c a 0 0 CD co C)D In V WCl) C) N V ISN V cow O�MCDC) In mco0 OCD Ln N IACD FN N M ��NNI- 7 m IfiN O�2701 �N m C) C) C) C) C) O O O O O O O O O O O O V N I- N In ID MID M 00 Co In N O In CNH a CA C)C)CDC)C) 00000 00000 00000 00000 00000 C)C) - oma C)C) Q) 0- -O 70 -�f Cl C) O C) Cl Cl Cl O O O O O O O O O CD V N 11, N ID IC) M IC) M cO IC) ID O V O a M ca i o 0 0 0 0 0 0 0 0 0 O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O W X00000 00000 00000 00000 00000 00000 00000 0� J i 0 0 0 0 0 0 0 0 0 0 00000 0 0 0 C) C) C) C) C) C) O o 0 0 0 C) o 0 0 0 C) O O m M V V CD V (D - N M MMN - O) ION --0) MON V 0) S CD OoS CD W V S IO aO 1- 00 o M N M Cl) C) N Cl) H Q CA Cl Cl Cl Cl O O O O O O O Cl Cl Cl Cl Cl Cl Cl Cl Cl O O � C) � O O O O O � C) � C) N O O N a -0 C) C) O C) C) O- C) C)- O O O O O O Cl Cl Cl Cl O O O O O O O O O O C) C) -- N I[) C > .- O (Z' N L i N MIt O0) It ID - N N N MN C)I- IDN -C) cO MC) - N CD S CDH IO I- V (DC)1- V N J O M - N N M 0) N M Z F -- 0 0 N O O O O O - C) C)- N 0 0 0 O O O N N 00-0 - C) C) M Cl) (D N J 100000 0ooOC) 00000 00000 00000 00000 000 C) C) F �C)C)C)C)C) C)—C)C)— 00000 00000 00000 00000 000 00 co OOC)C)O 00000 00000 00000 00000 00000 00000 00 N a Na 00000 00000 00000 00000 00000 00000 000 C) Cl 75 Z)rn CU0jr -a ���2C)C)OC)C) 00000 00000 00000 00000 00000 00000 00 H C)C)C)C)o C)—C)O— 00000 00000 00000 00000 00000 00 J E O O C) C) O C) C) O C) C) O O C) C) O C)C)O O C) O O C) C) O C) C) O O C) O O C) C) O O O p M V CD C)M C)C)N'tCD N — In NC) MI - N CD I C) V NMC) tm m V MC)O CO p H N ��N I[) co V W am 1-00 0) �;co co Q CA O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O C) N a c0000 00000 000Oo 00000 00000 00000 C)000C) -o X70 �� rn Q02 (D -r- j i M V ID OM C)C)NIt CD ��N�LO NO MI,N (D�I�O� NMC) V 0) 0) V 00 mC) 00� J 1 N CN ID co V c0 V m I,- 00 mmM I -CD CDC)C)C)CD 00000 00000 00000 00000 00000 000�� N J EC) C) 0 0 0 0 0 0 0 0 C) O C) C) C) 0 0 0 0 0 C) O 0 C) C) O O O O O O O O O O O O D Iv 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 22 EQQQQo <<<<t QQQQo <<<<t QQQQo <<<<t QQQQo " O up O m F O In O ID F O ID O In F O IC) O I[) F O In O In F O ID O In F O I1) O In F O In O M V O M V O M V O M O M O M O M V C) N NN N NN N N MM MM V V ID In ID ID mmCfl Cfl r r L O O O O O O O O O O O O Cl Cl Cl Cl Cl O O Cl O O O O O O m co 00 r v J co 06 a) > co r a) Q N J ti I N I. O U U co 00 r vJ M z 065 `~" OO > > Q zz14WY ._ J W CA Y U 7 CO U a N C d Cn Q 7 0 O O O } O MCON O O Z I� m� mI- zU+. a� m MOmr M M11 r CO CA LL v/ 0 LL 4�-. yj ?�I r N r N V M M M M N M V U c0 A V O C� i--1 I. O U U co 00 r vJ M z 065 `~" OO > > Q zz14WY ._ J W CA Y U 7 CO U a N C d Cn Q 7 0 �p MCON mI�CO CO I� m� mI- MN m� m MOmr M M11 r CO CD Mmmr CO r COO r N r N V M M M M N M V M M m N N c0 A V O m mmM V CON MmmmN CO�Nr CO CO I�m(D m��CO� ao CO COr� Hr �N r w �Nm�OLo r r r r r r r a CA O O O O O O O O O O O O O O r O r N O r O r N O O O O O 0 0 0 0 0 O O O r r N a -p mcDm MOON OM M (D m1 -LO COMO V N r CO mMr m V COMM V to r CO CO mm N r N N r r r r L O r r r C O r r r r C o r r r r c O r r r Lo <J iE M ca i O O O O O O O O O O O O O O O r O r O O O O O O O O O O O O O O O O O O O O W O O r r O O r N O O O N N O O r N M O r O r N --00 N O r r r M -CC- N J EO O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D m r 0 CD O 7 co co 7 co Cfl N CO CO O M m r r O M m m M r N m V M (D N O M r CO N p �mr 7M7 o: 7 CO V V CO CO LoLo�N mmm coN Lo V cDmm cD V cD CON 1- (D W 1- a) a w O O O O O N O N O O O O O r 0 0 0 r r 0 0 0 r 0 0 0 0 0 O N r O M O O O Cl Cl N a -d MM CO N CO LO CO I- OD CD NM 't'tMN M rNCf) cOr ON CM CDr IOM LO 7 f MN77M N C 7 r N N Q o (Z' N L i 7 CO cO N r CO cO m r N co r N CO O O It N m m CO LO N r M 1- M m N O CO N r CO CO CO O V N J Z M V 7 N M M V M M M (M M V (M M V t V 't V CO V M V V r LO N V CO Lo CO cD cD N w NOLO C) CO CO G) LO CO mm CDN OCD CD LO r- O V MCMC) CDC) �CD0 77 LO 't �cD 1�0I- r r r r r r r r r r r r r Jr iOOO OOOOO OrOOr OOOOO OOOOO OOOOO 0o000 OOOOO F ip CO OCC) rOr N V N r V NLo CO V N V CO CO W MCDN mmmmN 'tMCO Lo r: I-MNN04 V H CA O O O r 0 0 Cl r Cl O O CD m O Cl Cl O O O r r O N O O O r r O O O O O r 0 0 0 r N a 70 r O r O O O O O O O O N N N N r r m M M O M m m— N M N O O O N N N O O r M 5 Im CU0jr -a cn2000 OOOOO OOrOr OOOOO Oroor 000rr oroor 000OO H 'tO't OOr NM N I -M V CO MN -Mm NMNMO MNr Mm V NIOM V V MNrO N J EcD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD cD 0 CD D ip CO m1- CO mm a) Lo N C) LO MO COQ N CO m CDr CD OM OO COr CO Oco 1-000 mMm V CO p H N wM I'- co (D ION CO IO CD CON V CO V W V IO CD CON CO 'D 't ION COM 't 't W MCO V IOm Q CO r O N O O O O O O O O N hl Cl Cl O Cl O O r O O r O O O r r Cl Cl O O O r 0 0 0 r N a - r O N O O O O O Cl O O M M O r r O N N r r O r r O O N O M O N CO r r r O M <0 (D j iMM N 1--m I --CO NM M (DC) CDN r M N CO CO COM CO CO CDN 7 m M CD CO r CON CD M CD J N co I- CD CD CO N CO V co V N t V CO V ao 't V m V V CO "t CO N O 7 M 7 7 M CO "t CO cO Cl) 04 w c, m N O N O O r N N C O N r O r N r O N LO r r N V W r N r O N O N r Lo N J O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EO D Iv 22 a 222 2 m 222 2 m 2222 u 222 2 m 2222 u 222 2 m 2222 u EQQo QQQQ o QQQQ o QQQQ o QQQQ o mama o mama o mama o O CO F O �O O IO O In O lO O In O Lo F O In O LO F --O In O lO F --O In O LO F --O �O O IO F- M 7t O r c n15: O r M 7t O r M V O r M O r M V O r M O r M V i I- 1- O O W CO Co c0 Cl O O O mmmm Cl Cl O O OOOO r r r r r r NNNN r r r O O O O NNNN O O O O m co 00 r co 06 a) > co r a) Q N J ti I N ,:I- co I. U U co 00 r �T. vJ co z 065 `~" 0) > N> Of zzY ._ J W LMI O c() M 0 Z N O M Z U r (O O V r Cl I- u( M m m M m LL v/ 0 LL Clyy ?�I CON r r r N _m r r0 I- N N N N I- N r Ol�r W N N N r (O MMcO c0 r r r r Mr Clr ([) r r r r (O CO m 1- co U Cl MM N F C� i--1 I. U U co 00 r �T. vJ co z 065 `~" 0) > N> Of zzY ._ J W LMI c() m V N O M M CO r 1� (n r (O O V r Cl I- u( M m m M m m c() M CON r r r N _m r r0 I- N N N N I- N r Ol�r W N N N r (O MMcO c0 r r r r Mr Clr ([) r r r r (O CO m 1- co (nun M Cl MM N F O CO m O (n M M W V r N N r M Hr r r r r r r M r M r N a mOOOOO 00000 00000 oOrOr 00000 00000 00000 00 a m N m 1,- 1 c 7 N 7 c O c 0 c 0 0 (n r m m W m N M M N c 0 (D Lo r N N r N r r r r r M r r r r r M M r N O a -0 M u) i 0 0 0 0 0 O O Cl O Cl O O O Cl O Cl O O O O O O O O O O O O o 0 0 0 0 0 0 O O W r N O N (n O r r N t M r O r( n O O r O r r N r r u) N O r O M O O O O O O r J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O m M (n I- N M O W S (n (n M cn O O m M N It m a) v N M O m a) 1- It cn c0 o F co mOMr r r MMr �N r r r r rMr 0) ([) r r r (D 1 -I -I- W OI- LOI- M I- LO't't V N 1: NMNMN Nr Q N Cl Cl O O O O r O O r O O O O Cl O Cl Cl Cl O r 0 0 0 r O O O O O O O O O O O O N a N (n (n N 7 u7 N M 7 7 0 0 r'It u7 O N r N uo O r O N M O O O r r O O O O O O N C j 7 _ Q 0 N I-Nrmm (OMOmcO V ml�r c0 ON N CON NCOM V mIt Lo Lo Lo Nm V N V J Z7 c0 comr M r �Or r Or Oc0 r r r �O (O I� c0 'D (D c0 (O V I� mr N V MMM(n NM N MN Mr N r F �COOr mN V ANN Mm cnO� Ocn mNM mCO(D 7N 7r NMO 00 cl)J r r r r r r r room'tN iOorOr 00000 00000 oOrOr 00000 00000 00000 00 F ip cn MNc0 c0 (O W NN M V I,- 'D (D wt LorCO rMrr(O Or cO cn OOO cn Or H r r (A O O O O O r 0 0 0 r O O O O O O O O Cl O O O O O O O N O O N O O O O O O O N a N -6 M O O N Lo O r M CO N (n r N N 0 r r 0 (O O r r O N O r O Cl r N Cl Cl Cl N O r 5 i7 CU0jr -a (�a)2OOOrr 00000 rOOOr OrOOr 00000 00000 00000 00 H N M N M O I W m m I M (n v m N r r r N O r r r O r M M O O O M O O N N J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O E0 �p V OMMO r M(O�� wM(O MO NCO NrM I- V (O V r rcom c, mCO mM p H V �(D I- r N O(o(fl(o 1- (D(D(flN (flet L V N V MMN V N MMr m N N r (O r Q y O O O O O O O Cl O O O O O O O O O O O O O O Cl Cl O o 0 o N N Cl O O O O O O N a a -�f NOO V (O MMOr 11- rOONM 00 rN NOOrM OOrOr oOrOr 00 <0 (D i _ mM 1-O CO c0(ON V rMc0 O(O NIS mm Un V CO N 1- Cl V (O Cl 0) mM J 0 L V V (D (D N (D (n(D(flLo r (D(D(flN (D(D (n M N V CO CO N M N Cl) r m N N r cO r r r O N V Cl N Cl r M O O O r r O r O O r O O O r r O O O O O O O O O O O O N J E0 0 0 0 0 O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O D Iv 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 22 Eaaaaoaaaao aaaao aaaao aaaao aaaao aaaao as O nO(n� O nO(n� O c, Lo o noun O noun o no(n� O r>O(n� O n F- O r M V O r M V O r M V O r M V O r M V O r M V O r M15: O r i MCl) Cl) Cl) O O Cl Cl It V V It Cl O O O (n(n(n(n O O O O (D(D (D ID O O Cl Cl I - I - I - I- O O O O c0 c0 co c0 O O O O mm mm O O O O OO r r m 6) co 00 'r vJ co 06 a) Q co r a) Q c N J ti � N I. L U co 00 r vJ M z 065 `~ w 0)L- > ^a:' Of 14WW " zz ._ J W O Y U 7 CO U a N C d U Q 7 0 C) M 0 Z 00 rim CA LL v/ VJ LL �-.yj ?�I V W (O r -- M cM F rr�l V U W C� Mr i -i c --N CO M cl- I. L U co 00 r vJ M z 065 `~ w 0)L- > ^a:' Of 14WW " zz ._ J W O Y U 7 CO U a N C d U Q 7 0 curing �m�00� 00 rim 0 r V W (O r -- M cM F W W m Mr 00 rrN O c --N CO M cl- H P- OC) ^ r N ^O O) a cA O O O O O Cl O Cl r- r r M W V r N O V a U') -0 M r d r r N O V N CO r 03 00 c `2 N u W ^ co W r O O O a � M Co i 0 0 0 O O O O r O r O r 0 0 0 w f O CD r OOOOO r00 V MrN M J LO O M LO V 1 0 0 0 O O O O O 0 0 0 0 (D 0 0 m 00Nr r V 0) r- c- co W MOO c-- H rcp rr N ^ O(Desch mact VI m r Q w O O O O O O O O N M r 00 cl Nt PM 'O N —66 OO co a (00 -d O O N O O O O O M V W c- In (D Lf) r M > U r _M O N L i ONr W r00 (DM 0)M W (O MM c - J O rco r M -N 00 �(O M Cr) Z F Cl)00 M Cl)Or w NON Mr r00 M,tcO�t ,tU)(p J � O f f r N W E OvoOO F o ip r Cl N O O O O O N 00 co V W (O H LO N N (O M N W cA O O O O O O O O (p N Cl) O) r r rU)Or N c- a °' N -6 O t Cl Cl r Cl Cl Cl Cl Cl In 00 00 ^ CO M N c - i t 71 N O^ C N CU o of -a M i 000 O O O O O c-- W r c- 00 0 00� t NO O rOr OOOOO m W cl- ONM W J { V M (O W 1 0 0 0 O O O O O 0 0 0 0 0 0 0 D Z co co M co V c0 r c0 00 M c- (D V H M N 00 (D (I Cl) CO Q co O O O O O O O Cl 0) N r 00 G)— r _0 O O 00 IL 00 r - 0 0 0 O O O O O In N LO O M In r >O P r O Q Q co r (D -r- M co OM co V c0 r c0 04 P- _ CO (O V V H M Cl) O) r 0 00 O OO OO N (O c� r"tr (p O (D_,, M co r J p) 1 0 0 0 O O O O O 0 0 0 0 0 0 (D @ N N o o t t N N Eaao aaaao of C)U hq � OUoC)U orches � H `�° 00C) m m 2 2 Lr 0 0 r rrr r : QH O e m mQ ^ T1 - ti N 4 U i U M 00 CO 06 a) Q (.0 a) O � N J183rd Circle Out In Total � N O 229 243 472 p 7 9 16 i c O 236 252 488 O CU 0 c6 CU z Jti O 73 7 150 0 13 4 p o z U +� Op 75 07 156 0 14 � CO Right Thru Left UTrn Peds O ca 0- 4-j OD— W W yNV N --i � oD n� 0_ Q 0_ 0_ m r` CC O OD F c _ z (Dm W W ODIC > O) ED L 7 0 ID JCO -IT Cq vv OF oDr�n OD U) (DU�� �ch0 P2 -. c`') c`') F J I- W (O Uc�')�07 v�vO O� i V O V a� will 4 n�l 140!21 sPad O 0 Lb L Z99 L O 0tia O 0 Z 0 £L b O Oro 0 6£ L 6£9 £ O o p 4 Z££L LOL eg O 6£ 6 L 1£6ZL Z99 �p 18101 ul lno is PIC U i U M 00 U) M Z 0 ~ " (3) - �ry C:Y zz ._ J LJ Tl - N 4 U i U M 00 /T. v J co 7-4, a) Q co r a) C) J ti C) CQ 0 Z Z U a cu U- U) 0 a_ a) o z 065 5 Of J W N WIDN r O M CO CO O rn V rn rnM M rrr rin c0 �r� M Q) NO NNN co W �mO�N CD rn Q) W O Wf�MQ) O N r r r n co r r r M 0 0 0 0 0 0 0 r O r O N V O 0 0 0 0 0 0 00 M Ul O m O M N r r 00 Q) M V V rn O W f- V N NN f- O N r r nn r m W � co 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O r00 r NM 0rOr r Mr0 r NMr r - MM 0 c6 � L6 ^ co 0 0 0 Cl 0 Cl 00 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 O O cp�r ID Un r0 W r w LO V N co V c0 r (D U') V co V�M O) N m r r rn W Cl Cl Cl 0 Cl Cl 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 O O 't C;2 Un NMm NMrnOOr 00 m V OO r- Nr w r a r co CD V NwW mr W rn rn N Mrn(ON O W V (O O)V N cMMS N V V V V f�Nj r- OrOrM�N r 00 c0 r^ Q) r r MT M W r NOOM(O� V Mcg (O (0N ^ U) N MM MN _O r M r r r N M r r m M 0000000 0 0000000 0000000 O O Cl Un C, r(D 00 co coco(O m(D N nM V V (O M ^ r r O O O O r r r O r r O O N n O 0 0 0 0 0 0 0 6 N ^ O O rn O Cl r O O r r- 0 M O M (O N N O M a O LO r r- W r c0 N O co r It L r M U') 0 0 0 0 0 0 00 r 0 0 0 r M r0 O O r O r N O O M N N N O It O O V r- 0 M N M M r M f l- w m r- m N C) r0 (O N r ' Q) 0 0 Cl 0 Cl 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 O O MU� m WU� O M O O n N O V W M m 00 N 00 1- r- U� in (DU') LO N M On O n M r N OD N 00 O O O r r O O N� 00 r 0 0 o r (n rr f @ 0 0 0 0 0 0 00 p L 11 2 O 11 O Y Q (L 10 rn O y Q O r O O r M O d r r 0 r M V O d(> Orr O N n O r Lo O s L (� rn r r� rn o rn no 7 MNI-NCO O Wrn W w M V r C ON P -m W W O A co 00 �c0r�6M O- V (OV V O O (D (D rl- (O(O n 7 N M p r N S M N N N 00 o Q m d m (D c c [D r N (O cD a N p O r O N r M 00 p O O r O O r� rrf 7 0 O O r r n N O V O -°' EN EN N 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O c p0 LL D O LL D O J- N N N N 'w�����mLL rOW��2��m� rOW����0m� aaaa E oa Q o<<< E o2 C:oaaaa E o2 C)voo~ rnOrn0 2 Orn0� �Fd 3 r,r,W� 7 3r c) "t O O 3 3c) V O O Q O O r i Q O O i Q ==0000@Q 22rr�� mQ 220000 mQ Y y O o Y Y Y Y (0 (0 F N (0 O \ N (0 O is as (D ~� T Cn Y U 7 CO U a N C d Cn Q 7 0 o W Om cO N M r r (0 O Z Z U MCO M MCO CO r r r r m mm ca 0) — +. M m CO V I� r CO I� LL (n () a_ CA N_ CO c0 r F U r r r r C O N MMM N M V Ct C i--1 m o V Mr O rrrr co OI' -COON r r ?�I (D COI- Cfl CPO N Mr r N M r r M M I - Mr (o C D N M V C O I- (D C O r r r 0 N C O U) r r r �G W vl Z c N ~ " > > Y azz ._ J LU Cn Y U 7 CO U a N C d Cn Q 7 0 m W Om cO N M r r CO V N MO m M r r N MCO M MCO CO r r r r mr CO my CO r N r r m CO V I� r CO I� N 10 W N c0 LO I' -r O m M r M N_ CO c0 r F r r r r C O N MMM N M V C m o V Mr O rrrr co OI' -COON r r co CO CO co M (D COI- Cfl CPO N Mr r N M r r M M I - Mr (o C D N M V C O I- (D C O r r r 0 N C O F r r r r r r Q Cn O O O O O O O O O O O O O O O O O O O O O O O O O O O Cl O O Cl O O O O O O N a -O L MNCO Cl) M CO MCO(0 r MMr COM CO CO cO MCOM (D M (D M CDM OCD C r M r r r r M N N m M N O O Q c (6 i m(D CO CO CO N c) N N r r'tco r N ON CO Cl LO 00 cOr r O� OmCO M N N N O W 00 1- M C O LoC O V COM r I- m W N N LO r N O CO r r 0 LO N CO r r r, N N r N r O r O r N c0 c0 M O L CO m r M r N W r M J i'coo' OOOOO OOOOO OOOOO OOOOO OOOOO O0000 oO H m I"OoLo V V W CDCO(DLo V (0 V N MNNr MOI - NN I-OCDOM CO V I�CO� G) 00 o N N r r Cl) N N r (V m N N H Q Cn Cl Cl Cl Cl Cl Cl Cl Cl O O O O O Cl Cl Cl Cl Cl Cl Cl Cl Cl r Cl r O O Cl O O O O O r r O O a -6 -�f O O r O r r O r O N O O O r r CD r r O N O O O O O O r r r M r M 7 r m co N C (n � O O Q' C Q (0 M r 0 0 O O O M M O r O O r O O O- r O O O O O r r O r co r N 7 r r M N O i Z 1- v m r CD 7 M CO V r N r r co M O CO (V r (D co CO co m N N N N N N N J i00000 oOOOO o000o OOOOO o000o O000O OOOOO OO F i p o r N r M r N M r m O V r N I- M V N M N a ram r r r w I,- co CO r MM CO COW r M O co m I-I-mmM 0 C o r H (n O O O O O O O O O O O O O O O O O O O O O Cl O r r r 0 0 0 r O r r r M O O N a -6 0 0 0 0 0 O O O O O O O O r r Cl O O O O O r O O r O r N O M M O N M co CO m > j Q O Q o�m i r N r N r N M N O r r (D N M N N m 't O M c o Lot mN VMC OCO MCO O IOD- IO' C Oro N m M �� r r r r r m M r r 0 0 0 0 0 r 0 0 0 r O O O O CD r r O r M Cl O r Cl r r N r N CD M N I- CO N m N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD CD 0 CD CD 0 0 0 0 0 0 0 0 0 O O ip MCON N N 000't V r r Mr(D r CO COr CDN Or m a) (D mOd' co V r I� N CO p F N r N N Lo CO V I- CD N 1- O O m 04 r r I-O O r r Q CA O O O O O O O O O O O O Cl Cl Cl O Cl O O O O O O O O r 0 0 0 r O O O O O O O N a a r COrr M 0007 rr Mr(D It CO COr CDr mao V co CO NrO 11, mNm CO (n 3 i- N rrrCO MV ICON I�mcococM, ;co) (D Q C L CO j O i N Or r't O O O O O O O O O O O O O O O O r O N M O O V V c0 M MIC r N CD M r U) � CD 0 0 0 0 O O O O O O O O O O O O Cl Cl O Cl Clrr N Cl r M CO m V V CO CO W m I' - N J i 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 22 aaaao < aaaao t aaaao aaaao aaaao aaaao aaaao as o<< O CO O CO t O CO O CO t O CD OCD t O CO O CO -§ O CO O CO t O CO O CO -§ O CO F- Cl r Cl) V O r M V O r M V O r M It O r Cl) 't O r Cl) It O r Cl) V O r N NN N N N N N MM MM V V It It CO CO CO CO CDCDCDCD I- I- L r r r r O O O O O O O O O O O O Cl Cl Cl O O O O O O O O O O O m T U) C .c� G U) ca N d) Q (.0 a) Q J (fl N Cn Y U 7 CO U a N C d U Q 7 0 E cu 0)N CU O Z Z U a) mcu 0) — +. co LL (n () a_ CA r F 0 CON V V V MO LA I M M M M N M M M M M M CD MM N M M M M U NOM ONM LO V V V V c0 V V 7 V W M cO 1 "t LO LO () ct C i --I ip LANN O V 0 MM 0 LA CD I -A I'- I'- MIS ?�I CDI'- M' V N M� V O OT C)M v J Omr N -CD V �O V � �� �LO O N LO r � � �� NN MLA V - - -- LO M LO MM ----0 MI - W CON - - - -r I- CD CD -N � N �G W vl Z c N ~ " > : zzY Cn ._ J LU Cn Y U 7 CO U a N C d U Q 7 0 p 0)N I- NOIR LOV CO ONOMO r F 0 CON V V V MO LA I M M M M N M M M M M M CD MM N M M M M � r V M M V M V NOM ONM LO V V V V c0 V V 7 V W M cO 1 "t LO LO () C ip LANN O V 0 MM 0 LA CD I -A I'- I'- MIS W V 0000 CDI'- M' V N M� V O OT C)M p F Omr N -CD V �O V � �� �LO O N LO r � � �� NN MLA V - - -- LO M LO MM ----0 MI - W CON - - - -r I- CD CD -N � N LO 0) V MA O I- -N N N O) Q Cn OOO OOO OO O O N OO - O - OOOOO OOOOO OO M O M O- OO CD a 70 LO O 00 LO 00 V 00MCl) r't OO O V N 0)LO 0)[-000 V 00 MN OCOO C: LO Cl) OOOr 1- OC) V 0)N 00 �! NCO CO MOM 4 mO0)0) M 0) O O Q M M M V V V M M M N V M M M V M M IOD 7 M N 7 00 L O Cl) N I 00 00 M w LDA MN CON MM ONO V � MM ON N JON 67 NON W N M M NV NN NN M M N i— 0 O O O O O O 0 0 O O O O O — O— N V O N— O M O O N o 0 N H m LO �M W Mm V V c0 MO0 LO 11, NMN 11, 11, SCD CD O V ON LO MCOM V M o F MMN M Mm LO0 LO I-OLON r COO W r M W O r MM M M r r- ON MM cO li Q N O O O O O O O O 0 0 O 0 0 Cl O O Cl Cl O 00000 O O O O 0 0 a -6 NODO N 00't LOO) I- LO (D V N LO I - LO' Oco I - OO O00r N 0 I'- 0)O LOQ CDN ON CD C U) N N N N M M N LO O O jr C � N(0 p O V W OOH CO N OON 00 N r Or co V CO LO CO co N CO ON M O N M N N N O r COON O N LO ON C I N N N N N N O Z F N M O N m O L D m M W MNN �N M O O N M 7 777 cc MIt O O f� LDOr 0 UO M O UO M OOCA W N � M N aOOOCAM M L O 0 CD V OCA OCAM M � O� M r r CA OCAM J N cN,) i000 00000 Ocoo O 00000 00000 000�� 00000 00000 F ip 0)O c0 I - OM NN Cl V MCO CD UO M OI1, CD 11, � (D It 00M LO V M MN N N O N CD It C) (D p F N V N W w MUM W I- co co a) LD LO LD V N LD V OCDN IDS V r N OO LO 1- ItOO co I -N co OOO O O O OO O OOOO � OOO O O N Cl � OO � OOOOO O D M N a -0 LD O0) 0) V V CDM V OMM� LDMN OO LON M� OOr ON V V V COO MLAS CON QC N N N N M N M jr Q C) i CO O CO MN UD CO M I� r r CA M 00MI-O V CO CD CD OO N"tr W ; I- C4 00OI- s N I- I - I - M 00 I� cD M I -N � � V M I- M� It Cn 00 M V MCDN Un cD't U N 't Cn cD CDN � w c0 V � Un V Un NO N MMNO MLO'tN ONNIT 7NN"t 7—00 CA ONU � V N N J O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EO D m O0)CD I - I'- LO Oto OOOI,- 0 Un LO OO N CD w OCOM r V N V N OMN ID r MIt LO V p OOO r Or 0 W 0M V N Un (D 't 0 N 04 M LD 0 LA co N It ID co LD LAM N (0 V Un ON N LO LO 00r 1- N N Q Cl) O O Cl O O O O O O O O O O � O O CD O � O N O O O O O Cl Cl O O O O O O N a C4 LO WMOz r ItMO� O�O� M NCD O CD 11, V I, MALA MOLD NO N V V ..-. 3 (n04 BOOM cD CA CD UD LA'tMV r MLOMV LA CMV V V LA V MMMV 't co MMV MMLAV 0 0 N C L Nj i 0)M� co LA LD V N Ft CO CA V co NO V N� V OI- OCOL0 ISO M)F a, rOM� O U) M M M N L O N N 0 N r N L O N N N W w 0000) V V N 04 N 'It cD7 LOO LO N7 cD I: MO)M7O ID -t W OI- V ID M CAS N N N M J O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EO 2 o 2 22 2 a 2222 o 2222 u 2222 o 2222 u 2222 o 2222 o EQQ o QQQQ o QQQQ o QQQQ o QQQQ o aaaa o aaaa o aaaa o oLAt O<OLAt O<O<t O<O<F OLAO<t OmOmt OmOmt OmOLD-5 F- M 7t O- (Y) 't O- Cl) It O- Cl) V O- M O- M V O- M O- Cl) V i I- 1- O O 00 W co CA Cl O O O 0)0)0)0) O O O O OOOO NNNN O O O O NNNN O O O O M T U) C .c� G U) ca N ^I' W a) Q J (fl I N U -)U-) 1:11M E cu W com V CU O Z Z U co In pp r a) mcu 0) — +. co In r (D 04 m LL (n () a_ CA cD 1, - In I" r N In In cD CD 1" V OOOON N M O O(S� mr OON m lD In O Lo� ITN U N O M W N co 04 N I M r W N r N N r r In r m 1- r ct F i--1 N C ?�I v J mOCD m MN�Nr cDMrppW COr �r� I- (D pp Intim V O to V rrr �G W vl cD lnml� N N N N Z N V rrm r M M M M c N ~ " > > ra) LO r Q zzY Q .._ J LU m W com V m Or co In pp r In 11- N c) (D In r (D 04 m V mr cD O CD W OOm1,- cD 1, - In I" r N In In cD CD 1" V OOOON N M O O(S� mr OON m lD In O Lo� ITN O V O 1" m 't V MN N O M W N co 04 N I M r W N r N N r r In r m 1- r F N C ip mOCD m MN�Nr cDMrppW COr �r� I- (D pp Intim V O to V rrr MIn p H cD lnml� N N N N W ppr OCO O N N M M N V rrm r M M M M �� I�Inr N N N N N Nm W MM O N r r r M11- NOI I-- r r r r ra) LO r In V M Q U O O r O r O O O O O r 0 0 0 r O O O O O O O O O O O O O r r O O O O O O O N a -O 1- V rON r WCO C0O MCDm V N Inr mcDr In cO N LO C) mvON In tr OD V MIS � O m r r O r CN LO O r O r O O O m W 1- W I n O V t n a Cl)I N M N N r r ��� r r r r r r r r r O O N (6 i N mMcD c.4 a.' W O In W I r m OmN r� r mr N W M V NNM O InI M Otn cOOOM O'ClO W W IS O M MI -r m0 W In I�InMN W N InN V'tMN I� tnm V Nr I J, J t r r M r r r r r r r Lo r r M N N Imn ccoo�W r ccoo coOWr W W W co�N Imn MCD 8F ImnA NLuB MV MM4 NNNO pop Inm r J N N M N E "t r r t O O r O r 0 0 0 0 0 O O r r N O O O O O O O O O O O O O r r O O H �¢ V MOI- V OI - un cD W W NCD V O rco Mrr MM W W co N CD w V O W o F N M;t VV r In ;tM In In r r 2 ;t�2 c0� MMLo r r N Om OD r r OI'- CO CO r CN) In In 't 't N MN Q N r N O O M O O O O O O N O r M O O r O r N O O r M o 0 0 o O O O O O O O O a 76 mmv W I� O�Nr1� IL ILaMminr mminOM rminmv MV rml� V I�vm Ind S= U) � r r r o- r r N r o- N r r r 1 r r r r ( D r r V r r r It O O Q' C � c0 In OO CO r Ifl to l' m V m0 V mm0 Clr r I� m InmmmN I-cOco V I- u V N p N N M N O M N N M r M M N M N M r N N N N N r 1- r r r (D N Z F w min cDM M m I-Cp CON MM W CON cD W N r OMN r cD M V (D 'It CD In M CDS r O N J W m m 0 CC p, O O W O r r m m m m CC p' rO m m m CC p' m I'- m m N I'- V I n 7 V N 't M M I n N N 100000 00000 00000 00000 00000 O000O 00000 00 F ip W Inr O7 ON W MM MCD 'MCD ON O1, -m In N CD 1,-O mmr OCD m1, -NCD V Nr o F coNrN r r r 7 r MNInN r r r r O V Mrm In r r r r rCO 1-1,-M r In In'tMm Cl) MM V M V MMNrr rr N r o 0 o r O O N O N O N O O N O O r N M N O O O N r 0 0 0 r r O r O N O O N a -0 a) c, V M OIn MO W Nr1� V V rOln cDN M7 cD oCO NNNI�M In NOr W rN >!_ 0) N r r I n N r r N (D r N r r (D It Q N i IflOc0O0 Nm c0 'A4cc',), F MCD I� In MInIt ON N COO W Inln ma I� m m O C2 Cl) O r cm) W O m r m cD V m N V M M In CO CO CO N N M M r r m r w NmM Co c, In Lot m W 1- W NIn co Co I- V M I -m CDN W Nun Mr N V MOm Nr N N r N N N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O �p 11- ON W 11- W mItM V V V I-cDr W M M In Or ppm ISMO V d' MNm w p F I - I - I - I- m m I-I-coM N In I -I -I -N Cl) I'- Co l'- V N N W V co d' M W M V MN M MN r W r Q y O Cl O Cl O O O r Cl r O Cl r Cl r O o 0 0 0 O O O O Cl O O O O O r O r Cl N O O N a aW 0) C) W In r to O CO CD r r (D CN In 7 <D cOM I-c0O V 77 COMM MmMI� N W In (n04 0) In Inc) cD In In unm MIn In'tc0 04 m Lo 7Na0 MMNNr rMrrr Nrr ID N Q C L L Nr( M N r WN r 2. � In m1-�rNpp O M mWM I D n N N O r mN0im w OmO1-m r m ID CN I -r I�OIn cD V cc, NO V co I' -u m cDM V In W �r Mrm Nr U r r M r M r r Cl) r r It J E O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 O O 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 22 aaaao aaaao aaaao aaaao aaaao aaaao aaaao as o In o In F O In O In F O ID O In F o In o In F O In O In F o In O In F O ID O In F O In F- Cl r co V O r M V O r Cl) V O r Cl) V O r Cl) V O r Cl) V O r MIt O r i MMMM O O O O It V V O O Cl O to In to to O O O O OO ID (D O O O O r r r r O O O O c0 W W W O O O O mmmm Cl Cl Cl O OO r r m 6) T Uo Y U i CO U a N C d Un Q 7 0 E cu CU OZ 0 z C) I- a) a)�cu0) — +. co LL (n () a_ CA r co UO UO UO M N N 00 M�NM WN m 00 F c U N ct i -i M M N 00 M U n � (p r H CD M^ M co ?�I N V N W vJ Q r �G W Un vl O O O O O Z m O c N `~ w > : zz W " ._ J LU Uo Y U i CO U a N C d Un Q 7 0 mmm C) I- O r co UO UO UO M N N 00 M�NM WN m 00 F c N m't M M N 00 M U n � (p r H CD M^ M co N V N W Q r Un O O O O O O O O O r 0 m O r O N r W r a a N M m N Q) O r O r r U O Cl)co rCD N � r O O Q c6 i N Cl) co co UO CC) OU-- N W N N W w (D UI N V w MWUO mcD CD Or OV N V W O J r V N ^ Q) (N (Op M N N N W E O O O O O O O O N r O O O N O O N O m O V m O r O N m O N M M r- rl- H M N r r N N r (D W W p r N W r Q N O O O O O O O O (p M r O O O O r O O r 0 a -6 I- M m N N U O N r 0') N O CO r r - U) O) � W N� N r r O O Q' C Q CO Nm MUOr NUO UO V O (D (o Of�(OM 0 co"t�00 r w OCOM N V O UON (p McoONOco U N r c p r r r V LO Lo r-- co M r i000 OOOOO rOOr000 F o ip M UO c0 co r UO O m 00 Un N H r N co co N M Q N N co O O O O O O O O Un Un r N 00 M N N p O N 00 r a -6 OO co r NOOM N r � O UnN UO Qj 0) t f T r f r N jr W Q N W 4% i r UOcm Or UOO (p Ung co u-) co Un Tj r Ur) �pp{ � U) CD N O Un r O O O r r Un rI;t (O r- It J N N n W N 1 0 0 0 O O O O O 0 0 0 0 0 0 0 D Z r M r I- I- 0 0 n r- LO r N M N Un r Cl) W r V Q co O O O O O O O O M N O 00 M r r O co d co r a CN :E OOm OMI- C) c0 (pm V r - O LO Un in O O 0 0)r Cl) r 11 C L Nj i rMm ONr OM 00 r 00r r U—M co N W m O CE O O M r N N O UO � (0 00 00 N J mop r co W cv) co 1 0 0 0 O O O O O 0 0 0 0 0 (D (D t N N Eaao aaaao of F C) U( nq C) U( C)Un orches H `�° _0o0C) m m 2 2 Lr 0 0 r rrr r QH O e mQ r^ Q (.0 a) o J (.0 LO LO 1:11 LO E cu CU O Z z U m a) +2 (0 LLU)U)a_ U) U) � z CQ N ~` 6 - <ry C:Y zz ._ J W 181 st Ave Out In Total 5089 543 c 0 O o 466 565 5314 [110109 O O G pJti O 470 4313 284 0 22 p 12 00 0 4821 4516 291 0 25 Right Thru Left UTrn Peds O OD — M ,�cooco -o v N g � N r rn co 0_ Q D_ 0_ N O N 0� N W 0 0 0 O�OO � V N W. OD OD F� N V tL � N N N CP%')� �� W� NrO C N N N-��� �J ~Z NN `�� ~~� ���-N m arD= vv OF cooco N I-Wl a) LO W (`') N (O N N F �-j V (O N W Ov�v o� 00 O (O (O i T O W N t F will iia -1 ni41 140!21 sPad O LZ LZLZ OL9b £81,9 OL O otia /� 0 66 ZZZ 60L L O /Oro LZ ZZ9Z 8t," bLO9 6 O N �c O O 4 EL6bZ S09ZL 89EZL / O£8 1 166C 1pJ` ct bLLZL 696LL 10 lelol ul ln0 is uley� I W Q r a) Q J (. I N LO LO 1:11 (.0 E cu (0 O Z z U m (Q '''a-^^-� cu LL v^^ J vl a_ WE W L � Z c N d > Y J LLJ c00 a)cNI- N (0(000) r M V LO00 c0 r MV V ar m V NMO 0)M O(O 0)ul V V V V r W 00r(ON W u) N N O Q) O r M M co N (O ('' ) r N V Omr N W 0 0M N ON V co M N r (0 c0 r r M m M M M N 0) Cl Cl 0 Cl 0 Cl 00 000 0 0 0 00 O r O O r r iif O O O N Cl (0 0 Cl r Ln u) W W r 0 Mu') W m (O M (0 00 u-, MN V 00N0 Nco 000)0 0 r OrO V V r N r r v 1 r r r r r V M W cO MO r cO m N (0 00 V O V L r M N MOO rm�mmw(0 (`M(OV (ONMW M ��N�V O) 0 r N c0 Nm0V q (O LOOO V (O MMO(DNr (0 r M N V N m� M N V N N om^ r 0 0 0 Mm N M. O O r Cl r r up N O N r u7 r u) 0 0 0 0 0 0 0 p N N O (O O mroOrM m u)rrOr M (O coN(ON M N NMMN r- r --(2w N O) V r r M r r r r In Cl 0 Cl 0 0 Cl 00 0 0 0 0 0 0 00 O O N O N M O O O O N cO N N cO 0 M 0 (O M 00 r O N m M M r M 00 N (p N co (6 co r N r r (0 M 0 - (O r M 0 V c0 c0 O (O (D Nu') M r In r V O) r In r r 4u) N N M N O O M M M N M N a O r N 00 r N 00 c)mm Lo V MNW rM W MMOONNr N N N r c0 pj N co co W M N O 0 0 0 0 0 6 0 c O m c `M r W r M O W 0000000 0000000 0CD 000000 O O c0 r m Cl c0 m (O co co ul r M M (O V (O (O NMN�� m 00 u)NtM r u)OV Mu)M rW rrr N OO rrrr Cl Cl Cl 0 Cl Cl Cl0 0 0 r O r d- iif O O N O N V O 0 O N O N 0m00m00 m00) r LO LO V O N r Or M r N Lo N r cl N 0) N r r co O O M 0 mM cO c0 c00 V 000(000r LO m(OM (0u) M r N r O V u-) LO V m W V r W N O r r r r m m r co co r r r t I- W N m(0 It m rNtNN u)m(O u')0r WW M N co r cMr M^ c') 0 0 0 0 0 Cl Cl 0 Cl O O O O O O O 0 0 0 0 0 0 0 O O N Lo C, m(D r (Or V 00 LO M V V r- co r O O O m O c0 (O (O (O V N 00 ul r r 00 (O m N O) N co O O 0 0 Cl 0 Cl Cl 00 0 0 0 0 0 0 C) @ O O O r r M O 0 (1) O d O N Y Q d y�ru)N WcONr �V OVrm) r Lf) V oo�r tV 0 QmcOc0c0V uj0 d� V V cl)(`')�Nr d�In(`M��O)rM 50(P (`")cpm V .-. r00 u) O x000 r N 7 @(D MmMM cO� 00 ON 00 Ul^ V M r0 C U-) CO N 000r 00 7 ur r r 0 im r O) � 5) r r 0 0 gm QO N O N m am �[0�rmromr(O O O(O [MMM u)M O OOr�r u)NLO c (Y I� O .0 N oo OO O 'U r M N W O O O u?N O VO - w E N E N N 2 0 0 0 0 0 0 00[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O 00 LL O LL O ) l N � C)N ) � C) N co @W2E2 (D LL cOW�����m� aaaa oa Q oaaaa E o= Q oaaaa E o= 2 Roo`_noM� o~ inO{O �Fd �n0�0 =, 3 3 r r r r> 7 7 1 0 M O 3 3 V O M O LSOOOo_Fo 22�rCNN� 220000' Y 1 o o Y Y r@ a Y Y @ Q t0 t0 F 00 03 O \ N 03 O T N Y U 7 CO U a N C d U Q 7 0 o Ul mm (0 O Z Z U 1O W M� m mm ca 0) — +. M O cOMNr LL (n () a_ CA 1I- W M M r r N N r N W r r r to r N N N U m Com r N r N M 1- c 0 N M M M r N r N M M ct F i--1 C v J r 00 1- r Nr00 mLOmI'- O �m OmM for Or I' -N LOmI- MN m �G W vl Z co c N ~ " > > W W r O M Q Y azz .._ J LU N Y U 7 CO U a N C d U Q 7 0 @ Ul mm W MM1- 1O W M� W OO V O cOMNr W V Orr W I�r�M 1I- W M M r r N N r N W r r r to r N N N c0 N M LO 00 m Com r N r N M 1- c 0 N M M M r N r N M M F C m r 00 1- r Nr00 mLOmI'- O �m OmM for Or I' -N LOmI- MN m r 0 r r co M r M r N M W N M LO LO W W r O M r r to Q cA O O O O O O O O O O O O O O O O O O O O O O O O O O O Cl O O Cl O O O O O O N a -O W W LO N N CO O N O N N V M r N 1- W W M W mM O r t n� m N N M r r r r M N Cl) N M O O Q c (6 i m W r O M r 0 W N O r M M r O O M M W r r o rrM r N M m CO I- r 00 00 W 04 U0 U�1-N O LO 00 co W W N N LO N O m N L r N Cl M N N r 00 M N r 0 c0 r r O M LO m M r r r N N W N N J i000rr OOo0o 00000 00000 00000 00000 00000 00 H m 11- c 0 V O I- m W O M 0 r M N M m co r LO N V c O O N c 0 M It I- m LO LO N I- m I- LO O W o r N r M N N N N N O N M H Q w O O O O O O O Cl Cl O O Cl Cl O O O O O O O O Cl Cl Cl O O O O O O O O O O O O O a a r O O r N O O O O O O r r r M r 0 0 0 r O O O O O O r r O N N 7 7 u-) !� O N C (n � O O Q' C Q CO N O i rOrON N rOOM OrOOr N O O O N rOrrM OrOOr rMN W N N I� Z w c0 c0 CMmN CD CO rrrN� MrcONr LOOr�O V LOW`�N mC)N WCr0 M0) r r r J i00000 00000 00000 00000 00000 00000 OOOoo 00 F i p o W N N r M O r N W r m M r UO N r M O N W r V M m V r N O W W c O m U0 N M W V 0 c 0 0 c 0 11, W I- m m O 11, O F M r Cl) O O O O O O Cl Cl O O O O O O O O O O Cl O Cl Cl r O r O O O O O N O r O M O O N a -0 O O r O r O O O O O O O O O O O O O r r Cl O O Cl Cl O Cl r Cl r r r c0 LO N M W > j Im Q O jr N 00� i co OrN W m Mr N0 M ON M W SMI 'C W WI -W "t2MWmm M r r N� NMW VIS rW WmM O m 0 0 0 0 0 O O O O O O O r O r O Cl O N N O O r O r O r r M c0 r co M M M c0 N N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O p M V U�r M ONN't W rr Nr to NO MI - N W r NNr M I- r W m 01,-� V W �I o F r N r N N W Cl) V W V N W m 0 0 r mW W Q Cl) O O O O O O Cl Cl Cl O O O O Cl O O O O O O O O O Cl O O O r Cl r r Cl 0 Cl r O O N a -0 rN u -1r m ONrM W rr rr NO MI - N W r NOM MONO C) It W M I W (n r N r N CII U� M V 1,- v m I m m W M I I N Q C L co OO O M n N- m I0i N V W O r O O r O O O O O O O O O Cl O Cl Cl Cl O Cl Cl O r r O r r m N u7 7 7 M N J E "coo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 `c 0 0 0 0 0 0 0 0 O O 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 22 aaaao <� aaaao t <� aaaao t <� aaaao t aaaao <� -§ aaaao <� aaaao t <� -§ as O� O� O� O<O<t O� O� O� Oen F- Cl r Cl) V O r M V O r M V O r Mt O r Mt O r M It O r M V O r N N N N N N N N M M (M Cl) V V It It LO LO LO LO W W W W I- I- L r r r r O O O O O O O O O O O O Cl Cl Cl O O O O O O O O O O O m T E Cu M N N m CO O Z ZU V't M CM a) mCu 0) — +. Co Lo O � V LL (n () a_ V] W Co m � m N F CD V M N N Co N cO M M M M M M cO M U m V V V V V V V V V V CA V m Ct C i--1 m MMI- OI- m V CDS CA CA V mmCD ?�I OD MMI- V MmN CA V MODO U) mOCD 04 Mem V (D �� I- Co CDM MCA V ���CO V V V COO - - - - I- W I- mN (D - - - - W a) OD tn�r I- ���NCO r OI - --04 �G W vl Z Cu N ~ " > : zzY Cn ._ J LU co M N N m CA O CA S CD M I'- m V V't M CM � V r� Lo O � V W N N m m CmD OCA CID W Co m � m N F CD V M N N Co N cO M M M M M M cO M V V V V V m V V V V V V V V V V CA V m C m MMI- OI- m V CDS CA CA V mmCD CA MO CA 1- OD MMI- V MmN CA V MODO p H mOCD 04 Mem V (D �� I- Co CDM MCA V ���CO V V V COO - - - - I- W I- mN (D - - - - W a) OD tn�r I- ���NCO r OI - --04 M OC) N I� �NNN CA Q Cn OOO OOO OO 0 00-- O- M 000-- 0 cc 0 0 o 0 000 OOOOO CU a -O C) LO ao V V N V V M MCON CO M(D CA N LOCO m mm m� N 1-O) V I - ON N I- C) C (� 7 �� V M V V CD I� Cfl r Cfl W N I- W I- W Cl)NmmmmM mOOO(D CA CA OmM ma) mM O O Q N (6 i Co CA Nim 1' mCAM 01- CD V MCD Cfl r CA CAM CA V V MMCD 1� Om M V �� CD W m1- CA V V CDM M W W MN CD CD V SCA W 1,-N W CA CO ID Lo CD mCD CD V M V Tao l�ao w t- Cl) - - N N N w I - ON CAIN 1 -lb CD CO��N V NCOM CD LO we W V MIEN A W O W O mCD CD I" U N V M N N M N M M N M N M M N M M M M V N N M M N N M N N 7 7 7 CD J 1 0 0 0 O O O O O O O O O O 0 0 0 0 0 0 -coo- O O M- V O N O M H m Co V CA CA CD CA CAO N W I- W OI - N O I- W m w N CD V CO I -I -M OCD m CO ao� m m o F M M N N M M M V C D c D C D I- N c D O m m r M m m m 0 VO N m -- V O V Co M O M w Q N O O O O O O O Cl O Cl Cl CD Co N O O M O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O a -6 CD COr MMO V O CA I- 'D COM Co m mm Co CD Co CA mm CD m1 -CD CA CA mMmm Ommm1- C U) N Cl) N N M M O O Q' C � N Q N p CO CON CD CDm mm N Cl 1-m N V CON COO V N CD OCAS 1- N N V Cfl OO I N N CD MM CO V 1- N N CO COmM W Co 1- N I Z F w CD m maom CDS CD V CO O CO r w V CD V CD V N CDmmCDM O W 1I- CD MOCD N J N NCA NN NO M V V CA MCD1- (D N 1- 1- aoO a)CA Co r- 't OCA I'- CAM I' OmM i000 00000 00000 00000 00000 0000CD 00000 `CD` F ip NOV m1 -N COV CD COM V W CD mNMa) MC) LO I - MCA Cl) �M CA CA S CD S CD p H mr't CA CO CA OM m 1,- CDooch CDCOr CD N r r mCAN COr CD CDN CAIS I -N M CoI� I-mM co O O O - 0 0 0- O O O O O N O O O N O O CD O CA cc 0-- 0 0- CD- - O O- N CU a -6 �N V CD V m WCD OI - NN N m7 -'D CD ISO m CAO I --m w CON mCD I--�!V CDM I -N V >CM N N Nm Co Co N Q C) i m V 1- OOm CD CO 1� N mm m0 V CD CA 011, W mCDr MOOD CAm V N CD M CDr V CO m W CO CD m m r CD CD I- N V CD Co CD N CD CD V CD N V CO CO CD (D CD CD O O N CD CD CD r N w N V M MMMN� W I� V MN CD V -N M CD V MCDm CO COM V CD CD V COQ CD CD M CDm CU N N J O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD CD CD CD ip NCAm NCAV O N COQ V N OCD 0) 11, N a) CO NCD OCD CDM V m1 - CA 11, ��NCA p H Co CCD) Co I' -I'- CDN CD CA W CDN I' -CD CD CD N CD CD W CDN I- (D (D 1- N CD V mmm Lo 1- OCDN Q Cn OOO � OO O� O OOOO � OOO � OO Cl � OOOOO OOOOO OOO N a m0 V mmM �N CD N M V CO 0) UD CD CA CA CA M CA Om N OCA CO CO MO CA CO CD V CA CA V ..-. 3 I- Cl)CD CD CD CDN CDW V V M V CoV MO MV CDV 1: V V MV V M O MMV V V CMV I� N Q C L N j N 0 i CA CDM co CD coM N M a)mm M �� V V �� CD CDS V CA CD ����CD CD N mCA CA 04 I� r NCD MIS 1- CA OCAN W CD NCD U w CDOM W CD SCD M V -CON MCD V CD I� mmao l� O mr mOM m-aoMM V OCD CON CU J E O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 2 a 222 2 m 222 2 m 2222 u 222 2 m 2222 u 222 2 m 2222 u EQQ o QQQQ o QQQQ o QQQQ o QQQQ o aaaa o aaaa o aaaa o oIDt OCDOIAt OIDOIDt OIDO<F OIAOCDt OIDOIDt OIDOCDt OCDOCD-5 F- M V O- M V O- Cl) V O Cl) V O M V O M V O M V O- Cl) V i I- r O O CA CA Co CA O O O O m m m m O O O O O O O O N M N N O O O O N M N N O O O O m T E cu 00 00 00 CU O Z Z U r Om CO a) mcu 0) — +. co N LL (n () a_ CA MW V IO IO IOW W W IO IO I"r W W W ID V WNIOW W W WION M W WN IO COQ V U O W w CON04 Om Mm 04 NO c0 rr ct F i --I N CQ N C ?�I v J V I -r W W m Wrmin V Nmm Inr N W W W OOIOr W OM NO�r �G W vl M(, C, N N N M Z W r IO V N N M N N c N ~ " > > OO W W IO r r It IO IO M zzY Q .._ J LU @ 00 00 00 0) 0)0)0 CO r Om CO IO 00r W N MW V IO IO IOW W W IO IO I"r W W W ID V WNIOW W W WION M W WN IO COQ V d,Nm V MMMV O W w CON04 Om Mm 04 NO c0 rr F N CQ N C m V I -r W W m Wrmin V Nmm Inr N W W W OOIOr W OM NO�r I- �N p H M(, C, N N N M - COM O M M M N W r IO V N N M N N 't r N N N N ml1-c000m m r r r r , MN mm W r r r r OO W W IO r r It IO IO M Q N O O O O O Cl O Cl O O O O O O O N O Cl Cl N O Cl Cl Cl O Cl Cl Cl r r Cl O O O O O O N a -O r 00 C) CN I- W O Wr C) LO I -M CO W Nr NM V N W mr MOr IO SIO � 0) O m O r O m r 0 NN CO m 0 W M W O m I- M W I� W IO N V M I� M M N N O r r ��� r r r r r O O Q N (6 i W IOOCO I�mOOI- W N I�NrN NMrr V W OW W NN OW �r IO CO m W WI- IO V m W ILIO WIO V NmU � IO m4NMImO NN w t r r M r r r r r r r r M N r M mIOI-m0 OrN W r M W MMI- m u-)00 mN N J V IO W W W m W W I -M N I -M ID COW M V LO 71O N MM IU M�NNm0 NNvNm rr i r r O r M O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O H m a r M W W I O W r UO m m O r M M I O V UO N I n O co M O O N W O I I D It W V M M o F M M r c O r r cM M c O r U N c O c O M r r r m r N M r o O m m r C) O I I W r M V c O M W V N Q N O O O O O O O O O O O O O O O M Cl Cl Cl M O O O O O O O O O O O O O O O O O a 76 m M M m W N N V I O c O 0 W W W r N N M W NMN M M W W M O I, I O I r c O M (n � r r r r r r N W r r N r co r r r r UO r r r r r r M O O Q' C � c0 WIOW V W OIOOM I� WOV WIO WMN WOCO M" V WOON WmWNI'- cOW N p2 rrNMm m- N MN'N M(M MNN rr NN W rNr NI- rrrr UO rM Z F I- M N O N V N r M W UO lO r 0 7 7 m I- O M N r W M V W N W m W m cO M V U J O O I- r r r r m O m O m M r r m W m m m M I� W W W m M v m I,- W W M W I,- V u-) 7 N r M N M r N r M r 100000 000rr 00000 00000 00000 00000 rOOOr 00 F ip NNON W W WI- NMW VI- N W V N W ml -r W mr UO Wr V UO mr mM p F m I M O r r m N r Cl) r r r r M M M N m IO r r r W W m I m V c O c O I M M W C O V It N c O CO N T W r r co O Cl O O O r r Cl Cl N O O O O O O O r O r r 0 0 0 r O Cl Cl Cl O O O O O O O O N a -6 W ONN N Mmr I- C, V Nr 0I- mI-Mm CO W m W rN W IO I - NO ONr OM r0 > r r r r r r N I- r r r r N N N Q N i v m lD m O IO O W M O N W M W W I,- W N I UO 0 N In N O N M N W In I N W cO0 W r M N OCm:,-�M r r r \ 11-0 co W W I -m ��mm Un MCO CONN CO 04 I- rr � M W m I O UO 11, N V O M c O r c O W 11, c O M M c O W N M W O r N It M N r N O O r M r r N N r N r N J E O O O O O C:'- O O r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O i p I O W It N m O N M I O It I D I D m UD c O O d' r 0 I O V M W O UO M M O r m i n p F IO W I- W I- W I- W W N N m I'- W I'- M i zM N r I- W UO M W V UO V M N I� N V M N M N N N r W r Q Cf) O O O O O O O O O O O Cl O Cl O O O O O O O O O O O O Cl O O O O O O Cl O O O N a WOOW V I MV cD MCO amr IO II- Wmm OW WI�M cDVNVIO WI�OrN am �-0 (n �C-) cON W IOW UO Cl) 'D 'tW V N ID CO MM W MMNrr rMNr co rrr IO (D Q C L Nj U i OOmm r r r W In coram r r r r (M IOOW IO N r r r V IOm�Mr W r r r r WI�vmW W r Oml� WN M r Wc) Cl) r - N V N U) I- co I O I- I- W r W V m m V r O V r M m N I O I- UO N I O m O r CO M r M M N m M N N N r N r r r J EO O O O O O O O O O 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O O O 0 2222 m 2 2 2 2 m 2 2 2 2 m 22 2 2 m 2 2 2 2 m 2 2 2 2 m 2 2 2 2 m 22 aaaao aaaao aaaao aaaao aaaao aaaao aaaao as omOIDt OmOmt OmOmt OmOmt OmOmt OmOIDt OmOmt Om F- Cl r M V O r M V O r Cl) V O r Cl) V O r Cl) V O r Cl) V O r MIt O r i M M M co O O O O V V V O O Cl O c D UO c D U� O O O O W W W W O O O O I- I- I- I- O O O O co W W W O O O O m m m m Cl Cl Cl O O O r r m 6) T E cu Loco Lo CU OZ 0 z C) M a) mcu 0) — +. co oo M LL (n () a_ CA I- O MN �(O W �M F ' c U o0 N ^ N ct �I N cO co cD N co V cD In W In N u')F MN cD N MM r0 (h co (O"t(h ?�I vJ �G W Q vl Z c N `~ w > O O : zz W " .._ J LU N Loco Lo O) ooMLoO Lo Lo M LO � oo M I- O MN �(O W �M F ' c o0 N ^ N m N cO co cD N co V cD In W In N u')F MN cD N MM r0 (h co (O"t(h Q r cA O O Cl O O O o o W r (D r-- In r In _ N O n 04 a oo 70 1- co o a) co Ln ,I- r (D (D v r M D) r- Nr co ^ r OQ-� '0) Mr V W C Q c6 N (6 i M�rO r ��rOM7 V cDOO(omm� 7 LO fWM M W v co LO N w V I - NN ID �ID 7N Mu) M N N M J n O SLO M V N N N O r 1000 000c` vrovOOO ro ro m c)cDV McOr rr r— Moo V W (D o N r 0 r r r r c D p (D oo p) r ~ N W Q w O O O O O O O O N NO r r r o') ro r� o6 a a c) r N O r cM r cD O Or N N .-- U) Z;i pWNLO O O jr C Q c0 NO M V co mr rcp (D oo W n oOMN ZOrcM��rr � r w rO't ONr mW W W M LOM M� r M co co r r J c) Em 0 0 m O 0 0 F O ip rco �mWM C) OO)� C) r F r V W`M N 0, cA O O O O O O O O Olt- (D O V O N O O r CO N a 'O r ON MON rcD CO OOH OInN LO Q j t o p r f r N of W Q N i m WCD mm co rM r -00r- oo O W V t M r 6 O Co r n 6 V O 0 V N H r O M N O N O V O LO r CO CO N� J N N O O) p E cD 0 0 O O O O O N O O N O O O � O m o) oo r cO ID oo r 0 co co co (D O v H N (D W W V r M V Q co O O O O O O O O (D r 0 (D O O O Q) O O a a :E co cD l-- V co(o rV N MWS rulW u-) 3 (D cls ^ r N �O M M C L N0 i Or l- rMNOm cNr- r-- cnvcn � L N ^ o O r r r O O O O O W W V r N r- co J M op r W r c`l) W 1 0 0 0 O O O O O 0 0 0 0 0 0 0 @ N o o t t N N Eaao aaaao of ���� F OuF hq O�Ocn� orches H `�° -oo0C) m m 2 2 Lr 0 0 r rrr r QH O e mQ r^ Q (.0 a) o J ti LO LO 1:11 LO E cu CU O Z z U m a) +2 (0 LLU)U)a_ U) U) � z O7 N ~` 6 - <ry C:Y zz ._ J W 181 st Ave Out In Total 90-8 O O 5816 5577 110393 O G 0Jti O 476 4578 278 2 1612 209 2 p 00 0 4881 47871 280 2 20 Right Thru Left UTrn Peds c' IL a- a 0_ I�u1N p 1 OD O O O E N t L W N 0 W N F OD O OD (O OD d' W r W � C N N + W 200DD-0 O WO N ch J ~Z N N N? ~~ O (O ca N m vv OF r- 2N c7 rOD m W COLO (O F J d' V OD 01 W r f1 0 n n0 W (mmL imC,m IMO r m F 7 wi� ,� 3 ll iia -1 nALL 140!21 sPad o KIELZ bl8b bl6b 8 O otia AZ 0 Z£I 6EZ OL /Oro bl 669Z SLSb bb8b L O 3 �c 0 O 4 6IOSZ I8bZl 8ESZI ,� E68 1 1 ISb IOJ / 9ZIbZ 6EOZI LLSOZI 10 lelol ul ln0 1S UIELN Q a) Q J ti I N LO LO 1:11 (.0 E cu CU O Z z U m mc +. co LLU)U)a_ WE W L � Z c N d > Y J LLJ W MN Or M V 00O(O DO DO CM O Co Q) I'- N O) co N N V N O) LO N OO LO �O f� f� M M �O co I� W V V V V— m (O (O (O (O N O) O M M I- V co co f l- co (O V W (O r W LO 0 p O)O MIS M N ^ CN W � maM aMco co W O Cl O Cl O O Cl N 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O O WOO VrNN Nf InV f-- Wf ONNN Mvv M!n 1,- 000000) 00)r ON O r N W r r r co CO Q) r r r Nt M M. MON1* W Mm W (r0 wwM w f --(O LO N I -Nr NmC) (p"tr(OW M ��rr 00(`')00 r r M Lo 1- r N M (O r r co V 1- 0 W m r W V m r- V w M LO O N M W M NNS co Cl NM 0')m(O 0)00 co P- CO r W r i c o co C, . 0 0 Cl Cl Cl Cl 00 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 0 0 WWVWW Ln M M M N M W {� CD L O � V M V� O� M LO DO rrrr LO W 0 Cl Cl 0 Cl Cl 0 0 0 0 0 0 0 00 0 0 0 0 0 0 00 0 N LO LO MO O) r- (D D00(O c`') (O V NN V r P- LO MM M r r r N (0 ' N W I - LOW WNrM (00(O N^ V LO wC)U')(N co NV NN(00 Qj rW r r (O DO r N n m W r m LO M m M M U) 0 Q r M V V N Lo 0 CA rO)m co co n LO^DO 0O)00)O)n V W W F M^DO r r MW O) 0 Cl Cl 0 Cl Cl OD 0 0 0 0 0 0 00 O 00— r N O O O O N N O O) N W It O WIC WN 'D f�((D(MO 00DO V V co V M co rrr N 00 r r r in m O Cl Cl r r NO N O O r O r V l0 r r O O N V 00 O LO O LO W �N LO MmCl MMM O) co LO V M M—N Or M r W r NQ) r r M(O M Cl It W M f-MOMWrM C) LO MOmN M ma W 00 r- C, ID in LO in(DN M N OOr Mao rr 0 N�O0 r rrr V O) N N M r r W� O m t (O D O V O Il- N V O c `M m� O r n j 00 I n r N f - r in 0 Cl 0 0 Cl 0 OD 0 0 0 0 0 0 00 O r O O r N O O O O N 1- N WN W W D co O) co LO V f- O N m WSW W W M (D (D f- (D I- co W I- W DON (O M (N O) co O) O O oO O Cl r r O N 0 0 0 0 0 0 C) cc C) 0 0 0 0 0 0 0 a� o ag o Lo Y a a y� WmOmWLOW 2rC)wU') ')(DmN �8)—P-C)V U')00m 5<1-01- WAN, W't d� V m"t V COIN d4 W LO (D LO M U-) r (O W U') O (N^ O) r N no 7 N W W�O�MCOW O W WO0 fes^ V f� r0 ---V LM(O 7 N r 00 �r r r M M �r r 0 N N N am am m d c c CO M�nO rOLOM O O f-mC) m U000 UO O O 000 r (O� O)O) 00 N W r 7 0 r r r O Cr)M N W N a) r N V Oco -°' EN EN N E 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O 00 Lt D O LL — O l co N N co @W�����m�OW22220m� aaaa E oa Q oaaaa E o= Q oaaaa E o= 2 RLoCDvoo~ {ono �Fd oulo�n,Fd 3 3 r r r W> 7 7 M V O 0 7 7 0 M V 0 _= 0 0 0 0 �p Q == N C O> Q _= 0 0 0 0' Q Y 1 0 o Y Y r N Q Y Y m Q t0 t0 F N N 0 \ CO (0 0 is as (D ~� T o M 0 z z v �, LL (n (n a_ Q (n Tl - 00 00 Tl - 06 W N0N 0d cZc (n G � man Y -j > of LJ Lk cu M N 1� O N m 1,- CD m r N t M r 0 I I � r CD M m Cl r Cl V Cl m M I I O M N CD CD r r r r r N N r Co r co I M M M M m N N I- N M F C m co I- ID U�Cfl co MN uo rrr Co co NN r N 1- Cl Lo M co m V I -M (D co'tI,N CD H N r r co r MM O) MCD 1- CDS m0 N Q cA O O O O O O O O O O O O O O O O O O O O O O O O Cl O O r O r O O O O O O O N a -Q O r N N LO O r r Cl N O Cl O c N c N O r O O r O r (D V M V 'It OD C N N m M N N M 0 CND Q O IY N Q cc'S i 1" co't M m r N r Co m r r r M CD N O r N co O 't 't M r M O N aO co m Lo Lo I- co It r 11 t r r r N N M M N V r r OO N N OoON 00000 o o00 CD CD Or c) co V NIS V r Lor J i00oo0 O000O oo00o oroOr 00000 00000 00000 00 H m M N O r m r N N m O O N M Lo N r O r r N r r Lo Lo I- m I- W I- W I O N Lo Lo o r N r N LO N (D H Q w O O O O O O O O O O O O Cl Cl Cl Cl Cl O Cl Cl O Cl Cl Cl O O Cl O Cl Cl O Cl r O r O O a a a r 0 0 0 r r O r O cN O O O r r O O O O O O O O O O N r r Cl V M r M M O r 0 N C J i3 r Y c0 J O r M O O O— r O O O N N r r O O N r O O r N r Cl) M r c0 O N V m N O O Z F r r O o N o r r r M O O N O N r O CD r N CD N r O M N co uo (D (D a u o m r m I c o r N r Cl) Jr i00000 00000 00000 00000 00000 00000 00000 00 F i p N N r m M r N r 1 O Cl) O r M N N M O M CD O M I,- cD co co M "t r N V r m 0 o F r CN 't N M Uo Uo l CD I m m M r r cA 00000 00000 00000 00000 00000 OOOrr OOr Or 00 a a -6 O O O r r r 0 0 0 r O O O O O O O r O r O O O r r O O N O N r r N N m M N > j Q O of c(D) i N N r N I r Orr M O M O r M N r N a O M C D v m m c o N C D l m 0 O Cl V O rrM NM�� V u�O W aO cc)N Om O O O r r r r r O M O O O O O O O O r r O O O M M N m W m V O W N N aO r M r r J E cD 0 0 0 cD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O Z O r O O r N N O r Co r O O N M O N N r Co 't 'D co N O N Co N O m O M 1- r r r Co o rM rr Mvm CMV coV Co Coco H Q cA O o o o 0 O O O O O O O O O O O O O O O O O O Cl O O o o o 0 O O O O O O O N a a Oroo r N OOr(M r000r o o o00 rMNr 1� MCD m7N O W ITN w N 7 LM r M r Y c0 J j i O O O O O O r O O r O O O N N O N N r co M N V r ON m m N M r r m M N M 0 M V U) ~ ~ CD 0 0 0 CD O r O O r O O O O O O O O O O O r N O M r r N r co V co N W m 't W N J E 0 0 0 0 0 O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O Iv 2222 m 2222 mu 222 m 222 m 2222 mu 222 m 222 m 22 E Q Q Q Q OQ Q Q Q O <<<<t QQQQO <<<<-5 QQQQO <<<<-5 Q Q O Co O u7 F O co O co F O co O Co F O co O co F O co O co F O co O co F O Cc7 O Co F O co O r M V O r M V O r M V O r M 7t O r M O r cn 7t O r M V O r N NN N N N N N MM MM V V I co co co co CDCDCDCD I- I- L r r r r O O O O O O O O O O Cl O Cl Cl O O O O O O O O O O O O m U) T O M 0 z z v �, LL (n (n a_ Q (n Tl - 00 00 Tl - 06 W N0N 0d cZc (n G � man Y J : of LJ Lk NO W Nr t m W Nr mI�M W W r W ID I� mm W V W MM�N W cO W �1-N V V V I� W Mao MmM M I� W I� W W NNMM W I�I� W NM O V a) a) I:N co'r O F M M M r r r r 1 r rrr W r rrr r rrr W r rrr W r r r N I- r N N N m C p N� ��� I� V �M W V V V W V I� V Cl rc(DWD W W r� W m 11, !P m F r r N N N N r r r M Q N O O O O O O o 0 Cl O O Cl Cl Cl O O O O Cl Cl O Cl Cl O O r o r O o 0 0 o O r o r N N a -O N I- o m y W r N r W I- N W I- W r wt m W V o N V W W W W W M N M m I'- > I\ Lo N r r r I D r N r r r r c M r r N r W r rrr W r CO N N m O ry m2 m W O O Wm N c.' M O M m W W 11, 11, W O OmM W 0) CO W N Cl OD (6 W V MV V MV SD MM�M� MN V MN �MMN MI-I-I-W N W Wc) N V ID 71D r V MWN MM IDM V LO V MN I'- MW W N u -)I'- m IDN mmr M2w 04 r J E O o 0 O O O O O O O O o 0 O O O r r O O O o 0 N o 0 0 N O O O r r O O O O O m W Mr V 0004 W MID NNM IDr eco co mm W W moN co MON V m O V OmM o H I- I- A N N M N m N N N N m N N N N m co N M V c0 N M M N r M M M M N M V c0 't l� Q N O O o O O O Cl Cl Cl Cl O Cl O O O O O O O O O r r 0 0 0 0 0 o o o 0 o O O O O O a a -O OOr V ID't M MM CM co W I—N u')IDm W ID W W co 71D W IDrr mO W Nm N Cr 7 r M r N N N N r M r r r Y 0 cc J OmW W ID (D 'tr O W rrr O W OOcc)m MrOrtt� �70cDN ID OIDrr V V V W O C p7 � N r W N r r M r r r M r rrr � r N r r r r I D r rrr W Z F W 7 V 7 r m 7 W O cD W u) m m 1- r V 1- r m O r I1') O V W c0 O M N N I� r O W m v � V 7 7 r r r r ID r r M r M N r r M W r N r r W r r r r N r r W J i000 00000 00000 00000 OrOor r000r 00000 00000 F ip r WN V W W Wr m WrNNM NNNI- M Or W W mV cOMr W Wr p F OOM r r I - I - W I- c) 11 -co W W M W V WIDV N Cl vv��m N V cOV uD ID IDV ISM W V CoID ID N N mo0o 00000 00000 OOror o000o -Door 00000 00000 a a -6 N CO O r V W N M M N o N It CO r O r r N I D m r N O I- r r N M I- I D I- r N I D >r 7 N O Of m i W o c,'4, I W O co. m I D N N W W I� O I D O I D M m N W M W W W M I- N N m M W a ` �js I W W W W W I D I D I D c O N M V cc:,' Cl) M Cl) v Cl) Cl) M Cl) It Cl) u0 co 't N W 1- � W W V N O W W O W O W r c O m LO 1- W H O N I O M NN V NON N r r Cl)I r r r r Cl)O r r r r M r r r r r r r V J E 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 O O o 0 0 0 0 0 0 0 0 0 0 0 0 ip MWIDI-V W MN II ID mCD WIC WCO W OOmWID W V o1:m MWcO I' -r N1: IDrr p H cO M 0 N M N N N r M N N N r r r r r( r M N r W N N N r co N r r N W N r N N m Q cA O o o O O O O O 0 0 0 0 0 O O r O r O O O o 0 O O O O O O O O o 0 O O O r r N a a W WM ID I -O WM N O1' -m Mr u7 V M Nr W W ON u) I --N W ID ID mN I"O W'tN N 7 r r r �W, r N r r Y ca J j S- 7 i co))0 (co, I�NNrN I D r N r r NNmOM W N rrr armr W r r r V7 cOW W WM r r � WMWr r r r N W WI�� I D r r MIDMr W r r r U) WV04 VuOWvm MM c)ro rLO MOm MM1-'r 77N77 MNrr I'- NN70M N04 J E O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 022 mu 222 m 222 m 2222 mu 222 m 2222 mu 222 m 2222 mu EQQ o QQQQ o QQQQ o QQQQ o QQQQ o mama o mama o mama o O Lo Opo Lo (DV DLoF oV(D Lo oIDOLoF (DV VD (D VD OVOIDF M� O r c n� O r c n 7t O r M V O r M 7t O r M V O r M 7t O r M V i I- r O O W W co co Cl O O O m m m m O O O O O O O O r r r r r r N N N N r r r O O O O N N N N O o O o m U) T O M 0 z z v �, LL (n U) a_ Lk Q (n Tl - 00 00 Tl - 06 W N0N 0d cZc (n G � man Y J of LJ N CAr Or CO CD ISN r CD MIS IN- (O mN I- I- GN) CD 11 MCO a 11V m goONOr W CA�r N (M M M _M I, (Dr CpM M M M V MCD V I2 CDM V V M M m12 (O M N N N I -m r N N r r MmMcOO 1 r rrr NOm(D (D r r 10-) CD M F C m (O CDr r M r Cl Lo a) I - CAS CD CD CA V co CD (Dr N M CD CD Lo a) I- co OmO m p F N rMr r r r r CA M NCDMM r rrr mCD CD CD Lo r rrr r M MOO) (D r r r r mm CA 1,-'t r mmCD M co CD V t N N W MN Q N r O r r M 0 0 0 r O O r O r O r N O O O O O O r O O r r 0 0 0 r O O O r r N CU a -O I�Mm m CA 1,-C0 NCO CA 'tO rCD I�mNrCOOmm 00 V CDm NN jM N N m N r N N C A Cl) r r N m r r r r (D r rrr C D r r r t r r N Q O (Y Cb N i Om m1� CD NCD OCA m'g �r u' CA mCn M MIS r N CDr �_ CDO V Om m r I J, J t W rrCAN mw mID M r Nr Co r r r r m mOO1�m r r mmOCD M V V N V Cl) NN N NN wW MN W r r NmCAO CD V OI�(D MIS mI�M I�OOCDN cc CDr CD W r W W V r OM r N r m r N r r r N N N r Co r r r r(D r r r r N N J i00000 cror 00000 00000 00000 00000 C:) 00 H m Cn OD OD N Un I-Mr[p 0) V M V CO CON V M(Or� NCn V OD 0) UDr rCA Un mN o F (DC D C A r r OD m m M 0 r 'C N4 0)— r CA C A OD C D (Dt M C � M M� C n N M r M 0 N N r Co r r Q N O r O O r CD O O O CD O O O O O r 0 0 0 r Cl r O O r r Cl Cl Cl r Cl Cl N Cl N O Cl a a -6GOON N V CA Cpr CA CA mmr r O M CON N CON ON MMMOr mCA V t CD IDN N C J tr MNr r N NNrm rN N r un r rrr rM N Y (0 J W OCA V OCDr r O V CDN D CD (D CDM mr MOM CON r MCO MCO V Cl)CO un (D C p� Z r C D N N N M V V e r m V V V M m N N r r CA r r r N m N Cl) F w I1,I1,OCDm CD rCA (OO I - OCD V CD SCA W CD CD MMrr CD (D7 MCD CA 1- 04 r V Q) M I- 't M a O C') M C D (M (O M V M M V r r r r (D r rrr N Cl) r N J iOOOoo 00000 ooror ooror 00000 ooror 00000 ro F ip CD I,- CDN m V N r m N m1,- m1,- mm V 0(OCD M Co (D Orr CD I- CD w OO W Co V p F CD I -m r m rOr M r r r N O V OmCD r r r OCD 1-(DCD r mm CD V Cl) N Cl) V V CMa N CMN N r Cp r co O r O O r O O r O r r r O N V N O O O N O N r O M O O O O O Cl O O O O O O CD a -6 O V M M O CA M O CA m C A M I'- I'- C D I'- CA V MN N r CO r O Cl) Lo r m N O N 0 7 O N QC r N r r Cl) r MN of Q N i MOCAO M OCA N MIS 2-4M CON a) Co r t (D r (D 1-r M� MIS r (D W �CDmr N m W1�mM I�OaO r �M, Co CD CD V Cl)SCD V MI- NMNNr NNr (D w MCN4 m CD rMCA I� N N MaO CD r (D mw V N m W r O MI - OI - I- CD M CD MCO CD r r r m N N r r 1 N M r r Co r r r r r N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD r O CD r O O ip MNCDM M Co COCO I- 1- (O mIU mCD (D 1- mr M CAN d' aON r OCD CDr N OCD al ID CAI - p M M M N N V M N N M C D N N r N M N r N 0 N r r r 1- r N r r m r r r H Q y O O r O r O O r CD r 1� r CD O CA Cl r O r N O O CD r r O Cl r Cl r Cl Cl Cl O O O O -6 r r N a a MCD CD O CA Mm CAoo I'- V CO wuN mCD CD CAN m V N m 't I'- N V r MCD I'- Mm MN C r r r r N 7 Y S _ (0 J j i CD CAV r r r r r W CD mMMO C D r rrr Mr m CA m N r r CA N N OmM C D N r r Cl)M(D V C D r r m (D CC) mr M r M� CDm N r N U) w CD W m r CD V M (O W m O CD M CD m V M CD CD (D O I� r CD CD CD m N r r CD It CU N r N N J E O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N2222 m 2222 mu 2222 mu 222 m 2222 mu 222 m 222 m 22 Eaaaaoaaaao aaaao aaaao aaaao aaaao aaaao as O(DOCD� O nO(D� O(DO(D� ou�o(D� O nO(D� O noCD� O DO(D� O n O r Co V O r M V O r M V O r M V O r M V O r M V O r M15: O r i MCl) Cl) MV O O O O V V It O O O O CD CD CD CD O O O O mm (Dm O O Cl Cl r r r r O O O O Co Co Co Co O O O O mm mm O O O O OO r r m T O M 0 z z v �, LL (n (n a_ Y Q (n Tl - 00 00 Tl - 06 W N0N 0d cZc (n G � man Y J : of LU @ OO V O N O m co O M C, N N N r O (O m ^ co V ^ Lo c`') (O O F N V W � C F (M r Cl c0 N f-- It O r- N co O u) (D f -- N V M O) Lf) Q to O O O O O O O O (O w M m OO fl- N O O M U) a W O -O �Mr Or MrO c`')rM0 V O(O Lo Q O O ry r NON W Q _N O N i MOm m V M OOON mmr V r w _�(O(n�00 H MON c`) mr Ori r Nr Nc0 f— N 00 N (OO J Q O M N a7 f E o0o O0000 (orO(o000 0 0 m OMO r OO MN O (O In OM V F N m m(o O r4 r D7 N N Q to O O O O O O O O co V r r (pN V room Lo a a �-6 �rM rNr07 MV Nf— V (D (D O 3N 3 O V (D (Do,M O Y N cc Jj O O O r N r O O CO f� m m Z L (, O M (O m V NNO 7M0MO cn NON mc`')r J O N LO O It Ncl) i 0 0 r O O` O` (O N O (O O O O F � O ip r NM (O MM MO N (D U-) V P� O F r M N V V NtO cA O O O O O O Cl O In M r Or- O M rOOr (O co IL O M 'O r't r 000r QO)r NOrN WrO O of N W i m O M V M N M N N O f� Q (O m V r� N (f�M 'A r V H M^ N M a) m r r(O rOr ON BOON V (D (D J w 0 0^ M V W 1 0 0 0 0 0 0 0 0 r O O r 0 0 0 � O ip O O O V N r O I- V r O M O H N W N(D O O V r r O) Q to O O O O O O Cl O (O N N m (O r— V M O N O M d co a - C M r m O O O O O m O N N OO 00 N O N M W M N Y c0 J -1 O j i r'tOp rNr OV (ONaO 0 (D c) W M N U) r O 0 m ♦— r o w M O O O M M M m O N 00 00 J N r N N W 1 0 0 0 O O O O O 0 0 0 0 0 0 0 @ N o o t t N N �aao aaaao of mm22 o�F hq oocn� or hes H `�° 00C) m m 2 2 Lr 00 r rrr r c: D O e mQ r^ W �i Q r 00 TI - 06 0�z a man � Y Mw J ry H W 181 st Ave Out In Total 4573 4455 9028 21 17 7 200 O O 4776 4672 [94348 iP�� cop 4 OJti O 230 3463 751 1 10 p p 17 159 36 0 5 �7 O1 2471 3622 787 1 15 O Right Thru Left UTrn Peds e mu a�a Dorn D_ r c ���� 000 E N tLOc`�') V _ O (O N F---MTI-Tl y (ON V ��NODZr � C N N + W ? W V V �c'N') W y J Cr OD N oD J �O (O (O Nyj �trn O NDN Cco Z N N N i ~ -j vv OF 3 3 (O O (O N c`') U) ~ OD7 � O N O L� N N N N V (O ~ �J rNrn O^ °D N rn)O W rn i 0 0 O n OD OD L j � ro ulfll;al1 nA41 140!21 sPad 0 9 L8S OS8E ELZL 9t O otia 9 0 9t 69L 89 L O Oro 9 LtS 169E SLZL 6E O o �c o p 4 89111 Z9LS 90tS 9 OZS IOLZ OSZ OJ` 1 8t9OL Z6tS 9915 �p lelol ul lno any is L 8 L W Y ca Q N I N Qo (.0 1:11 (.0 O M 0 z z v �, _ ca U_U)U)a_ Q 00 Tl_ Ti c0 cON O I� CONN MM N r O V CO 00 It(ON c:' N M N a0 U') V W M N MMMM m rrr N f__ 00 V cn V V (O co c0 I� O V N O W N O O LO f__ 00 O N (O f__ f__ co W N V N 00 r (O 00 O O O Cl O O O 0 00 0 0 0 C) V O f� O N M O O r M co m N N I- Cl M m O O W W W M V f� N O M� O M (D I- U n m U n m r r r r (p V N N co r W r e') N W I—Mm LO 'tm C)MM t (Or (O LOCDCO 0 (Or (O V V V V C, V V V (D CD O W��coco00 r V LO x(0000 c0 LO (O r._d7O fl- NO O o7 V V O NOj^ (O r rNN MCOM W 0 0 0 Cl 0 Cl OO O O O r r CO O r O O O r N O O O N O N LO LO CO M r N co O N V W m M r O) M (O 00 (N (O I— I— N r co co co co N V (`M O O) r t M W 00 Cl 0 Cl 0 0 Cl 0 0 0 0 0 0 0 OO 0 0 0 0 0 0 OO O O r 0 0 Cl M O) r W^ M N O N M M N m O N N r N r ^ r r N O I—Nc, m(D'tN UO CD U) l00 fl- � V LOM co r Ul Ul V V V V a0 V f-- N� r r r M O W I� Un 00 V V w 0 Om N N P_ V V W (O fl- C) (M fl- rMV V V pin rrr r (6 CD LO MM V f:wm r i n r M O r M OOOOOpo OOOOOOpo OOOOOpo O O O O V V N O) LO M N f: N 0) O O) rOOM 1O V r-- W OrO Cl 0 Cl 0 0 Cl OO 0 0 0 0 0 0 OO —0-- M (O O O LO O O M N N M Cl N M r r N M f M M O a 0 0 0 MMM O LO 00 iO r co � Oa00N r c0 (O(OM f-- N WW W 0') m m m Omr 00 UO It V V MSO 00W f� W f�O rf,- co M X00 r �f� r M 00 't OR N(q0Nr--CDm NN W MOO N N LO r V r r N r l p m r r r r M r r N co co M 0 Cl Cl 0 Cl 0 Cl 0 0 0 0 0 0 OO O O O O O O O O O LOM c0 LO W MCO �O f� O O n MO LO co �O c0 UO MN 0000 NrrN W n NNLONM M O O 0 Cl 0 Cl 0 Cl Cl ClO @ 0 0 0 0 0 0 C) @ r O r M r M r O ) O d r N Y a a <00 ID aoa0(Ommmw(O aMWaOf�VaOf�o0 p N C O N 11 f 5 OO r r i n O CO 0 0 U-) O N n V V no Zt nib M'tMNLON �0 O C Na000f 0(ON r C MM(`')r O V N j ur rm W �r r L6 (D O 0) rNr (p 4 LO Om Qm am v g d c c S CO't 00(O'tN 1-00 O L:) MN r r P- (D O 0 co (O 0)000 f_ O N c O S O .0 W 00 O 'U r N O O 7 0 r0 0 N N N y U N O fN -°' EN EN N 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O C 0 0 0 0 0 0 0 O c D 00 LL O LL — O l N � C) N (D C) 'w2222 0 oLL @W ���� O _F5 LL C0 cD aacD aa oa Q oaaaa E o= Q oaaaa E o= 2 �C) c)M't o~ 0LO0LO �Fd OU-)O� �� d 3 3 r r r r> 7 7 0 r M V O 3 7 c) V O O O- O Orrrr> O' O O i O- 000000mQ 22 a 22CDCDC) ) n LS 0000 �pQ 0000 �pQ co N F o N@ O N N O is as (D ~� T 0 O M 0 z z v �, LL (n (n a_ Q (n Tl - 00 00 Tl - 06 W N0N 0d cZc (n G � man Y -j > of LJ Lk O V V r � m V M W aOM O(01� CON ON N Om (n(O CO(OM O11 r Ow N Cl N r r r co r N r r co r r (O r V I\ M M co N N N W N M F C m 0w O(n M M r0c0O V N"tV � r O MM1,- r,tr (0N N mr't c0 (0 mMm (D c) o r N r r co r M m M (O (D m (n I- 04 -N r Q N O O O O O O O O O O O O O O Cl Cl O O O O O O O O O O O r O r O O O O O O O N a -Q O M O N (n r O O O r O O O N N O O O r r O r M CO N V N w r M M M M cO0 Q O IY N Q Ni O V O (M 1: N 0 0't (0 M (V't N r Cl O M r r M (0 M M O M (0 (O N A V N q M w r �M r O r 0 o r O r O N M r O o 0 r r O O r N O O r O r O r r N 7 m u7 U') m V MCD N J Ec000O o00OO o00OO o00OO pOOOo OoOOo 00000 00 H D m (n O N r CO O M M M m N x M 0 c0 V O N N CO r M 0 7 CO (n M N r r m N (0 O I- r m o r r N N r N CD r H Q N O O O O O O O O O Cl Cl Cl Cl O O O O O O O O O O O O O O O O O r r Cl Cl N Cl Cl a a -6 0 0 0 0 0 O r N Cl M r Cl Cl Cl r r 0 0 0 r O O O O O r O N rIt N V M M N C� J Y (0 J i 0 0 N O N r r O O N O O r O r r Orr M r 0 0 0— r r M M CO N I- V (0 m N CO O r Z ~ ~ t n O O r (0 m r r M V r r N O V N O r r It O M 0 7 11, M N 11, M un V O m r N I r r M r N J EcooOO O000O 00000 00000 00000 00000 00000 Or F ip V mN 1- NOM NI,- Nr N1, -N un un (n W M w1,- mNm -- W MgMw (0 CO o H r r N M (n V (0 I a o m m M O m y O O O O O O O O Cl O O O O O O O O Cl Cl O O Cl O O O O O O O O O r O O r O O a a -6 O O r O r r 0 0 0 r O O O O O O O r N M O O O Cl O Cl O O r r N Cl r r r M > j Q O Q c(D) i M M r r CO O O r ('M V N O M N 1- r 0 0 (n (0 (n un V 0 O N W (CD4 O M M N 1-) Lo rrM NCN)(nM V ISDIU W aO0 CO aO r 0 0 0 r O r O r N O O O O O r r r O M O O r Lo N (O m m I- m O O N N r M N J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O E0 �p r M 0 0 V r r O O N Cl O O O O r r M O (0 M I- W M r O (O (0 N It N c0 N V V M V o rM rr N(n0 (M(M't(OI LO H Q cA O O O O O O O O O O O O O O Cl O O O O O O O O O O O O O O O O O O Cl O O Cl N a a 0 0 0 0 o O O O O O 0 0 0 0 0 O O r O r — M O N c0 't (O m O w m (0 N r c0 w N 7 r N r M Y (0 J j i O M O O M r r O O N Cl Cl O Cl Cl r r N 0 7 N 7 u7 r N t0 r M M r r r (r0 m N M V N M M U) r 0 0 0 r O O O O O O O O O Cl Cl Cl Cl Cl Cl Cl Cl M Cl M r 0 v v m V V c0 W (t7 r N r J E0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O D 02222 m 2 22 2 mu 222 m 222 m 2222 mu 222 m 222 m 22 E Q Q Q QO Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q Q Q O Q Q O u7 O Lo F O (0 0 (n F O (O O Lo F O (n O (n F O (0 0 (O F O (0 0 (O F O (0 0 (n F O (0 O r Cl) V O r M V O r M V O r MC? O r M 7t O r M 7t O r M V O r N NN N NN N N MM MM V V It LOLoLoLo (0(0(0(0 r r L r r r r O O O O O O O O O O O O O O O O O O O Cl O O O O O O m U) T N 1 N Qo CO 1:11 N O M 0 z z v �, LL (n (n a_ Q (n Tl - 00 00 Tl - 06 W N0N 0d cZc (n G � man Y J : of LJ Lk op N mcON r1'- 00 (D CO MM I'- N N m O CON r r (D (D Com CAM co CA CA 1-r Lo a,W O V cDCo t co W�rOr M r r r N _m mCo1�r I N r r r Wm�Co 1 r r r r rrCOW ID r r r r W rm1�m ID r r r r t mmr WO I- r r N N mrCoCor m r N N N m C m V N N ID co Lo C P (D (D O CA O M m N C o m m Cl m r m Cl Cl 1 1 r c p N m 'D CA C P I M M 1,- 0 p F V co r r Co m Lo 't Co r Co Co Lo V N r V Lo Co Lo N Cl Lo (o Co �'t N r co ID N C, r r CA 1- M r (D m O CA Lo M r M Q Cn O O O O O O O O O O O r r O r O O r O O O O O O O O O O 0 0 0 0 0 O O O O O CU a -Q 00 V N m 0 m N r I O C O N N m N r m M l V M I N V N C P M V N C P C O r N V > CA I'- N r r r Lo r r Cl) r r r r r Lo r N r Cl) CA N N CO CO r r r M r I- O ry CA Cb (6 i O N CP M m mmM m N CO O O Cfl Cfl N CA m Co (D oo (D m m N Cfl O m ID CA CO ID M ID W SCA VCoo)NM� MVMMCP CN VM ��MVr V V�V W 'CPV Vr "t Cfl (D "t N m CDm r WCD"N MCD V CDm MOMI� N V Co V w r- C2 m7 (D 7N (O a) a) r r M , J 1000 OOOoo 00000 O000O OO000 O000O OOrOr oo000 H m V Com MCOr MM O mOCO'It CDN CAr m C) LO CDN r OmLOLO Oc01- MCD m V r N m g H mmN NrN NCA Co NNNN NMNMr V N M V V MM Co MMMNN 'ItM DI -N Q Cn O O O O O O O O O O O O O Cl Cl O Cl O O Cl O O O 0 0 0 0 0 0 0 0 0 0 O r O O r a a -6 CAm V r Coo MCP m Com c) N CD m CD O r'- 't MCom N mCD r,- "t CDr N Om N MOaOM r Cl) r Cl) r r N V r r r r Co J Y (0 J N CP V W ISN m aOmmN COQ CON L ClO Cl m V MOOD CA I� mCD N MMON CA C p Z � N N N Lo C o N r � r r M r r r� m r r r� m M ID r r N N CD F w V m I- "t Lo O I --CD V ONCOMr CD r NrO CD c W Co mCA m Co CP �I�r N"t Q) Lo Lo C o r r r N r r C D r r r r C P N r N N C O N r N r I- r r r ID r N M Cl) m J ioor 00000 00000 00000 00000 00000 00000 00000 F ip co Co Co MCO CA CON MMCO CO CA I- Co Co Lo CO OCA mMO COr r Co CP mmmmw m Co O CO p F ,OCo r r rCow WO W Co'D Cl) Co CO CoCoCo N Co COMCor N �mCPCor N mCPrmCP N CPmmrCP N N y 0 0 0 O O r O r 0 0 0 0 0 0 0 0 0 0 r r O O N O r O O r 0 0 0 0 0 O r O O r a a -6 1.� LO CO N V N N N O M O N It m V CO r N O M W N r Lo N r r m It V V M !P N M V Lo N > j O Q N i �r MCO Co COO O CA V m Cor CO Co N Mm Co W CD CD m CD I- CD W Mm CD "t W ID c) W ` s CA M CO I� I� 04 1'- V Co Co N V CA V' M V CD Cl) V M V CD Co M Co V m V V Co CO � VD CO 1-0 CAM O CoOMM W mm W MO co I- (DI -N r w mr COr MOCP CP N r r r r r r r r CW, r r r I- CM r r r r J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD 0 0 CD O O O O O 0 0 0 0 0 m r�N Co V Co c00 OCOmV r mCP r,-Vm I-mror Co r V I�I�Co I-ONMN OV ON CD p C O CO m N N N CO r M N r N 0 r N N r co N r r N co r r r r ID N M N N O N N CO N Cl) H Q CO O O O O O O O O O O O r r O r O O r O O O O O O O O O O O O O O O O O O O O N a a Of a co co ml - l- OCM, cD r r 1-N � r r cD I- (o co V 1` 71, ON COO MI - Co Co CO CON N � r N N r N Y Q (0 J j � i mcl 04 V NM MNCP MM rrrNCO m V CPV rrrrCO N NMCOmO rrr mmmV CP r r� CP �mm7 CA N V I�rLo N rrrrCP mMCPrcO rrr� U) 'It 'It M LO M M V LO M CO N M CO V M V a v v M C P M r N M m m C D N LO c D ID m C P N N N J E O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 022 mu 222 m 222 m 2222 mu 222 m 2222 mu 222 m 2222 mu EQQo QQQQ o QQQQ o QQQQ o QQQQ o mama o mama o mama o OCP O POCP� OCPOCP� O (D Lo O nOCPF O nOCP� O nOCP� O POCP� M� O r M� O r M 7t O r M V O r M 7t O r M V O r M 7t O r M V i I- r O O CA CA co cc) Cl O O O m m m m Cl Cl O O O O O O r r r r r r N N N N r r r O O O O N N N N O O O O m U) T N 1 N C9 CO "t CO O M 0 z z v �, LL (n U) a_ Lk Q (n Tl - 00 00 Tl - 06 W N0N 0d cZc (n G � man Y J of LJ N co CD m7 I- CA CDO co Cl Lo CAOM I-7 CO w LO N r Mr I- (D M OLD LOr r W LO M mCON N N N co M O O COo N 7 M 7 V I'- N W COr C 17 V M M M W OIC 7 Loco V M N N N mCA O7 O r r r r Cfl Om Or co r r r r N OCA I'- C O r r W OLA M F C m NCOrr LA O7MrCA (o W aOM COOmMaO aO07O W W OM W LA rM V Cl V w p F Orr M'D r r r r LA LOMCO r r r r CA OCON N1� L A r r r r Mr OO Lo r r r r LO W w r 7 r r W W LAO M LO LO V Co M MN N Q u) r 0 0 0 r r 0 0 0 r r 0 0 0 r O O O O O O O O O O O O O O O O O O O O O O CU a -O COITN N mCD m 7 CA cl a, rCO CON LO 70 co N7 1-0 CO W r COrM00 N7 O > r N r N C A r N r N C A N N r r 1- r r r r Lo r r r 7 r M r r M Q O (Y Cb C6 i N CO rCAW mN m r LA CAM OOmO _M c2 5! rmOM OCO LA7O OCA W rLA LOOLOMM OCfl LA LAM N mO CO OCfl 4M CA OCA I� 7MMNLO LA CAO NN r IJ,J t Co r r r r r r r CO N N 'I -N7 M MMCO7 D NCO O MIS 'ODD mm W ISM mOrrr CTO r CD Cfl 4777 CDm r7 r r L O N N r N a O r r N r C D r r L O r r r 7 r r M J i00000 00000 oroor 00000 00000 00000 00000 00 H m m N m 7 7 r O LO r I- N OD 1- (D M 01- M r r N Co m 1 7 7 CD m N r m O N r N 1- (D o F CO I -CD I -cc OD r N NI' -I' -LO r Co CO LO LO COQ 77NrM NNNNO NNrrI- Q Cn LO O O O LA O O O O O O N O O N Cl O O Cl O O Cl O O O O O O O O O O O r r O O a a -6 71�COr CA N cpr N CO N CO CO mN MM CAM1- r 7 Lo 1- r I -m7 LO LO LA W CO7 M LOr C n C J t m Lo N r N N W N r r Co r r r r Lo r r CO N N Y cc J C p� 14M 7 C O N N M N W (D 14 LO 1 O N N LO 7 7 M 7 M 1 4 LO LO COM N 1 (D 7 0 7 7 N N N r 7 O I N I CA N r r C O m C O C O r r r M r O m 7 N C O r LO r 7 N Z F OD OD m 11, N M 7 0 N m (D (D m O r O L O 7 Cl r L O N CO r 7 CO m 7 LO M CO N N O r r N N M M M C O M LO 7 C A 7 N N N N N N r C V Co r r r 7 N r N J i r 0 0 0 r O r O O r r 0 0 0 r O O O O O O O O O O O O O O O r O O N M O O ip (D (D 711, LO CAN N r r LOr r7 m11, r w 07 N CON MM CO COr W MCA W r mLO p H m Lo m m M O Orr CO r r r r M O N M m 7 r r r Lo r r C O L 7 O 7 7 7 M M C 0 7 M M N MN N r r r r U) 7 0 0 0 7 0 0 0 0 Cl 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a a -6 CO COO CAO r mOmLO OOM CDm 1,-771,-N NOLO MO 7rr Mm Nr Nr CD ON > r M r CO r r r CO N jr Q c(D) i 0 C A L O 7 1� O 'I-- 7 (CED A m N 7 7 Lao) 0 O O m M N Lo O I,- M N I,- L A l r m CA O M O m 0 OMIT O N CA ICA CONr mmmcM, OO LO CON MM CMN N MN CO r r r LO r r w Nr N Cfl CA LO CR r CA MOmMLO N M 7 CAr r m1,- CDm r LO O LOr r 7 CD7 r OM N r r NIS r N r r 1 N N r N CA r r M N N J E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD 0 0 CD 0 0 0 0 0 0 0 0 0 0 O O CD MIS LO r N 700 CD OCDN LAM N 01: CD LO N r CAN M r aON Or r LOr m 77 o N N N N 0 7 N M M N M N M M N M M r N 0N r r LO N r r r m r M H Q U) r O o N M r 0 Cl 0 r r Cl 0 Cl r O Cl O O O O O O O O O Cl O O O O O O O O O O CU a a O r ID m70 MCA m CO NI�I�r�mM LA LO W WCD LA7rrr N7LA NM 7NNN0 r r N r COCO CY) 04Y C0 J j i CcAN OLO NO 7rNr CA LA mCAO mmLOr m7 LfCAN cDr7 Lf)M r MrMLON NM � F- � O UOC A 7 O C D Cl 7 Cl 7 7 O CA C A m 7 1� A M N M c 0 CO M M CO N 7 N N h 1 0 r Cl CU N r C N C N J E O O O O o O o 0 0 o O O O O O cc 0 o o 0 0 0 0 0 O O O O O O O O O O O O 02222 m 2222 mu 2222 mu 222 m 2222 mu 222 M 222 m 22 aaaao aaaao aaaao aaaao aaaao aaaao aaaao as 0 u7 o m F O Ln O Lo O LO O LO F o Ln o Lo O Ln O Lo o Ln O Lo O LA O LA O Ln O r Cl) 7 O r M 7 O r M 7 O r M 7 O r M 7 O r M 7 O r M 7 O r i MMMCO O O O O 7 777 O O O O LA LO LO Lo O O O O Cfl CD Cfl CD O O O O I - I - I - I- O O O O Co CA CA CA O O O O mmmm O O O O OO r r m 6) T Q 60 N0 Ld_ Y CQ Q O M 0 z z v �, LL (n U) a_ Lk Cll Q (n Tl_ 00 Tl_ W N0N 0d cZc (n G � man Y J : of I U00 O V (O V V MOO LON O V N a O M N N r C O) COO m m000 MrM UOM (O V00 X00 U')H rr0p rr M 00 ^ mON Lf) Q N O O O O O O O O (0- 0 V f. N M N O a (00 Cl) -Q X00 NrN Ou7 rfl- In f- W r Q3 Z 71 V { N W N� O ry Q _N N i N O O 0) 00 c0 LO N W In V O (O r uJ r 0^0(6N O (DU) O) W V r H Cl) M M O M N N r O LO (O M O) V M N f - O) E` 0 0 O O O O O N O O N O O O � O m 0 I-- O 0) V UO N O r I n 00 M N F r M N O CD(DM C') N Q N O O O O O O O O r r r O O O � rooro a a -O CO M N N O ,t f— N CO fes CO N O t CD (O (O M Y N mN (0 J OM M N O r N r O V M CO O f V r0 CO (D M Z L O M r— r 0 M J CO M N M W N O O O O F � O ip rc0 I�OmOW V N (ON V r N COM W W m F ^ V U') V 0 O O O 0 0 0 0 0 O N r M O r O r O O W a -6 NOV —coo— m V f, -r— V N(O QC: O) NN�r V N � 00 co V'� c0 SOW (OLCO4 LO00V OMV r CO H M^ N M O r N (O O r r O N M M M N 0')_ 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D Z r N r r M M r 00 O U V CO (O f l- F CO ^ COON r O) Q CO O O O O O O O O � V O Ul V N (O O CO d n N a I :E ONS ON Mr- 00 r (D 00 N 7 A N N M Y O N O (0 J i O O N O) f- (O (O U) It N U) L 0 r O O N ♦- w rON OON ON mIl- N N V r (O J OM r N O r C) W 1 0 0 0 O O O O O 0 0 0 0 0 (D 0 g 2222m ma o ++ n n Eaao aaaao OU hq F OOcn� or hes H `�° 00C) m m 2 2 Lr 0 0 r rrr r � QH O e mQ r^ W �i N CO CO 1:11 Lf') } O O p Z Z U cu LL (n (n a_ Q r 00 06 0�z a man � Y MW J ry H W 181 st Ave Out In Total 6 45922 9198 O O 19, 404 48108 4784 [96202 r�r� t O O O </ OJti O 247 3604 732 0 9 p p 12 148 31 0 1 r7 O 259 3752 763 0 10 O Right Thru Left UTrn Peds O 1-i zi N O a � a NODo 0_ ornrn o�n oNo m FN N 000E N- tLNNV F _ (D (O y (O W O� N 1 � NO vv OF 3 3 CD LO �o� ~ IT 'IT OD ODNO ONOL� Q)M ILO ~ O O F �J W O OOD� W N�070 SOD W if - Of- C11 -m � ODM u lfl 4 n�41 Nf0! sPad O Z 969 1, LRE 1, Cl, 9 O otia 0 ZS 081, bS Z O rOro Z bbS 169E LSZL b p o p 4 179£LL 98LS 8LSS � bOS 88Z 9LZ OJ'` r 09801 MG Z9ES 110 lelol ul lno any is L 8 L W N I N Qo (.0 1:11 (.0 O M 0 z z v �, cu U- v) v) a_ Q (n Tl - 00 r Ti N Cl N m M0O co OO f- O O V O O O) 00 c 0 N N W W V V V M (D co W N M V M M r ID C, V NN LO N W (O OO O M O M r O L- L- 00 L- r M O (O 0 0 M r r r r M O) r r r r (p Q) 0 0 Cl Cl 0 0 00 0000 0 0 00 O O r O r N O O O O N O OW V NMID V m V N(O V O) V (`')0)000 _W M 10 M r N 6 N N co co r L6 N r N N N 0) L6 Lo rM 00 r OO MM0 N 00 N (000)x0 f� 00 co W 000 co V Min �nW Vr V(OV V �:(DW Q)0��mm W W M7 c0 c00)NN m V (D V mm a) (0 7OO(O V CO r�r N^c r Nrr LAN 0 0 0 Cl 0 0 0 O O r O r M O O O O r r N O Cl O O N o N rwIt Un 't W C) (D Ll- c`')(O 0) Or NO(O N r't0)0)N ID mm 0')N N LO N Nr m Ll - r N V r r V co Cl 0 Cl 0 0 0 00 0 0 0 0 0 0 00 O O O N N O O O O O N M rc0 10,tMr (0 rN OM Ll -m NN(O(00 rr�r� rrN V NNNraOCON N O r 07 N M N N- V M L-- 0) co N V O L- 0' ) V M r O r (y^ V OMO(,.�L- N0 N V Co. N r"tmN w V OO(O OOMN O N (D (D V COO r NUn UO!OO V rrr (pr�� O V V N (Or N r inO rOV r(,.)00 O r O O r O Cl 0 0 0 0 0 0 00 O O r O r N O O O N M00(O 00 LO LO 0)mm 0') 00 V (O N_ O m V O m O O r M O co r O N O r r N 00 r rt 0) 0 0 0 Cl 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 00 O O r M LO M N N 00 V V V( `' ) O 0 O 00 0, )) O W O O M( O 0 r L6 0 r r co O UO r r r LO O O M O) (O (O O V (DV O M M N 00 W r 00M OO In MO V Q)L-r 000O Ll- 0) MO) O r MW co M^ Co. O V W cO IS N M (p r f� N V M Ll- M O M- M (V r (V r r O 0) r r r co r r N N f V OO r r CO. 0 Cl Cl 0 0 0 Cl 0 0 0 0 0 0 00 O O O O O O O O O M V r It r rON ('MN O OOO(O (O Ll - V UOMO) 000 NMN N O O co co co (N r (0 00 O) O O Cl 0 Cl 0 0 0 C,0 0 0 0 0 0 C)6 C, cc CD @ O O r O r M p 0 a) O d O N Y a a y�MW0000Oc000 �O(OOML-OOO � o0)(OL--L-0)O(O Q M� j M 0- ' r N O a. N N O 5 Cl r 0 0 0 N O 0 0 W O r - 04 r @ r @ no _ _ 7 N in 0) N 00 m� O N V r r V N V r 0 0O 0 V O j N M M V N�� O O �f�r r r r (O N W O �N N r r r M 00 M Om am am co g d c c S CO Lo 't 't 't Ln LO O O0)(ONONMr O OO V V V NmC) c N CV V O N O' O j 0 r LO O N N O N N r o r y U N O 2-°) EN EN N E 0 0 0 0 0 0 0 0[ 0 0 0 0 0 0 0 O E 0 0 0 0 0 0 0 O 00 LL - O LL - O J- NO N(D (D O N N j,.0 aaaa oa Q oaaaa E o= Q oaaaa E o= 2 �C) c) 't 0 O�nOLn Fa. OU-)O� 3 3 r r r r> 7 7 0 r M V O 3 7 c) V O O O- O Orrrr> O' O O i O - o O0000 mQ 22 a 22vv�iiC) n LS 0000 �pQ 0000 �pQ co N F o N@ O N N O ~is as �as ~� SPACK Appendix C - Signal Warrant Analyses Traffic Signal Warrant Analysis ACADEMY Warrants 1- 3 (Volume Warrants) Line Ave Operations in Elk River 359-16-01 Existing Major Street (E/W Road) 77 _.7, 77 181st Ave I q Minor Street (N/S Road) Twin Lakes Rd Analyzed with 2 or more approach lanes Analyzed with 2 or more approach lanes Total Approach Volume 10042.8 vehicles Total Approach Volume 4631.76 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 50 percent applied Right turn reduction of 50 percent applied No high speed or isolated community reduction applied to the Volume Warrant thresholds. anouia oe appiiea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 2 hours Criteria See Figure Below -._. Condition A Condition B Condition Satisfied? Condition Satisfied?Not Required values reached for Condition A Satisfied 4 hours Condition B Not Satisf led 1 hour Condition A+B* NotSatisfied 6 (Cond. A) & 3 (Cond. B) Criteria - Major Street (veh/hr) 600 900 480 (Cond. A) & 720 (Cond. B) Criteria - Minor Street (veh/hr) 200 100 160 (Cond. A) & 80 (Cond. B) anouia oe appiiea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 2 hours Criteria See Figure Below -._. Condition A Condition B Condition Satisfied? Required values reached for 1560 total, 422 minor, 1.4 delay 0 hours Criteria - Total Approach Volume (veh in one hour) 800 See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) 150 Criteria - Minor Street High Side Delay (veh-hrs) 5 T 900 800 700 600 500 400 300 200 100 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies S_.a �11"M!"n SPACK COUN-iriN� traffic A C A D E M 1' C5.��m TAAlf7[ DATA INC. Traffic Impact Study C 1 Line Avenue Operations igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) # -*-Warrant 2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes • • • • • 2500 SPACK Appendix C - Signal Warrant Analyses Traffic Signal Warrant Analysis ACADEMY Warrants 1- 3 (Volume Warrants) Line Ave Operations in Elk River 359-16-01 Existing Major Street (N/S Road) Twin Lakes Rd (E/W Road) Line Ave Analyzed with 2 or more approach lanesith 7Right 1 Approach Lane Total Approach Volume 5752.32 vehicles ach Volume 3530.88 vehicles Total Ped/Bike Volume 0 crossings ike Volume 0 crossings Right turn reduction of 100 percent applied duction of 0 percent applied No high speed or isolated community reduction applied to the Volume Warrant thresholds. anouia oe appuea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 0 hours Criteria See Figure Below Condition A Condition B Condition Satisfied? Not Examined Condition Satisfied?Not Required values reached for Condition A Satisfied 0 hours Condition B Not Satisf led 0 hours Condition A+B* NotSatisfied 0 (Cond. A) & 0 (Cond. B) Criteria - Major Street (veh/hr) 600 900 480 (Cond. A) & 720 (Cond. B) Criteria - Minor Street (veh/hr) 150 75 120 (Cond. A) & 60 (Cond. B) anouia oe appuea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 0 hours Criteria See Figure Below T 900 800 700 600 500 400 300 200 100 igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes Condition A Condition B Condition Satisfied? Not Examined Required values reached for 0 hours Criteria - Total Approach Volume (veh in one hour) See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) Criteria - Minor Street High Side Delay (veh-hrs) T 900 800 700 600 500 400 300 200 100 igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes • • 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies S a c k Mi + n S PACK CQUN-irING L �,; ACADEMY cars.com TPAFf7C DATA Traffic Impact Study C2 Line Avenue Operations 2500 SPACK Appendix C - Signal Warrant Analyses Traffic Signal Warrant Analysis ACADEMY Warrants 1- 3 (Volume Warrants) Line Ave Operations in Elk River 359-16-01 Alternative A Major Street (E/W Road) ral�x 181st Ave p Minor Street (N/S Road) Twin Lakes Rd Analyzed with 2 or more approach lanes Analyzed with 2 or more approach lanes Total Approach Volume 13426.08 vehicles Total Approach Volume 7330.56 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 50 percent applied Right turn reduction of 50 percent applied No high speed or isolated community reduction applied to the Volume Warrant thresholds. anouia oe appuea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 4 hours Criteria See Figure Below -._ Condition A Condition B Condition Satisfied? Not Examined Condition Satisfied?Not Required values reached for Condition A Satisfied 6 hours Condition B Not Satisf led 4 hours Condition A+B* NotSatisfied 9 (Cond. A) & 6 (Cond. B) Criteria - Major Street (veh/hr) 600 900 480 (Cond. A) & 720 (Cond. B) Criteria - Minor Street (veh/hr) 200 100 160 (Cond. A) & 80 (Cond. B) anouia oe appuea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 4 hours Criteria See Figure Below -._ Condition A Condition B Condition Satisfied? Not Examined Required values reached for 2 hours Criteria - Total Approach Volume (veh in one hour) See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) Criteria - Minor Street High Side Delay (veh-hrs) I igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) T 900 800 700 600 500 400 300 200 100 -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes • • •• • • 'Die i • 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies S M!"n SPACK COUN-irNa li C�"5.��m TAAlf7[ DATA INC._.traffic ACADEMY Traffic Impact Study C 3 Line Avenue Operations 2500 SPACK Appendix C - Signal Warrant Analyses Traffic Signal Warrant Analysis ACADEMY Warrants 1- 3 (Volume Warrants) Line Ave Operations in Elk River 359-16-01 Alternative B Major Street (E/W Road) 77 181st Ave I III Minor Street (N/S Road) Twin Lakes Rd Analyzed with 2 or more approach lanes Analyzed with 2 or more approach lanes Total Approach Volume 11573.0310912 vehicles Total Approach Volume 8042.9664 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 50 percent applied I Right turn reduction of 50 percent applied No high speed or isolated community reduction applied to the Volume Warrant thresholds. anouia oe appuea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 4 hours Criteria See Figure Below Condition A Condition B Condition Satisfied? Not Examined Condition Satisfied?Not Required values reached for Condition A Satisfied 4 hours Condition B Not Satisf led 2 hours Condition A+B* NotSatisfied 8 (Cond. A) & 5 (Cond. B) Criteria - Major Street (veh/hr) 600 900 480 (Cond. A) & 720 (Cond. B) Criteria - Minor Street (veh/hr) 200 100 160 (Cond. A) & 80 (Cond. B) anouia oe appuea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 4 hours Criteria See Figure Below T 900 800 700 600 500 400 300 200 100 igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies S a c k Mi + n S PACK CQUN-irING L �,; ACADEMY cars.com TPAFf7C DATA Traffic Impact Study C4 Line Avenue Operations 2500 Condition A Condition B Condition Satisfied? Not Examined Required values reached for 2 hours Criteria - Total Approach Volume (veh in one hour) See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) Criteria - Minor Street High Side Delay (veh-hrs) T 900 800 700 600 500 400 300 200 100 igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies S a c k Mi + n S PACK CQUN-irING L �,; ACADEMY cars.com TPAFf7C DATA Traffic Impact Study C4 Line Avenue Operations 2500 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies S a c k Mi + n S PACK CQUN-irING L �,; ACADEMY cars.com TPAFf7C DATA Traffic Impact Study C4 Line Avenue Operations 2500 SPACK Appendix C - Signal Warrant Analyses Traffic Signal Warrant Analysis ACADEMY Warrants 1- 3 (Volume Warrants) Line Ave Operations in Elk River 359-16-01 Alternative C Major Street (E/W Road) 77 181st Ave I rol Minor Street (N/S Road) Twin Lakes Rd Analyzed with 2 or more approach lanes Analyzed with 2 or more approach lanes Total Approach Volume 11919.3257952 vehicles Total Approach Volume 7889.386512 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 1 0 percent applied I Right turn reduction of 50 percent applied No high speed or isolated community reduction applied to the Volume Warrant thresholds. anouia oe appuea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 4 hours Criteria See Figure Below Condition A Condition B Condition Satisfied? Not Examined Condition Satisfied?Not Required values reached for Condition A Satisfied 5 hours Condition B Not Satisf led 4 hours Condition A+B* NotSatisfied 9 (Cond. A) & 5 (Cond. B) Criteria - Major Street (veh/hr) 600 900 480 (Cond. A) & 720 (Cond. B) Criteria - Minor Street (veh/hr) 200 100 160 (Cond. A) & 80 (Cond. B) anouia oe appuea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 4 hours Criteria See Figure Below T 900 800 700 600 500 400 300 200 100 igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes Condition A Condition B Condition Satisfied? Not Examined Required values reached for 2 hours Criteria - Total Approach Volume (veh in one hour) See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) Criteria - Minor Street High Side Delay (veh-hrs) T 900 800 700 600 500 400 300 200 100 igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes • • 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies S a c k Mi + n S PACK CQUN-irING L �,; ACADEMY cars.com TPAFf7C DATA Traffic Impact Study C 5 Line Avenue Operations 2500 SPACKAppendix C - Signal arrant Analyses Traffic Signal Warrant Analysis ACADEMY Warrants 1- 3 (Volume Warrants) Line Ave Operations in Elk River 359-16-01 Existing Major Street (E/W Road) 5th St Minor Street (N/S Road) Dodge Ave Analyzed with 1 approach lane Analyzed with 1 Approach Lane Total Approach Volume 3203.52 vehicles Total Approach Volume 2104.8 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 0 percent applied Right turn reduction of 0 percent applied No high speed or isolated community reduction applied to the Volume Warrant thresholds. anouia oe appiiea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 0 hours Criteria See Figure Below _s a - Condition Satisfied? Condition Satisfied?Not Required values reached for Condition A Satisfied 0 hours Condition B Not Satisf led 0 hours Condition A+B* NotSatisfied 0 (Cond. A) & 0 (Cond. B) Criteria - Major Street (veh/hr) 500 750 400 (Cond. A) & 600 (Cond. B) Criteria - Minor Street (veh/hr) 150 75 120 (Cond. A) & 60 (Cond. B) anouia oe appiiea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 0 hours Criteria See Figure Below T 900 800 700 600 500 400 300 200 100 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies a C k Milix-neshiGn S PACK COUN-irING lit traffic A C A C) E M T r-c11"'S'�om TPAFf7C DATA INC. Traffic Impact Study C 6 Line Avenue Operations igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) 2500 Condition A Condition B Condition Satisfied? Required values reached for 524 total, 180 minor, 0.7 delay 0 hours Criteria - Total Approach Volume (veh in one hour) 800 See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) 100 Criteria - Minor Street High Side Delay (veh-hrs) 4 T 900 800 700 600 500 400 300 200 100 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies a C k Milix-neshiGn S PACK COUN-irING lit traffic A C A C) E M T r-c11"'S'�om TPAFf7C DATA INC. Traffic Impact Study C 6 Line Avenue Operations igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) 2500 SPACKAppendix C - Signal Warrant Analyses Traffic Signal Warrant Analysis ACADEMY Warrants 1- 3 (Volume Warrants) Line Ave Operations in Elk River 359-16-01 Existing Major Street (N/S Road) _.., 7771 Line Ave rol Minor Street (E/W Road) 5th St Analyzed with 1 approach lane Analyzed with 1 Approach Lane Total Approach Volume 7127.04 vehicles Total Approach Volume 1853.28 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 0 percent applied Right turn reduction of 0 percent applied No high speed or isolated community reduction applied to the Volume Warrant thresholds. anouia oe appiiea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 0 hours Criteria See Figure Below Condition A Condition B Condition Satisfied? Condition Satisfied?Not Required values reached for Condition A Satisfied 1 hour Condition B Not Satisf led 0 hours Condition A+B* NotSatisfied 5 (Cond. A) & 2 (Cond. B) Criteria - Major Street (veh/hr) 500 750 400 (Cond. A) & 600 (Cond. B) Criteria - Minor Street (veh/hr) 150 75 120 (Cond. A) & 60 (Cond. B) anouia oe appiiea only arier an aaequaie mai or omer aiternanves mat couia cause less aeiay ana inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 0 hours Criteria See Figure Below T igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) 900 800 700 600 500 400 300 200 100 -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes Condition A Condition B Condition Satisfied? Required values reached for 865 total, 151 minor, 0.7 delay 0 hours Criteria - Total Approach Volume (veh in one hour) 650 See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) 100 Criteria - Minor Street High Side Delay (veh-hrs) 4 T igure 4C-1 (Warrant 2) & Figure 4C-3 (Warrant 3) 900 800 700 600 500 400 300 200 100 -*-Warrant2 Threshold —Ar -Warrant 3 Threshold • Intersection Volumes • 0 0 500 1000 1500 2000 Major Street Volume (Both Approaches) Spack Academy is part of the Spack Enterprise family of companies C k Mi +9,n S PAC K CQUIN r NG ,� e•,efG$ tC ACADEMY car' •�O�il TPAFf7C DATA Traffic Impact Study C 7 Line Avenue Operations 2500 Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\AM Existing.pdf Line Avenue Operations Intersection Analysis Summary Spa.clk Scenario 1: AM Existing 6/8/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 SB Thru 0.000 10.9 B 2 Line Ave & 5th St Two-way stop HCM 2010 SEB Left 0.099 13.8 B 3 Twin Lakes Rd & Line Ave Two-way stop HCM 2010 WB Thru 0.046 16.0 C 4 Line Ave & 3rd St Two-way stop HCM 2010 WB Left 0.005 14.7 B 5 Line Ave & Main St Signalized HCM 2010 NB Left 0.498 19.5 B 6 Twin Lakes Rd & 181st Ave All -way stop HCM 2010 NWB Thru 12.1 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 1 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 10.9 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 0 2 94 0 0 18 10 0 0 1 42 130 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 0 2 94 0 0 18T 10 0 0 42 130 Peak Hour Factor 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 1 27 0 0 5 3 0 0 12 38 Total Analysis Volume [veh/h] 1 0 2 109 0 0 21 12 0 0 49 151 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 2 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 0.14 0.00 0.00 0.02 0.00 u.00 0.00 d_M, Delay for Movement [s/veh] 9.68 10.66 8.39 10.45 10.90 9.67 7.68 7.25 :1.00 0.00 Movement LOS A B A B B A A A A A A A 95th -Percentile Queue Length [veh] 0.01 0.01 0.01 0.49 0.49 0.49 0.07 0.07 0.07 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 0.24 1 0.24 1 0.24 12.31 12.31 12.31 1.86 1 1.86 1 1.86 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 8.82 10.45 4.88 0.00 Approach LOS A B A A d_I, Intersection Delay [s/veh] 3.85 Intersection LOS B Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 3 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 13.8 Level Of Service: B Volume to Capacity (v/c): 0.099 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 35 101 310 115 43 56 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 10 28 86 32 12 16 Total Analysis Volume [veh/h] 39 112 344 128 48 62 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 4 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.04 0.10 0.09 d_M, Delay for Movement [s/veh] 8.44 13.83 11.59 Movement LOS A A A A B B 95th -Percentile Queue Length [veh] 0.48 0.48 0.00 0.00 0.69 0.69 95th -Percentile Queue Length [ft] 12.08 12.08 0.00 0.00 17.15 17.15 d_A, Approach Delay [s/veh] 2.18 0.00 12.56 Approach LOS A A B d_I, Intersection Delay [s/veh] 2.33 Intersection LOS B Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 5 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Spark Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 16.0 HCM 2010 Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.046 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration #11 r I Imo► + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 0 1 0 0 0 0 Pocket Length [ft] 100.00 100.00 175.00 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 30.00 Grade [%] 0.00 0.00 10.00 3.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 34 63 1 1 127 375 115 3 24 4 1 14 1 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 34 63 1 1 127 375 -115T 3 1 24 4 1 14 1 1 Peak Hour Factor 0.9000 1 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 1 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 9 1 18 0 0 35 104 32 1 7 1 4 0 Total Analysis Volume [veh/h] 38 70 1 1 141 417 1287 3 27 4 16 1 Pedestrian Volume [ped/h] 0 0 10 10 Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 6 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.04 0.00 0.00 0.00 0.21 1 0.01 0.03 0.01 0.05 0.00 d_M, Delay for Movement [s/veh] 8.71 0.00 7.37 G 12.69 12.85 10.78 13.56 15.99 9.21 Movement LOS A A A A A A B B B B C A 95th -Percentile Queue Length [veh] 0.12 FO.00 0.00 0.31 0.31 0.00 0.96 0.96 0.96 0.18 0.18 0.18 95th -Percentile Queue Length [ft] 2.94 1 0.00 0.00 7.70 7.70 0.00 23.92 1 23.92 1 23.92 4.45 4.45 4.45 d_A, Approach Delay [s/veh] 3.04 0.01 12.37 15.21 Approach LOS A A B C d_I, Intersection Delay [s/veh] 3.08 Intersection LOS C Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 7 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 4: Line Ave & 3rd St Delay (sec / veh): 14.7 Level Of Service: B Volume to Capacity (v/c): 0.005 Name Line Ave Line Ave 3rd St 3rd St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 6 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Line Ave Line Ave 3rd St 3rd St Base Volume Input [veh/h] 6 135 24 7 352 6 1 0 28 2 1 0 1 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 6 135 24 7 352 6 1 0 28 2 0 1 Peak Hour Factor 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 39 7 2 101 2 0 0 8 1 0 0 Total Analysis Volume [veh/h] 7 155 28 8 405 7 1 0 32 2 0 1 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 8 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 u.00 0.01 0.00 0.00 1 0.00 0.05 0.01 0.00 0.00 d_M, Delay for Movement [s/veh] 8.17 0.00 7.61 G 14.29 14.41 10.94 14.71 14.02 9.18 Movement LOS A A A A A A B B B B B A 95th -Percentile Queue Length [veh] 0.60 FO.60 0.60 1.29 1.29 1.29 0.17 0.17 0.17 0.02 0.02 0.02 95th -Percentile Queue Length [ft] 14.90 1 14.90 14.90 32.26 32.26 32.26 4.14 1 4.14 1 4.14 0.49 0.49 0.49 d_A, Approach Delay [s/veh] 0.30 0.15 11.04 12.86 Approach LOS A A B B d_I, Intersection Delay [s/veh] 0.81 Intersection LOS B Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 9 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Snack Intersection Level Of Service Report Intersection 5: Line Ave & Main St Control Type: Signalized Delay (sec / veh): 19.5 Analysis Method: HCM 2010 Level Of Service: B Analysis Period: 15 minutes Volume to Capacity (v/c): 0.498 Intersection Setup Name Zane Ave Line Ave Line Ave Main St Main St 181 st Ave Approach 181 st Ave Northbound Base Volume Input [veh/h] Southbound 19 Eastbound 29 26 Westbound Lane Configuration 381 #7 I"► 1 1 16 *1� 30 l j r 1.0000 1 1.0000 i l F Turning Movement Left Th1ru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 1.00 1 1 0 Pocket Length [ft] 225.00 1.00 75.00 1.00 175.00 0 75.00 100.00 0 Speed [mph] 0 30.00 130.00 0 135.00 0 0 Site -Generated Trips [veh/h] 40.00 Grade [%] 0 0.00 0 0.00 0 0.00 0 6 0.00 Crosswalk Diverted Trips [veh/h] Yes 0 Yes 0 Yes 0 0 Yes volumes Name Zane Ave Line Ave Main St 181 st Ave Base Volume Input [veh/h] 84 19 18 29 26 326 113 381 144 16 467 30 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right -Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 84 19 18 29 26 326 113 381 144 16 467 30 Peak Hour Factor 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 24 5 5 8 7 94 32 109 41 5 134 9 Total Analysis Volume [veh/h] 97 22 1 21 33 30 375 130 438 1 166 18 537 34 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 Pedestrian Volume [ped/h] 10 0 10 0 Bicycle Volume [bicycles/h] 10 0 10 0 Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 10 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Located in CBD No Signal Coordination Group Permiss Protecte Permiss Cycle Length [s] 100 Coordination Type Time of Day Pattern Isolated Actuation Type Fully actuated Offset [s] 0.0 Offset Reference LeadGreen Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Protecte Permiss Permiss Permiss Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal group 3 8 4 5 2 1 6 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Minimum Green [s] 5 10 5 5 10 5 10 Maximum Green [s] 11 40 25 11 35 11 35 Amber [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All red [s] 1.0 2.0 2.0 1.0 2.0 1.0 2.0 Split [s] 15 45 30 15 40 15 40 Vehicle Extension [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Walk [s] 0 0 0 0 Pedestrian Clearance [s] 0 0 0 0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 1 2.0 2.0 2.0 12, Clearance Lost Time [s] 2.0 3.0 3.0 2.0 3.0 2.0 3.0 Minimum Recall No No No No Yes No Yes Maximum Recall No No No No No No No Pedestrian Recall No No No No No No No Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 11 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Group Calculations Spa,ck Lane Group L C L C L C R L C C L, Total Lost Time per Cycle [s] 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] C A 2.00 C 0.00 I B I B 0.00 C I C 12, Clearance Lost Time [s] 2.00 3.00 3.00 3.00 0.00 3.00 3.00 0.00 3.00 3.00 g_i, Effective Green Time [s] 4 24 16 16 20 14 14 20 11 11 g / C, Green / Cycle 0.07 0.44 0.30 0.30 0.37 0.27 0.27 0.37 1 0.21 0.21 (v / s)_i Volume / Saturation Flow Rate 0.03 0.03 0.02 0.26 0.12 0.13 0.11 0.02 0.16 0.16 s, saturation flow rate [veh/h] 3412 1698 1345 1586 1127 3478 1568 1071 1827 1789 c, Capacity [veh/h] 245 756 471 473 493 940 424 497 387 379 d1, Uniform Delay [s] 23.66 8.43 15.40 17.65 12.22 16.26 15.89 11.08 19.67 19.68 k, delay calibration 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 1.03 0.03 0.06 4.58 0.28 0.36 0.59 0.03 T2.84 2.94 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.40 0.06 0.07 0.86 0.26 1 0.47 1 0.39 0.04 1 0.74 1 0.75 d, Delay for Lane Group [s/veh] 24.69 8.46 15.46 22.23 12.50 1 16.62 1 16.48 11.11 22.51 1 22.62 Lane Group LOS C A B C B I B I B B C I C Critical Lane Group 50th -Percentile Queue Length [veh] 0.58 0.24 0.29 4.68 0.91 1.97 1.50 0.11 3.15 3.10 50th -Percentile Queue Length [ft] 14.40 6.03 7.15 116.99 22.87 49.29 37.38 2.84 78.74 77.62 95th -Percentile Queue Length [veh] 1.04 0.43 0.51 8.23 1.65 1 3.55 2.69 0.20 5.67 5.59 95th -Percentile Queue Length [ft] 25.92 10.86 12.87 205.69 41.17 88.71 67.29 5.10 141.73 139.72 Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 12 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Movement, Approach, & Intersection Results Spa,ck d_M, Delay for Movement [s/veh] 24.69 8.46 8.46 15.46 1 22.23 1 22.23 12.50 1 16.62 1 16.48 11.11 1 22.56 1 22.62 Movement LOS C A A B C I C B I B I B B I C I C d_A, Approach Delay [s/veh] 19.70 21.72 15.86 22.22 Approach LOS B C B C d_I, Intersection Delay [s/veh] 19.46 Intersection LOS B Intersection V/C 0.498 ■ ti ti ti ti ti ti ti Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 13 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 6: Twin Lakes Rd & 181st Ave Control Type: All -way stop Delay (sec / veh) Analysis Method: HCM 2010 Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 12.1 B Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Approach Northeasttbiound Southwestbound Northwestbound Southeastbound Lane Configuration 1 41 I I"► 1 11 1 F 1T1hr1u #11F 11 1 F 1Thru Turning Movement Left T1hru Right Left Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 0 1 0 Pocket Length [ft] 200.00FF 175.00 175.00 175.00 Speed [mph] 40.00 40.00 40.00 40.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Base Volume Input [veh/h] 142 59 36 22 138 30 71 345 11 19 175 231 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 142 59 36 22 138 30 71 345 11 19 175 231 Peak Hour Factor 0.8300 0.8300 0.8300 0.8300 0.8300 0.8300 0.8300 1 0.8300 0.8300 0.8300 0.8300 0.8300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 43 1 18 11 7 42 9 21 104 3 6 53 70 Total Analysis Volume [veh/h] 171 71 43 27 166 36 867 416 13 23 211 278 Pedestrian Volume [ped/h] 0 0 10 10 Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 14 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S na c k Version 4.00-02 Intersection Settings Lanes Movement, Approach, & Intersection Results 95th -Percentile Queue Length [veh] 0.64 1 0.64 1 0.48 0.25 0.17 0.70 0.68 0.59 1.81 1.79 0.13 1.67 2.21 95th -Percentile Queue Length [ft] 16.04 16.04 12.01 6.19 4.31 17.57 16.88 14.67 45.16 44.75 3.34 41.85 55.21 Approach Delay [s/veh] 11.25 10.91 12.77 12.45 Approach LOS B B B B Intersection Delay [s/veh] 12.11 Intersection LOS B Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D 15 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control a Line Avenue Operations Scenario 1: 1: AM Existing Traffic Impact Study D16 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Base Volume I� a Line Avenue Operations Scenario 1: 1: AM Existing N c + r 0 - Q :'C'4 'N r/ Traffic Impact Study D 17 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM Existing.pdf Line Avenue Operations Intersection Analysis Summary Spa.clk Scenario 2: PM Existing 6/8/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 SB Thru 0.004 14.1 B 2 Line Ave & 5th St Two-way stop HCM 2010 SEB Left 0.268 20.9 C 3 Twin Lakes Rd & Line Ave Two-way stop HCM 2010 EB Thru 0.029 35.9 E 4 Line Ave & 3rd St Two-way stop HCM 2010 WB Left 0.102 21.4 C 5 Line Ave & Main St Signalized HCM 2010 SB Right 0.555 22.3 C 6 Twin Lakes Rd & 181st Ave All -way stop HCM 2010 SEB Thru 12.1 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D18 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 14.1 Level Of Service: B Volume to Capacity (v/c): 0.004 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 2 2 168 2 5 54 33 3 3 1 40 206 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 2 2 168 2 5 54 33 3 3 40 206 Peak Hour Factor 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 1 46 1 1 15 9 1 1 11 57 Total Analysis Volume [veh/h] 1 2 2 185 2 5 59 36 3 3 44 226 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D 19 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 0.31 0.00 0.01 0.05 0.00 u.00 0.00 d_M, Delay for Movement [s/veh] 11.04 12.39 8.53 13.67 14.07 11.77 7.93 7.31 :1.00 0.00 Movement LOS B B A B B B A A A A A A 95th -Percentile Queue Length [veh] 0.02 FO.02 0.02 1.35 1.35 1.35 0.25 0.25 0.25 0.63 0.63 0.63 95th -Percentile Queue Length [ft] 0.58 1 0.58 0.58 33.71 33.71 33.71 6.17 6.17 1 6.17 15.79 15.79 15.79 d_A, Approach Delay [s/veh] 10.58 13.62 4.77 0.08 Approach LOS B B A A d_I, Intersection Delay [s/veh] 5.56 Intersection LOS B Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D20 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 20.9 Level Of Service: C Volume to Capacity (v/c): 0.268 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 128 320 168 98 80 71 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 34 84 44 26 21 19 Total Analysis Volume [veh/h] 135 337 177 103 84 75 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D 21 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.11 0.27 0.09 d_M, Delay for Movement [s/veh] 8.15 20.87 13.54 Movement LOS A A A A C B 95th -Percentile Queue Length [veh] 1.73 1.73 0.00 0.00 1.58 1.58 95th -Percentile Queue Length [ft] 43.24 43.24 0.00 0.00 39.59 39.59 d_A, Approach Delay [s/veh] 2.33 0.00 17.41 Approach LOS A A C d_I, Intersection Delay [s/veh] 4.25 Intersection LOS C Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D22 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Snack Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 35.9 HCM 2010 Level Of Service: E 15 minutes Volume to Capacity (v/c): 0.029 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration #11 r I Imo► + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 0 1 0 0 0 0 Pocket Length [ft] 100.00 100.00 175.00 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 30.00 Grade [%] 0.00 0.00 10.00 3.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 55 191 9 0 111 168 361T 13 23 2 11 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 14 50 2 0 29 44 94 3 6 1 3 0 Total Analysis Volume [veh/h] 57 199 9 0 116 175 376 14 24 2 11 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D23 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.05 u.00 0.00 0.00 0.76 1 0.03 0.03 0.00 0.03 0.00 d_M, Delay for Movement [s/veh] 7.98 0.00 7.65 G 35.80 F35.94 32.42 13.76 14.48 9.59 Movement LOS A A A A A A E E D B B A 95th -Percentile Queue Length [veh] 0.14 FO.00 0.00 0.00 0.00 0.00 7.79 7.79 7.79 0.10 0.10 0.10 95th -Percentile Queue Length [ft] 3.54 1 0.00 0.00 0.00 0.00 0.00 194.83 194.83 1 194.83 2.53 2.53 2.53 d_A, Approach Delay [s/veh] 1.72 0.00 35.61 14.37 Approach LOS A A E B d_I, Intersection Delay [s/veh] 15.65 Intersection LOS E Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D24 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 4: Line Ave & 3rd St Delay (sec / veh): 21.4 Level Of Service: C Volume to Capacity (v/c): 0.102 Name Line Ave Line Ave 3rd St 3rd St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 56 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Line Ave Line Ave 3rd St 3rd St Base Volume Input [veh/h] 56 434 8 1 239 2 5 0 36 23 1 0 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 434 8 1 239 2 5 0 36 23 0 13 Peak Hour Factor 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 15 117 2 0 64 1 1 0 10 6 0 3 Total Analysis Volume [veh/h] 60 467 9 1 257 2 5 0 39 25 0 14 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D25 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.05 u.00 0.00 0.00 0.02 1 0.00 0.05 0.10 0.00 0.02 d_M, Delay for Movement [s/veh] 7.90 0.00 8.33 G 19.50 18.52 10.05 21.43 19.71 12.77 Movement LOS A A A A A A C C B C C B 95th -Percentile Queue Length [veh] 2.06 F2.06 2.06 0.94 0.94 0.94 0.22 0.22 0.22 0.43 0.43 0.43 95th -Percentile Queue Length [ft] 51.52 1 51.52 51.52 23.54 23.54 23.54 5.60 5.60 1 5.60 10.69 10.69 10.69 d_A, Approach Delay [s/veh] 0.88 0.03 11.13 18.32 Approach LOS A A B C d_I, Intersection Delay [s/veh] 1.92 Intersection LOS C Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D26 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Spark Intersection Level Of Service Report Intersection 5: Line Ave & Main St Control Type: Signalized Delay (sec / veh): 22.3 Analysis Method: HCM 2010 Level Of Service: C Analysis Period: 15 minutes Volume to Capacity (v/c): 0.555 Intersection Setup Name Zane Ave Line Ave Line Ave Main St Main St 181 st Ave Approach 181 st Ave Northbound Base Volume Input [veh/h] Southbound 125 Eastbound 37 55 Westbound Lane Configuration 477 #7 I"► 1 1 31 *1� 62 l j r 1.0000 1.0000 i l F Turning Movement Left Th1ru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 1.00 1 1 0 Pocket Length [ft] 225.00 1.00 75.00 1.00 175.00 0 75.00 100.00 0 Speed [mph] 0 30.00 130.00 0 135.00 0 0 Site -Generated Trips [veh/h] 40.00 Grade [%] 0 0.00 0 0.00 0 0.00 0 6 0.00 Crosswalk Diverted Trips [veh/h] Yes 0 Yes 0 Yes 0 0 Yes volumes Name Zane Ave Line Ave Main St 181 st Ave Base Volume Input [veh/h] 364 125 64 37 55 204 309 477 404 31 414 62 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right -Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 364 125 64 37 55 204 309 477 404 31 414 62 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 94 32 16 10 14 53 80 123 104 8 107 16 Total Analysis Volume [veh/h] 375 129 1 66 38 57 210 319 11 492 416 32 427 64 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 Pedestrian Volume [ped/h] 10 0 0 0 Bicycle Volume [bicycles/h] 10 0 0 0 Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D27 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Located in CBD No Signal Coordination Group Permiss Protecte Permiss Cycle Length [s] 110 Coordination Type Time of Day Pattern Isolated Actuation Type Fully actuated Offset [s] 0.0 Offset Reference LeadGreen Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Protecte Permiss Permiss Permiss Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal group 3 8 4 5 2 1 6 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Minimum Green [s] 5 10 5 5 10 5 10 Maximum Green [s] 26 45 15 26 25 26 25 Amber [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All red [s] 1.0 2.0 2.0 1.0 2.0 1.0 2.0 Split [s] 30 50 20 30 30 30 30 Vehicle Extension [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Walk [s] 0 0 0 0 Pedestrian Clearance [s] 0 0 0 0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 1 2.0 2.0 2.0 12, Clearance Lost Time [s] 2.0 3.0 3.0 2.0 3.0 2.0 3.0 Minimum Recall No No No No Yes No Yes Maximum Recall No No No No No No No Pedestrian Recall No No No No No No No Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D28 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Group Calculations Spa,ck Lane Group L C L C L C R L C C L, Total Lost Time per Cycle [s] 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] C B 2.00 C 0.00 I B I C 0.00 C I C 12, Clearance Lost Time [s] 2.00 3.00 3.00 3.00 0.00 3.00 3.00 0.00 3.00 3.00 g_i, Effective Green Time [s] 9 25 12 12 26 20 20 26 11 11 g / C, Green / Cycle 0.15 0.42 0.20 0.20 0.42 0.32 0.32 0.42 1 0.18 0.18 (v / s)_i Volume / Saturation Flow Rate 0.11 0.11 0.03 0.16 0.24 0.14 0.27 0.03 0.14 0.14 s, saturation flow rate [veh/h] 3412 1741 1171 1620 1315 3478 1568 1031 1827 1745 c, Capacity [veh/h] 527 724 224 317 612 1117 503 510 334 319 d1, Uniform Delay [s] 24.58 11.77 26.18 23.71 13.35 16.44 19.21 10.84 23.69 23.72 k, delay calibration 0.11 0.11 0.11 0.16 0.13 0.11 0.17 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 1.79 0.20 0.36 8.42 0.84 0.27 5.44 0.05 T3.37 3.66 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.71 0.27 0.17 0.84 0.52 1 0.44 1 0.83 0.06 1 0.75 1 0.76 d, Delay for Lane Group [s/veh] 26.37 11.97 26.53 32.12 14.20 1 16.71 1 24.65 10.89 27.06 1 27.38 Lane Group LOS C B C C B I B I C B C I C Critical Lane Group 50th -Percentile Queue Length [veh] 2.54 1.58 0.51 4.18 2.76 1 2.45 5.52 0.22 3.36 3.27 50th -Percentile Queue Length [ft] 63.58 39.57 12.87 104.49 68.94 F61.27 138.00 5.46 83.96 81.65 95th -Percentile Queue Length [veh] 4.58 2.85 0.93 7.52 4.96 1 4.41 9.37 0.39 6.05 5.88 95th -Percentile Queue Length [ft] 114.44 71.23 23.17 188.08 124.10110.29 234.33 9.83 151.14 146.98 Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D29 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Movement, Approach, & Intersection Results Spa,ck d_M, Delay for Movement [s/veh] 26.37 11.97 11.97 26.53 1 32.12 32.12 14.20 16.71 24.65 10.89 27.19 27.38 Movement LOS C B B C C C B B C B C C d_A, Approach Delay [s/veh] 21.44 31.43 18.75 26.21 Approach LOS C C B C d_I, Intersection Delay [s/veh] 22.30 Intersection LOS C Intersection V/C 0.555 .1 '105 30s LG 3 N3O5 :5 3N YW rr ■ Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D30 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 6: Twin Lakes Rd & 181st Ave Control Type: All -way stop Delay (sec / veh) Analysis Method: HCM 2010 Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 12.1 B Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Approach Northeasttbiound Southwestbound Northwestbound Southeastbound Lane Configuration 1 41 I I"► 1 11 1 F 1T1hr1u #11F 11 1 F 1Thru Turning Movement Left T1hru Right Left Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 0 1 0 Pocket Length [ft] 200.00FF 175.00 175.00 175.00 Speed [mph] 40.00 40.00 40.00 40.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Base Volume Input [veh/h] 161 178 83 19 64 27 78 327 37 78 416 92 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 161 178 83 19 64 27 78 327 37 78 416 92 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 1 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 41 1 46 21 5 16 7 20 84 10 20 107 24 Total Analysis Volume [veh/h] 166 184 86 20 66 28 807 337 38 80 429 95 Pedestrian Volume [ped/h] 0 0 0 10 Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D31 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S na c k Version 4.00-02 Intersection Settings Lanes Movement, Approach, & Intersection Results 95th -Percentile Queue Length [veh] 0.61 1 0.61 1 1.03 1 0.95 0.11 1 0.26 1 0.24 0.53 1 1.45 1 1.41 0.52 1 2.33 1 2.20 95th -Percentile Queue Length [ft] 15.19 15.19 25.78 23.79 2.79 1 6.44 1 6.06 13.25 1 36.25 1 35.24 12.88 1 58.25 1 54.90 Approach Delay [s/veh] 11.64 9.16 11.85 13.14 Approach LOS B A B B Intersection Delay [s/veh] 12.09 Intersection LOS B Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D32 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control a Line Avenue Operations Scenario 2: 2: PM Existing Traffic Impact Study D33 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Base Volume I� a fL�Ag 309 404 4 4f2 v Line Avenue Operations Scenario 2: 2: PM Existing NCD f 7r - N { a 8 23 LoIr � Traffic Impact Study D34 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\AM - Alt A.pdf Line Avenue Operations Intersection Analysis Summary Spa.ck Scenario 5: AM - Alt A 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 SB Thru 0.000 10.9 B 2 Line Ave & 5th St Two-way stop HCM 2010 SEB Left 0.000 11.5 B 3 Twin Lakes Rd & Line Ave Two-way stop HCM 2010 WB Left 0.062 17.0 C 4 Line Ave & 3rd St Two-way stop HCM 2010 EB Thru 0.000 11.5 B 5 Line Ave & Main St Signalized HCM 2010 SB Right 0.393 12.9 B 6 Twin Lakes Rd & 181st Ave All -way stop HCM 2010 SWB Right 18.9 C V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D 3 5 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 10.9 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 0 2 94 0 0 18 10 0 0 1 42 130 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 0 2 94 0 0 18T 10 0 0 42 130 Peak Hour Factor 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 1 27 0 0 5 3 0 0 12 38 Total Analysis Volume [veh/h] 1 0 2 109 0 0 21 12 0 0 49 151 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D36 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 0.14 0.00 0.00 0.02 0.00 u.00 0.00 d_M, Delay for Movement [s/veh] 9.68 10.66 8.39 10.45 10.90 9.67 7.68 7.25 :1.00 0.00 Movement LOS A B A B B A A A A A A A 95th -Percentile Queue Length [veh] 0.01 0.01 0.01 0.49 0.49 0.49 0.07 0.07 0.07 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 0.24 1 0.24 1 0.24 12.31 12.31 12.31 1.86 1 1.86 1 1.86 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 8.82 10.45 4.88 0.00 Approach LOS A B A A d_I, Intersection Delay [s/veh] 3.85 Intersection LOS B Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D37 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 11.5 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 115 -101 -310 -115 -43 43 Other Volume [veh/h] 0 1 5 0 0 0 Total Hourly Volume [veh/h] 150 1 5 0 0 99 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 42 0 1 0 0 28 Total Analysis Volume [veh/h] 167 1 6 0 0 110 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D 3 8 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.10 0.00 0.10 d_M, Delay for Movement [s/veh] 7.50 11.53 8.73 Movement LOS A A A A B A 95th -Percentile Queue Length [veh] 0.35 0.35 0.00 0.00 0.34 0.34 95th -Percentile Queue Length [ft] 8.73 8.73 0.00 0.00 8.54 8.54 d_A, Approach Delay [s/veh] 7.45 0.00 8.73 Approach LOS A A A d_I, Intersection Delay [s/veh] 7.79 Intersection LOS B Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D39 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Snack Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 17.0 HCM 2010 Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.062 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration #11 r I Imo► + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 0 1 0 0 0 0 Pocket Length [ft] 100.00 100.00 175.00 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 30.00 Grade [%] 0.00 0.00 10.00 3.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 34 63 1 1 127 375 115 3 24 4 1 14 1 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -34 117 3 0 377 -377 115 -3 -24 14 -14 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 180 4 1 504 0 OT 0 0 18 1 0 1 1 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 1 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 50 1 0 140 0 0 0 0 5 0 0 Total Analysis Volume [veh/h] 0 200 4 1 560 0 0 0 0 20 0 1 Pedestrian Volume [ped/h] 0 0 10 10 Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D40 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 u.00 0.00 0.01 0.00 1 0.00 0.00 0.06 0.00 0.00 d_M, Delay for Movement [s/veh] 8.58 0.00 7.65 G 16.31 15.86 11.85 16.99 16.55 10.04 Movement LOS A A A A A A C C B C C B 95th -Percentile Queue Length [veh] 0.00 0.00 0.00 2.06 2.06 0.00 0.00 0.00 0.00 0.20 0.20 0.20 95th -Percentile Queue Length [ft] 0.00 1 0.00 0.00 51.49 51.49 0.00 0.00 0.00 1 0.00 5.07 5.07 5.07 d_A, Approach Delay [s/veh] 0.00 0.01 14.67 16.66 Approach LOS A A B C d_I, Intersection Delay [s/veh] 0.45 Intersection LOS C Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D 41 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 4: Line Ave & 3rd St Delay (sec / veh): 11.5 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Line Ave Line Ave 3rd St 3rd St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 6 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Line Ave Line Ave 3rd St 3rd St Base Volume Input [veh/h] 6 135 24 7 352 6 1 0 28 2 1 0 1 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 5 15 6 -6 -256 -5 1 0 1 0 0 0 Other Volume [veh/h] 0 5 0 0 1 0 0 1 0 0 0 0 0 Total Hourly Volume [veh/h] 11 155 30 1 97 1 0 0 29 2 0 1 Peak Hour Factor 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 45 9 0 28 0 0 0 8 1 0 0 Total Analysis Volume [veh/h] 13 178 34 1 111 1 0 0 33 2 0 1 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D42 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 u.00 0.00 0.00 0.00 1 0.00 0.04 0.00 0.00 0.00 d_M, Delay for Movement [s/veh] 7.47 0.00 7.66 G 11.03 11.51 8.97 11.28 11.26 9.29 Movement LOS A A A A A A B B A B B A 95th -Percentile Queue Length [veh] 0.54 FO.54 0.54 0.27 0.27 0.27 0.11 0.11 0.11 0.01 0.01 0.01 95th -Percentile Queue Length [ft] 13.49 1 13.49 13.49 6.83 6.83 6.83 2.73 1 2.73 1 2.73 0.35 0.35 0.35 d_A, Approach Delay [s/veh] 0.43 0.07 8.97 10.62 Approach LOS A A A B d_I, Intersection Delay [s/veh] 1.16 Intersection LOS B Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D43 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Snack Intersection Level Of Service Report Intersection 5: Line Ave & Main St Control Type: Signalized Delay (sec / veh): 12.9 Analysis Method: HCM 2010 Level Of Service: B Analysis Period: 15 minutes Volume to Capacity (v/c): 0.393 Intersection Setup Name Zane Ave Line Ave Line Ave Main St Main St 181 st Ave Approach 181 st Ave Northbound Base Volume Input [veh/h] Southbound 19 Eastbound 29 26 Westbound Lane Configuration 381 #7 I"► 1 1 16 *1� 30 l j r 1.0000 1 1.0000 i l F Turning Movement Left Th1ru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 1.00 1 1 0 Pocket Length [ft] 225.00 1.00 75.00 1.00 175.00 0 75.00 100.00 0 Speed [mph] 0 30.00 130.00 0 135.00 0 0 Site -Generated Trips [veh/h] 40.00 Grade [%] 0 0.00 0 0.00 0 0.00 0 6 0.00 Crosswalk Diverted Trips [veh/h] Yes 0 Yes 0 Yes 0 0 Yes volumes Name Zane Ave Line Ave Main St 181 st Ave Base Volume Input [veh/h] 84 19 18 29 26 326 113 381 144 16 467 30 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 -14 14 44 -21 -278 86 86 0 21 278 126 Other Volume [veh/h] 0 0 0 0 0 5 1 0 0 0 0 0 Right -Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 84 5 32 73 5 53 28 467 144 37 745 156 Peak Hour Factor 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 24 1 9 21 1 15 8 134 41 11 214 45 Total Analysis Volume [veh/h] 97 6 1 37 84 6 61 32 1 537 166 43 856 179 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 Pedestrian Volume [ped/h] 10 0 0 0 Bicycle Volume [bicycles/h] 10 0 0 0 Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D44 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Located in CBD No Signal Coordination Group Permiss Protecte Permiss Cycle Length [s] 100 Coordination Type Time of Day Pattern Isolated Actuation Type Fully actuated Offset [s] 0.0 Offset Reference LeadGreen Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Protecte Permiss Permiss Permiss Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal group 3 8 4 5 2 1 6 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Minimum Green [s] 5 10 5 5 10 5 10 Maximum Green [s] 11 40 25 11 35 11 35 Amber [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All red [s] 1.0 2.0 2.0 1.0 2.0 1.0 2.0 Split [s] 15 45 30 15 40 15 40 Vehicle Extension [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Walk [s] 0 0 0 0 Pedestrian Clearance [s] 0 0 0 0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 1 2.0 2.0 2.0 12, Clearance Lost Time [s] 2.0 3.0 3.0 2.0 3.0 2.0 3.0 Minimum Recall No No No No Yes No Yes Maximum Recall No No No No No No No Pedestrian Recall No No No No No No No Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D45 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Group Calculations Spa,ck Lane Group L C L C L C R L C C L, Total Lost Time per Cycle [s] 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] B B 2.00 C 0.00 B A 0.00 B I B 12, Clearance Lost Time [s] 2.00 3.00 3.00 3.00 0.00 3.00 3.00 0.00 3.00 3.00 g_i, Effective Green Time [s] 3 10 3 3 21 15 15 21 16 16 g / C, Green / Cycle 0.08 0.25 0.07 0.07 0.51 0.37 0.37 0.51 1 0.38 0.38 (v / s)_i Volume / Saturation Flow Rate 0.03 0.03 0.06 0.04 0.04 0.15 0.11 0.04 0.29 0.29 s, saturation flow rate [veh/h] 3412 1601 1345 1589 743 3478 1568 1025 1 1827 1719 c, Capacity [veh/h] 278 401 182 116 497 1270 573 682 685 645 d1, Uniform Delay [s] 18.05 12.00 20.78 18.67 6.58 9.91 9.37 5.43 11.46 11.47 k, delay calibration 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 1.00 1.00 d2, Incremental Delay [s] 0.74 0.12 1.82 4.52 0.05 0.22 0.28 0.04 1.95 2.07 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.35 0.11 0.46 0.58 0.06 0.42 0.29 0.06 1 0.78 1 0.78 d, Delay for Lane Group [s/veh] 18.80 12.12 22.60 23.18 6.63 10.13 9.65 5.46 13.41 1 13.54 Lane Group LOS B B C C A B A A B I B Critical Lane Group 50th -Percentile Queue Length [veh] 0.41 0.27 0.86 0.69 0.09 1.37 0.82 0.11 3.27 3.10 50th -Percentile Queue Length [ft] 10.31 6.68 21.49 17.28 2.25 34.30 20.58 2.73 81.80 77.59 95th -Percentile Queue Length [veh] 0.74 0.48 1.55 1.24 0.16 1 2.47 1.48 0.20 5.89 5.59 95th -Percentile Queue Length [ft] 18.56 12.02 38.68 31.10 4.06 61.73 37.04 4.91 147.24 139.66 Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D46 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Movement, Approach, & Intersection Results Spa,ck d_M, Delay for Movement [s/veh] 18.80 12.12 12.12 22.60 1 23.18 23.18 6.63 10.13 9.65 5.46 13.46 13.54 Movement LOS B B B C C C A B A A B B d_A, Approach Delay [s/veh] 16.75 22.86 9.87 13.15 Approach LOS B C A B d_I, Intersection Delay [s/veh] 12.94 Intersection LOS B Intersection V/C 0.393 ■ ti ti ti ti ti ti ti Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D47 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 6: Twin Lakes Rd & 181st Ave Control Type: All -way stop Delay (sec / veh) Analysis Method: HCM 2010 Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 18.9 C Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Approach Northeasttbiound Southwestbound Northwestbound Southeastbound Lane Configuration 1 41 I I"► 1 11 1 F 1T1hr1u #11F 11 1 F 1Thru Turning Movement Left T1hru Right Left Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 0 1 0 Pocket Length [ft] 200.00FF 175.00 175.00 175.00 Speed [mph] 40.00 40.00 40.00 40.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Base Volume Input [veh/h] 142 59 36 22 138 30 71 345 11 19 175 231 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 29 -29 0 -3 -21 391 0 5 -5 120 3 21 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 171 30 36 19 117 421 71 350 6 139 178 252 Peak Hour Factor 0.8300 0.8300 0.8300 0.8300 0.8300 0.8300 0.8300 1 0.8300 0.8300 0.8300 0.8300 0.8300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 52 1 9 11 6 35 127 217 105 2 42 54 76 Total Analysis Volume [veh/h] 206 36 43 23 141 507 86 7 422 7 167 214 304 Pedestrian Volume [ped/h] 0 0 0 10 Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D48 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S na c k Version 4.00-02 Intersection Settings Lanes Movement, Approach, & Intersection Results 95th -Percentile Queue Length [veh] 0.86 1 0.86 1 0.24 0.27 0.14 1.02 9.08 0.68 2.21 2.20 1.60 2.15 3.46 95th -Percentile Queue Length [ft] 21.62F21.62 T 6.09 6.76 3.48 25.42 226.97 16.93 55.29 55.06 40.04 53.79 86.43 Approach Delay [s/veh] 12.29 27.38 15.14 16.19 Approach LOS B D C C Intersection Delay [s/veh] 18.91 Intersection LOS C Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D49 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control a Line Avenue Operations Scenario 5: 5: AM - Alt A Traffic Impact Study D50 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume a Line Avenue Operations Scenario 5: 5: AM - Alt A R 0 o CD Qeoer 4 T Dh� 7j` 9 { 3s R 0 o CD Qeoer 4 rte' { 0 9 029 _ - 0 Traffic Impact Study D51 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM - Alt A.pdf Line Avenue Operations Intersection Analysis Summary Spa c,k Scenario 8: PM - Alt A 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 SB Thru 0.004 14.1 B 2 Line Ave & 5th St Two-way stop HCM 2010 SEB Left 0.000 13.4 B 3 Twin Lakes Rd & Line Ave Two-way stop HCM 2010 WB Left 0.052 19.0 C 4 Line Ave & 3rd St Two-way stop HCM 2010 WB Left 0.085 14.9 B 5 Line Ave & Main St Signalized HCM 2010 SB Left 0.515 20.3 C 6 Twin Lakes Rd & 181st Ave All -way stop HCM 2010 SEB Left 19.2 C V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D52 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 14.1 Level Of Service: B Volume to Capacity (v/c): 0.004 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 2 2 168 2 5 54 33 3 3 1 40 206 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 2 2 168 2 5 54 33 3 3 40 206 Peak Hour Factor 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 1 46 1 1 15 9 1 1 11 57 Total Analysis Volume [veh/h] 1 2 2 185 2 5 59 36 3 3 44 226 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D53 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 0.31 0.00 0.01 0.05 0.00 u.00 0.00 d_M, Delay for Movement [s/veh] 11.04 12.39 8.53 13.67 14.07 11.77 7.93 7.31 :1.00 0.00 Movement LOS B B A B B B A A A A A A 95th -Percentile Queue Length [veh] 0.02 FO.02 0.02 1.35 1.35 1.35 0.25 0.25 0.25 0.63 0.63 0.63 95th -Percentile Queue Length [ft] 0.58 1 0.58 0.58 33.71 33.71 33.71 6.17 6.17 1 6.17 15.79 15.79 15.79 d_A, Approach Delay [s/veh] 10.58 13.62 4.77 0.08 Approach LOS B B A A d_I, Intersection Delay [s/veh] 5.56 Intersection LOS B Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D54 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 13.4 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 98 320 -168 -98 -80 80 Other Volume [veh/h] 0 5 2 0 0 0 Total Hourly Volume [veh/h] 226 5 2 0 0 151 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 59 1 1 0 0 40 Total Analysis Volume [veh/h] 238 5 2 0 0 159 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D55 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.15 0.00 0.15 d_M, Delay for Movement [s/veh] 7.62 13.39 8.91 Movement LOS A A A A B A 95th -Percentile Queue Length [veh] 0.53 0.53 0.00 0.00 0.52 0.52 95th -Percentile Queue Length [ft] 13.25 13.25 0.00 0.00 12.90 12.90 d_A, Approach Delay [s/veh] 7.46 0.00 8.91 Approach LOS A A A d_I, Intersection Delay [s/veh] 7.99 Intersection LOS B Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D56 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Snack Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 19.0 HCM 2010 Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.052 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration #11 r I Imo► + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 0 1 0 0 0 0 Pocket Length [ft] 100.00 100.00 175.00 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 30.00 Grade [%] 0.00 0.00 10.00 3.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -55 364 13 0 168 -168 364 -13 -23 11 -11 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 555 22 0 279 0 0 0 0 13 0 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 145 6 0 73 0 0 0 0 3 0 0 Total Analysis Volume [veh/h] 0 578 23 0 291 0 0 0 0 14 0 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D57 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 u.01 0.00 0.00 0.00 1 0.00 0.00 0.05 0.00 0.00 d_M, Delay for Movement [s/veh] 7.85 0.00 8.71 G 18.52 17.85 9.83 19.00 18.18 12.73 Movement LOS A A A A A A C C A C C B 95th -Percentile Queue Length [veh] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.16 0.16 0.16 95th -Percentile Queue Length [ft] 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.00 4.06 4.06 4.06 d_A, Approach Delay [s/veh] 0.00 0.00 15.40 19.00 Approach LOS A A C C d_I, Intersection Delay [s/veh] 0.29 Intersection LOS C Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D58 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 4: Line Ave & 3rd St Delay (sec / veh): 14.9 Level Of Service: B Volume to Capacity (v/c): 0.085 Name Line Ave Line Ave 3rd St 3rd St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 56 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Line Ave Line Ave 3rd St 3rd St Base Volume Input [veh/h] 56 434 8 1 239 2 5 0 36 23 1 0 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 1 -209 1 -1 -86 -1 4 0 4 9 0 -9 Other Volume [veh/h] 0 5 0 0 2 0 0 0 1 0 0 1 0 1 0 Total Hourly Volume [veh/h] 57 230 9 0 155 1 1 0 40 32 0 4 Peak Hour Factor 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 15 62 2 0 42 0 0 0 11 9 0 1 Total Analysis Volume [veh/h] 61 247 10 0 167 1 1 0 43 34 0 4 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D59 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.04 u.00 0.00 0.00 0.00 1 0.00 0.05 0.09 0.00 0.01 d_M, Delay for Movement [s/veh] 7.68 0.00 7.77 G 13.62 13.79 9.35 14.90 14.36 10.44 Movement LOS A A A A A A B B A B B B 95th -Percentile Queue Length [veh] 0.87 FO.87 0.87 0.00 0.00 0.00 0.16 0.16 0.16 0.30 0.30 0.30 95th -Percentile Queue Length [ft] 21.83 1 21.83 21.83 0.00 0.00 0.00 4.07 1 4.07 1 4.07 7.42 7.42 7.42 d_A, Approach Delay [s/veh] 1.47 0.00 9.44 14.43 Approach LOS A A A B d_I, Intersection Delay [s/veh] 2.52 Intersection LOS B Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D60 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Spark Intersection Level Of Service Report Intersection 5: Line Ave & Main St Control Type: Signalized Delay (sec / veh): 20.3 Analysis Method: HCM 2010 Level Of Service: C Analysis Period: 15 minutes Volume to Capacity (v/c): 0.515 Intersection Setup Name Zane Ave Line Ave Line Ave Main St Main St 181 st Ave Approach 181 st Ave Northbound Base Volume Input [veh/h] Southbound 125 Eastbound 37 55 Westbound Lane Configuration 477 #7 I"► 1 1 31 *1� 62 l j r 1.0000 1.0000 i l F Turning Movement Left Th1ru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 1.00 1 1 0 Pocket Length [ft] 225.00 1.00 75.00 1.00 175.00 0 75.00 100.00 0 Speed [mph] 0 30.00 130.00 0 135.00 0 0 Site -Generated Trips [veh/h] 40.00 Grade [%] 0 0.00 0 0.00 0 0.00 0 6 0.00 Crosswalk Diverted Trips [veh/h] Yes 0 Yes 0 Yes 0 0 Yes volumes Name Zane Ave Line Ave Main St 181 st Ave Base Volume Input [veh/h] 364 125 64 37 55 204 309 477 404 31 414 62 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 -88 88 93 -36 -130 219 219 0 36 98 100 Other Volume [veh/h] 0 0 0 0 0 2 5 0 0 0 0 0 Right -Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 364 37 152 130 19 76 95 696 404 67 512 162 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 94 10 39 34 5 20 24 179 104 17 132 42 Total Analysis Volume [veh/h] 375 38 1 157 134 20 78 98 718 416 69 528 167 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 Pedestrian Volume [ped/h] 10 0 10 0 Bicycle Volume [bicycles/h] 10 0 10 0 Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D 61 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Located in CBD No Signal Coordination Group Permiss Protecte Permiss Cycle Length [s] 110 Coordination Type Time of Day Pattern Isolated Actuation Type Fully actuated Offset [s] 0.0 Offset Reference LeadGreen Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Protecte Permiss Permiss Permiss Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal group 3 8 4 5 2 1 6 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Minimum Green [s] 5 10 5 5 10 5 10 Maximum Green [s] 26 45 15 26 25 26 25 Amber [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All red [s] 1.0 2.0 2.0 1.0 2.0 1.0 2.0 Split [s] 30 50 20 30 30 30 30 Vehicle Extension [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Walk [s] 0 0 0 0 Pedestrian Clearance [s] 0 0 0 0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 1 2.0 2.0 2.0 12, Clearance Lost Time [s] 2.0 3.0 3.0 2.0 3.0 2.0 3.0 Minimum Recall No No No No Yes No Yes Maximum Recall No No No No No No No Pedestrian Recall No No No No No No No Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D62 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Group Calculations Spa,ck Lane Group L C L C L C R L C C L, Total Lost Time per Cycle [s] 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] C B 2.00 C 0.00 I B I C 0.00 B I B 12, Clearance Lost Time [s] 2.00 3.00 3.00 3.00 0.00 3.00 3.00 0.00 3.00 3.00 g_i, Effective Green Time [s] 9 23 10 10 27 19 19 27 19 19 g / C, Green / Cycle 0.16 0.38 0.16 0.16 0.45 0.32 0.32 0.45 0.31 0.31 (v / s)_i Volume / Saturation Flow Rate 0.11 0.12 0.11 0.06 0.10 0.21 0.27 0.07 0.20 0.20 s, saturation flow rate [veh/h] 3412 1615 1171 1617 970 3478 1568 934 1827 1679 c, Capacity [veh/h] 529 623 176 264 486 1119 505 -469T 569 523 d1, Uniform Delay [s] 23.87 12.77 29.19 22.17 10.67 17.25 18.63 10.52 17.58 17.60 k, delay calibration 0.11 0.11 0.11 0.11 0.11 0.11 0.16 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 1.76 0.28 6.69 0.86 0.20 0.62 4.99 0.14 1.18 1.30 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.71 0.31 0.76 0.37 0.20 1 0.64 1 0.82 0.15 1 0.64 1 0.64 d, Delay for Lane Group [s/veh] 25.63 13.06 35.88 23.04 10.87 17.87 23.62 10.67 18.77 1 18.90 Lane Group LOS C B D C B I B I C B B I B Critical Lane Group 50th -Percentile Queue Length [veh] 2.46 1.66 2.18 1.20 0.65 1 3.75 5.27 0.43 3.80 3.52 50th -Percentile Queue Length [ft] 61.44 41.49 54.45 30.10 16.29 F93.73 131.78 10.86 95.01 88.10 95th -Percentile Queue Length [veh] 4.42 2.99 3.92 2.17 1.17 1 6.75 9.04 0.78 6.84 6.34 95th -Percentile Queue Length [ft] 110.60 74.68 98.01 54.18 29.33168.71 225.91 19.55 171.01 158.59 Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D63 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Movement, Approach, & Intersection Results Spa,ck d_M, Delay for Movement [s/veh] 25.63 13.06 13.06 35.88 1 23.04 23.04 10.87 17.87 23.62 10.67 18.81 18.90 Movement LOS C B B D C C B B C B B B d_A, Approach Delay [s/veh] 21.33 30.46 19.25 18.09 Approach LOS C C B B d_I, Intersection Delay [s/veh] 20.29 Intersection LOS C Intersection V/C 0.515 SG 3 305 djLfia i' IG: 5 3N 16 ■ Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D64 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 6: Twin Lakes Rd & 181st Ave Control Type: All -way stop Delay (sec / veh) Analysis Method: HCM 2010 Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 19.2 C Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Approach Northeasttbiound Southwestbound Northwestbound Southeastbound Lane Configuration 1 41 I I"► 1 11 1 F 1T1hr1u #11F 11 1 F 1Thru Turning Movement Left T1hru Right Left Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 0 1 0 Pocket Length [ft] 200.00FF 175.00 175.00 175.00 Speed [mph] 40.00 40.00 40.00 40.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Base Volume Input [veh/h] 161 178 83 19 64 27 78 327 37 78 416 92 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 46 -46 0 -5 -18 179 0 9 -9 377 5 18 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 207 132 83 14 46 206 78 336 28 455 421 110 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 53 34 21 4 12 53 20 87 7 117 109 28 Total Analysis Volume [veh/h] 213 136 86 14 47 212 80 346 29 469 434 113 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D65 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S na c k Version 4.00-02 Intersection Settings Lanes Movement, Approach, & Intersection Results 95th -Percentile Queue Length [veh] 0.96 1 0.96 1 0.95 1 0.87 0.08 1 0.26 1 1.46 0.60 1 1.71 1 1.68 9.87 2.60 2.44 95th -Percentile Queue Length [ft] 24.10 24.10 23.74 21.87 1.96 1 6.57 1 36.60 15.00 1 42.79 1 41.98 246.65 65.01 60.92 Approach Delay [s/veh] 13.26 10.80 13.58 26.60 Approach LOS B B B D Intersection Delay [s/veh] 19.24 Intersection LOS C Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D66 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control a Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D67 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Sp7--r ark F4-a_aa Line Avenue Operations Scenario 8: 8: PM - Alt A Traffic Impact Study D68 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\AM - Alt B.pdf Line Avenue Operations Intersection Analysis Summary Spack Scenario 4: AM - Alt B 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 SB Thru 0.000 11.6 B 2 Line Ave & 5th St Two-way stop HCM 2010 SEB Left 0.158 9.2 A 3 Twin Lakes Rd & Line Ave Two-way stop HCM 2010 EB Left 0.219 21.7 C 4 Line Ave & 3rd St Two-way stop HCM 2010 EB Thru 0.000 9.5 A 5 Line Ave & Main St Signalized HCM 2010 SB Right 0.309 11.6 B 6 Twin Lakes Rd & 181st Ave All -way stop HCM 2010 SWB Right 14.7 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D69 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 11.6 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 0 2 94 0 0 18 10 0 0 1 42 130 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 9 46 0 0 0 -9 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 0 2 94 0 0 27T 56 0 0 42 121 Peak Hour Factor 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 1 27 0 0 8 16 0 0 12 35 Total Analysis Volume [veh/h] 1 0 2 109 0 0 31 65 0 0 49 141 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D70 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 0.16 0.00 0.00 0.02 0.00 u.00 0.00 d_M, Delay for Movement [s/veh] 10.21 11.18 8.63 11.19 11.61 9.85 7.67 7.35 :1.00 0.00 Movement LOS B B A B B A A A A A A A 95th -Percentile Queue Length [veh] 0.01 0.01 0.01 0.56 0.56 0.56 0.22 0.22 0.22 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 0.26 1 0.26 1 0.26 13.96 13.96 13.96 5.61 1 5.61 1 5.61 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 9.16 11.19 2.48 0.00 Approach LOS A B A A d_I, Intersection Delay [s/veh] 3.73 Intersection LOS B Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D 71 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 9.2 Level Of Service: A Volume to Capacity (v/c): 0.158 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -35 101 -310 26 102 -56 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 0 0 141 145 0 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 0 39 40 0 Total Analysis Volume [veh/h] 0 0 0 157 161 0 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D72 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.16 0.00 d_M, Delay for Movement [s/veh] 7.54 9.19 8.99 Movement LOS A A A A A A 95th -Percentile Queue Length [veh] 0.00 0.00 0.00 0.00 0.56 0.56 95th -Percentile Queue Length [ft] 0.00 0.00 0.00 0.00 13.97 13.97 d_A, Approach Delay [s/veh] 3.77 0.00 9.19 Approach LOS A A A d_I, Intersection Delay [s/veh] 4.65 Intersection LOS A Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D73 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Spark Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 21.7 HCM 2010 Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.219 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration #11 r I Imo► + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 0 1 0 0 0 0 Pocket Length [ft] 100.00 100.00 175.00 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 30.00 Grade [%] 0.00 0.00 10.00 3.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 34 63 1 1 127 375 115 3 24 4 1 14 1 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 26 55 1 0 299 -299 54 -1 56 11 -11 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 60 118 2 1 426 76 61 2 80 15 3 1 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 17 33 1 0 118 21 17 1 22 4 1 0 Total Analysis Volume [veh/h] 67 131 2 1 473 84 68 2 89 17 3 1 Pedestrian Volume [ped/h] 0 0 10 10 Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D74 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.07 0.00 0.00 0.00 0.22 1 0.01 0.15 0.07 0.01 0.00 d_M, Delay for Movement [s/veh] 8.82 0.00 7.49 G 21.67 21.33 16.17 20.68 18.76 10.12 Movement LOS A A A A A A C C C C C B 95th -Percentile Queue Length [veh] 0.21 0.00 0.00 1.45 1.45 0.00 1.72 1.72 1.72 0.26 0.26 0.26 95th -Percentile Queue Length [ft] 5.33 1 0.00 0.00 36.16 36.16 0.00 43.06 1 43.06 1 43.06 6.47 6.47 6.47 d_A, Approach Delay [s/veh] 2.96 0.01 18.59 19.90 Approach LOS A A C C d_I, Intersection Delay [s/veh] 4.23 Intersection LOS C Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D75 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 4: Line Ave & 3rd St Delay (sec / veh): 9.5 Level Of Service: A Volume to Capacity (v/c): 0.000 Name Line Ave Line Ave 3rd St 3rd St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 6 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Line Ave Line Ave 3rd St 3rd St Base Volume Input [veh/h] 6 135 24 7 352 6 1 0 28 2 1 0 1 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 6 -135 7 -7 -352 -6 1 0 1 1 0 -1 Other Volume [veh/h] 0 1 0 0 4 0 0 0 1 0 0 1 0 1 0 Total Hourly Volume [veh/h] 12 1 31 0 4 0 OT 0 29 3 1 0 1 0 Peak Hour Factor 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 1 0.8700 0.8700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 0 9 0 1 0 0 0 8 1 F 0 0 Total Analysis Volume [veh/h] 14 1 36 0 5 0 0 0 33 3 0 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D76 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 u.00 0.00 0.00 0.00 1 0.00 0.03 0.00 0.00 0.00 d_M, Delay for Movement [s/veh] 7.26 0.00 7.30 G 8.94 9.54 8.45 9.07 9.35 8.42 Movement LOS A A A A A A A A A A A A 95th -Percentile Queue Length [veh] 0.10 0.10 0.10 0.00 0.00 0.00 0.09 0.09 0.09 0.01 0.01 0.01 95th -Percentile Queue Length [ft] 2.45 1 2.45 2.45 0.00 0.00 0.00 2.37 2.37 1 2.37 0.25 0.25 0.25 d_A, Approach Delay [s/veh] 1.99 0.00 8.45 9.07 Approach LOS A A A A d_I, Intersection Delay [s/veh] 4.43 Intersection LOS A Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D77 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Spark Intersection Level Of Service Report Intersection 5: Line Ave & Main St Control Type: Signalized Delay (sec / veh): 11.6 Analysis Method: HCM 2010 Level Of Service: B Analysis Period: 15 minutes Volume to Capacity (v/c): 0.309 Intersection Setup Name Zane Ave Line Ave Line Ave Main St Main St 181 st Ave Approach 181 st Ave Northbound Base Volume Input [veh/h] Southbound 19 Eastbound 29 26 Westbound Lane Configuration 381 #7 I"► 1 1 16 *1� 30 l j r 1.0000 1 1.0000 i l F Turning Movement Left Th1ru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 1.00 1 1 0 Pocket Length [ft] 225.00 1.00 75.00 1.00 175.00 0 75.00 100.00 0 Speed [mph] 0 30.00 130.00 0 135.00 0 0 Site -Generated Trips [veh/h] 40.00 Grade [%] 0 0.00 0 0.00 0 0.00 0 6 0.00 Crosswalk Diverted Trips [veh/h] Yes 0 Yes 0 Yes 0 0 Yes volumes Name Zane Ave Line Ave Main St 181 st Ave Base Volume Input [veh/h] 84 19 18 29 26 326 113 381 144 16 467 30 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 8 -16 8 -25 -24 -302 94 47 0 24 302 -12 Other Volume [veh/h] 0 0 0 0 1 3 1 0 0 0 0 0 Right -Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 92 3 26 4 3 27 20 428 144 40 769 18 Peak Hour Factor 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 0.87000.8700 0.8700 0.8700 0.8700 0.8700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 26 1 7 1 1 8 6 123 41 11 221 5 Total Analysis Volume [veh/h] 106 3 1 30 5 3 31 23 1 492 166 46 884 21 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 Pedestrian Volume [ped/h] 10 0 0 0 Bicycle Volume [bicycles/h] 10 0 0 0 Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D78 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Located in CBD No Signal Coordination Group Permiss Protecte Permiss Cycle Length [s] 100 Coordination Type Time of Day Pattern Isolated Actuation Type Fully actuated Offset [s] 0.0 Offset Reference LeadGreen Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Protecte Permiss Permiss Permiss Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal group 3 8 4 5 2 1 6 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Minimum Green [s] 5 10 5 5 10 5 10 Maximum Green [s] 11 40 25 11 35 11 35 Amber [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All red [s] 1.0 2.0 2.0 1.0 2.0 1.0 2.0 Split [s] 15 45 30 15 40 15 40 Vehicle Extension [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Walk [s] 0 0 0 0 Pedestrian Clearance [s] 0 0 0 0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 1 2.0 2.0 2.0 12, Clearance Lost Time [s] 2.0 3.0 3.0 2.0 3.0 2.0 3.0 Minimum Recall No No No No Yes No Yes Maximum Recall No No No No No No No Pedestrian Recall No No No No No No No Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D79 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Group Calculations Spa,ck Lane Group L C L C L C R L C C L, Total Lost Time per Cycle [s] 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] B B 2.00 C 0.00 I B I A 0.00 B I B 12, Clearance Lost Time [s] 2.00 3.00 3.00 3.00 0.00 3.00 3.00 0.00 3.00 3.00 g_i, Effective Green Time [s] 3 9 1 1 17 11 11 17 12 12 g / C, Green / Cycle 0.09 0.24 0.04 0.04 0.48 0.32 0.32 0.48 0.34 0.34 (v / s)_i Volume / Saturation Flow Rate 0.03 0.02 0.00 0.02 0.03 0.14 0.11 0.04 0.25 0.25 s, saturation flow rate [veh/h] 3412 1590 1357 1589 810 3478 1568 1086 1 1827 1812 c, Capacity [veh/h] 314 387 200 65 554 1105 498 722 623 617 d1, Uniform Delay [s] 15.42 10.59 18.11 17.02 5.82 9.82 9.43 5.24 10.48 10.48 k, delay calibration 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 1.00 1.00 d2, Incremental Delay [s] 0.63 0.09 0.05 6.23 0.03 0.28 0.39 0.04 1.67 1.68 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.34 0.09 0.03 0.52 0.04 1 0.45 1 0.33 0.06 1 0.73 1 0.73 d, Delay for Lane Group [s/veh] 16.05 10.68 18.16 23.25 5.85 1 10.10 1 9.82 5.28 12.15 1 12.16 Lane Group LOS B B B C A I B I A A B I B Critical Lane Group 50th -Percentile Queue Length [veh] 0.37 0.17 0.04 0.35 0.05 1.11 0.75 0.10 2.27 2.26 50th -Percentile Queue Length [ft] 9.20 4.21 0.97 8.68 1.34 27.85 18.69 2.40 56.79 56.38 95th -Percentile Queue Length [veh] 0.66 0.30 0.07 0.63 0.10 2.01 1.35 0.17 4.09 4.06 95th -Percentile Queue Length [ft] 16.55 7.58 1.74 15.63 2.42 50.13 33.64 4.32 102.22 101.49 Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D80 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Movement, Approach, & Intersection Results Spa c,,k d_M, Delay for Movement [s/veh] 16.05 10.68 10.68 18.16 1 23.25 1 23.25 5.85 1 10.10 1 9.82 5.28 1 12.15 1 12.16 Movement LOS B B B B C I C A I B I A A I B I B d_A, Approach Delay [s/veh] 14.78 22.60 9.89 11.82 Approach LOS B C A B d_I, Intersection Delay [s/veh] 11.55 Intersection LOS B Intersection V/C 0.309 ■ ti ti ti ti ti ti ti Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D81 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 6: Twin Lakes Rd & 181st Ave Control Type: All -way stop Delay (sec / veh) Analysis Method: HCM 2010 Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 14.7 B Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Approach Northeasttbiound Southwestbound Northwestbound Southeastbound Lane Configuration 1 41 I I"► 1 11 1 F 1T1hr1u #11F 11 1 F 1Thru Turning Movement Left T1hru Right Left Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 0 1 0 Pocket Length [ft] 200.00FF 175.00 175.00 175.00 Speed [mph] 40.00 40.00 40.00 40.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Base Volume Input [veh/h] 142 59 36 22 138 30 71 345 11 19 175 231 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -7 7 0 12 15 339 0 -18 18 57 -12 -15 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 135 66 36 34 153 369 71 327 29 76 163 216 Peak Hour Factor 0.8300 0.8300 0.8300 0.8300 0.8300 0.8300 0.8300 1 0.8300 0.8300 0.8300 0.8300 0.8300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 41 1 20 11 10 46 111 21 98 9 23 49 65 Total Analysis Volume [veh/h] 163 80 43 41 184 445 86 7 394 35 92 196 260 Pedestrian Volume [ped/h] 0 0 10 10 Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D82 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S na c k Version 4.00-02 Intersection Settings Lanes Movement, Approach, & Intersection Results 95th -Percentile Queue Length [veh] 0.60 1 0.60 1 0.41 0.38 0.25 1.42 5.99 0.61 1.91 1.87 0.66 1.66 2.26 95th -Percentile Queue Length [ft] 1494T14 94 10.13 9.47 6.28 35.44 149.77 15.22 47.83 46.79 16.50 41.55 56.44 Approach Delay [s/veh] 11.08 18.49 13.31 13.10 Approach LOS B C B B Intersection Delay [s/veh] 14.66 Intersection LOS B Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D83 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control a Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Sp7--r ark F4-a_aa Line Avenue Operations Scenario 4: 4: AM - Alt B Traffic Impact Study D85 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM - Alt B.pdf Line Avenue Operations Intersection Analysis Summary Spa c,k Scenario 7: PM - Alt B 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 SB Thru 0.005 21.2 C 2 Line Ave & 5th St Two-way stop HCM 2010 SEB Left 0.293 10.0 A 3 Twin Lakes Rd & Line Ave Two-way stop HCM 2010 EB Left 0.829 103.0 F 4 Line Ave & 3rd St Two-way stop HCM 2010 WB Thru 0.000 10.2 B 5 Line Ave & Main St Signalized HCM 2010 SB Right 0.450 14.8 B 6 Twin Lakes Rd & 181st Ave All -way stop HCM 2010 SEB Left 13.1 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D86 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 21.2 Level Of Service: C Volume to Capacity (v/c): 0.005 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 2 2 168 2 5 54 33 3 3 1 40 206 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 49 133 0 0 0 -49 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 2 2 168 2 5 103 166 3 3 40 157 Peak Hour Factor 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 1 46 1 1 28 46 1 1 11 43 Total Analysis Volume [veh/h] 1 2 2 185 2 5 113 182 3 3 44 173 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D87 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.01 0.00 0.45 0.00 0.01 0.08 0.00 u.00 0.00 d_M, Delay for Movement [s/veh] 13.90 15.14 9.28 20.99 21.21 16.14 7.92 7.61 :1.00 0.00 Movement LOS B C A C C C A A A A A A 95th -Percentile Queue Length [veh] 0.03 FO.03 0.03 2.37 2.37 2.37 0.85 0.85 0.85 0.56 0.56 0.56 95th -Percentile Queue Length [ft] 0.79 1 0.79 0.79 59.29 59.29 59.29 21.17 21.17 1 21.17 14.12 14.12 14.12 d_A, Approach Delay [s/veh] 12.55 20.87 3.00 0.10 Approach LOS B C A A d_I, Intersection Delay [s/veh] 6.97 Intersection LOS C Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D88 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 10.0 Level Of Service: A Volume to Capacity (v/c): 0.293 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -128 -320 -168 79 204 -71 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 0 0 177 284 0 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 0 47 75 0 Total Analysis Volume [veh/h] 0 0 0 186 299 0 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D89 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.29 0.00 d_M, Delay for Movement [s/veh] 7.60 9.98 9.78 Movement LOS A A A A A A 95th -Percentile Queue Length [veh] 0.00 0.00 0.00 0.00 1.23 1.23 95th -Percentile Queue Length [ft] 0.00 0.00 0.00 0.00 30.66 30.66 d_A, Approach Delay [s/veh] 3.80 0.00 9.98 Approach LOS A A A d_I, Intersection Delay [s/veh] 6.15 Intersection LOS A Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D90 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Snack Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 103.0 HCM 2010 Level Of Service: F 15 minutes Volume to Capacity (v/c): 0.829 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration #11 r I Imo► + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 0 1 0 0 0 0 Pocket Length [ft] 100.00 100.00 175.00 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 30.00 Grade [%] 0.00 0.00 10.00 3.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 79 191 0 0 158 -158 191 0 71 10 -10 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 134 382 9 0 269 10 170T 13 94 12 1 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 35 99 2 0 70 3 44 3 24 3 0 0 Total Analysis Volume [veh/h] 140 398 9 0 280 10 177 14 98 13 1 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D 91 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.11 u.00 0.00 0.00 0.83 1 0.06 0.13 0.07 0.00 0.00 d_M, Delay for Movement [s/veh] 8.20 0.00 8.14 G 102.99 102.12 90.89 27.17 22.71 12.25 Movement LOS A A A A A A F F F D C B 95th -Percentile Queue Length [veh] 0.37 FO.00 0.00 0.00 0.00 0.00 10.78 10.78 10.78 0.25 0.25 0.25 95th -Percentile Queue Length [ft] 9.30 1 0.00 0.00 0.00 0.00 0.00 269.45 269.45 1269.45 6.30 6.30 6.30 d_A, Approach Delay [s/veh] 2.10 0.00 98.84 26.85 Approach LOS A A F D d_I, Intersection Delay [s/veh] 26.39 Intersection LOS F Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D92 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 4: Line Ave & 3rd St Delay (sec / veh): 10.2 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Line Ave Line Ave 3rd St 3rd St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 56 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Line Ave Line Ave 3rd St 3rd St Base Volume Input [veh/h] 56 434 8 1 239 2 5 0 36 23 1 0 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 1 0 0 Existing Site Adjustment Volume [veh/h] 2 -434 1 -1 -239 -2 5 0 5 13 1 0 -13 Other Volume [veh/h] 0 4 0 0 3 0 0 0 1 0 0 1 0 1 0 Total Hourly Volume [veh/h] 58 4 9 0 3 0 __0T0 41 36 0 0 Peak Hour Factor 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 16 1 2 0 1 0 0 0 11 10 0 0 Total Analysis Volume [veh/h] 62 4 10 0 3 0 0 0 44 39 0 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D93 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.04 u.00 0.00 0.00 0.00 1 0.00 0.04 0.05 0.00 0.00 d_M, Delay for Movement [s/veh] 7.32 0.00 7.25 G 9.60 10.15 8.48 10.06 10.24 8.63 Movement LOS A A A A A A A B A B B A 95th -Percentile Queue Length [veh] 0.15 FO.15 0.15 0.00 0.00 0.00 0.13 0.13 0.13 0.16 0.16 0.16 95th -Percentile Queue Length [ft] 3.71 1 3.71 3.71 0.00 0.00 0.00 3.19 3.19 1 3.19 4.11 4.11 4.11 d_A, Approach Delay [s/veh] 5.97 0.00 8.48 10.06 Approach LOS A A A B d_I, Intersection Delay [s/veh] 7.53 Intersection LOS B Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D94 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Snack Intersection Level Of Service Report Intersection 5: Line Ave & Main St Control Type: Signalized Delay (sec / veh): 14.8 Analysis Method: HCM 2010 Level Of Service: B Analysis Period: 15 minutes Volume to Capacity (v/c): 0.450 Intersection Setup Name Zane Ave Line Ave Line Ave Main St Main St 181 st Ave Approach 181 st Ave Northbound Base Volume Input [veh/h] Southbound 125 Eastbound 37 55 Westbound Lane Configuration 477 #7 I"► 1 1 31 *1� 62 l j r 1.0000 1.0000 i l F Turning Movement Left Th1ru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 1.00 1 1 0 Pocket Length [ft] 225.00 1.00 75.00 1.00 175.00 0 75.00 100.00 0 Speed [mph] 0 30.00 130.00 0 135.00 0 0 Site -Generated Trips [veh/h] 40.00 Grade [%] 0 0.00 0 0.00 0 0.00 0 6 0.00 Crosswalk Diverted Trips [veh/h] Yes 0 Yes 0 Yes 0 0 Yes volumes Name Zane Ave Line Ave Main St 181 st Ave Base Volume Input [veh/h] 364 125 64 37 55 204 309 477 404 31 414 62 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 1 0 1 0 0 1 0 1 0 Existing Site Adjustment Volume [veh/h] 23 -110 87 9 -48 -180 270 111 1 0 48 1 179 1 -51 Other Volume [veh/h] 0 1 0 0 1 2 3 0 1 0 0 1 0 1 0 Right -Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 387 16 151 46 8 26 42 1 588 404 79 593 11 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 100 4 39 12 2 7 11 152 104 20 153 3 Total Analysis Volume [veh/h] 399 16 1 156 47 8 27 43 606 416 81 611 11 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 Pedestrian Volume [ped/h] 10 0 10 0 Bicycle Volume [bicycles/h] 10 0 10 0 Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D95 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Located in CBD No Signal Coordination Group Permiss Protecte Permiss Cycle Length [s] 110 Coordination Type Time of Day Pattern Isolated Actuation Type Fully actuated Offset [s] 0.0 Offset Reference LeadGreen Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Protecte Permiss Permiss Permiss Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal group 3 8 4 5 2 1 6 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Minimum Green [s] 5 10 5 5 10 5 10 Maximum Green [s] 26 45 15 26 25 26 25 Amber [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All red [s] 1.0 2.0 2.0 1.0 2.0 1.0 2.0 Split [s] 30 50 20 30 30 30 30 Vehicle Extension [s] 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Walk [s] 0 0 0 0 Pedestrian Clearance [s] 0 0 0 0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 1 2.0 2.0 2.0 12, Clearance Lost Time [s] 2.0 3.0 3.0 2.0 3.0 2.0 3.0 Minimum Recall No No No No Yes No Yes Maximum Recall No No No No No No No Pedestrian Recall No No No No No No No Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D96 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Group Calculations Spa,ck Lane Group L C L C L C R L C C L, Total Lost Time per Cycle [s] 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] B B 2.00 C 0.00 B B 0.00 B I B 12, Clearance Lost Time [s] 2.00 3.00 3.00 3.00 0.00 3.00 3.00 0.00 3.00 3.00 g_i, Effective Green Time [s] 8 14 2 2 23 16 16 23 17 17 g / C, Green / Cycle 0.17 0.30 0.04 0.04 0.49 0.34 0.34 0.49 1 0.36 0.36 (v / s)_i Volume / Saturation Flow Rate 0.12 0.11 0.04 0.02 0.04 0.17 0.27 0.08 0.17 0.17 s, saturation flow rate [veh/h] 3412 1590 1196 1624 965 3478 1568 1021 1 1827 1816 c, Capacity [veh/h] 598 476 152 64 596 1169 527 -615T 657 653 d1, Uniform Delay [s] 18.28 13.07 23.74 22.37 6.75 12.67 14.24 6.97 11.74 11.74 k, delay calibration 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 1.00 1.00 d2, Incremental Delay [s] 1.29 0.46 1.15 6.92 0.05 0.36 2.69 0.10 0.53 0.54 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.67 0.36 0.31 0.54 0.07 0.52 0.79 0.13 1 0.47 1 0.47 d, Delay for Lane Group [s/veh] 19.58 13.53 24.88 29.30 6.80 13.03 16.93 7.07 12.27 1 12.27 Lane Group LOS B B C C A B B A B I B Critical Lane Group 50th -Percentile Queue Length [veh] 1.91 1.28 0.55 0.47 0.17 2.12 3.58 0.30 2.01 2.00 50th -Percentile Queue Length [ft] 47.65 32.06 13.76 11.81 4.17 53.04 89.45 7.56 50.25 49.99 95th -Percentile Queue Length [veh] 3.43 2.31 0.99 0.85 0.30 1 3.82 6.44 0.54 3.62 3.60 95th -Percentile Queue Length [ft] 85.78 57.70 24.78 21.27 7.51 95.47 161.02 13.61 90.46 89.97 Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D97 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Movement, Approach, & Intersection Results Spa,ck d_M, Delay for Movement [s/veh] 19.58 13.53 13.53 24.88 1 29.30 29.30 6.80 13.03 16.93 7.07 12.27 12.27 Movement LOS B B B C C C A B B A B B d_A, Approach Delay [s/veh] 17.76 26.77 14.30 11.67 Approach LOS B C B B d_I, Intersection Delay [s/veh] 14.77 Intersection LOS B Intersection V/C 0.450 .1 '105 30s LG 3 N3O5 :5 3N YW rr ■ Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D98 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 6: Twin Lakes Rd & 181st Ave Control Type: All -way stop Delay (sec / veh) Analysis Method: HCM 2010 Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 13.1 B Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Approach Northeasttbiound Southwestbound Northwestbound Southeastbound Lane Configuration 1 41 I I"► 1 11 1 F 1T1hr1u #11F 11 1 F 1Thru Turning Movement Left T1hru Right Left Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 0 1 0 Pocket Length [ft] 200.00FF 175.00 175.00 175.00 Speed [mph] 40.00 40.00 40.00 40.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Base Volume Input [veh/h] 161 178 83 19 64 27 78 327 37 78 416 92 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -18 18 0 7 2 230 0 -36 36 216 -7 -2 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 143 196 83 26 66 257 78 291 73 294 409 90 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 37 51 21 7 17 66 20 75 19 76 105 23 Total Analysis Volume [veh/h] 147 202 86 27 68 265 80 300 75 303 422 93 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D99 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S na c k Version 4.00-02 Intersection Settings Lanes Movement, Approach, & Intersection Results 95th -Percentile Queue Length [veh] 0.54 1 0.54 1 1.16 1 1.08 0.15 1 0.37 1 1.89 0.53 1 1.47 1 1.39 3.48 1 2.32 1 2.19 95th -Percentile Queue Length [ft] 13.47 13.47 29.05 27.09 3.68 1 9.35 1 47.20 13.27 1 36.63 1 34.81 87.00 1 57.91 1 54.80 Approach Delay [s/veh] 12.03 10.94 11.85 15.21 Approach LOS B B B C Intersection Delay [s/veh] 13.06 Intersection LOS B Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D100 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control a Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D101 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume a 42 404 � 4 ?P m� f Line Avenue Operations Scenario 7: 7: PM - Alt B Traffic Impact Study D102 Line Avenue Operations h Traffic Impact Study D102 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\AM - Alt C.pdf Line Avenue Operations Intersection Analysis Summary Spa c,k Scenario 3: AM - Alt C 6/8/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 SB Thru 0.000 11.7 B 2 Line Ave & 5th St Two-way stop HCM 2010 SEB Left 0.175 9.7 A 3 Twin Lakes Rd & Line Ave Two-way stop HCM 2010 EB Left 0.255 24.4 C 4 Line Ave & 3rd St Two-way stop HCM 2010 SB Left 0.039 9.1 A 5 Line Ave & Main St Signalized HCM 2010 NB Left 0.294 5.1 A 6 Twin Lakes Rd & 181st Ave All -way stop HCM 2010 SWB Right 15.0 C V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D103 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 11.7 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 0 2 94 0 0 18 10 0 0 1 42 130 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 5 61 0 0 0 -5 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 0 2 94 0 0 23T 71 0 0 42 125 Peak Hour Factor 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 1 27 0 0 7 21 0 0 12 36 Total Analysis Volume [veh/h] 1 0 2 109 0 0 27 83 0 0 49 145 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D104 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 0.16 0.00 0.00 0.02 0.00 u.00 0.00 d_M, Delay for Movement [s/veh] 10.30 11.28 8.71 11.31 11.72 9.89 7.67 7.39 :1.00 0.00 Movement LOS B B A B B A A A A A A A 95th -Percentile Queue Length [veh] 0.01 0.01 0.01 0.57 0.57 0.57 0.26 0.26 0.26 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 0.27 1 0.27 1 0.27 14.23 14.23 14.23 6.52 1 6.52 1 6.52 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 9.24 11.31 1.88 0.00 Approach LOS A B A A d_I, Intersection Delay [s/veh] 3.53 Intersection LOS B Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D105 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 9.7 Level Of Service: A Volume to Capacity (v/c): 0.175 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -34 70 -280 29 104 -43 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 31 30 144 147 13 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 9 8 40 41 4 Total Analysis Volume [veh/h] 1 34 33 160 163 14 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D106 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.17 0.01 d_M, Delay for Movement [s/veh] 7.62 9.75 9.36 Movement LOS A A A A A A 95th -Percentile Queue Length [veh] 0.08 0.08 0.00 0.00 0.69 0.69 95th -Percentile Queue Length [ft] 1.96 1.96 0.00 0.00 17.27 17.27 d_A, Approach Delay [s/veh] 0.22 0.00 9.72 Approach LOS A A A d_I, Intersection Delay [s/veh] 4.27 Intersection LOS A Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D107 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Spark Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 24.4 HCM 2010 Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.255 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration #11 r I Imo► + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 0 1 0 0 0 0 Pocket Length [ft] 100.00 100.00 175.00 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 30.00 Grade [%] 0.00 0.00 10.00 3.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 34 63 1 1 127 375 115 3 24 4 1 14 1 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 48 49 2 0 288 -288 48 -2 84 11 -11 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 82 112 3 1 415 87 67 1 108 15 3 1 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 23 31 1 0 115 24 19 0 30 4 1 0 Total Analysis Volume [veh/h] 91 124 3 1 461 97 74 1 120 17 3 1 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D108 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.09 0.00 0.00 0.00 0.25 1 0.00 0.20 0.08 0.01 0.00 d_M, Delay for Movement [s/veh] 8.93 0.00 7.48 C 24.38 24.02 18.00 23.07 20.19 10.43 Movement LOS A A A A A A C C C C C B 95th -Percentile Queue Length [veh] 0.30 FO.00 0.00 1.38 1.38 0.00 2.35 2.35 2.35 0.30 0.30 0.30 95th -Percentile Queue Length [ft] 7.43 1 0.00 0.00 34.58 34.58 0.00 58.77 1 58.77 1 58.77 7.38 7.38 7.38 d_A, Approach Delay [s/veh] 3.73 0.01 20.45 22.05 Approach LOS A A C C d_I, Intersection Delay [s/veh] 5.31 Intersection LOS C Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D109 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 4: Line Ave & 3rd St Delay (sec / veh): 9.1 Level Of Service: A Volume to Capacity (v/c): 0.039 Name Line Ave 3rd St 3rd St Approach Southbound Eastbound Westbound Lane Configuration "r i �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 Pocket Length [ft] 3.00 3.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave 3rd St 3rd St Base Volume Input [veh/h] 7 6 1 0 0 1 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 24 6 28 0 0 2 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 31 12 29 0 0 3 Peak Hour Factor 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 9 3 8 0 0 1 Total Analysis Volume [veh/h] 36 14 33 0 0 3 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D110 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.04 0.01 0.02 d_M, Delay for Movement [s/veh] 9.14 8.54 7.28 Movement LOS A A A A A A 95th -Percentile Queue Length [veh] 0.17 0.17 0.06 0.06 0.00 0.00 95th -Percentile Queue Length [ft] 4.13 4.13 1.57 1.57 0.00 0.00 d_A, Approach Delay [s/veh] 8.97 7.28 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 8.01 Intersection LOS A Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study Dl l l Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Spark Intersection Level Of Service Report Intersection 5: Line Ave & Main St Control Type: Signalized Delay (sec / veh): 5.1 Analysis Method: HCM 2010 Level Of Service: A Analysis Period: 15 minutes Volume to Capacity (v/c): 0.294 Intersection Setup Name Zane Ave Main St Main St 181st Ave Approach 84 Northbound Eastbound 144 16 Westbound Lane Configuration 1.0000 i i r 11 r 1.0000 1.0000 *111 Turning Movement Left Right Thru Right Left Thru Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 0 1 1 0 Pocket Length [ft] 225.00 0 0 75.00 100.00 0 Speed [mph] 0 30.00 35.00 0 0 40.00 Grade [%] 0 0.00 0.00 0 0 0.00 Crosswalk 9 Yes Yes 0 26 Yes volumes Name Zane Ave Main St 181st Ave Base Volume Input [veh/h] 84 18 381 144 16 467 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 4.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 9 11 58 0 26 328 Other Volume [veh/h] 0 0 0 0 0 0 Right -Turn on Red Volume [veh/h] 0 0 0 Total Hourly Volume [veh/h] 93 29 439 144 42 795 Peak Hour Factor 0.8700 0.8700 0.8700 0.8700 0.8700 0.8700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 27 8 126 41 12 228 Total Analysis Volume [veh/h] 107 33 505 166 48 914 Presence of On -Street Parking No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 Pedestrian Volume [ped/h] 10 10 10 Bicycle Volume [bicycles/h] 0 0 0 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D112 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Located in CBD No Signal Coordination Group Permissive Protected Permissi Cycle Length [s] 90 Coordination Type Time of Day Pattern Isolated Actuation Type Fully actuated Offset [s] 0.0 Offset Reference LeadGreen Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Protected Permissive Permissive Permissive Protected Permissi Permissive Signal group 3 2 1 6 Auxiliary Signal Groups Lead / Lag Lead Lead Minimum Green [s] 5 10 5 10 Maximum Green [s] 26 35 16 55 Amber [s] 3.0 3.0 3.0 3.0 All red [s] 1.0 2.0 1.0 2.0 Split [s] 30 40 20 60 Vehicle Extension [s] 3.0 3.0 3.0 3.0 Walk [s] 0 0 0 Pedestrian Clearance [s] 0 0 0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 12, Clearance Lost Time [s] 2.0 3.0 2.0 3.0 Minimum Recall No Yes No Yes Maximum Recall No No No No Pedestrian Recall No No No No Detector Location [ft] 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D113 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Group Calculations Spack Lane Group L R C R L C L, Total Lost Time per Cycle [s] 4.00 4.00 5.00 5.00 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] B B A A 0.00 A 12, Clearance Lost Time [s] 2.00 2.00 3.00 3.00 0.00 3.00 g_i, Effective Green Time [s] 1 1 16 10 15 15 g / C, Green / Cycle 0.04 0.04 0.39 0.39 0.60 0.60 (v / s)_i Volume / Saturation Flow Rate 0.03 0.02 0.15 0.11 0.04 0.26 s, saturation flow rate [veh/h] 3412 1568 3478 1568 1081 3478 c, Capacity [veh/h] 152 70 1353 1 610 983 2104 d1, Uniform Delay [s] 12.09 11.97 5.60 5.36 2.20 2.72 k, delay calibration 0.11 0.11 0.11 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 5.83 4.89 0.17 0.24 0.02 0.14 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.70 0.47 0.37 0.27 0.05 0.43 d, Delay for Lane Group [s/veh] 17.92 16.85 5.77 5.60 2.22 2.86 Lane Group LOS B B A A A A Critical Lane Group 50th -Percentile Queue Length [veh] 0.34 0.23 0.39 0.27 0.01 0.04 50th -Percentile Queue Length [ft] 8.47 5.66 9.81 6.67 0.14 1.04 95th -Percentile Queue Length [veh] 0.61 0.41 0.71 0.48 0.01 0.07 95th -Percentile Queue Length [ft] 15.25 10.19 17.65 12.00 0.25 1.87 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D114 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Movement, Approach, & Intersection Results SpaCk d_M, Delay for Movement [s/veh] 17.92 16.85 5.77 5.60 2.22 2.86 Movement LOS B B A A A A d_A, Approach Delay [s/veh] 17.67 5.73 2.83 Approach LOS B A A d_I, Intersection Delay [s/veh] 5.10 Intersection LOS A Intersection V/C 0.294 .Sia' 1 las _ 41 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D115 Line Avenue Operations tl■ i Traffic Impact Study D115 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 6: Twin Lakes Rd & 181st Ave Control Type: All -way stop Delay (sec / veh) Analysis Method: HCM 2010 Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 15.0 C Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Approach Northeasttbiound Southwestbound Northwestbound Southeastbound Lane Configuration 1 41 I I"► 1 11 1 F 1T1hr1u #11F 11 1 F 1Thru Turning Movement Left T1hru Right Left Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 0 1 0 Pocket Length [ft] 200.00FF 175.00 175.00 175.00 Speed [mph] 40.00 40.00 40.00 40.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Base Volume Input [veh/h] 142 59 36 22 138 30 71 345 11 19 175 231 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -9 9 0 15 12 354 0 -21 21 69 -13 -16 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 133 68 36 37 150 384 71 324 32 88 162 215 Peak Hour Factor 0.8300 0.8300 0.8300 0.8300 0.8300 0.8300 0.8300 1 0.8300 0.8300 0.8300 0.8300 0.8300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 40 1 20 11 11 45 116 21 98 10 27 49 65 Total Analysis Volume [veh/h] 160 82 43 45 181 463 86 7 390 39 106 195 259 Pedestrian Volume [ped/h] 0 0 10 10 Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D116 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S na c k Version 4.00-02 Intersection Settings Lanes Movement, Approach, & Intersection Results 95th -Percentile Queue Length [veh] 0.58 1 0.58 1 0.41 0.38 0.28 1.38 6.55 0.61 1.91 1.87 0.79 1.66 2.26 95th -Percentile Queue Length [ft] 1452T14 52 10.26 9.60 6.91 34.41 163.76 15.21 47.82 46.66 19.70 41.43 56.41 Approach Delay [s/veh] 11.01 19.51 13.29 13.15 Approach LOS B C B B Intersection Delay [s/veh] 15.03 Intersection LOS C Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D117 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control a O � �r O D�r O� Line Avenue Operations Scenario 3: 3: AM - Alt C Traffic Impact Study D118 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume a 23 J 126 71 42 0 � � 0 rQN. l 439 144 7 9S >� 42n�klcl/ ❑i Line Avenue Operations Scenario 3: 3: AM - Alt C 108 67 29 0 3 `- 0 �- 0 75 CO— Traffic Impact Study DI 19 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM - Alt C.pdf Line Avenue Operations Intersection Analysis Summary Spa c,k Scenario 6: PM - Alt C 6/8/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 SB Thru 0.005 22.3 C 2 Line Ave & 5th St Two-way stop HCM 2010 SEB Left 0.367 11.8 B 3 Twin Lakes Rd & Line Ave Two-way stop HCM 2010 EB Left 1.151 239.6 F 4 Line Ave & 3rd St Two-way stop HCM 2010 SB Left 0.012 9.4 A 5 Line Ave & Main St Signalized HCM 2010 NB Left 0.423 9.3 A 6 Twin Lakes Rd & 181st Ave All -way stop HCM 2010 SEB Left 12.8 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D120 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 22.3 Level Of Service: C Volume to Capacity (v/c): 0.005 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 2 2 168 2 5 54 33 3 3 1 40 206 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 34 182 0 0 0 -34 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 2 2 168 2 5 88 215 3 3 40 172 Peak Hour Factor 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 1 46 1 1 24 59 1 1 11 47 Total Analysis Volume [veh/h] 1 2 2 185 2 5 97 236 3 3 44 189 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D121 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.01 0.00 0.47 0.01 0.01 0.07 0.00 u.00 0.00 d_M, Delay for Movement [s/veh] 14.26 15.56 9.59 22.15 22.29 16.99 7.92 7.73 :1.00 0.00 Movement LOS B C A C C C A A A A A A 95th -Percentile Queue Length [veh] 0.03 FO.03 0.03 2.52 2.52 2.52 1.01 1.01 1.01 0.65 0.65 0.65 95th -Percentile Queue Length [ft] 0.82 1 0.82 1 0.82 63.06 63.06 63.06 25.18 1 25.18 1 25.18 16.22 16.22 16.22 d_A, Approach Delay [s/veh] 12.91 22.02 2.29 0.10 Approach LOS B C A A d_I, Intersection Delay [s/veh] 6.61 Intersection LOS C Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D122 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 11.8 Level Of Service: B Volume to Capacity (v/c): 0.367 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -123 -252 -133 89 224 -42 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 5 68 35 187 304 29 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 18 9 49 80 8 Total Analysis Volume [veh/h] 5 72 37 197 320 31 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D123 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.37 0.03 d_M, Delay for Movement [s/veh] 7.72 11.80 11.15 Movement LOS A A A A B B 95th -Percentile Queue Length [veh] 0.18 0.18 0.00 0.00 1.92 1.92 95th -Percentile Queue Length [ft] 4.61 4.61 0.00 0.00 48.09 48.09 d_A, Approach Delay [s/veh] 0.50 0.00 11.74 Approach LOS A A B d_I, Intersection Delay [s/veh] 6.28 Intersection LOS B Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D124 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Spark Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 239.6 HCM 2010 Level Of Service: F 15 minutes Volume to Capacity (v/c): 1.151 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration #11 r I Imo► + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 0 1 0 0 0 0 Pocket Length [ft] 100.00 100.00 175.00 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 30.00 Grade [%] 0.00 0.00 10.00 3.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 125 149 6 0 158 -158 151 -6 129 11 -11 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 180 340 15 0 269 10 210 7 152 13 0 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 47 89 4 0 70 3 55 2 40 3 0 0 Total Analysis Volume [veh/h] 188 354 16 0 280 10 219 7 158 14 0 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D125 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.15 u.00 0.00 0.00 1.15 1 0.04 0.21 0.10 0.00 0.00 d_M, Delay for Movement [s/veh] 8.34 0.00 8.04 C 239.63 238.80 225.47 32.15 25.52 12.82 Movement LOS A A A A A A F F F D D B 95th -Percentile Queue Length [veh] 0.52 FO.00 0.00 0.00 0.00 0.00 20.58 20.58 20.58 0.31 0.31 0.31 95th -Percentile Queue Length [ft] 13.03 1 0.00 0.00 0.00 0.00 0.00 514.57 514.57 1514.57 7.78 7.78 7.78 d_A, Approach Delay [s/veh] 2.81 0.00 233.79 32.15 Approach LOS A A F D d_I, Intersection Delay [s/veh] 73.67 Intersection LOS F Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D126 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 4: Line Ave & 3rd St Delay (sec / veh): 9.4 Level Of Service: A Volume to Capacity (v/c): 0.012 Name Line Ave 3rd St 3rd St Approach Southbound Eastbound Westbound Lane Configuration "r i �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 Pocket Length [ft] 3.00 3.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave 3rd St 3rd St Base Volume Input [veh/h] 1 2 5 0 0 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 8 56 36 0 0 23 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 9 58 41 0 0 36 Peak Hour Factor 0.9300 0.9300 0.9300 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 16 11 0 0 10 Total Analysis Volume [veh/h] 10 62 44 0 0 39 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D127 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.06 0.03 d_M, Delay for Movement [s/veh] 9.44 8.68 7.37 Movement LOS A A A A A A 95th -Percentile Queue Length [veh] 0.23 0.23 0.09 0.09 0.00 0.00 95th -Percentile Queue Length [ft] 5.66 5.66 2.17 2.17 0.00 0.00 d_A, Approach Delay [s/veh] 8.78 7.37 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 6.17 Intersection LOS A Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D128 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Spark Intersection Level Of Service Report Intersection 5: Line Ave & Main St Control Type: Signalized Delay (sec / veh): 9.3 Analysis Method: HCM 2010 Level Of Service: A Analysis Period: 15 minutes Volume to Capacity (v/c): 0.423 Intersection Setup Name Zane Ave Main St Main St 181st Ave Approach 364 Northbound Eastbound 404 31 Westbound Lane Configuration 1.0000 i i r 11 r 1.0000 1.0000 *111 Turning Movement Left Right Thru Right Left Thru Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 0 1 1 0 Pocket Length [ft] 225.00 0 0 75.00 100.00 0 Speed [mph] 0 30.00 35.00 0 0 40.00 Grade [%] 0 0.00 0.00 0 0 0.00 Crosswalk 62 Yes Yes 0 55 Yes volumes Name Zane Ave Main St 181st Ave Base Volume Input [veh/h] 364 64 477 404 31 414 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 4.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 62 63 155 0 55 205 Other Volume [veh/h] 0 0 0 0 0 0 Right -Turn on Red Volume [veh/h] 0 0 0 Total Hourly Volume [veh/h] 426 127 632 404 86 619 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 110 33 163 104 22 160 Total Analysis Volume [veh/h] 439 131 652 416 89 638 Presence of On -Street Parking No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 Pedestrian Volume [ped/h] 10 10 10 Bicycle Volume [bicycles/h] 0 0 0 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D129 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Located in CBD No Signal Coordination Group Permissive Protected Permissi Cycle Length [s] 90 Coordination Type Time of Day Pattern Isolated Actuation Type Fully actuated Offset [s] 0.0 Offset Reference LeadGreen Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Protected Permissive Permissive Permissive Protected Permissi Permissive Signal group 3 2 1 6 Auxiliary Signal Groups Lead / Lag Lead Lead Minimum Green [s] 5 10 5 10 Maximum Green [s] 21 45 11 60 Amber [s] 3.0 3.0 3.0 3.0 All red [s] 1.0 2.0 1.0 2.0 Split [s] 25 50 15 65 Vehicle Extension [s] 3.0 3.0 3.0 3.0 Walk [s] 0 0 0 Pedestrian Clearance [s] 0 0 0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 12, Clearance Lost Time [s] 2.0 3.0 2.0 3.0 Minimum Recall No Yes No Yes Maximum Recall No No No No Pedestrian Recall No No No No Detector Location [ft] 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D130 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Group Calculations Spack Lane Group L R C R L C L, Total Lost Time per Cycle [s] 4.00 4.00 5.00 5.00 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] B B A B 0.00 A 12, Clearance Lost Time [s] 2.00 2.00 3.00 3.00 0.00 3.00 g_i, Effective Green Time [s] 6 6 13 13 20 20 g / C, Green / Cycle 0.16 0.16 0.37 0.37 0.57 0.57 (v / s)_i Volume / Saturation Flow Rate 0.13 0.08 0.19 0.27 0.09 0.18 s, saturation flow rate [veh/h] 3412 1568 3478 1568 1014 3478 c, Capacity [veh/h] 558 256 1300 586 785 1998 d1, Uniform Delay [s] 13.79 13.11 8.29 9.17 3.67 3.81 k, delay calibration 0.11 0.11 0.11 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 2.51 1.58 0.30 1.60 0.06 0.09 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.79 0.51 0.50 0.71 0.11 0.32 d, Delay for Lane Group [s/veh] 16.31 14.69 8.59 10.77 3.73 3.90 Lane Group LOS B B A B A A Critical Lane Group 50th -Percentile Queue Length [veh] 1.47 0.84 1.20 1.87 0.08 0.30 50th -Percentile Queue Length [ft] 36.83 20.94 29.90 46.82 2.01 7.56 95th -Percentile Queue Length [veh] 2.65 1.51 2.15 3.37 0.14 0.54 95th -Percentile Queue Length [ft] 66.30 37.69 53.83 84.27 3.61 13.60 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D131 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Movement, Approach, & Intersection Results Spa c,,k d_M, Delay for Movement [s/veh] 16.31 14.69 8.59 10.77 3.73 3.90 Movement LOS B B A B A A d_A, Approach Delay [s/veh] 15.93 9.44 3.88 Approach LOS B A A d_I, Intersection Delay [s/veh] 9.29 Intersection LOS A Intersection V/C 0.423 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D132 Line Avenue Operations 1. Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 6: Twin Lakes Rd & 181st Ave Control Type: All -way stop Delay (sec / veh) Analysis Method: HCM 2010 Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 12.8 B Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Approach Northeasttbiound Southwestbound Northwestbound Southeastbound Lane Configuration 1 41 I I"► 1 11 1 F 1T1hr1u #11F 11 1 F 1Thru Turning Movement Left T1hru Right Left Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 2 0 1 0 1 0 1 0 Pocket Length [ft] 200.00FF 175.00 175.00 175.00 Speed [mph] 40.00 40.00 40.00 40.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd 181 st Ave 181 st Ave Base Volume Input [veh/h] 161 178 83 19 64 27 78 327 37 78 416 92 Base Volume Adjustment Factor 1.0000 1 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 4.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 6 0 0 Diverted Trips [veh/h] TT 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -21 21 0 30 7 260 0 -41 41 218 -30 -6 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 140 199 83 49 71 287 78 286 78 296 386 86 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 36 51 21 13 18 74 20 74 20 76 99 22 Total Analysis Volume [veh/h] 144 205 86 51 73 296 80 295 80 305 398 89 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D133 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S na c k Version 4.00-02 Intersection Settings Lanes Movement, Approach, & Intersection Results 95th -Percentile Queue Length [veh] 0.51 1 0.51 1 1.13 1 1.05 0.30 1 0.41 1 2.31 0.51 1 1.41 1 1.33 3.43 1 2.06 1 1.96 95th -Percentile Queue Length [ft] 12.65 12.65 28.16 26.28 7.39 1 10.30 1 57.86 12.83 1 35.14 1 33.30 85.73 1 51.60 1 48.91 Approach Delay [s/veh] 11.65 11.63 11.46 14.70 Approach LOS B B B B Intersection Delay [s/veh] 12.75 Intersection LOS B Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D134 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control a O � �r O D�r O� Line Avenue Operations Scenario 6: 6: PM - Alt C Traffic Impact Study D135 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Sp7--r ark F4-a_aa to q, fa32 f� 404 � }. 86 4� Line Avenue Operations Scenario 6: 6: PM - Alt C M, R, U5 4r1`\ 1 41 36 0 0 Traffic Impact Study D136 Line Avenue Operations Generated with Version 4.00-02 Appendix D - Capacity Analysis Backup Line Avenue Operations Spa.ck Vistro File: C:\...\Line Ave Vistro.vistro Scenario 9: AM Existing - Mitigation Report File: C:\...\AM Existing - Mitigation.pdf 6/9/2016 Intersection Analysis Summary ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 NB Thru 0.000 11.0 B 2 Line Ave & 5th St Two-way stop HCM 2010 NEB Left 0.079 13.7 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 9: 9: AM Existing - Mitigation Traffic Impact Study D137 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 11.0 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 0 2 94 0 0 18 10 0 0 1 42 130 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 0 2 94 0 0 18T 10 0 0 42 130 Peak Hour Factor 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 1 27 0 0 5 3 0 0 12 38 Total Analysis Volume [veh/h] 1 0 2 109 0 0 21 12 0 0 49 151 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 9: 9: AM Existing - Mitigation Traffic Impact Study D138 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Stop Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 J 0.00 0.03 1 0.02 0.00 0.00 0.03 j.00 d_M, Delay for Movement [s/veh] 10.03 10.98 8.84 -00 G10.91 10.06 8.96 7.52 7.52 13.00 Movement LOS B B A A A A B F B A A A A 95th -Percentile Queue Length [veh] 0.01 0.01 0.01 0.00 0.00 0.00 0.15 0.15 0.15 0.47 0.47 0.47 95th -Percentile Queue Length [ft] 0.26 1 0.26 0.26 0.00 0.00 0.00 3.84 3.84 1 3.84 11.73 11.73 11.73 d_A, Approach Delay [s/veh] 9.23 0.00 10.60 1.84 Approach LOS A A B A d_I, Intersection Delay [s/veh] 2.16 Intersection LOS B Line Avenue Operations Scenario 9: 9: AM Existing - Mitigation Traffic Impact Study D139 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 13.7 Level Of Service: B Volume to Capacity (v/c): 0.079 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 35 101 310 115 43 56 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 10 28 86 32 12 16 Total Analysis Volume [veh/h] 39 112 344 128 48 62 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 9: 9: AM Existing - Mitigation Traffic Impact Study D140 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Free Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.08 0.14 0.23 d_M, Delay for Movement [s/veh] 13.73 10.88 8.08 Movement LOS B B A A A A 95th -Percentile Queue Length [veh] 0.82 0.82 0.88 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 20.59 20.59 21.94 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 11.62 5.89 0.00 Approach LOS B A A d_I, Intersection Delay [s/veh] 6.18 Intersection LOS B Line Avenue Operations Scenario 9: 9: AM Existing - Mitigation Traffic Impact Study D141 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control 411. 'NAM f 7. 1 } Spark 00 0 \\, -� Y Line Avenue Operations Scenario 9: 9: AM Existing - Mitigation Traffic Impact Study D142 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Base Volume SP Line Avenue Operations Scenario 9: 9: AM Existing - Mitigation Traffic Impact Study D143 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\AM - Alt A - Mitigation.pdf Line Avenue Operations Intersection Analysis Summary Spa.ck Scenario 13: AM - Alt A - Mitigation 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 NB Thru 0.000 11.0 B 2 Line Ave & 5th St Two-way stop HCM 2010 SWB Thru 0.010 10.8 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 13: 13: AM - Alt A - Mitigation Traffic Impact Study D144 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 11.0 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 0 2 94 0 0 18 10 0 0 1 42 130 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 0 2 94 0 0 18T 10 0 0 42 130 Peak Hour Factor 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 1 27 0 0 5 3 0 0 12 38 Total Analysis Volume [veh/h] 1 0 2 109 0 0 21 12 0 0 49 151 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 13: 13: AM - Alt A - Mitigation Traffic Impact Study D145 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Stop Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 J 0.00 0.03 1 0.02 0.00 0.00 0.03 j.00 d_M, Delay for Movement [s/veh] 10.03 10.98 8.84 -00 G10.91 10.06 8.96 7.52 7.52 13.00 Movement LOS B B A A A A B F B A A A A 95th -Percentile Queue Length [veh] 0.01 0.01 0.01 0.00 0.00 0.00 0.15 0.15 0.15 0.47 0.47 0.47 95th -Percentile Queue Length [ft] 0.26 1 0.26 0.26 0.00 0.00 0.00 3.84 3.84 1 3.84 11.73 11.73 11.73 d_A, Approach Delay [s/veh] 9.23 0.00 10.60 1.84 Approach LOS A A B A d_I, Intersection Delay [s/veh] 2.16 Intersection LOS B Line Avenue Operations Scenario 13: 13: AM - Alt A - Mitigation Traffic Impact Study D146 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 10.8 Level Of Service: B Volume to Capacity (v/c): 0.010 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 115 -101 -310 -115 -43 43 Other Volume [veh/h] 0 1 5 0 0 0 Total Hourly Volume [veh/h] 150 1 5 0 0 99 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 42 0 1 0 0 28 Total Analysis Volume [veh/h] 167 1 6 0 0 110 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 13: 13: AM - Alt A - Mitigation Traffic Impact Study D147 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Stop Free Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.00 d_M, Delay for Movement [s/veh] 10.79 9.12 7.56 Movement LOS A A B A A A 95th -Percentile Queue Length [veh] 0.00 0.00 0.03 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 0.00 0.00 0.72 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 0.00 10.79 0.00 Approach LOS A B A d_I, Intersection Delay [s/veh] 0.23 Intersection LOS B Line Avenue Operations Scenario 13: 13: AM - Alt A - Mitigation Traffic Impact Study D148 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control f 7. 1 } 00 Y Line Avenue Operations Scenario 13: 13: AM - Alt A - Mitigation Spark Traffic Impact Study D149 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Spark oQ O 1& J 130 10 ------ . - 42 �6 R R Line Avenue Operations Scenario 13: 13: AM - Alt A - Mitigation Traffic Impact Study D150 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\AM - Alt B - Mitigation.pdf Line Avenue Operations Intersection Analysis Summary Spa.ck Scenario 12: AM - Alt B - Mitigation 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 EB Left 0.048 11.3 B 2 Line Ave & 5th St Two-way stop HCM 2010 NEB Left 0.000 10.4 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 12: 12: AM - Alt B - Mitigation Traffic Impact Study D151 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 11.3 Level Of Service: B Volume to Capacity (v/c): 0.048 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 0 2 94 0 0 18 10 0 0 1 42 130 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 9 46 0 0 0 -9 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 0 2 94 0 0 27T 56 0 0 42 121 Peak Hour Factor 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 1 27 0 0 8 16 0 0 12 35 Total Analysis Volume [veh/h] 1 0 2 109 0 0 31 65 0 0 49 141 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 12: 12: AM - Alt B - Mitigation Traffic Impact Study D152 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Stop Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 J 0.00 0.05 1 0.09 0.00 0.00 0.03 j.00 d_M, Delay for Movement [s/veh] 9.99 10.91 8.84 -00 G 11.33 10.57 9.46 7.52 7.52 13.00 Movement LOS A B A A A A B B A A A A 95th -Percentile Queue Length [veh] 0.01 0.01 0.01 0.00 0.00 0.00 0.46 0.46 0.46 0.44 0.44 0.44 95th -Percentile Queue Length [ft] 0.26 1 0.26 1 0.26 0.00 0.00 0.00 11.56 1 11.56 1 11.56 11.06 11.06 11.06 d_A, Approach Delay [s/veh] 9.22 0.00 10.81 1.94 Approach LOS A A B A d_I, Intersection Delay [s/veh] 3.60 Intersection LOS B Line Avenue Operations Scenario 12: 12: AM - Alt B - Mitigation Traffic Impact Study D153 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 10.4 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -35 101 -310 26 102 -56 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 0 0 141 145 0 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 0 39 40 0 Total Analysis Volume [veh/h] 0 0 0 157 161 0 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 12: 12: AM - Alt B - Mitigation Traffic Impact Study D154 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Free Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 d_M, Delay for Movement [s/veh] 10.36 9.94 7.55 Movement LOS B A A A A A 95th -Percentile Queue Length [veh] 0.00 0.00 0.00 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 0.00 0.00 0.00 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 10.15 0.00 0.00 Approach LOS B A A d_I, Intersection Delay [s/veh] 0.00 Intersection LOS B Line Avenue Operations Scenario 12: 12: AM - Alt B - Mitigation Traffic Impact Study D155 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control 411. 'NAM f 7. 1 } Spark 00 0 \\, -� Y Line Avenue Operations Scenario 12: 12: AM - Alt B - Mitigation Traffic Impact Study D156 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Spark � h MJ1 42as � Line Avenue Operations Scenario 12: 12: AM - Alt B - Mitigation Traffic Impact Study D157 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\AM - Alt C - Mitigation.pdf Line Avenue Operations Intersection Analysis Summary Spa.ck Scenario 11: AM - Alt C - Mitigation 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 EB Left 0.042 11.5 B 2 Line Ave & 5th St Two-way stop HCM 2010 NEB Left 0.002 10.9 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 11: 11: AM - Alt C - Mitigation Traffic Impact Study D158 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 11.5 Level Of Service: B Volume to Capacity (v/c): 0.042 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 0 2 94 0 0 18 10 0 0 1 42 130 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 5 61 0 0 0 -5 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 0 2 94 0 0 23T 71 0 0 42 125 Peak Hour Factor 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 1 27 0 0 7 21 0 0 12 36 Total Analysis Volume [veh/h] 1 0 2 109 0 0 27 83 0 0 49 145 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 11: 11: AM - Alt C - Mitigation Traffic Impact Study D159 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Stop Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 J 0.00 0.04 1 0.11 0.00 0.00 0.03 j.00 d_M, Delay for Movement [s/veh] 10.00 10.94 8.84 -00 C 11.48 10.68 9.58 7.52 7.52 13.00 Movement LOS B B A A A A B B A A A A 95th -Percentile Queue Length [veh] 0.01 0.01 0.01 0.00 0.00 0.00 0.54 0.54 0.54 0.45 0.45 0.45 95th -Percentile Queue Length [ft] 0.26 1 0.26 1 0.26 0.00 0.00 0.00 13.38 1 13.38 1 13.38 11.32 11.32 11.32 d_A, Approach Delay [s/veh] 9.23 0.00 10.88 1.90 Approach LOS A A B A d_I, Intersection Delay [s/veh] 3.83 Intersection LOS B Line Avenue Operations Scenario 11: 11: AM - Alt C - Mitigation Traffic Impact Study D160 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 10.9 Level Of Service: B Volume to Capacity (v/c): 0.002 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -34 70 -280 29 104 -43 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 31 30 144 147 13 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 9 8 40 41 4 Total Analysis Volume [veh/h] 1 34 33 160 163 14 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 11: 11: AM - Alt C - Mitigation Traffic Impact Study D161 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Free Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.05 0.02 d_M, Delay for Movement [s/veh] 10.94 10.25 7.63 Movement LOS B B A A A A 95th -Percentile Queue Length [veh] 0.15 0.15 0.07 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 3.83 3.83 1.81 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 10.27 1.30 0.00 Approach LOS B A A d_I, Intersection Delay [s/veh] 1.51 Intersection LOS B Line Avenue Operations Scenario 11: 11: AM - Alt C - Mitigation Traffic Impact Study D162 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control 411. 'NAM f 7. 1 } Spark 00 0 \\, -� Y Line Avenue Operations Scenario 11: 11: AM - Alt C - Mitigation Traffic Impact Study D163 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Spark 23 J 126 71 42 ..A roN M Line Avenue Operations Scenario 11: 11: AM - Alt C - Mitigation Traffic Impact Study D164 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with S I a a k Version 4.00-02 Line Avenue Operations Vistro File: C:\...\Line Ave Vistro.vistro Scenario 10: PM Existing - Mitigation Report File: C:\...\PM Existing - Mitigation.pdf 6/9/2016 Intersection Analysis Summary ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 EB Left 0.117 13.5 B 2 Line Ave & 5th St Two-way stop HCM 2010 NEB Left 0.224 20.4 C 3 Twin Lakes Rd & Line Ave Two-way stop I HCM 2010 EB Thru 1 0.029 1 33.9 D V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation Traffic Impact Study D165 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 13.5 Level Of Service: B Volume to Capacity (v/c): 0.117 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 2 2 168 2 5 54 33 3 3 1 40 206 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 2 2 168 2 5 54 33 3 3 40 206 Peak Hour Factor 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 1 46 1 1 15 9 1 1 11 57 Total Analysis Volume [veh/h] 1 2 2 185 2 5 59 36 3 3 44 226 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation Traffic Impact Study D166 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Stop Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 J 0.00 0.12 1 0.05 0.00 0.00 0.03 j.00 d_M, Delay for Movement [s/veh] 11.06 12.34 9.28 -00 G 13.47 11.67 10.24 7.70 7.71 0.00 Movement LOS B B A A A A B B B A A A 95th -Percentile Queue Length [veh] 0.02 FO.02 0.02 0.00 0.00 0.00 0.62 0.62 0.62 0.74 0.74 0.74 95th -Percentile Queue Length [ft] 0.61 1 0.61 0.61 0.00 0.00 0.00 15.59 1 15.59 1 15.59 18.47 18.47 18.47 d_A, Approach Delay [s/veh] 10.86 0.00 12.71 1.33 Approach LOS B A B A d_I, Intersection Delay [s/veh] 2.93 Intersection LOS B Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation Traffic Impact Study D167 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 20.4 Level Of Service: C Volume to Capacity (v/c): 0.224 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 128 320 168 98 80 71 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 34 84 44 26 21 19 Total Analysis Volume [veh/h] 135 337 177 103 84 75 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation Traffic Impact Study D168 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Free Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.22 0.44 0.12 d_M, Delay for Movement [s/veh] 20.38 19.09 7.81 Movement LOS C C A A A A 95th -Percentile Queue Length [veh] 5.06 5.06 0.41 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 126.53 126.53 10.32 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 19.46 4.93 0.00 Approach LOS C A A d_I, Intersection Delay [s/veh] 11.60 Intersection LOS C Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation Traffic Impact Study D169 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Snack Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 33.9 HCM 2010 Level Of Service: D 15 minutes Volume to Capacity (v/c): 0.029 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Line Ave Approach Northbound Southbound Eastbound 55 Westbound Lane Configuration #11 r i i r i t 361 13 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 1 1 0 1 0 0 Pocket Length [ft] 100.00 100.00 175.00 175.00 3.00 150.00 3.00 Speed [mph] 40.00 40.00 30.00 3.00 30.00 Grade [%] 0.00 0.00 10.00 1.00 1.00 0.00 Crosswalk Yes Yes Yes 1.00 Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 55 191 9 0 111 168 361T 13 23 2 11 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 14 50 2 0 29 44 94 3 6 1 3 0 Total Analysis Volume [veh/h] 57 199 9 0 116 175 376 14 24 2 11 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation Traffic Impact Study D170 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.05 u.00 0.00 0.00 0.76 1 0.03 0.03 0.00 0.03 0.00 d_M, Delay for Movement [s/veh] 7.98 0.00 7.65 G 33.79 F33.94 8.96 13.76 14.48 9.59 Movement LOS A A A A A A D D A B B A 95th -Percentile Queue Length [veh] 0.14 FO.00 0.00 0.00 0.00 0.00 7.13 7.13 0.08 0.10 0.10 0.10 95th -Percentile Queue Length [ft] 3.54 1 0.00 0.00 0.00 0.00 0.00 178.15 178.15 1 1.98 2.53 2.53 2.53 d_A, Approach Delay [s/veh] 1.72 0.00 32.36 14.37 Approach LOS A A D B d_I, Intersection Delay [s/veh] 14.28 Intersection LOS D Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation Traffic Impact Study D171 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation l� IN Spark Traffic Impact Study D172 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Sn ark t e+ 2 3 361 54 206 2Y �. 33 3 40ti 70 rc�ni. RM�ry� �mry� Line Avenue Operations Scenario 10: 10: PM Existing - Mitigation Traffic Impact Study D173 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM - Alt A - Mitigation.pdf Line Avenue Operations Intersection Analysis Summary Spa.ck Scenario 16: PM - Alt A - Mitigation 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 EB Left 0.117 13.5 B 2 Line Ave & 5th St Two-way stop HCM 2010 SWB Thru 0.004 11.7 B 3 Twin Lakes Rd & Line Ave Two-way stop I HCM 2010 WB Left 0.052 19.0 C V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation Traffic Impact Study D174 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 13.5 Level Of Service: B Volume to Capacity (v/c): 0.117 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 2 2 168 2 5 54 33 3 3 1 40 206 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 2 2 168 2 5 54 33 3 3 40 206 Peak Hour Factor 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 1 46 1 1 15 9 1 1 11 57 Total Analysis Volume [veh/h] 1 2 2 185 2 5 59 36 3 3 44 226 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation Traffic Impact Study D175 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Stop Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 J 0.00 0.12 1 0.05 0.00 0.00 0.03 j.00 d_M, Delay for Movement [s/veh] 11.06 12.34 9.28 -00 G 13.47 11.67 10.24 7.70 7.71 0.00 Movement LOS B B A A A A B B B A A A 95th -Percentile Queue Length [veh] 0.02 FO.02 0.02 0.00 0.00 0.00 0.62 0.62 0.62 0.74 0.74 0.74 95th -Percentile Queue Length [ft] 0.61 1 0.61 0.61 0.00 0.00 0.00 15.59 1 15.59 1 15.59 18.47 18.47 18.47 d_A, Approach Delay [s/veh] 10.86 0.00 12.71 1.33 Approach LOS B A B A d_I, Intersection Delay [s/veh] 2.93 Intersection LOS B Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation Traffic Impact Study D176 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 11.7 Level Of Service: B Volume to Capacity (v/c): 0.004 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 98 320 -168 -98 -80 80 Other Volume [veh/h] 0 5 2 0 0 0 Total Hourly Volume [veh/h] 226 5 2 0 0 151 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 59 1 1 0 0 40 Total Analysis Volume [veh/h] 238 5 2 0 0 159 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation Traffic Impact Study D177 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Stop Free Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 d_M, Delay for Movement [s/veh] 11.74 9.52 7.73 Movement LOS A A B A A A 95th -Percentile Queue Length [veh] 0.00 0.00 0.01 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 0.00 0.00 0.28 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 0.00 11.74 0.00 Approach LOS A B A d_I, Intersection Delay [s/veh] 0.06 Intersection LOS B Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation Traffic Impact Study D178 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Snack Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 19.0 HCM 2010 Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.052 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Line Ave Approach Northbound Southbound Eastbound 55 Westbound Lane Configuration #11 r i i r i t 361 13 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 1 1 0 1 0 0 Pocket Length [ft] 100.00 100.00 175.00 175.00 3.00 100.00 3.00 Speed [mph] 40.00 40.00 30.00 3.00 30.00 Grade [%] 0.00 0.00 10.00 1.00 1.00 0.00 Crosswalk Yes Yes Yes 1.00 Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -55 364 13 0 168 -168 364 -13 -23 11 -11 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 555 22 0 279 0 0 0 0 13 0 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 145 6 0 73 0 0 0 0 3 0 0 Total Analysis Volume [veh/h] 0 578 23 0 291 0 0 0 0 14 0 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation Traffic Impact Study D179 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 u.01 0.00 0.00 0.00 1 0.00 0.00 0.05 0.00 0.00 d_M, Delay for Movement [s/veh] 7.85 0.00 8.71 G 18.52 17.85 9.83 19.00 18.18 12.73 Movement LOS A A A A A A C C A C C B 95th -Percentile Queue Length [veh] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.16 0.16 0.16 95th -Percentile Queue Length [ft] 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.00 4.06 4.06 4.06 d_A, Approach Delay [s/veh] 0.00 0.00 15.40 19.00 Approach LOS A A C C d_I, Intersection Delay [s/veh] 0.29 Intersection LOS C Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation Traffic Impact Study D180 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation l� 12 �Ir Spark Traffic Impact Study D181 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Sn ark 5 6 40 rNN. l Line Avenue Operations Scenario 16: 16: PM - Alt A - Mitigation N � a 0 25 n1 �] CjnNV UN Traffic Impact Study D182 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM - Alt B - Mitigation.pdf Line Avenue Operations Intersection Analysis Summary Spa.ck Scenario 15: PM - Alt B - Mitigation 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 EB Left 0.207 16.8 C 2 Line Ave & 5th St Two-way stop HCM 2010 NEB Left 0.000 11.7 B 3 Twin Lakes Rd & Line Ave Two-way stop I HCM 2010 EB Left 0.829 82.9 F V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation Traffic Impact Study D183 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 16.8 Level Of Service: C Volume to Capacity (v/c): 0.207 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 2 2 168 2 5 54 33 3 3 1 40 206 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 49 133 0 0 0 -49 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 2 2 168 2 5 103 166 3 3 40 157 Peak Hour Factor 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 1 46 1 1 28 46 1 1 11 43 Total Analysis Volume [veh/h] 1 2 2 185 2 5 113 182 3 3 44 173 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation Traffic Impact Study D184 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Stop Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 11.00 0.00 0.21 1 0.27 0.00 0.00 0.03 j.00 d_M, Delay for Movement [s/veh] 10.82 11.85 9.27 0.00 G 16.81 15.56 14.13 7.70 7.71 0.00 Movement LOS B B A A A A C C B A A A 95th -Percentile Queue Length [veh] 0.02 FO.02 0.02 0.00 0.00 0.00 2.60 2.60 2.60 0.57 0.57 0.57 95th -Percentile Queue Length [ft] 0.58 1 0.58 1 0.58 0.00 0.00 0.00 64.95 1 64.95 1 64.95 14.22 14.22 14.22 d_A, Approach Delay [s/veh] 10.62 0.00 16.02 1.65 Approach LOS B A C A d_I, Intersection Delay [s/veh] 7.26 Intersection LOS C Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation Traffic Impact Study D185 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Spark Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 11.7 Level Of Service: B Volume to Capacity (v/c): 0.000 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -128 -320 -168 79 204 -71 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 0 0 177 284 0 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 0 0 47 75 0 Total Analysis Volume [veh/h] 0 0 0 186 299 0 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation Traffic Impact Study D186 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Free Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 d_M, Delay for Movement [s/veh] 11.70 10.89 7.87 Movement LOS B B A A A A 95th -Percentile Queue Length [veh] 0.00 0.00 0.00 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 0.00 0.00 0.00 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 11.29 0.00 0.00 Approach LOS B A A d_I, Intersection Delay [s/veh] 0.00 Intersection LOS B Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation Traffic Impact Study D187 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Spark Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 82.9 HCM 2010 Level Of Service: F 15 minutes Volume to Capacity (v/c): 0.829 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Line Ave Approach Northbound Southbound Eastbound 55 Westbound Lane Configuration #11 r i i r i t 361 13 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 1 1 0 1 0 0 Pocket Length [ft] 100.00 100.00 175.00 175.00 3.00 100.00 3.00 Speed [mph] 40.00 40.00 30.00 3.00 30.00 Grade [%] 0.00 0.00 10.00 1.00 1.00 0.00 Crosswalk Yes Yes Yes 1.00 Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 79 191 0 0 158 -158 191 0 71 10 -10 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 134 382 9 0 269 10 170T 13 94 12 1 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 35 99 2 0 70 3 44 3 24 3 0 0 Total Analysis Volume [veh/h] 140 398 9 0 280 10 177 14 98 13 1 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation Traffic Impact Study D188 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median i Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.11 u.00 0.00 0.00 0.83 1 0.06 0.13 0.07 0.00 0.00 d_M, Delay for Movement [s/veh] 8.20 0.00 8.14 G 82.94 F82.07 10.47 27.17 22.71 12.25 Movement LOS A A A A A A F F B D C B 95th -Percentile Queue Length [veh] 0.37 FO.00 0.00 0.00 0.00 0.00 7.13 7.13 0.44 0.25 0.25 0.25 95th -Percentile Queue Length [ft] 9.30 1 0.00 0.00 0.00 0.00 0.00 178.15 178.15 1 11.10 6.30 6.30 6.30 d_A, Approach Delay [s/veh] 2.10 0.00 58.32 26.85 Approach LOS A A F D d_I, Intersection Delay [s/veh] 16.12 Intersection LOS F Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation Traffic Impact Study D189 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation l� IN Spark Traffic Impact Study D190 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Sn ark t 2 103 J 157 166 ------ 40 3 � � 3 rNN. Line Avenue Operations Scenario 15: 15: PM - Alt B - Mitigation 3 4 4 12 Traffic Impact Study D191 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM - Alt C - Mitigation.pdf Line Avenue Operations Intersection Analysis Summary Spa.ck Scenario 14: PM - Alt C - Mitigation 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 1 Dodge Ave & 5th St Two-way stop HCM 2010 EB Left 0.182 18.1 C 2 Line Ave & 5th St Two-way stop HCM 2010 NEB Left 0.010 13.5 B 3 Twin Lakes Rd & Line Ave Two-way stop I HCM 2010 EB Left 1.151 174.5 F V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation Traffic Impact Study D192 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 1: Dodge Ave & 5th St Delay (sec / veh): 18.1 Level Of Service: C Volume to Capacity (v/c): 0.182 Name Parking Lot Dodge Ave 5th St 5th St Approach Northbound Southbound Eastbound Westbound Lane Configuration + Base Volume Input [veh/h] 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 30.00 30.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Parking Lot Dodge Ave 5th St 5th St Base Volume Input [veh/h] 1 2 2 168 2 5 54 33 3 3 1 40 206 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 34 182 0 0 0 -34 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1 2 2 168 2 5 88 215 3 3 40 172 Peak Hour Factor 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 0.9100 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 1 46 1 1 24 59 1 1 11 47 Total Analysis Volume [veh/h] 1 2 2 185 2 5 97 236 3 3 44 189 Pedestrian Volume [ped/h] 0 10 10 0 Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation Traffic Impact Study D193 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Stop Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.00 0.00 J 0.00 0.18 1 0.35 0.00 0.00 0.03 j.00 d_M, Delay for Movement [s/veh] 10.89 12.00 9.28 -00 C 18.14 16.73 15.29 7.70 7.71 0.00 Movement LOS B B A A A A C C C A A A 95th -Percentile Queue Length [veh] 0.02 FO.02 0.02 0.00 0.00 0.00 3.17 3.17 3.17 0.62 0.62 0.62 95th -Percentile Queue Length [ft] 0.59 1 0.59 0.59 0.00 0.00 0.00 79.32 1 79.32 1 79.32 15.46 15.46 15.46 d_A, Approach Delay [s/veh] 10.69 0.00 17.12 1.54 Approach LOS B A C A d_I, Intersection Delay [s/veh] 8.02 Intersection LOS C Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation Traffic Impact Study D194 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Control Type: Two-way stop Analysis Method: HCM 2010 Analysis Period: 15 minutes Intersection Setup Snack Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Delay (sec / veh): 13.5 Level Of Service: B Volume to Capacity (v/c): 0.010 Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] -123 -252 -133 89 224 -42 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 5 68 35 187 304 29 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 18 9 49 80 8 Total Analysis Volume [veh/h] 5 72 37 197 320 31 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation Traffic Impact Study D195 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Stop Free Free Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.12 0.03 d_M, Delay for Movement [s/veh] 13.46 12.13 8.05 Movement LOS B B A A A A 95th -Percentile Queue Length [veh] 0.46 0.46 0.09 0.00 0.00 0.00 95th -Percentile Queue Length [ft] 11.50 11.50 2.35 0.00 0.00 0.00 d_A, Approach Delay [s/veh] 12.22 1.27 0.00 Approach LOS B A A d_I, Intersection Delay [s/veh] 1.87 Intersection LOS B Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation Traffic Impact Study D196 Line Avenue Operations Generated with Version 4.00-02 Control Type: Analysis Method Analysis Period: Intersection Setup Appendix D - Capacity Analysis Backup Spark Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Two-way stop Delay (sec / veh): 174.5 HCM 2010 Level Of Service: F 15 minutes Volume to Capacity (v/c): 1.151 Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Line Ave Approach Northbound Southbound Eastbound 55 Westbound Lane Configuration #11 r i i r i t 361 13 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 1 1 1 1 0 1 0 0 Pocket Length [ft] 100.00 100.00 175.00 175.00 3.00 100.00 3.00 Speed [mph] 40.00 40.00 30.00 3.00 30.00 Grade [%] 0.00 0.00 10.00 1.00 1.00 0.00 Crosswalk Yes Yes Yes 1.00 Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 125 149 6 0 158 -158 151 -6 129 11 -11 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 180 340 15 0 269 10 210 7 152 13 0 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 47 89 4 0 70 3 55 2 40 3 0 0 Total Analysis Volume [veh/h] 188 354 16 0 280 10 219 7 158 14 0 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation Traffic Impact Study D197 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Priority Scheme Free Free Stop Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.15 u.00 0.00 0.00 1.15 1 0.04 0.21 0.10 0.00 0.00 d_M, Delay for Movement [s/veh] 8.34 0.00 8.04 C 174.53 173.70 11.01 32.15 25.52 12.82 Movement LOS A A A A A A F F B D D B 95th -Percentile Queue Length [veh] 0.52 FO.00 0.00 0.00 0.00 0.00 11.68 11.68 0.78 0.31 0.31 0.31 95th -Percentile Queue Length [ft] 13.03 1 0.00 0.00 0.00 0.00 0.00 292.08 292.08 1 19.60 7.78 7.78 7.78 d_A, Approach Delay [s/veh] 2.81 0.00 107.23 32.15 Approach LOS A A F D d_I, Intersection Delay [s/veh] 34.67 Intersection LOS F Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation Traffic Impact Study D198 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation l� IN Spark Traffic Impact Study D199 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Sn ark \} 2 to as0 i 162 e 215 -�� �-~ _ o Line Avenue Operations Scenario 14: 14: PM - Alt C - Mitigation Traffic Impact Study D200 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Line Avenue Operations Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM Existing - Mitigation - Roundabout.pdf Spa c,k Scenario 20: PM Existing - Mit - Roundabout Intersection Analysis Summary 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 3 Twin Lakes Rd & Line Ave Roundabout HCM NB Thru 1 8.2 A V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 20: 20: PM Existing - Mit - Roundabout Traffic Impact Study D201 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Control Type: Roundabout Delay (sec / veh) Analysis Method: HCM Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 8.2 A Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration + 9 0 111 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 55 191 9 0 111 168 361T 13 23 2 11 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 14 50 2 0 29 44 94 3 6 1 3 0 Total Analysis Volume [veh/h] 57 199 9 0 116 175 376 14 24 2 11 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 20: 20: PM Existing - Mit - Roundabout Traffic Impact Study D202 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings Spark Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 402 72 123 653 Exiting Flow Rate [veh/h] 14 70 123 594 Demand Flow Rate [veh/h] 55 191 1 9 1 0 111 1 168 1 361 1 13 23 1 2 11 1 0 Adjusted Demand Flow Rate [veh/h] 57 199 1 9 1 0 116T 175 1 376 1 14 24 1 2 11 0 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] 1.67 -11 2.16 0.07 Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3.00 3.00 8.57 6.56 A (intercept) 1130.00 1130.00 1130.00 1130.00 B (coefficient) 0.00100 0.00100 0.00100 0.00100 HV Adjustment Factor 0.96 0.97 0.97 0.97 Entry Flow Rate [veh/h] 275 301 427 14 Capacity of Entry and Bypass Lanes [veh/ 757 1052 1000 589 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 729 1017 971 572 X, volume / capacity 0.36 0.29 0.43 0.02 Movement, Approach, & Intersection Results Lane LOS A A A A 95th -Percentile Queue Length [veh] 1.67 1.19 2.16 0.07 95th -Percentile Queue Length [ft] 41.65 29.68 54.12 1.75 Approach Delay [s/veh] 9.55 6.38 8.57 6.56 Approach LOS A A A A Intersection Delay [s/veh] 8.16 Intersection LOS A Line Avenue Operations Scenario 20: 20: PM Existing - Mit - Roundabout Traffic Impact Study D203 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control _ 9c, [ t: �,, Noe F.w � Spark Line Avenue Operations Scenario 20: 20: PM Existing - Mit - Roundabout Traffic Impact Study D204 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Base Volume t:;Y F.w � EVAL14-0 Spark Line Avenue Operations Scenario 20: 20: PM Existing - Mit - Roundabout Traffic Impact Study D205 Line Avenue Operations Generated with Version 4.00-02 Appendix D - Capacity Analysis Backup Line Avenue Operations Spa c,k Vistro File: C:\...\Line Ave Vistro.vistro Scenario 19: PM - Alt A - Mit - Roundabout Report File: C:\...\PM - Alt A - Mitigation - Roundabout.pdf 6/9/2016 Intersection Analysis Summary ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 3 Twin Lakes Rd & Line Ave Roundabout HCM NB Thru 1 8.7 A V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 19: 19: PM - Alt A - Mit - Roundabout Traffic Impact Study D206 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Control Type: Roundabout Delay (sec / veh) Analysis Method: HCM Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 8.7 A Name Twin Lakes Rd Twin Lakes Rd Line Ave Approach Northbound Southbound Westbound Lane Configuration �"► I "r Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 Pocket Length [ft] 3.00 Growth Rate 1.00 Speed [mph] 40.00 40.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Base Volume Input [veh/h] 191 9 0 111 2 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 4.00 3.00 3.00 4.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 364 13 0 168 11 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 555 22 0 279 13 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 145 6 0 73 3 0 Total Analysis Volume [veh/h] 578 23 0 291 14 0 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 19: 19: PM - Alt A - Mit - Roundabout Traffic Impact Study D207 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Number of Conflicting Circulating Lanes 1 1 1 Circulating Flow Rate [veh/h] 0 14 601 Exiting Flow Rate [veh/h] 0 14 601 Demand Flow Rate [veh/h] 555 22 0 279 13 0 Adjusted Demand Flow Rate [veh/h] 578 23 0 291 14 0 Lanes Overwrite Calculated Critical Headway No No No User -Defined Critical Headway [s] 4.00 4.00 0.07 Overwrite Calculated Follow -Up Time No No No User -Defined Follow -Up Time [s] 3.00 3.00 6.24 A (intercept) 1130.00 1130.00 1130.00 B (coefficient) 0.00100 0.00100 0.00100 HV Adjustment Factor 0.96 0.96 0.97 Entry Flow Rate [veh/h] 625 303 15 Capacity of Entry and Bypass Lanes [veh/ 1130 1114 620 Pedestrian Impedance 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1087 1071 602 X, volume / capacity 0.55 0.27 0.02 Movement, Approach, & Intersection Results Lane LOS B A A 95th -Percentile Queue Length [veh] 3.51 1.11 0.07 95th -Percentile Queue Length [ft] 87.69 27.67 1.79 Approach Delay [s/veh] 10.09 5.97 6.24 Approach LOS B A A Intersection Delay [s/veh] 8.71 Intersection LOS A Line Avenue Operations Scenario 19: 19: PM - Alt A - Mit - Roundabout Traffic Impact Study D208 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control _ 9c, [ t: �,, Noe F.w � Spark Line Avenue Operations Scenario 19: 19: PM - Alt A - Mit - Roundabout Traffic Impact Study D209 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Spat{ Line Avenue Operations Scenario 19: 19: PM - Alt A - Mit - Roundabout Traffic Impact Study D210 k i Line Avenue Operations Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Spa.ck Line Avenue Operations Vistro File: C:\...\Line Ave Vistro.vistro Scenario 18: PM - Alt B - Mitigation - Roundabout Report File: C:\...\PM - Alt B - Mitigation - Roundabout.pdf 6/9/2016 Intersection Analysis Summary ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 3 Twin Lakes Rd & Line Ave Roundabout HCM NB Thru 1 10.5 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 18: 18: PM - Alt B - Mitigation - Roundabout Traffic Impact Study D211 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Control Type: Roundabout Delay (sec / veh) Analysis Method: HCM Level Of Service: Analysis Period: 15 minutes Intersection Setup Snack 10.5 B Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration + 9 0 111 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 79 191 0 0 158 -158 191 0 71 10 -10 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 134 382 9 0 269 10 170T 13 94 12 1 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 35 99 2 0 70 3 44 3 24 3 0 0 Total Analysis Volume [veh/h] 140 398 9 0 280 10 177 14 98 13 1 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 18: 18: PM - Alt B - Mitigation - Roundabout Traffic Impact Study D212 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings Spark Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 197 159 305 740 Exiting Flow Rate [veh/h] 14 145 305 596 Demand Flow Rate [veh/h] 134 382 9 1 0 269 10 1 170 13 94 1 12 1 0 Adjusted Demand Flow Rate [veh/h] 140 398 9 1 0 280 10 1 177 14 98 1 13 1 0 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] 4.29 1_..1 1.63 0.08 Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3.00 3.00 8.69 7.20 A (intercept) 1130.00 1130.00 1130.00 1130.00 B (coefficient) 0.00100 0.00100 0.00100 0.00100 HV Adjustment Factor 0.96 0.96 0.97 0.97 Entry Flow Rate [veh/h] 568 302 298 15 Capacity of Entry and Bypass Lanes [veh/ 929 965 834 539 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 895 928 810 524 X, volume / capacity 0.61 0.31 0.36 0.03 Movement, Approach, & Intersection Results Lane LOS B A A A 95th -Percentile Queue Length [veh] 4.29 1.34 1.63 0.08 95th -Percentile Queue Length [ft] 107.34 33.55 40.66 2.06 Approach Delay [s/veh] 13.19 7.20 8.69 7.20 Approach LOS B A A A Intersection Delay [s/veh] 10.45 Intersection LOS B Line Avenue Operations Scenario 18: 18: PM - Alt B - Mitigation - Roundabout Traffic Impact Study D213 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control _ 9c, [ t: �,, Noe F.w � Spark Line Avenue Operations Scenario 18: 18: PM - Alt B - Mitigation - Roundabout Traffic Impact Study D214 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Spat{ Line Avenue Operations Scenario 18: 18: PM - Alt B - Mitigation - Roundabout Traffic Impact Study D215 k i Line Avenue Operations Line Avenue Operations Generated with Version 4.00-02 Appendix D - Capacity Analysis Backup Line Avenue Operations Vistro File: C:\...\Line Ave Vistro.vistro Report File: C:\...\PM - Alt C - Mitigation - Roundabout.pdf Intersection Analysis Summary Spa c,k Scenario 17: PM - Alt C - Mit - Roundabout 6/9/2016 ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 3 Twin Lakes Rd & Line Ave Roundabout HCM NB Thru 1 11.8 B V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 17: 17: PM - Alt C - Mit - Roundabout Traffic Impact Study D216 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 3: Twin Lakes Rd & Line Ave Control Type: Roundabout Delay (sec / veh) Analysis Method: HCM Level Of Service: Analysis Period: 15 minutes Intersection Setup Snack 11.8 B Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Approach Northbound Southbound Eastbound Westbound Lane Configuration + 9 0 111 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru TRght Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 0 0 0 0 0 Pocket Length [ft] 1.0000 1.0000 1.0000 1.0000 Speed [mph] 40.00 40.00 30.00 130.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes volumes Name Twin Lakes Rd Twin Lakes Rd Line Ave Line Ave Base Volume Input [veh/h] 55 191 9 0 111 168 361 13 23 2 1 11 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 4.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 _77-6 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 125 149 6 0 158 -158 151 -6 129 11 -11 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 180 340 15 0 269 10 210 7 152 13 0 0 Peak Hour Factor 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 0.9600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 47 89 4 0 70 3 55 2 40 3 0 0 Total Analysis Volume [veh/h] 188 354 16 0 280 10 219 7 158 14 0 0 Pedestrian Volume [ped/h] 0 10 10 10 Line Avenue Operations Scenario 17: 17: PM - Alt C - Mit - Roundabout Traffic Impact Study D217 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings Spark Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 233 208 306 787 Exiting Flow Rate [veh/h] 7 194 306 594 Demand Flow Rate [veh/h] 180 340 15 1 0 269 10 1 210 7 152 1 13 0 1 0 Adjusted Demand Flow Rate [veh/h] 188 354 16 1 0 280 10 1 219 7 158 1 14 0 0 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] 4.86 1_..1 2.59 0.09 Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3.00 3.00 10.80 7.56 A (intercept) 1130.00 1130.00 1130.00 1130.00 B (coefficient) 0.00100 0.00100 0.00100 0.00100 HV Adjustment Factor 0.96 0.96 0.97 0.97 Entry Flow Rate [veh/h] 579 302 396 15 Capacity of Entry and Bypass Lanes [veh/ 896 918 833 515 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 864 883 809 500 X, volume / capacity 0.65 0.33 0.48 0.03 Movement, Approach, & Intersection Results Lane LOS B A B A 95th -Percentile Queue Length [veh] 4.86 1.44 2.59 0.09 95th -Percentile Queue Length [ft] 121.38 35.99 64.73 2.16 Approach Delay [s/veh] 14.66 7.70 10.80 7.56 Approach LOS B A B A Intersection Delay [s/veh] 11.77 Intersection LOS B Line Avenue Operations Scenario 17: 17: PM - Alt C - Mit - Roundabout Traffic Impact Study D218 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control _ 9c, [ t: �,, Noe F.w � Spark Line Avenue Operations Scenario 17: 17: PM - Alt C - Mit - Roundabout Traffic Impact Study D219 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume w� lei__yam Line Avenue Operations Scenario 17: 17: PM - Alt C - Mit - Roundabout Traffic Impact Study D220 Spark AL- Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Spa.ck Line Avenue Operations Vistro File: C:\...\Line Ave Vistro.vistro Scenario 21: AM Existing - Roundabout on 5 Line Report File: C:\...\AM Existing - Roundabout at 5th & 6/9/2016 Line.pdf Intersection Analysis Summary ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 2 Line Ave & 5th St Roundabout HCM SWB Thru 1 5.8 A V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 21: 21: AM Existing - Roundabout on 5 Line Traffic Impact Study D221 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Control Type: Roundabout Delay (sec / veh) Analysis Method: HCM Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 5.8 A Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 35 101 310 115 43 56 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 35 101 310 115 43 56 Peak Hour Factor 0.9000 0.9000 0.9000 0.9000 0.9000 0.9000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.06 Total 15 -Minute Volume [veh/h] 10 28 86 32 12 16 Total Analysis Volume [veh/h] 39 112 344 128 48 62 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 21: 21: AM Existing - Roundabout on 5 Line Traffic Impact Study D222 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Number of Conflicting Circulating Lanes 1 1 1 Circulating Flow Rate [veh/h] 49 40 354 Exiting Flow Rate [veh/h] 49 40 354 Demand Flow Rate [veh/h] 35 101 310 115 43 56 Adjusted Demand Flow Rate [veh/h] 39 112 344 128 48 62 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] 4.00 0.50 95th -Percentile Queue Length [ft] 12.62 Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3.00 3.00 A A A (intercept) 1130.00 1130.00 1130.00 1130.00 B (coefficient) 0.00100 0.00100 0.00100 0.00100 HV Adjustment Factor 0.97 0.97 F 0.97 0.97 Entry Flow Rate [veh/h] 156 355 132 114 Capacity of Entry and Bypass Lanes [veh/ 1076 1086 1086 793 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1045 1054 1054 770 X, volume / capacity 0.14 0.33 0.12 0.14 Movement, Approach, & Intersection Results Lane LOS A A A A 95th -Percentile Queue Length [veh] 0.50 1.43 0.41 0.50 95th -Percentile Queue Length [ft] 12.62 35.77 10.33 12.43 Approach Delay [s/veh] 4.75 6.10 6.17 Approach LOS A A A Intersection Delay [s/veh] 5.83 Intersection LOS A Line Avenue Operations Scenario 21: 21: AM Existing - Roundabout on 5 Line Traffic Impact Study D223 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control Spark (zi Line Avenue Operations Scenario 21: 21: AM Existing - Roundabout on 5 Line Traffic Impact Study D224 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Spark Line Avenue Operations Scenario 21: 21: AM Existing - Roundabout on 5 Line Traffic Impact Study D225 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Spa.ck Line Avenue Operations Vistro File: C:\...\Line Ave Vistro.vistro Scenario 22: PM Existing - Roundabout on 5 Line Report File: C:\...\PM Existing - Roundabout at 5th & 6/9/2016 Line.pdf Intersection Analysis Summary ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS 2 Line Ave & 5th St Roundabout HCM NEB Thru 1 7.3 A V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. Line Avenue Operations Scenario 22: 22: PM Existing - Roundabout on 5 Line Traffic Impact Study D226 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Level Of Service Report Intersection 2: Line Ave & 5th St Control Type: Roundabout Delay (sec / veh): Analysis Method: HCM Level Of Service: Analysis Period: 15 minutes Intersection Setup Spark 7.3 A Name Line Ave Line Ave 5th St Approach Northeastbound Southwestbound Southeastbound Lane Configuration I i r Ir Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Pocket 0 0 0 1 0 0 Pocket Length [ft] 3.00 150.00 3.00 Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes volumes Name Line Ave Line Ave 5th St Base Volume Input [veh/h] 128 320 168 98 80 71 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 3.00 3.00 3.00 3.00 3.00 3.00 Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 128 320 168 98 80 71 Peak Hour Factor 0.9500 0.9500 0.9500 0.9500 0.9500 0.9500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 34 84 44 26 -_ 21 19 Total Analysis Volume [veh/h] 135 337 177 103 84 75 Pedestrian Volume [ped/h] 0 0 0 Line Avenue Operations Scenario 22: 22: PM Existing - Roundabout on 5 Line Traffic Impact Study D227 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Intersection Settings SpaCk Number of Conflicting Circulating Lanes 1 1 1 Circulating Flow Rate [veh/h] 87 139 182 Exiting Flow Rate [veh/h] 87 139 182 Demand Flow Rate [veh/h] 128 320 168 98 80 71 Adjusted Demand Flow Rate [veh/h] 135 337 177 103 84 75 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] 4.00 0.63 95th -Percentile Queue Length [ft] 63.83 Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3.00 3.00 A A A (intercept) 1130.00 1130.00 1130.00 1130.00 B (coefficient) 0.00100 0.00100 0.00100 0.00100 HV Adjustment Factor 0.97 0.97 F 0.97 0.97 Entry Flow Rate [veh/h] 487 183 107 164 Capacity of Entry and Bypass Lanes [veh/ 1037 984 984 942 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1007 955 955 915 X, volume / capacity 0.47 0.19 0.11 0.17 Movement, Approach, & Intersection Results Lane LOS A A A A 95th -Percentile Queue Length [veh] 2.55 0.68 0.36 0.63 95th -Percentile Queue Length [ft] 63.83 16.95 9.04 15.69 Approach Delay [s/veh] 9.04 5.26 5.63 Approach LOS A A A Intersection Delay [s/veh] 7.29 Intersection LOS A Line Avenue Operations Scenario 22: 22: PM Existing - Roundabout on 5 Line Traffic Impact Study D228 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Lane Configuration and Traffic Control Spark (zi Line Avenue Operations Scenario 22: 22: PM Existing - Roundabout on 5 Line Traffic Impact Study D229 Line Avenue Operations Appendix D - Capacity Analysis Backup Generated with Version 4.00-02 Traffic Volume - Future Total Volume Spark Line Avenue Operations Scenario 22: 22: PM Existing - Roundabout on 5 Line Traffic Impact Study D230 Line Avenue Operations a r -• �e+AL� mow; � }y } ' Line Avenue Traffic Operations Study June 20, 2016 City of Elk River C • Evaluate Options for Line Avenue Cul-de-sac A. At Twin Lakes Road B. Between 5th St. and 3rd St. C. Between 3rd St. and Main St. r.• F' �I r � •� ' Z� C � f /* 4k :s 4L an; 10 f - • Intersection Levels of Service (LOS) "Level of Service A ( LOS A) represents light traffic flow (free flow conditions) while LOS F represents heavy traffic flow (over capacity conditions) . LOS D is considered acceptable at intersections." LOS A _ _ LOS D = Acceptable LOS F = Unaccee ble Sol mr III Table 1 - Existing Peak Hour Level of Service' Intersection A.M. Peak P.M. Peak Dodge Ave/5t' St A (b) A (b) Line Ave/5tI St A (b) A (c) Twin Lakes Rd/Line Ave A (c) C (e) Line Ave/31 St A (b) A (c) Line Ave/Main St B (c) C (c) Twin Lakes Rd/181st Ave B (b) B (b) 'The first letter is the Level of Service for the intersection. The second letter (in parentheses) is the Level of Service for the worst operating movement. �► p . Table 3 - Line Avenue Alternatives PM Peak Hour Level of Service' Intersection P.M. Peak Hour Existing Alt. a Alt. B a Dodge Awe/511 St A (b) A (b) A (c) A (c) Line Ave/5' St A c A a A a A b Twin Lakes Rd/Line Ave C e A c D f F f Line Ave/31 St A (c) A (b) A (b) A (a) Line Ave/Main St C (c) C (d) B (c) A (b) Twin Lakes Rd/181 st Ave B (b) C (d) B (c) B (b) 'The first letter is the Level of Service for the intersection. The Mond letter (in parentheses) is the Level of Service for the worst operating movement. C fks, Study Recommendations • Keep Line Avenue connected between Main Street and Twin Lakes Road (TLR) at this time unless a non traffic related compelling reason exists to change it. • Consider a left turn lane on TLR at Line Avenue • Revise 5th Street intersection at Dodge to recognize dominant traffic pattern. Ito jo VL . ,. . .n . ♦ - _ dpi too- 4 AD Ir M � ' y-VV a � ,1 � .fir. •�