Loading...
5.4. PRSR 07/13/2016 , r ).- tl Request for Action River To Item Number Parks and Recreation Commission 5.4 Agenda Section Meeting Date Prepared by Action Items July 13,2016 Tim Sevcik,Parks Superintendent Item Description Reviewed by Approve Parks and Recreation Master Plan Capital Michael Hecker,Parks and Recreation Director Project Priorities Reviewed by Action Requested Discussion of Parks and Recreation Master Plan capital project priorities for inclusion in a possible Community Center Referendum. Recommend,by motion,priority capital projects from the Parks and Recreation Master Plan. Background/Discussion The Parks and Recreation Master Plan is intended to provide long-term guidance for city recreation services and facilities. The Parks and Recreation Commission reviewed the projects listed in Table 6.1, Priorities—Momentum Actions and Projects, of the Master Plan during the work session on Wednesday, July 7,2016 and made the following recommendations for inclusion into a possible Community Center Referendum: Orono Park • $300,000 Skatepark • $650,000 Splashpad • $400,000 Parking Lot • $300,000 New Trails • $250,000 Restrooms • $50,000 Pickleball Court Youth Athletic Complex • $500,000 Restrooms — 1 restroom per pinwheel including an attached shelter at each • $900,000 Field Lights (Fields 1-6) • $75,000 Maintenance Shed • $75,000 Finish current YAC Building Hillside City Park • $100,000 Trail Redevelopment Trails • $1,000,000 Trail connections on East side of town INATUREI ill 11 Total Estimated Project Cost: $4,600,000 Once these capital improvements are recommended by the Commission,it will then be reviewed by City Council for final approval and inclusion into a possible Community Center Referendum. Financial Impact An amount of up to $4,600,000 for possible inclusion into a possible Community Center Referendum. Attachments ■ Parks and Recreation Master Plan Momentum Projects listed in Table 6.1 on page 71. N:\Departments\Parks and Recreation\Commission\Packets\2016\07-13-16 PRC Packet\5.4 MasterPlan project priorities\5.4 sr Parks and Recreation Master Plan Priorities.docx Table 6.1 Priorities - Momentum Actions and Projects IIIIIRio tj Actions $ .a . . ost Estimatejj Skate Park $400,000 Adult Fitness Features $25,000 Splash Pad $650,000 Orono Restrooms $250,000 Parking lot paving(to follow concept plan) $600,000 New and extended trail(to follow concept plan) $425,000 Restrooms $200,000 Parking Lot Paving $600,000 Finish Building $75,000 Maintenance Shed $75,000 Youth Athletic Complex Field Lights— (1-6) $800,000 Playground I $175,000 Upgrade Irrigation and Well $20,000 Additional Fencing $5,000 Woodland Trails Maintenance Shed $100,000 Amenity life-cycle Neighborhood Parks(various) On-going,based on amenity life-cycle and replacement costs-TBD replacement needs based on individual park needs over time Nature Preserve Improvements(trailhead,parking Bailey Point Nature Preserve lot,natural resource restoration,picnicking, $640,000 signage,boardwalk,bridge,trails,site amenities). Trail gaps/neighborhood connections to Great $3,250,000 Northern Trail Complete trail connection between Mississippi $1,400,000 Trails River/Main Street and the Great Northern Trail Sign trail connections as part of the Signage and Based on signage and Wayfinding Plan wayfinding master plan (currently in process) Park signage as part of the Signage and Wayfinding Based on signage and All Parks Plan wayfinding master plan (currently in process) Comprehensive recreation facilities study to evaluate the Activity Center(55+),Arena,Lions Buildings Park Center,and the Trott Brook Barn and determine if they should be renovated, replaced on their current site,or consolidated into a centrally located facility Oak Knoll Parking lot upgrades,toilets,lights,bleachers, $575,000 better back stops 11 City of Elk River-Parks and Recreation Master Plan