Loading...
5.4B. SR 12-13-2004 Item # 5.4B MEMORANDUM TO: Mayor and City Council FROM: stephen Rohlf, Building and Environmental Administrator "51Z DATE: December 13, 2004 SUBJECT: Hamilton Property Staff would like to discuss several issues regarding the property located at 13913 Highway 10. A vicinity map is attached to this memo. Background Custom Motors 13913 Highway 10 was formerly used as an automobile salvage yard called Custom Motors. Liesch and Associates conducted a Phase II Environmental Assessment of the property for the city in 1993, after the junk vehicles were removed. Residual contamination from the junkyard was found, which has yet to be cleaned up. The types of contamination that were found, such as Gasoline Range Organics, were types that don't migrate rapidly and, therefore, posed no immediate threat to adjacent properties at the time. A copy of the Phase II Environmental Assessment was provided to American Park Investments, represented by Russell Hamilton, when they purchased the property. They were told at the time that cleanup was necessary prior to the property being redeveloped into another use. The redevelopment of the property has taken a lot longer than the city anticipated and cleanup should not wait any longer. Staff did an inspection on July 9, 2002 and ordered the buildings on the property razed or repaired and the contamination from the automobile salvage yard remediated. From that time until May of 2003, Building and Environmental staff dealt with several issues at this site such as unlicensed vehicles and potential commercial uses on the property. With no headway with the property owner regarding the buildings or contamination from the junkyard having been made, the issue was turned over to Chris Johnson, City Attorney in May of 2003. Several meetings between Mr. Hamilton, his attorney and city staff followed, culminating in a meeting on November 5, 2003, at which a timetable for removal the buildings on the site and the cleanup of the contamination was agreed to by all parties involved. The deadline for these actions was October 31, 2004. The letter attached to this memo dated November 6, 2003 contains this timetable. Staff next met with Mr. Hamilton, his attorney, his environmental consultant and a potential developer of the property on September 22, 2004. The letter attached to this memo dated September 29, 2004 goes into detail about what was discussed at this meeting. Reportedly, Mr. Hamilton's environmental consultant had trouble getting a work plan for the investigation of the contamination approved by Minnesota Pollution Control Agency (MPCA) and it would now be too late to complete this work and the potential cleanup in the 2004 construction season. Staff informed Mr. Hamilton the MPCA approval in question had nothing to do with the buildings on the site being removed and that their recommendation to the City Council would be to take immediate legal action if the October 31, 2004 deadline for this item was not met. Mr. Hamilton argued to keep the pole barn on the site to store the equipment he would need to do the cleanup. Staff agreed to this and the older white building, the one in the worse shape has since been removed. Mr. Hamilton's environmental consultant contends a new realistic deadline for the cleanup is August 31, 2005. Mr. Hamilton would like the city to sponsor a Contamination Remediation Grant. This grant would pay up to 75% of the cost of investigating the extent of the contamination and cleanup. The city would be responsible for the other 25% of these costs. Under this grant, the property would either have to be redeveloped into a use that produces jobs (it is currently zoned residential) or workforce housing. RC RoIl-offs This was the site of illegal burning of refuse by the RC Roll-off Company in 2002. Contamination from that incident was remediated at a cost of $74,673.72 in the summer of 2002 by (MPCA). The City of Elk River reimbursed MPCA out of its Landfill Abatement Funds. Other costs associated with this crime, including such items as Police and Street Department time, came to $35,114.09. The owner of RC Roll-offs was convicted of a felony and has paid the city $10,000 in restitution. With the exception of the issue of reimbursement of city costs, this issue is resolved. Mr. Hamilton would like to discuss forgiving these costs with the City Council. Discussion topics: ~ Should the city agree to the proposed August 31, 2005 deadline for removing the remaining building on the site and the cleanup of the residual contamination from the Custom Motors Junkyard or immediately start legal action? ~ Should the city participate in a 25% cost-sharing grant for cleaning up this site? ~ Is work force housing appropriate in this location? ~ Should the city and can the city assess the cost of the RC Roll-off cleanup to the property? ",,, I \ ~~ " I 0 ~ c 205TH 1="'"" "X~ I / I I ~~ I "~m~D /F.; " ~ I _ _ ~ _ _ _j-- I .J'T~ r;". 1 - _1_ 203RO / Ai I 'N -'-"1\.-/ ~<-" ,.. I - ;' ~"1' ~M-1K .,. ,. ~r1~ L +_-1 . ~, '1EC#1 DDtlD\ \r- ..1 ':!! -~=. - ---j~'..L'k ~ I I 20,5T ~. f--! ~ &::::! ~ \\,-.\ '#1 - ~;; '~~,' f~' 1/ 7",~r~"' ~j '-t/' ..~ ~ ,. C .....~ r , ::::: ,n:> \ 11 -""" 198TH I -~ """ /Il L 0 ST,,~ ,,~ L r----.: '\\ ,\ \ ~ ~ JL "" ~. V %.:::t<::-: ~ I \~ '97TH F-- I g d\\ If- u: Y.I. :UI' :; '\ _ i I Ie ~, / ~ \1/ Uh,': g!1 jiI, '96TH I . \ ,- [\Y' ~/ I L' ,..ow I _ _ I I '- ~I- my I.n 195TH - -,- + hi1J LI Y'CJ ,..... ~ l....L...r/\" ~ -,.."'~ ~? , .... i\ - --to bi, >. . PARK I I ,J1 ~L--I _ _ .,L, iLW ",," ~ 93RD ,- - + - - .so;,. 'V?1f;:~ -- - - -~~ V j '<::JJ. i~ ~ 1 tl iE: n ~ .L~~.tL, -. qTI~~I~ ifi'1~. ,-' I ~F~~~ ~,_ .00 '..1= ~ y ~, r ~ ~';' "h; ,81 JTo P ~ .. "'W {1'::' ' , 1 HAMILTON PROPERTY ;: "" ~ '~ ..~ E~.... : 'BBTH fT" 1V'1 ~ ~~ ,~ 1 ~ .. ~c ~ ~~ E crt\. D~ ~.-// _0 r'~ co .TRY /" ="" l.~l" ~1;" k .(0"" ; ) / , l-~""T ..m '''" c;~;SI~f~~ss .:~ 'j lr-f l o~, .= ~a,".T . I ~/ ~" ,I.g 1"1 1 I I SECON'''''''''f ~~/ / ELK r1ENfER HOUSE ~ - ~f~L!i' oa".<S+5. _ _ =1 . 183RD - 3:J '%I '" ~ ~ II' - I t ~ \\ ~ 1B2ND m~o "'l, I r;t C> Y. ~ ~"'~ I .c OJ]] :,,; ~~ O~"" I~ 1 :"> ." r~nEt'= ~ 160TH l...~.~~.t~~. . 204TH 194TH 190TH 185TH "" I "'P ., 187TH - - c' . ~ 186TH -.l '"'' r-~ 3 --- I~ - -. 184TH ':~:'::::'\'I".- Wli: nil. .~ .......-; I", .. .)~A1t , , m i~I,~~.. ' ., 13065 Orono Parkway Elk River, MN 55330 November 6, 2003 Subject: Property located at 13919 Highway 10, Elk River, MJlT Dear Mr. Hamilton: As per our meeting on November 5, 2003 (attended by yourself, Bruce Johnson, Allan Gibas, Rebecca Haug, Chris Johnson and me) the following timeframe for cleaning up environmental and safety concerns on your property located at 13919 Highway lOin Elk River was discussed and agreed to: . Environmental investigation of the site shall be completed by May 31, 2004. The work plan for the investigation shall be approved by MPCA (Minnesota Pollution Control Agency) as pali of the VIC (Voluntary Investigation and Cleanup) program and copied to the city for review. . Cleanup of contamination and debris found during the investigation shall begin in the spring of2004 and shall be completed by October 31, 2004. Testing, as required by MPCA, shall be conducted to verify the cleanup is complete. Al1 test results shall be copied to the city. . All buildings on the property shall be removed by October 31, 2004. A demolition permit shall be obtained from the City of Elk River for the removal of the buildings prior to this work commencing. Prior to the issuance of a demolition permit a qualified consultant shall be retained to assess potential contaminates in these buildings. Proper documentation of the assessment shall be provided to MPCA and copied to the city as pali of the demolition pennit submittal. Records of proper disposal ofthe demolition debris shall be provided to the city. . By November 30, 2004, all information necessary to obtain a certificate of completion under the VIC pi"ogram shall be submitted to MPCA and copied to the city. Once you know what work is required on the property and you have cost estimates for this work, city staffwil1 schedule a discussion at al1 appropriate City Council meeting to discuss the city's cost associated with the RC Roll-off clean up. I trust the aforementioned timefraJ.ne is acceptable to you. If you have any questions, please feel free to cal1 me at (763) 635-1061. Sincerely, ~L~dmmi"~O; Phone: 763.441.=74W ""'3S- _ /0(, I Fax: 763.44H42--5 '" 3 S- - 10 7 0 www.cLelk-rivermn.us 13065 Orono Parkway Elk River, MN 55330 September 29, 2004 Russell Hamilton 1572 West Van Buren Ave. St. Paul, MN 55104 Subject: Testing and Remediation of Contamination at 13913 Highway 10, Elk River, MN Mr. Hamilton, September 22, 2004 Meeting On September 22, 2004 a meeting was held at Elk River City Hall to discuss testing and remediation of contamination on property you own located at 13913 Highway 10, Elk River, Minnesota. Those present at this meeting included: yourself; Allen Gibas, your attorney; Stephen Rohlf, City Building and Environmental Achninistrator; Rebecca Haug, City Environmental Technician, Bruce Johnson, your environmental consultant; DJ. Bakken and Dean Otterson, potential developers of the property; Cathy Mehelich, City Director of Economic Development; Heidi Steinmetz, City Assistant Director of Economic Development; and Michele McPherson, City Planning Director. Issues Discussed at the September 22, 2004 Meeting: Deadline for investigation of contamination on the site. At our November 5, 2003 meeting, May 31, 2004 was agreed to as the deadline for the completion of the investigation at the site. Bruce Johnson indicated that, although a work plan for the investigation was submitted to the Minnesota Pollution Control Agency (MPCA) under the Voluntary Investigation and Cleanup (VIe) program on April 6, 2004, it had not been approved by MPCA until just recendy. According to Mr. Johnson, this caused a delay in meeting the May 31, 2004 deadline. Also agreed to at the November 5, 2003 meeting, the City is to be copied on the work plan as approved by MPCA for the investigation. As of the date of this letter I have not received this document. Phone: 763.635.1000 Fax: 763.635.1090 www.d.elk-river.mn.us Cleanup of the site. At our November 5, 2003 meeting, October 31, 2004 was set as the deadline for the completion of the cleanup and testing to verify the cleanup of the site. You contend that the delay in the approval of the investigation work plan by MPCA made it impossible to meet this deadline. Potential Brown Field Grant. You reiterated your desire to apply for a Department of Employment and Economic Development (DEED) ''Brown Field" grant to aid financially in the cleanup of the site. This topic was first discussed at an April 4, 2004 meeting. As discussed with the potential developers of the site, the property is zoned residential and will need to be developed into "Affordable Housing" to qualify for a DEED grant. City staff cautions that the conversations held at our April 4, 2004 and September 22, 2004 meetings should not be construed as city support for the concept of affordable housing on this property or support for a brown field grant. This support can only come from the Elk River City Council. The Elk River City Council will need to approve resolutions in support of the grant and the concept of affordable housing on this site. Cathy Melelich is the lead city contact for the DEED grant process and Michele McPherson is the lead city staff person to pursue the plat concept as part of this process. Removal of the buildings on the site. October 31, 2004 was set as a deadline for the removal of the two building on the site. At our September 22, 2004 meeting you indicated a desire to leave the pole barn structure on the property to store equipment that you will be using during the cleanup of the contamination on the site. As discussed, you will need to be properly certified through MPCA to perform the cleanup of the site. Past issues and concerns with the current contamination on the site have elevated the level of concern regarding your property. The issue of this structure remaining through the cleanup will need to be discussed with the Elk River City Council. However, staff sees no reason for delay in the removal of the other structure on the property. In the opinion of the Building Department this building is dangerous and there is no reason to delay its removal. New deadline for testing and cleanup of the property. In order to comply with DEED grant deadlines (that no work on a qualifying project takes place earlier than six moths prior to application) Bruce Johnson suggested the following new deadlines: ~ Testing begins after November 1, 2004. ~ A Remedial Action Plan (RAP) will be submitted to MPCA on or before April 30, 200S. MPCA has 60 days to approve the RAP, which they may amend. ~ Cleanup completed by August 31,2005. ~ Pole barn removed from site by October 31, 200S. ~ Certificate of Compliance copied to the city as soon as it is available. Note: The City still expects the older white structure removed from the site by October 31, 2004. City staff will get direction from the Elk River City Council regarding the issues discussed at our September 22, 2004 meeting and relay their desires onto you. The Council may not agree with supporting the grant and the new timetable and require that the activities listed occur sooner. If you have any questions or feel the contents of this letter do not accurately reflect what was discuss at our meeting, please call me. Sincerely, ental Administrator - Stephen Rohlf, Building and Envir cc. Allen Gibas Attorney at Law Suite 320 1422 West Lake Street Minneapolis, MN 55408 Summit Envirosolutions Bruce Johnson, PG 1217 Bandana Boulevard North St. Paul, MN 55108 Bakken Building and Remodeling . D. J. Bakken and Dean Otterson PO Box 130 Big Lake, MN 55309 Chris Johnson, City Attorney Cathy Mehelich, City Director of Economic Development Michele McPherson, City Planning Director Rebecca Haug, City Environmental Technician Heidi Steinmetz, City Assistant Economic Development Director Patrick Klaers, City Administrator