6.3. PRSR 08/10/2016 r'
i,ikk .� Request for Action
River
To Item Nur
Parks and Recreation Commission Click here3ext.
Agenda Section Meeting Date Prepared by
Action Items August 10,2016 Tim Sevcik,Parks Superintendent
Item Description Reviewed by
Rivers Edge Commons —Dock Project Cal Portner, City Administrator
Reviewed by
Michael Hecker,Parks and Recreation Director
Action Requested
Recommend,by motion,whether or not any dock or fishing pier structure at Rivers Edge Commons
must be constructed to meet Americans with Disabilities Act construction standards.
Recommend,by motion,establishing October 31,2016, as the no later than date for the Downtown
Rivers Edge Business Association group to respond to all staff questions regarding feasibility of placing a
dock within Rivers Edge Commons.
Background/Discussion
The Rivers Edge Commons dock project was presented to the City Council by Annie Deckert and Fred
McCoy as representatives of the Downtown Rivers Edge Business Association on April 4,2016, during
work session. The group proposed installing a dock along the Mississippi River within Rivers Edge
Commons as part of the expansion of the park. Council directed staff to assist the group as they develop
a proposal. Additionally, council proposed the following questions:
• Costs and staff time required for installing and removing the dock each year;
• annual maintenance expenses;
• location of storage during winter months;
• where funds would be obtained for the purchase and maintenance of the dock.
Staff met with Annie Deckert on May 10, 2016,and discussed the Council direction and proposed the
following questions to be answered by the group:
• Develop a design to meet ADA accessibility requirements:
• Option 1 would be to construct an elevated ramp platform on concrete footings to
minimize disturbance to the current shoreline;
• Option 2 would be to construct a paved ramp along the shoreline;this option is less
desired as it would require substantial disturbance to the shoreline.
• Develop a maintenance plan to include installation and removal and determine if volunteers or
staff would conduct these activities;
• Conduct a survey to determine depth of water along the shoreline to include the ordinary high
water mark to a minimum distance of 10 feet beyond the end of the proposed dock design to
determine feasibility;
• Propose design options describing the type of dock and ramp including materials type;
• Develop construction documents for city review;
• Provide a budget and funding source (Council indicated no city funding for the project);
FI ■ EIEI 11
NATURE
1 ,
• Determine required permits.
Staff received a response from the Downtown Rivers Edge Business Association on June 23, 2016,
answering some of the questions proposed by staff and Council as well as potential designs. A follow-up
meeting wasinducted on July 28, 2016 to further discuss the requirements of the project and
information tart avgs required.
It is understood that requiring ADA accessibility in this area adds substantial costs to the project. The
DNR representative indicated that not all of their docks are ADA accessible,however they do state that
they do have ADA accessible docks within the same geographic area. In this case,there will be no other
ADA docks within the area. The Commission will need to determine and recommend whether or not to
require an ADA-accessible dock.
Financial Impact
None
Attachments
• Letter from Annie Deckert,Decklan Group—June 23, 2016
• Design Concepts
1 C \Uscrs\Iwetch\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\RT5ZIL5X\Rivers Edge Commons
Dock.docxN:ADepartments\Parks and Recreation\Cw rT\P \244 OF 1-6-11RC I3aeket special meeting\sr Woodland Trails Park
a. la .max
June 23, 2016
Emailed to TSevcik(a�elkrivermn.gov on 6-23-16
Tim Sevcik, Parks Superintendent
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
Dear Mr. Sevcik,
On behalf of the Downtown Rivers Edge Business Association, we want to thank you for
working with us as we move forward with the downtown dock project. Upon Council direction on
4-14-16, you and I met on 5-10-16 to discuss our next steps.
On 5-11-16, you provided several comments/recommendations; the purpose of this letter is to
address some of those recommendations, and to submit three different dock options for your
review and direction. Your support of the dock is appreciated and you indicated you would like
to see the dock project executed in coordination with the River's Edge Commons expansion
which begins 8-15-16, provided we address your comments.
Your feedback on our proposed specifications will allow us to better define total project costs,
while maximizing our time and supporting project efficiency. Our group will address your
remaining comments upon your direction and feedback.
Please see our initial comments below:
• Any fishing dock installed in the park would need to be ADA accessible - T. Sevcik
Considerable research and multiple discussions have been conducted to address the city's
request for the dock to meet ADA regulations. Discussion with Trygve Hanson, Acquisition and
Development Specialist for the DNR, Division of Parks and Trails on 5-11-16 concluded:
"...the slope at the river bank makes meeting ADA requirements quite difficult. The site would
probably require some form of switch back ramp and there might not be enough room to do that.
Obviously the cost, if feasible, would be high. Due to the physical characteristics of many of our
public water access sites it's not possible to meet ADA requirements or would be very cost
prohibitive.
Our policy is to try and provide this opportunity on sites that lend themselves to providing ADA
accessibility... our goal is to have ADA opportunity within a geographic area but not necessarily
on every site."-Mr. Hanson
Discussions were also conducted to discuss dock specifications, pricing and ADA feasibility with
Charlie Groetsch, MINNCOR's engineer and Doug Johnson, Account Manager on 5-24-16. Mr.
Johnson indicated "the cost, if this site were to be made ADA accessible, would be extremely
high." Mr. Groetsch concurred. In May of 2016, discussions with Paul Paige, Hoisington
Koegler, also indicated that high costs may be used as a factor to determine ADA accessibility
infeasible.
Additional discussions with the DNR indicated that approximately one of every four public docks
in the state are ADA accessible, and that often, "extremely high costs and location"justify and
support ADA requirements being infeasible. .
Based on our research and discussions with professionals in the field, we strongly recommend
staff to recognize that providing an ADA compliant dock would be infeasible at this particular
location.
• Design options describing the type of dock and ramp to include materials type
(aluminum, composite, wood, etc.) would need to be reviewed by city staff- T.
Sevcik
City staff has requested that a public dock located in downtown Elk River must be temporary.
Attached are three temporary design options and estimated costs provided by MINNCOR:
1. 52-ft Custom Fishing Pier(1072100600): Cost estimate: $20,000- $23,000
2. "L" Pier Assembly (1078108600): Cost estimate: $16,000- $18,000
3. "T" Pier Assembly (1078104000): Cost estimate: $16,000- $18,000
Dock materials include sturdy 2" by 8" board construction, modular construction with treated
pine deckinga and rails, steel parts that are hot-dip galvanized for long wear, rotation-molded
with solid foam filled floats and rod mount holes. We are proposing temporary, aluminum stairs
that are compliant with the DNR and MINNCOR. Estimated cost is $5,000.
We are excited about this opportunity, and look forward to your prompt feedback, so we can
proceed with this project in conjunction with the park expansion.
If you have any questions, or would like to meet further to discussion, please do not hesitate to
contact me at 763-568-9498 or at anniedecklangroup.com.
Thank you
Respectfully
Annie B. Deckert, Decklan Group
Fred McCoy, McCoy's Irish Pub, Downtown Rivers Edge Business Association Chair
Chris Carlson, Sportech CEO
ski
0
' . - - \
,,,,,, \
tf
1 I kNii
'
...., A ,0041'74::// ... \
_ # "04— \
.V)I 116‘1,,
aCf}
ti1141111) . .
NII)
0 .
0 0 -- .
,,��' /
C0 , 2 '0 r`
r !J 4'?,.
0 /'/491 J�
I
I I /
/ rf /Of
y
f
f if
l; /./
V�
1 J
i
1k, r
Sp `' ,
1. ,„ \
fin. f
N Co
jig I NJ
Z E--L
._...7•,:. \\\\ 1, V) 01
m H 0
X 0 C.
K
I
1
rfr
, : , /I NI,
't�+�t00 tt a 441L. .
j
.
j,
N4iti wili.,
r"t fit, / ,,„,,,.
-*/,.fig
grit\ }`(
P "i
ill" ON\ lit'' 0 i i
CO
v 417
, ► I
,
NIP
0 NI IS/ -
' 16 t7 kill
0 CD
i IN i C . .1* Nr51:
' `
—Os 0 0
et a"i,
,1,411$k i i
I 1 / ..\.1k4_,
\i
_ ° \ . , /
W r 1—Y
00 s'''-_,_-
I s u
_ r 1"
t00
..0O
r 'a
vl vs
Od VI
m
X
,p w
0 r
-CI>
�
Cs\
illi
a iIw0
o- ,i 1.
ar iv z,/ / / ,„
0
141,-.1,'"'ilrf.fl \
I
x-xl...T .';...9A, //7 ) r.4,,,.. 3\
"Cf}
,,,y;;,X13' 40,3-NIA.\Ili/
� :; '/ tl? 1.1%;;;1/4\
3,,,,,,,,,,----
ef / :'7 .Alla
00
4
/17
f \
...
.,„ ,..
{ irk.�� �"�•
.,,,(k
. o
. ;
• .
t.
0
41.
.fir of)jJ'/ .�� f • r •�4
pp.)
- /fJ F � \ CD
"71 / (♦ .�41 Jr .' e'A .- , /I 1116\\
\ . • ' ,�
rim ra—/1'1a \� Y t '1 `
��r ` r f Y t` •y // Pr's - --•� A
r J ....A..-.1_1111, ;
ib
ii
•
\It irONE O
� r ' fig x, N I
RSR ik\'46 (1//
, / Z r ' f fr'/
f ti
4(4'4 +.'h" k /if / i f 6
.,,-,:._. \,,:‘,..\ \ ,,,,,, , . .
7 if arit7
', \\ ;I " r;ff CC S.''/'
15 �� � `/ +'