7.4. SR 08-15-2016 EOty1� ,.,�� Request for Action River To Item Number Mayor and City Council 7.4 Agenda Section Meeting Date Prepared by Public Hearin s lAugust 15, 2016 Zack Carlton,Planning Manager Item Description Reviewed by Paxmar— (Oudot C —River Park Second Addition) Justin Femrite, City Engineer ■ Preliminary Plat approval of River Park Fourth Reviewed by Addition Cal Portner, City Administrator ■ Resolution for Final Plat ■ Development Agreement Action Requested Approve,by motion, the Preliminary Plat for River Park Fourth Addition with the following conditions: 1. Street lights be installed as required by Elk River Utilities. 2. Address all comments in the comment letter date July 12, 2016. 3. Plat and development plans shall be updated to show a roadway connection between River Park and Twin Lakes Parkway,which will be constructed as part of this subdivision. 4. Staff approval of updated plans. 5. All structures shall remain outside of the required 45 foot wetland setback, as required in city ordinances. 6. Setback requirements for the front yard will be reduced to 25 feet, and applies to both front yards of a corner lot. 7. Setback requirements for the side yard will be adjusted to require a minimum of 15 feet between buildings. 8. Update the plat to reflect the recommendation of the Parks and Recreation Commission. Approve,by resolution, the Final Plat for River Park Fourth Addition with the following conditions: 1. Staff approval of an updated Final Plat reflective of required changes to the Preliminary Plat, including a connection to Twin Lakes Parkway. 2. A developers agreement be prepared and executed outlining the terms and conditions of the plat approval prior to releasing the Final Plat for recording. 3. Park Dedication shall be satisfied with a combination of land and cash. The cash amount will equal the percentage not satisfied with land, and in the amount required by the city at the time the Final Plat is released for recording. (currently$1,425.93/ lot) 4. Surface Water Management Impact Fee be paid in the amount required by the city at the time the Final Plat is released for recording. (currently$226/ lot) 5. Water Availability Charge shall be paid in the amount required by the city at the time the Final Plat is released for recording. (currently$335/ plumbing unit) 6. A Letter of Credit shall be provided to the city in the amount of 100% of the costs of the public improvements. 7. Upon completing all of the improvements, and having them accepted by the city, a security or warranty in a form acceptable to the City Engineer will be secured. POWERED 6T A IR 8. A development plan shall be approved by the City Engineer prior to the issuance of building permits. 9. Any item or condition found that indicates the site is likely to yield information important to pre- history or history shall be reported to the city immediately. Further, the city reserves the right to stop work authorized in its approval until the site is appropriately investigated and work is authorized. Approve,by motion, the Development Agreement for River Park Fourth Addition with the following condition: 1. The Development Agreement language will be updated to reflect the conditions of approval for the plat of River Park Fourth Addition. Background/Discussion Case No. P 16-11 The property is zoned Planned Unit Development (PUD) and was included in the original River Park Subdivision. However,previous preliminary plat approvals have expired. The applicant is proposing to plat 41 single-family parcels in accordance with the approved River Park plans. The applicant is proposing typical parcels to be 70+ feet in width, and will be consistent with the previously approved plans. There is a proposed change to Block Two that changes three 90+ foot lots to 65 foot lots,which are consistent with other areas of the River Park and 1Vliske Meadows plats. Staff is supportive of the change. The applicant is requesting a change to the setbacks from what had been approved as part of the original River Park plans. Setbacks for single-family homes,per previous approvals, are: 30 feet—front yard, 5 feet—garage side, 10 feet—living space side, and 30 feet—rear yard. The applicant's request is to reduce the front yard setback to 25 feet, and adjust the side yard setback to require 15 feet between buildings. Staff is supportive of the change as the Miske Meadows subdivision was approved with the same setbacks, and the adjustment will provide consistency within and the larger subdivision as the project develops. Analysis Comprehensive Plan The property is guided for urban residential development per the Comprehensive Plan. This land use designation includes areas guided or residential uses in areas that will be served by municipal sewer and water services. The Comprehensive Plan supports the proposed land use. Transportation/ Circulation Currently, the only access to the River Park Subdivision is 191st Ave at Cleveland Street. This access is the only entrance/exit point for Twin Lakes Elementary School and the currently platted 91 residential properties,which includes the recently platted lots in River Park 3rd Addition. When the larger River Park Subdivision was originally laid out (now known as River Park and 1Vliske Meadows) it included four connections to adjacent public streets. These included the current access to Cleveland at 191 st Ave, a second connection to Cleveland at 190th Ave, a connection to Sunset Ridge, N:ADeportments\Community Development\Planning\Case Files\P\P 16-11 River Pork Fourth\new council\7.4 sr Staff Report RP4.docx and a crossing of Trout Brook to Twin Lakes Estates. The traffic study included in the EAW analyzed the traffic using these multiple connections. Two-lane roads,like 191st Ave, are designed to comfortably support 1,000 vehicle trips per day, a level of service D/E,based on general livability guidelines. In evaluating vehicle trips based on the existing uses and approved lots, the subdivision generates about 1,182 trips per day. The addition of the 41 homes in the current application,River Park 4th Addition,increases the estimated trips per day to 1,592, nearly 60 percent above the livability guideline. Under the current proposal, all of the estimated vehicle trips will continue to be forced to use the single access point at 191st Ave. Staff does not support approval of the plat without providing an additional access into and out of the subdivision in accordance with the traffic study completed in the EAW. Staff strongly recommends that the connection to the southwest onto Twin Lakes Parkway be constructed as part of the proposed River Park 4th Addition. The current proposal for River Park 4th Addition includes land that abuts Twin Lakes Estates, and a connection to Twin Lakes Parkway will provide the second access point that is needed to support the increasing number of homes in River Park/Miske Meadows. A connection to Twin Lakes Parkway addresses a number of traffic concerns that present themselves with this proposed development. It provides the second of four access points to support the additional trip generation and it eliminates the long dead end cul-de-sac as proposed. The proposed termination of Ivanhoe would be approximately three-quarters of a mile from the nearest access. Ordinance limits cul-de-sacs to 700 feet. Beyond the above described traffic needs, the connection improves connectivity of the local street and sidewalk system for that area of the city. Existing and future residents will have alternatives that do not place them on Cleveland Ave where we have heard about safety concerns on a number of occasions. Students and families of Twin Lakes Elementary School will be able to come from the south,rather than stacking into the turn lane on Cleveland Ave. Students within the Twin Lakes Estates and Trott Brook neighborhoods go to the school, and the connection would allow them to walk, bike, or drive to school without the need to use a county road (Twin Lakes Road or Cleveland Street). A letter from the principal of Twin Lakes Elementary School supporting staff's recommendation to connect the developments is attached. Grading/ Drainage The Engineering and Stormwater Departments continue to review the plans and are working with the applicant to ensure the proposal meets current city standards. One stormwater pond has been removed to reduce impacts from required buffer setbacks, and new ponds are either being expanded or created to treat the water. Wetlands There is a large wetland west of the parcels on the southern half of the plat. An easement over the parcels preserving the 45 foot wetland buffer must be added to preserve compliance with city code. The 25-foot wetland buffer is required to be signed at every property line in accordance with city codes. Landscaping The landscaping for the development will be consistent with previous plans, and includes two trees per lot,with additional trees identified on corner parcels. N:ADeportments\Community Development\Planning\Case Files\P\P 16-11 River Pork Fourth\new council\7.4 sr Staff Report RP4.docx Park Dedication The Parks and Recreation Commission recommends Park Dedication be satisfied with a combination of land and cash. The recently adopted Park Dedication ordinance requires 3.47 acres of park land for the 41 homes being platted. The percentage of the dedication not satisfied by land will be satisfied by cash. The final plat includes 3.1 acres of land to be dedicated,which was reviewed during a Parks and Recreation work session on July 13, 2016. The recommendation from the commission is to add a road along the north side of the park area, and accept 2.7 acres of land. The commission envisions a facility similar to Trott Brook Farms Park with public streets abutting multiple sides of the park to improve visibility of the park and provide on street parking for users. A sketch of the desired park configuration is attached. The Preliminary and Final Plats will need to be updated to show the additional right-of-way and reduced park area,reflecting the recommendation of the Parks and Recreation Commission. Planning Commission During the public hearing one resident spoke and expressed concerns about traffic and speed on 191st Ave and discussed impacts to allowing the development to occur with only one access point. He described situations where traffic backs up from the driveway to Twin Lakes Elementary School around the corner and onto Cleveland Street. He noted that this has caused instances where vehicles entering the subdivision have been forced into oncoming traffic. The applicant, the Commission, and staff discussed anticipated roadway connections to service the growing subdivision. The applicant does not want to construct the requested connection between River Park and Twin Lakes Estates, and requested to receive approval of the plat without a limit or condition to construct a road. The applicant is willing to commit to bringing a plat with 190th Ave as the next phase,but does not wish to link that to a condition of approval. The Planning Commission unanimously recommended approval of the Preliminary Plat. They also recommend building permits for homes south of the utility easement in the center of the plat should not be released until 190th Ave is under construction. I spoke with the Commission chair regarding the definition of"under construction." His recommendation is that home building permits for the area south of the power pole easements should not be released until a plat dedicating right-of-way for 1901h Ave is recorded, construction plans are approved, and a letter of credit for the public improvements is on file with the city. Since the Planning Commission, the applicant submitted an amended request to receive approval to build 15 of the 41 homes in the subdivision and leave the letter of credit in place for use by the city to construct a temporary access road if needed. This request is included in the attachments. Staff does not support this request as the city does not receive a connection to Twin Lakes Estates, and in the event development in the area ceases, the second access point would be a temporary bituminous street that would not be built to the standards of an urban street. N:ADeportments\Community Development\Planning\Case Files\P\P 16-11 River Pork Fourth\new council\7.4 sr Staff Report RP4.docx Applicable Regulation Approval of a Plat may only be ordered if the following findings have been made, as outlined in Section 30-375: (7) The proposed subdivision is consistent)a ith the honing regulations (allicle VI of this chapter) and conforms In all respects)arith all requirements of this Code, including the honing regulations and this alicle. The property is zoned PUD and is guided by previously approved River Park plans and documents. The proposed subdivision is consistent with the zoning regulations outlined in the city code and approved plans. (2) The proposed subdivision is consistent)a ith all applicable general and specialised city, county, and regional plans, including but not limited to, the city's comprehensive development plan. The proposed subdivision does not conflict with any city, county, or regional plans,including the Comprehensive Plan. The River Park subdivision was part of an Environmental Assessment Worksheet (EAW) which included analysis of traffic and other environmental impacts. The current plans do not conflict with that study. (3) The physical charactelistics of the site, * eluding but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding and drainage are suitable for the type and density of development and uses contemplated. The site is suitable for the proposed development. The applicant and city staff continue to work together to finalize grading, erosion control, and drainage plans. (4) The proposed subdivision makes adequate provision for avater supply, stoma drainage, seavage transpodation, erosion control and all other selVices,facilities and inaprovenaents othel7vise required in this allicle. The subdivision will connect to city sewer and water services, the streets will include storm drains with associated stormwater treatment ponds. (5) The proposed subdivision )grill not cause substantial environmental damage. The area was the subject of an EAW and has already been rough graded for the subdivision. The project will not cause substantial environmental damage. (6) The proposed subdivision )grill not conflict)arith easements of record or)arith easements established by judgment of a coud. The subdivision will not conflict with easements of record. (7) The proposed subdivision )grill not have an undue and adverse impact on the reasonable development of neighboling land. The lands to the north, east, and west have already been developed and include Twin Lakes Road, single-family development as part of River Park Second Addition, and a large lot single family development. The area south of the plat was included in the Miske Meadows PUD. (8) The proposed subdivision is not premature.A subdivision is premature if any of the folloaring exists: a. Lack of adequate stormavater drainage. b. Lack of adequate roads. c. Lack of adequate sanitary seaver systems. d. Lack of adequate off-site public inaprovenaents or suppo� systems. The above utilities and improvements will be connected or constructed as part of the development. The area is within the municipal service area and existing facilities can handle the additional capacity. There is significant concern regarding adequate road N:ADeportments\Community Development\Planning\Case Files\P\P 16-11 River Pork Fourth\new council\7.4 sr Staff Report RP4.docx connections to service the requested final plat configuration. However, approval of the plat with the requirement to connect the subdivision to Twin Lakes Estates with a road addresses these concerns. Provided the requirement to build a new road connection is maintained, staff is comfortable in stating this requirement is met. With staff's recommended conditions, the project appears be consistent will all required findings for approval of a Plat. If denial of the plat should occur,it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-375. Financial Impact None Statutory Review Period Per State Statute 15.99 the required 120 day review period for the plat ends on October 28, 2016. Attachments ■ Location Map ■ Applicants Narrative ■ Final Plat Resolution ■ Development Agreement ■ Site, Plat, and Landscape Plans ■ Staff Comment Letter dated July 12, 2016 ■ Applicant Response Letter dated August 8, 2016 ■ Parks and Recreation diagram dated July 13, 2016 ■ Letter from Public Safety dated August 11, 2016 ■ Letter from Dan Collins (Principal of Twin Lakes Elementary) dated August, 2016 ■ Development Request dated August 11, 2016 N:ADeportments\Community Development\Planning\Case Files\P\P 16-11 River Pork Fourth\new council\7.4 sr Staff Report RP4.docx r a iF lY 1 2 3 At w r _ $ If . " i t , ` - b IF ` .:• F el-AL RP3 C Preliniirl rand Final Plat El .- Rivet Park Fourth Adchtion 'base No: P 1 - 1 1 .iverr PA '7 AIVR: River Park 4th Addition (Portions of previously approved River Park) Outlets B&C River Park Second Addition Outlot A, River Park Residential Single Family Development Elk River, MINI Project Nnarrative June 27, 2016 3495 Northdale Blvd, NW SUIte 210, Coon Rapids. MN 55448 (763)75-3-6176 PA ' 7A/IA R,,,, Table of Contents Developinerit Tearn k Developer and applicant R Consultants 11, Introduction k [ZequesL B. Project Location and Brief Parcel I listory C. Zoning & Land Use D, Project Description E, Developi-nent Standards F, Projec.t Phasing I'lIa atUral ReSOUrces A. Wetland delineation confirmation 13. Soils and GroundWam.- C Existing trees D. Storm waLer planning M Larid scape Planning 3495 Nortlickile Blvd. NW Suite 210, Coon Rapids, MN 55448 (763)753-6176 C, PA.XMAR;-., 1. DEVE1,011"MENTYEAM Paxinar is a local owned and operated land development company, primarily I'MiSed on delivering finished single family lots to builders, For over 330 years ownership has taken raw gmUrid. erformed the land planning necessary with the conimunity, graded the site. installed all I P utilities, streets and curhs, and sold finished lots to builders. OLU Mission is to brim, livable. responsible, efficient neighborhoods to cornInUnitiCS in Minnesota. We are Minnesota based so all 01.11- FCVeIILW stay,., in Minnesota. Over 10,000 home site sales have been planned ind developed in ways to provide a, positive home building and neighborhood experience fOr the CUstoiner. Work has been performed in Over 50 different jurisdictions of the greater 'I'Nvin Cities and St, ("JOLid area, CONSULTANTS Previous plans were prepared by Schoell & Madson, a consulting oroup acquired by Sarnhatek, � L- now, \vith headqUarters in Minnetonka, MIN. This Phase has final design as follows: Land Planning - Paxim.ir & Sarn[nitek Surveyin" - Sarribatek E'riginecrin" - Sambatek StorniNvater reconciliation - Sambatek Geotech reports and testing - NTI assigned to HaLI(IO GCOteChIIiC,-d Parks Planiiing - Not Applicable Landscape Architecture - Sambatek III. INTRODucriON A. Request Paxrnar, LLC, is requesting the approval to plat this phase SUbstantially similar as was previously approved in the River Park Master Plans. Minor amendments to lot size width are planned consistent with the single family approvals granted to Miske Meadows and River Park 3 d Addition. 'I"hese include sone side lot line, sonic depth and area a4'justrnents to the lots nextto the pre-built \vater quality ponds to tile South of the power lines, and to transition lots to the westerly portion ofMiske Meadows on Ivanhoe Drive. 495 Northdale Blvd. NW Suite 210, Coon Rapids, MN 55448 (763)75.3-6176 PAA`A1L4RII�" An updated wetland delineation will confirm boundary edges for this plat and rear yards requiring buffer discussion for structure setbacks at the south end or Ivanhoe Street, R Location arid Brief Parcel History In April ol'2016, we closed on three Outlot parcels from Lennar Corporation. Due to the lack of written plat extension requests by Lennar to Elk River to allow the previous preliminary plats to stay in force, this portion of neighborhood requires a I-renewal" or Z7 the preliminary' plat documents. A companion final plat is submitted at the same time to move forward those lots fronting on Ivanhoe street to final construction. The lots applied for final plat approval are substantially sirrillar to priorapprovals, and most have services already installed. Lennar Homes of Minnesota and their underlying pro.ject LIC entities, assigned the Wfling riOlItS of OULlols bearing the River Park Plat Name with 121 PI'CViOLISly approved dwelling units, The still in force PUD includes 52 SF Dwelling UnItS planned in this central pocket of the master plan. Lots were 65' wide to 75' on average, with several wider near the power lines. Pending was partially completed flor several pockets of this phase. 34 sets of sanitary and water service stubs to proposed lots are complete but no underground utilities Ofelectric and gas were installed. Portions of the street storm sewer were also completed, and all that remains arc. sewer and water services for the corner lots and the placing the final curb, gutter, pavement. and sidewalks. We are looking to add as few services from the laterals in Ivanhoe instead cif the side streets with the new plan. About 10 difll.,,rcnt single fiamily lots were created in the Lennar Plan set that crossed over parcel lines to the Miske Meadows plat. C., Zoning &, Land Use Plans are consistent with PUD zoning and land use for a residential neighborhood. No change to land use is proposed. D, Project Description Sin ,le Family lots- horne sites The River Park Neighborhood was approved with a variety Ol'hOUSirIg types. "FhiS phase has two of the single fiarnily lot types. 65' and 75' minimum lot width averages, "I'lie submitted plat solves some transition areas between Miske Meadows and these outlots with improved lot layout, preserving previous infrastructure for reuse. 3495 Northdale Blvd. NW Suite 210, oon Rapids, MN 55448 (76-))75 3-6176 PAy ' Fhe lots in this phase were all Full Basement capable, with flat, lookout and walkout types proposed throughout. Sotne lots will also become [Lill basement with SFIMO grade ad'justments. These lot grade shifts will allow for future creativity by our holnebuilder clients. Multi family lots 43 attached townhome lots were preliminary platted on lands West ofthe single family lots to '-1'rott Brook creek and the future road connection to Twin Lakes neighborhood. We are not preparing any new plans for this area at this time, but Will preliminary plat SOILItiOnS in the lIeXt 12 to 24 months to revle,'Vr with staff and the City Commissions, 11- PI J 1) a rn e ti d m e n t None required R Revelopnient Stxandards No changes to h0LJSirlg standards are proposed G. Project Phasing The lots oil Ivanhoe will be built in one to two construction phases depending on the weather, starting as early as late ALIgUSt, based on plai-ming subi-nitted. 'This allows for construction to be completed ahead ol'the City ()ctober 31 deadline for concrete work. Several lots on the preliminary plat that do not front directly on Ivanhoe Street will not be final platted. into lots, but will remain in new, outlots for future neighborhood phases blended with the Miske Meadows phases that abut. M. NATURAL RESOURCES A. Wetland Delineation Update required and underway by Sambatek. Original lines approved by prior Council were placed on the plat of Otitlot A., River Park and will be compared to the liew lilies. Several of the temporary storm ponds will be reviewed for exclusion from wetland declaration, and several wetlarid mitigation areas built by Lenriar will be confirmed in place. All the wetland mitigation areas were west ofthe single family lots in the Multi- I'aii-ifly lot portions of the previous project plans. 3495 Northdale Blvd. NW Suite 210, C. l6pids, MN 55448 (763)753-6176 Pj,,V, �R(11� B. Soil and Groundwater The soils are free draining suitable for horne building. and will allow for infiltration per current goals ofwater resource planning, Groundwater recharge is enhanced from prior calculations, but is Substantially similar to the previous master plan. Existim-, 'frees Trees will be removed to accommodate planned storm, ponds. Several. nice oaks were saved along the westerly portion of the development to Miske Meadows and will remain in the back yards. 1). Storm water..Planning, Multiple Outlots have been identified and planned for public works oversight and monitoring, a platting shift from the original master plan. As currently proposed, about 1.25 acres is taken from lots for ponding purposes. PreSUrning the ponds stays as a dry pond, no pond buffer will be required, Additional infiltration has been planned in, the pond design. Openings into home basernents are protected via emergency overflow designs and height Z71 similar to the previous master plans. IV. LANDS(APE PLANNING 2, new trees per dwelling unit plus an additional tree on the corner- lots will be provided. z:1 V. PUBLIC PARKS AND TRAILS Dedication per the city ordinance includes the entrance to parkland from Ivanhoe Street and land dedication for future community park facilities. Total land f'or active field uses is about 6 total acres,. Since both park facilities and the neighborhood of single Earrilly homes create a requirement for storm water treatment and storage, land is provided and merged storm facilities will be coordinated. The total acreage For credit shall include lands tor storm water as well as upland due to the current rules. 1,,ands will also be dedicated for active uses in the power line corridor. We are requesting the City budget in the near term CIP to corninence desion development planning of the active park uses. We also think an examination of the power line corridor for the facilities that can work in. that space that are described in the City Master Parks Plan is prudent. Those uses include active walking, cycling sledding, bird and wildlife viewing, dog parks, perhaps disc golf' opportunities linear programmed play in addition to the active uses COITIrrion to tl,le larger )495 Noilhdale Blvd. NW Suite 210 Coon 1�apids, MN 55148 (76,1)753-6176 PJ,YA1-[AR.,,., park space of soccer, baseball, football, Court sports and any shelters and structures. it is iinportant that the City confirm sooner than later the intent to light any of these future fields or if there is a desire to acid lighting to the Twin Lakes Elementary JIM. That allows Lis to disclose to future buyers' early intentions. V1. TRAFFIC REVIEW No new impacts, with construction traveling slow per notices to our contractors. Primary inbound trips on 191" until Miske Meadows is completed late in 2017 to Cleveland Avenue, Bigger site construction vehicles will access from 19,1" or 190"'. Several ofthe machines to bL[11(1 the, water and sewer lines will offload from 192"Ll as well. 1-Jpon the completion of this phase, the circulation system lor the majority Of future home building will begin to move further south into, the Miske Meadows phases. Continuation of Ivanhoe assists Talk River utilities in the buildout of power towards Miske Meadows. 3495 Northdale Blvd. NW Suite, 210, Coon Rapids! MN 55448 (763)753-6176 / / / 0 r ub � Alml 30li ;Irk j m Ulm p �mimmNim � f d j UN c � I i +1� i ti f � n {"M ..,.... "�y� ._...... _ ........,,_. " q wmoAN i .� IIIN tZ w r A , , f r � l "INdOLn �„„ m W N ” v i m -t r�o AF „i 011 El I I " a , City of Elk River Resolution 16- A Resolution of the City of Elk River Granting Final Plat Approval for River Park Fourth Addition Case No. P 16-11 WHEREAS, application has been made for final plat approval,pursuant to Section 30-374 of the Elk River City Code of Ordinances, of the property legally described on attached Exhibit A and hereinafter referred to as "the Property"; and WHEREAS, a preliminary plat of the Property was approved by the City Council on August 15, 2016; and WHEREAS, the proposed final plat is consistent with the preliminary plat as approved by the City Council; and WHEREAS, the proposed final plat complies with each of the conditions set forth by the City Council in its approval of the preliminary plat of the Property; NOW, THEREFORE, BE IT RESOLVED 1. It is hereby determined by the City Council for the City of Elk River as follows: A. The proposed subdivision is consistent with Chapter of 30 of the City Code of Ordinances and conforms with all of its requirements. B. The proposed subdivision is consistent with all applicable general and specialized city, county, and regional plans including,but not limited to, the City's Comprehensive Plan. C. The physical characteristics of the site,including,but not limited to, topography, soils,vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and drainage are suitable for the type and density of development and uses contemplated. D. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage transportation, erosion control and all other services, facilities and improvements otherwise required herein. E. The proposed subdivision will not cause substantial environmental NATUREJ F. The proposed subdivision will not conflict with easements of record or with easements established by judgment of a court. G. The proposed subdivision will not have an undue or adverse impact on the reasonable development of neighboring land. 2. Final plat approval is hereby granted for the Property, subject to the conditions set forth in attached Exhibit B. 3. The officers of the City are hereby authorized, once the conditions set forth in Exhibit B are met and complied with, to sign the final plat for the Property and to issue a certified copy of this Resolution giving final approval of the plat. 4. The owner of the Property is authorized to record the final plat as required by law and shall file proof of said recording with the City. No building permits will be issued for the Property until the final plat is recorded. 5. This final plat approval shall expire two years from the date of this resolution if the final plat is not recorded within that time. Passed and adopted this 15th day of August 2016. John J. Dietz,Mayor ATTEST: Tina Allard, City NATUREI EXHIBIT A LEGAL DESCRIPTION Oudot C,RIVER PARK SECOND ADDITION, according to the recorded plat thereof, Sherburne County,Minnesota. And Oudot B,RIVER PARK SECOND ADDITION, according to the recorded plat thereof, Sherburne County,Minnesota. And Oudot A,RIVER PARK, according to the recorded plat thereof, Sherburne County, NATUREJ EXHIBIT B CONDITIONS OF APPROVAL 1. Staff approval of an updated Final Plat reflective of required changes to the Preliminary Plat,including a connection to Twin Lakes Parkway. 2. A developers agreement be prepared and executed outlining the terms and conditions of the plat approval prior to releasing the Final Plat for recording. 3. Park Dedication shall be satisfied with a combination of land and cash. The cash amount will equal the percentage not satisfied with land, and in the amount required by the city at the time the Final Plat is released for recording. (currently$1,425.93/ lot) 4. Surface Water Management Impact Fee be paid in the amount required by the city at the time the Final Plat is released for recording. (currently$226/ lot) 5. Water Availability Charge shall be paid in the amount required by the city at the time the Final Plat is released for recording. (currently$335/ plumbing unit) 6. A Letter of Credit shall be provided to the city in the amount of 100% of the costs of the public improvements. 7. Upon completing all of the improvements, and having them accepted by the city, a security or warranty in a form acceptable to the City Engineer will be secured. 8. A development plan shall be approved by the City Engineer prior to the issuance of building permits. 9. Any item or condition found that indicates the site is likely to yield information important to pre-history or history shall be reported to the city immediately. Further, the city reserves the right to stop work authorized in its approval until the site is appropriately investigated and work is NATUREJ Development Agreement River Park Fourth Addition Final Plat approved by the Elk River City Council August 15, 2016 Development Agreement August 15, 2016 Table of Contents 1. Warranty of Developer....................................................................................................................................... 1 2. Right to Proceed.................................................................................................................................................. 1 3. Development Plans..............................................................................................................................................2 4. Improvements......................................................................................................................................................2 5. Additional Regulatory Approvals......................................................................................................................3 6. Installation of Improvements............................................................................................................................3 7. City Installed Improvements..............................................................................................................................5 8. Fees and Security for Developer's Performanc...............................................................................................5 9. Responsibility for Costs......................................................................................................................................7 10. General Provisions Binding Effect...................................................................................................................7 11. Park Dedication....................................................................................................................................................9 12. Development Plan...............................................................................................................................................9 13. Landscaping..........................................................................................................................................................9 14. Surface and Groundwater Management...........................................................................................................9 15. Default.................................................................................................................................................................10 16. Issuance of Building and Occupance Permits...............................................................................................11 17. Model Homes.....................................................................................................................................................11 18. Miscellaneous......................................................................................................................................................11 19. Notices.................................................................................................................................................................13 EXHIBIT A Resolution No. 16-xx EXHIBIT B Legal Description EXHIBIT D Cost Estimate Form EXHIBIT E Development Plan Checklist EXHIBIT F Purposely Left Blank EXHIBIT G Consent of Mortgagee EXHIBIT H Summary of Payments Due i DEVELOPMENT AGREEMENT FOR River Park Fourth Addition THIS AGREEMENT (the Agreement), made and entered into this 15th day of August,2016,by and between the CITY OF ELK RIVER, a municipal corporation organized under the laws of the State of Minnesota (the City), and Paxmar,LLC (the Developer). WITNESSETH: WHEREAS, the Developer has made application to the City for approval of a final plat of land within the City described on Exhibit A attached hereto (the Subdivision); and WHEREAS, the City Council adopted Resolution No. 16-xx on August 15, 2016, (attached as Exhibit A hereto) granting final plat approval to the Subdivision, subject to several conditions, including a condition that Developer enter into an agreement with the City governing the provision of certain utilities, services and facilities to the Subdivision and the transfer of certain land interests and payments to the City, so as to fully comply with the Subdivision Ordinance; NOW, THEREFORE, in consideration of the premises and the mutual promises and conditions hereinafter contained,it is hereby agreed as follows: 1. Warranty of Developer. Developer hereby warrants and represents to the City, as inducement to the City's entering into this Agreement, that Developer is owner of certain real property legally described in EXHIBIT B attached hereto consisting of 85.7 acres of unimproved land located in the City of Elk River, Sherburne County, Minnesota. The Developer intends to improve and develop such property for single family residential uses, to be known as River Park Fourth Addition (the Development). A copy of the final plat is attached as EXHIBIT C. 2. Right to Proceed. Within the Subdivision, the Developer may not grade or otherwise disturb the earth, remove trees, unless authorized by a separate permit or letter; work to construct sewer lines, water lines, streets,utilities,public or private improvements, or any buildings may not proceed until all the following conditions have been satisfied: (1) this Agreement has been fully executed by both parties and filed with the City Clerk; (2) the necessary security has been received by the City; (3) the necessary insurance for the Developer and its construction contractors has been received by the City; (4) the final plat for the Subdivision has been filed with the office of the Sherburne County Recorder or Registrar of Titles, and (5) all required permits are secured and a copy filed with the City Engineer. 1 3. Development Plans. The Subdivision shall be developed in accordance with the following plans (The Plans). The Plans shall not be attached to this Agreement. With the exception of Plans A,B and E,the Plans may be prepared, subject to the City Engineer's approval, after entering into this Agreement,but before commencement of any work in the Development. The City Engineer may approve minor amendments to Plan B without City Council approval. If the Plans vary from the written terms of this Contract, the written terms shall control. The Plans are: Plan A-Plat Plan B -Final Grading,Drainage,and Erosion Control Plan &SWPPP Plan C-Plans and Specifications for Public Improvements Plan D -Street Lighting Plan Plan E-Landscape Plan Plan F — Storm water Management Plan detailing long term ownership, maintenance schedules and procedures for all stormwater facilities as required by the City's MS4 permit Plan G—Development Plan required by Section 12 hereto 4. Improvements. In accordance with the application materials submitted by Developer, the preliminary and final plats of the Subdivision, the City Council Resolution attached as Exhibit A hereto, and the applicable standards and ordinances of the City, the following described Improvements (the Improvements) shall be constructed and installed on the terms and conditions hereinafter contained: (01) Site grading to elevations shown in the approved grading and drainage plan and construction of retaining walls (Site Grading); (02) Streets, as required by the City,including grading,graveling and stabilizing, constructing and vegetating of berms, swales and boulevards,planting trees on boulevards,permanent street surfacing with bituminous material, installing concrete curbs, gutters and driveway approaches, and installing traffic control street signs as required the City Engineer and installing street lights as required by the local utility (Street Improvements) ; (03) Sidewalks,as required by the City (Sidewalk Improvements); (04) Storm sewers, as required by the City, including all necessary pipes, manholes, catch basin, ditches,inlets,retention areas and other appurtenances (Storm Sewer Improvements) ; (05) Sanitary sewers and laterals, as required by the City,including all pipes, manholes, pumping stations,building services and other appurtenances (Sanitary Sewer Improvements) ; (06) Watermain and laterals, as required by the City and Elk River Municipal Utilities,including all necessary pipes, hydrants, valves, building services and other appurtenances (Watermain Improvements) ; (07) Landscaping, Trees and grass as required by City Ordinance and any additional landscape Improvements required by the City (Landscape Improvements). 2 (08) Temporary and permanent erosion and sediment control measures as required by the City's MS4 permit and the MPCA National Pollutant Discharge Elimination System construction stormwater permit (Stormwater Management Improvements). (09) Surrey Monuments. Durable iron surrey monuments shall be set, pursuant to Minnesota Statutes, Section 505.02, Subd. 1, within one (1) year after recording of the final plat of the Subdivision. Developer shall provide,in writing, notice to the City a Surveyor's certification that all monuments have been set. (10) Mailboxes,in a style and location approved-by the City of Elk River, shall be provided prior to occupancy of any unit. 5. Additional Regulatory Approvals. All additional regulatory approvals required for construction of the Improvements or development of the Subdivision shall be obtained before commencement of construction on the Improvements. Additional approvals may include but are not limited to the Department of Health permits for water system modifications; Minnesota Pollution Control Agency permits for the extension of sanitary sewer or cluster on-site treatment systems; National Pollutant Discharge Elimination System permits for grading; Department of Natural Resources permits for water appropriations;Army Corps of Engineers permits for construction of sedimentation ponds; and City, County and/or State permits for access and work within existing road rights of ways. 6. Installation of Improvements. The Improvements will be installed at Developer's expense by Developer as hereinafter provided. (01) Developer shall construct and install at Developers sole expense all Improvements necessary to fully complete the Development,including those Improvements identified in Exhibit D, attached hereto, except as may otherwise be set forth in this Agreement. The installation of the Improvements shall be in accordance with all applicable City ordinances, including the City subdivision ordinance, and shall be subject to review, approval, inspection and authorization by the City and/or its specialty consulting staff,as provided in this agreement. (02) Deadline for Performance by Developer. Except as otherwise provided herein, Developer agrees to complete all Improvements and perform all other acts as are required by the Subdivision Ordinance, other applicable ordinances and the terms and conditions of this agreement, and resolution No. 16-xx and to do so on or before October 31, 2016, with the exception of the final wear course of asphalt on streets. The final wear course on streets shall be installed between August 15 and October 15 the year following the base layer of asphalt construction. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. Final wear course placement outside of this time frame must have the written approval of the City Engineer. (03) Approval of Contractor. The City reserves the right to approve or disapprove any contractor selected by the Developer. (04) Construction Plans. The construction, installation, materials and equipment shall be in accordance with plans and specifications prepared by a licensed professional engineer and approved by the City Engineer. Such plans and specifications shall be based upon such engineering surreys, including soil borings and material tests, determined to be necessary by the City Engineer. (05) Supervision and City Services. Construction and installation plans and activity shall be reviewed by and subject to the supervision of the City. Developer will cause the contractor(s) to 3 inform the City's representatives of the schedule to complete the Improvements as required in the approvals. City shall inspect all Improvements during and after construction for compliance with approved specifications. Developer will notify the City Engineer or his designee at such times during construction as the City Engineer requires for inspection purposes. (A) The Developer shall instruct its engineer to provide adequate field inspection personnel to assure accurate record drawings can be produced and an acceptable level of quality control to the extent that the Developer's engineer will be able to certify that the construction work meets the approved City standards as a condition of City acceptance. In addition, the City may, at the City's discretion and at the Developer's expense, have one or more City inspectors and an independent testing firm inspect the work on a full or part-time basis. The Developer, its contractors and subcontractors, shall follow all instructions received from the City's inspectors. The Developer's engineer shall provide for on-site project management. The Developer's engineer is responsible for design changes and contract administration between the Developer and the Developer's contractor. The Developer or its engineer shall schedule a pre-construction meeting at a mutually agreeable time at the City with all parties concerned,including the City staff,to review the program for the construction work. (06) Easements. The Developer shall convey to the City,prior to the final approval of plans and specifications and at no cost to the City, all permanent and temporary easements for the installation and maintenance of all Improvements determined to be necessary by the City. All such easements shall be in recordable form acceptable to the City and contain such terms and conditions as the City may prescribe. (07) Insurance. Developer shall cause each contractor engaged in the construction and installation of any Improvement to furnish the City with evidence acceptable to the City showing insurance coverage (including workers' compensation, liability and property damage) in such amounts as are required for City construction contracts. Developer shall also maintain adequate liability insurance for public use of Streets, Sidewalk and other Improvements until such time as those Improvements are completed and accepted by City as provided herein, and shall hold the City harmless and indemnify the City from any liability arising out of the public's use of said Improvements until such time as those Improvements are completed and accepted by the City as provided herein. (08) As Constructed Plans. Within thirty (30) days after the completion of the improvements and before the security is released, the Developer shall supply the City with a complete set of reproducible "as constructed" plans and an electronic file of the "as constructed" plans in an AutoCAD.dwg file or a.dxf file and.pdf formats, all prepared in accordance with City standards. All constructed public utilities shall be field surveyed after construction with all location, elevation, and data attributes information, deliverable to the City in an approved sub-foot accurate GIS/GPS format. (09) City Acceptance. The City shall accept, at no cost, ownership of all Improvements provided that such Improvements have been constructed in compliance with the plans and specifications therefore and City requirements with respect thereto as determined by the City. No improvements will be accepted prior to all disturbed areas of the site being fully vegetated and functioning in accordance with the approved construction and storm water management plans. Upon acceptance, all Improvements lying within the public easements or rights of way shall become City property without further notice or action. 4 (10) License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the Subdivision to perform all work and inspections deemed appropriate by the City in conjunction with the Development. (11) Faithful Performance of Construction Contracts. Developer will fully and faithfully perform the installation and construction of the Improvements in accordance with the approved plans and specifications therefore and shall comply with all terms of any and all contracts entered into by the Developer for the installation and construction of all such Improvements, at no expense to the City. (12) Warranty. Developer hereby warranties the workmanship and materials respecting such Improvements for a period of two (2) years following the City's final acceptance of the Improvements and agrees to repair or replace, as directed by the Citi and at Developer's sole cost and expense, any work or materials that become defective,in the sole opinion of the City,within said two (2) year period even though notice thereof be given by the City after said two (2) year period. 7. City Installed Improvements. (01) The Subdivision will have no City installed Improvements. (02) There are no assessments levied against the subdivision. 8. Fees and Security for Developer's Performance. (01) City Administration and Construction Observation Fees. Developer shall reimburse the City for all the City's costs and expenses incurred in the processing of the Subdivision and installation of improvements,including review of plans and construction observation and in regard to any action or event of default by Developer, resulting in any suit or proceeding at law or in equity to which the City shall become a party in reference to the Developer's interest in the Development. Reimbursement shall be due and payable to the City within thirty (30) days following the receipt of a statement therefore. The Developer shall post a cash escrow in the amount of ten percent (10%) of the estimated costs of the Improvements. This escrow will be drawn from as the project progresses to cover the City's ongoing costs and expenses relating to administration and construction observation of the Improvements. City administration will include,but is not limited to, supervision of construction observation, consultation with Developer and its engineer on status or problems regarding the project, coordination for final inspection and acceptance,project monitoring during the warranty period, and processing of requests for reduction in security. Construction observation shall include full to part time inspection of all work associated with the Improvements. Based on past experience it is estimated that an escrow of ten percent (10%) shall be sufficient to cover the City related expenses associated with the work. Delays, change in work scope, contractor performance, etc. can all contribute to this amount not being sufficient. All City costs experienced in excess of the escrow are the responsibility of the Developer. These costs will be billed directly to the Developer and become due per the terms stated in Section 10. Upon acceptance of all completed improvements, as required by this agreement, any remaining balance will be returned to the developer within 30 days. (02) Security for Developers Performance. (A) No work shall be commenced under this Agreement, and the Final Plat of the Subdivision will not be released for recording, until the Developer has filed with the City a cash deposit or an irrevocable and unconditional Letter of Credit acceptable to the City, in the amount Three Hundred Eighty-Two Thousand and 00/100 Dollars ($382,000). Said Letter of Credit shall also provide that funds shall be paid to the City upon written demand 5 of the City to the extent of default herein by Developer in the payment of any amount due or the performance of any other duty or obligation of Developer pursuant to this Agreement, including Developer's obligations to complete Improvements, to complete on- site Landscape Improvements, and to make payment of any amounts due hereunder. (B) The security provided in accordance with the above may be released periodically upon receipt of an invoice identifying work completed to date. The amount released each period will equal the amount of work completed by the Developer by the date of submittal, except that: (i) the security will not be released to an amount less than the amount of Developer's total indebtedness to the City pursuant to the terms of this Agreement,; and, (ii) the security will not be released below fifty thousand dollars ($50,000) until all Improvements pursuant to this Agreement have been completed in full and all other obligations of Developer under this Agreement have been fulfilled, including Developer's obligation to install required Landscaping Improvements along Twin Lakes Road. (C) The Letter of Credit shall contain a provision that states that the Letter of Credit shall be automatically renewable annually unless the issuer of the Letter of Credit first gives the City 30 days written notice by certified mail of its intent not to renew the Letter of Credit. The letter of credit shall also contain a minimum initial period of 1 year. The Letter of Credit shall be a guaranty to the City that the Improvements and all other requirements set forth in this Agreement will be timely completed to the City's satisfaction. The Letter of Credit shall be maintained continuously by the Developer, except as reductions are authorized by the City, until the Improvements are completed to the City's satisfaction, including certification by the City engineer that all items are satisfactorily completed, pursuant to this Agreement. The Letter of Credit shall have no conditions and shall be subject to being drawn upon by the City upon any default under this Agreement, including failure to pay contractors, subcontractors or costs or expenses owed to the City. If at any time the City shall draw upon the Letter of Credit, the Developer agrees that within 10 days upon being notified of such withdrawal by the City, Developer shall either pay the deficient amount in cash to the City or have the Letter of Credit restored to current amount (04) Maintenance Bond. The Developer shall post maintenance bonds in the amount of twenty-five percent (25%) of final certified construction costs to secure the warranty in Section 6 (12) hereof. The City shall retain ten percent (10%) of the security posted by the Developer until the maintenance bonds are furnished to the City or until the warranty period expires, whichever first occurs. The retainage may be used to pay for warranty work,grading,erosion control, and as built surrey escrow. (05) Grading, erosion control and as-built surrey escrow. The Developer shall post a cash escrow of $1,000.00 per lot to the City to guarantee compliance with the erosion control and grading requirements and the submittal of an as-built certificate of surrey. Prior to release of this escrow, an as-built certificate of surrey for single family lots must be submitted to verify that the final as-built grades and elevations of the specific lot and all building setbacks are consistent with the approved Plans for the development, and any amendments thereto as approved by the City Engineer, and that all required property monuments are in place. If the final as-built surreys are not timely completed, the City may enter the lot, perform the work, and apply the cash escrow toward the cost. Upon satisfactory completion of the grading, erosion control and as-built surrey,the escrow funds,without 6 interest, less any draw made by the City, shall be returned to the person who deposited the funds with the City. (06) Water Availability Charges. Developer shall pay Water Availability Charge in the amount of Thirteen Thousand Seven Hundred Thirty-Five and 00/100 dollars ($13,735), ($335 per lot). The balance of Water Availability Charges per unit ($3,090) shall be paid at the time of building permit,by the permit applicant. (07) Surface Water Management Fee. Developer shall pay surface water management fees in the amount of Nine Thousand Two Hundred Sixty-Six and 00/100 dollars ($9,266), ($226.00 per lot) for each lot in the Subdivision prior to release of the final plat for recording. 9. Responsibility for Costs. (01) Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the Subdivision, including but not limited to Soil and Water Conservation District charges, legal, planning, engineering and construction observation inspection expenses incurred in connection with approval and acceptance of the plat,the preparation of this Agreement, review of construction plans and documents, the payment of 41fines and penalties imposed on the city as a result of non-compliance with any permit or failure to obtain necessary permits, and all costs and expenses incurred by the City in monitoring and inspecting development of the Subdivision. (02) The Developer shall hold the City and its officers, employees, and agents harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval of the Development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages, or expenses which the City may pay or incur in consequence of such claims,including attorneys' fees. (03) The Developer shall reimburse the City for costs incurred in the enforcement of this Agreement,including engineering and attorneys' fees. (04) The Developer shall pay, or cause to be paid when due, and in any event before any penalty is attached, all special assessments referred to in this Agreement. This is a personal obligation of the Developer and shall continue in full force and effect even if the Developer sells one or more lots,the entire plat, or any part of it. (05) The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Agreement within thirty (30) days after receipt. If the bills are not paid on time, the City may halt development and construction within the Subdivision until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of eighteen percent (18%) per year. (06) In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as but not limited to sewer availability charges ("SAC"), Municipal water connection charges, City sewer connection charges, and building permit fees. 10. General Provisions Binding Effect. The terms and provisions hereof shall be binding upon, and inure to the benefit of the heirs,representatives, successors and assigns of the parties hereto and shall be binding upon all future owners of all or part of the Subdivision and shall be deemed covenants running with the land. References herein to Developer, if there be more than one, shall mean each and all of them. This Agreement shall be placed of record so as to give notice hereof to subsequent 7 purchasers and encumbrances of all or any part of the Subdivision, and all recording fees,if any, shall be paid by the Developer. (02) Severable. In the event that any portion of this Agreement shall be held invalid for any reason, the same shall not affect in any respect whatsoever the validity of the remainder of this Agreement. (03) Waiver. Any waiver, whether express or implied, by any party of a breach of any provision of this Agreement will not operate as or be construed to be a waiver of any subsequent breach of this Agreement. (04) Construction Times. All construction activities authorized by this agreement shall be confined to the following hours of operation: Monday-Friday 7:00 AM until 9:00 PM Saturday 8:00 AM until 5:00 PM (only with 48 hour advance notice to the City Engineer or their representatives) Sunday Not Allowed This does not apply to activities that are required on a 24-hour basis such as dewatering, etc. Any deviation from the above hours is subject to approval of the City Council. (05) Street Construction. No street construction will be allowed after October 15 or prior to May 15 unless approved by the City Engineer. (06) Snowplowing. Until the Improvements are accepted by the City or an agreement expressly reached in advance, the developer is responsible for snow removal and ensuring access by Emergency Response equipment. (07) Mailboxes. All mailboxes be clustered, and in a style and location acceptable to the City of Elk River. (08) Historv. Any item or condition found that indicates the site is likely to yield information important to pre-history or history shall be reported to the city immediately, and the city reserves the right in such event, to stop work immediately until the subdivision is appropriately investigated and developer is authorized to recommence work. 11. Park Dedication. Park dedication requirements shall be satisfied by a combination of land and cash as outlined in the Developer Agreement for River Park (Doc. No. 602028). Park dedication shall be based on the following formula: 224 total acres 201.5 acres -22.5 acres (school/fire station) -24.0 acres of wetland 201.5 acres 167.5 acres of land subject to park dedication 4.7 acres (park land) /16.75 acres (10%dedication rate) =28% (park dedication satisfied with land) $1,425.93 (2016 park dedication rate) x 72% _ $1,026.67 per unit The cash dedication due is $42,093.47 ($1,026.67 per unit x 41 units). 8 12. Development Plan. A development plan "Development Plan" shall be submitted by Developer and approved by the City Engineer or his designee prior to issuance of any building permit within the Subdivision. The Development Plan will identify, for each lot in the Subdivision those items noted on the checklist attached as Exhibit E to this Agreement. Approval of the Development Plan may be contingent upon soil borings verifying elevations and compaction tests for proposed house pads. 13. Landscaping. Developer shall cause the homebuilder to install two over story (deciduous) trees in the boulevard of each Lot. All required trees shall be 2 inches in caliper. (01) All residential landscaping requirements shall be completed prior to occupancy of the dwelling unit, or by June 1 following occupancy if occupancy occurs October 15 through May 31. (02) In the event the landscaping,including trees and establishment of turf,is not complete at the time of Certificate of Occupancy, the City may issue a certificate of occupancy and require the provision of a cash deposit from the builder of the lot to guarantee the successful completion of the landscaping improvement. The cash deposit shall be no less than $1,000.00. The City,its employees, agents or contractors shall have the right to go upon the property to complete the landscaping without permission of the owner of the property or lot, and shall not be liable for trespass. The City may also require a deposit as part of the building permit fee to secure compliance with the landscaping requirements. 14. Surface and Groundwater Management. (01) Dewatering. Due to the variable nature of groundwater levels and stormwater flows,it will be the Developer's and the Developer's contractors and subcontractors responsibility to satisfy themselves with regard to the elevation of groundwater in the area and the level of effort needed to perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations permits shall also be strictly followed. (02) Wetlands. If the Developer proposes the filling of wetlands in connection with development of the Subdivision, final plat approval is contingent upon, and the final plat shall not be recorded until, receipt of necessary permits from appropriate regulatory agencies to fill wetlands as proposed by the Developer and approval by the Technical Evaluation Panel of the proposed mitigation plan for wetlands filling. If these permits are denied, or approval of the wetland permit and mitigation plan is subject to conditions which significantly impact the Subdivision, the final plat for the Subdivision shall be resubmitted to the City Council for consideration of changes required for the wetland approvals. The City shall receive a copy of the monitoring report annually for three years. (03) Erosion Control. Prior to initiating any work on the site, the erosion control plan, Plan B, shall be implemented by the Developer and inspected and approved by the City or other regulating authority. The City may impose additional erosion control requirements if they are deemed necessary to protect the downstream waters of the state. All areas disturbed by the grading operations shall be stabilized per the MPCA NPDES Stormwater Permit for Construction Activity and the City MS4 permit. Seed shall be in accordance with the City's current seeding specification which will include temporary erosion control measures to provide ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and watered as necessary for seed retention and growth. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the MPCA NPDES Stormwater Permit for Construction Activity, the City MS4 permit, with the erosion control plan and schedule, or supplementary instructions received from the City or other 9 regulating authority, the City may take such action as it deems appropriate to control erosion. The City will endeavor to notify the Developer in advance of any proposed action,but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within ten (10) days, the City may draw down the letter of credit to pay any costs. No development, utility or street construction will be allowed and no building permits will be issued unless the plat is in full compliance with the approved erosion control plan. (04) Grading. The Subdivision shall be graded in accordance with the approved grading development and erosion control plan, Plan B. The plan shall conform to City specifications. Within thirty (30) days after completion of the grading and before the City approves individual building permits (except up to three model home permits on lots acceptable to the Building Official per section 18), the Developer shall provide the City with an "as constructed" grading plan certified by a registered land surveyor or engineer that all storm water treatment/infiltration basins and swales, have been constructed on public easements or land owned by the City. The "as constructed" plan shall include field verified elevations of the following: (a) cross sections of storm water treatment/infiltration basins; (b) location and elevations along all swales, wetlands, wetland mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed "conservation area" posts; and (c) lot corner elevations and house pads, and all other items listed in the City Code. The City will withhold issuance of building permits until the approved certified grading plan is on file with the City and all erosion control measures, including full vegetation of entire site, are in place as determined by the City Engineer. The Developer certifies to the City that all lots with house footings placed on fill have been monitored and constructed to meet or exceed FHA/HUD 79G specifications. The soils observation and testing report, including referenced development phases and lot descriptions, shall be submitted to the Building Official for review prior to the issuance of building permits. (05) CleanUp. The Developer shall clean dirt and debris from all streets that has resulted from construction work by the Developer, home builders, subcontractors, their agents or assigns, until all requirements of this agreement have been satisfied. Prior to any construction in the plat, the Developer shall identify in writing a responsible party and schedule for erosion control, street cleaning,and street sweeping. (06) National Pollutant Discharge Elimination System Requirements. Prior to the commencement of any work,the Developer shall provide a signed Storm Water Pollution Prevention Plan for City review and approval to control erosion from the site. Because the site is over one (1) acre, the Developer shall also apply for and obtain an NPDES permit from the Minnesota Pollution Control Agency. (07) Municipal Separate Storm Sewer System Requirements. All stormwater management activities shall comply with the City MS4 permit. 15. Default. (01) Remedies. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as determined by the City,is first given notice of the work in default, not less than forty- eight (48) hours in advance. This Agreement is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work,the City may,in addition to its other remedies,assess the cost in whole or in part. 10 (02) Acceleration on Default. In the event Developer, or its heirs, successors or assigns,violates any of the covenants and agreements herein contained, or fails to pay any amount due to the city,the City, at its option in addition to its other rights and remedies, by written notice of default given to the Developer, may declare all amounts to be paid by the Developer pursuant to this Agreement, , due and payable in full, with interest, immediately, or on such date as the City shall specify in its notice of default to Developer. If Developer fails to make payment in the amount and at the time specified in the City's notice of default to Developer, City may, at its option, draw on the security provided by Developer pursuant to Section 8 of this Agreement and/or commence legal action against Developer to collect the entire amount owed by Developer, including reasonable attorneys' fees. Developer shall be personally liable for such amounts due and,if more than one, such liability shall be joint and several. 16. Issuance of Building and Occupancy Permits. (01) Building Permits. The City will not issue any building permit (a permit issued for construction of a structure to be sold and occupied by a new owner) for any lot or parcel in the Subdivision until all gas, electric, and large utilities are installed, streets are paved with the first lift of pavement and vegetation is full established. City will not issue a certificate of occupancy (said certificate will allow the structure to be transferred to a new owner for the purpose of permanent occupancy) for any building constructed on any lot or parcel in the Subdivision until all Improvements (except final lift of paving) are completed, approved by the City Engineer and accepted by the City. Temporary certificates of occupancy may be issued for sites with model permits; however, such certificates will not allow the structure to be transferred to a new owner for the purpose of occupancy. (02) Notice to Homebuyers. If the Developer fails to comply with any of provisions of this Agreement, the City may refuse to issue a building permit or certificate of occupancy for any lot or parcel in the Subdivision. Developer agrees to advise purchasers of any lot or parcel within the Subdivision of the existence of this contract and the obligations and restrictions created herein prior to the completion of the sale. Further, Developer agrees to save and hold City harmless from any and all claims or actions arising from the right to withhold the issuance of such permits and certificates and from other provisions hereof. 17. Model Homes. (01) The City will issue building permits for the construction of up to three model homes on lots approved by the Building Official prior to completion of the public and private infrastructure, provided that access to the site for emergency vehicles is maintained at all times. Model home building permits shall follow the standards as outlined in Section 16 (02). City will not issue a certificate of occupancy (said certificate will allow the structure to be transferred to a new owner for the purpose of permanent occupancy) for any building constructed on any lot or parcel in the Subdivision until all Improvements (except final lift of paving) are completed, approved by the City Engineer and accepted by the City. Temporary certificates of occupancy may be issued for sites; however, such certificates will not allow the structure to be transferred to a new owner for the purpose of occupancy. 18. Miscellaneous. (01) Filing of Final Plat and Developer Agreement. Before construction commences on the Improvements, the Final Plat of the Subdivision and this Developer Agreement must be filed and 11 recorded and all necessary easements shall have been conveyed to the City,unless the City authorizes in writing the commencement of limited construction activities. (02) Incorporation by Reference. The exhibits to this Agreement shall be and hereby are made a part of this Agreement by reference as fully as if set forth herein in full. (03) No Replacement. This Agreement is in addition to and is not in replacement of the terms and conditions of the Petition for Public Improvements and Waiver of Right to Public Hearing and Right to Object relating to the Subdivision executed by Developer. (04) Regulatory Compliance. The Developer represents to the City that the Subdivision complies with all city, county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ordinances, and environmental regulations. If the City determines that the plat does not comply, the City may, at its option, refuse to allow construction or development work in the Subdivision until the Developer does comply. Upon the City's demand,the Developer shall cease work until there is compliance. (05) Third Parties. Third parties shall have no recourse against the City under this Agreement. (06) Breach. Breach of the terms of this Agreement by the Developer shall be grounds for denial of building permits,including lots sold to third parties. (07) Severabilit<r. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Agreement is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Agreement. (08) Damage to Improvements. If building permits are issued prior to the acceptance of Improvements, the Developer assumes all liability and costs resulting in delays in completion of public Improvements and damage to Improvements caused by the City, Developer, its contractors, subcontractors, material men, employees, agents, or third parties. No sewer and water connections or inspections may be conducted and no one may occupy a building for which a building permit is issued on either a temporary or permanent basis until the streets needed for access have been paved with a bituminous surface, the utilities are completed, and the vegetation is established and accepted by the City Engineer. (09) Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Agreement shall not be a waiver or release. (10) Binding Contract. This Agreement shall run with the land and may be recorded against the title to the property. The Developer covenants with the City, its successors and assigns, that the Developer is well seized in fee title of the property being final platted and/or has obtained consents to this Agreement,in the form attached hereto,from all parties who have an interest in the property; that there are no unrecorded interests in the property being final platted; and that the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants. (11) Insurance. The Developer and contractor shall acquire public liability and property damage insurance covering personal injury,including death, and claims for property damage which may arise out of the Developer's work or the work of their subcontractors or by one directly or indirectly employed by any of them. The insurance must be maintained until six (6) months after the City has accepted the Improvements. Limits for bodily injury and death shall be not less than $500,000 for 12 one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $200,000 for each occurrence; or a combination single limit policy of$1,000,000 or more. The City shall be named as an additional insured on the policy on a primary and noncontributory basis, and the Developer and contractor shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. (12) No Waiver. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right,power or remedy. (13) Assignment. The Developer may not assign this Agreement without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots,the entire plat, or any part of it. 19. Notices. All notices and demands specified herein shall be deemed appropriately and timely given when delivered personally or deposited in the United States mail to the addresses hereinafter set forth by certified mail (return receipt requested). The addresses of the parties hereto are as follows until changed by written notice given as above: If to the City at: City of Elk River Attn: City Administrator 13065 Orono Parkway Elk River,Minnesota 55330 If to the Developer at: RP3,LLC Attn: Alan Roessler 3495 Northdale Blvd. NW Suite 210 Coon Rapids,MN 55448 13 IN WITNESS WHEREOF,the City and Developer have caused this Agreement to be duly executed on this day and year first above written. CITY OF ELK RIVER By: John J. Dietz Its: Mayor By: Tina Allard Its: Clerk DEVELOPER: By: Its: President 14 STATE OF MINNESOTA ) ) ss. COUNTY OF SHERBURNE ) This instrument was acknowledged before me this day of by John J. Dietz and Tina Allard,the Mayor and City Clerk,respectively,for the City of Elk River,Minnesota. Notary Public STATE OF MINNESOTA ) ss. COUNTY OF ) This instrument was acknowledged before me this day of by Notary Public This instrument was drafted by: City of Elk River 13065 Orono Parkway Elk River,MN 55330 15 EXHIBIT A Resolution No.16-xx A-1 EXHIBIT B Legal Description Oudot C,RIVER PARK SECOND ADDITION, according to the recorded plat thereof, Sherburne County,Minnesota. And Oudot B,RIVER PARK SECOND ADDITION, according to the recorded plat thereof, Sherburne County,Minnesota. And Oudot A,RIVER PARK, according to the recorded plat thereof, Sherburne County,Minnesota. B-1 EXHIBIT C Final Plat C-1 EXHIBIT D Cost Estimate Form D-1 EXHIBIT E Development Plan Checklist Development Plan Requirements 1. Lot and block numbers 2. Street Names 3. Storm sewer alignment with top and invert elevations. Also Flared ends with invert elevations 4. Centerline Street elevations at 100 foot stations with high and low points 5. Centerline street percent grades 6. Cul-de-sac percent grade along curb 7. Building setback lines 8. Final Contours 9. House pads with house style and elevations 10. Front and rear lot corner elevations 11. Spot elevations at the rear of the house pads if the drainage is to be directed around the house pad to the front 12. Typical lot detail indicating where lot and house elevations are shown to. 13. Legend with type of house styles and grade difference for garage floor to walkouts or lookouts. 14. Lot dimensions to the nearest foot 15. Typical street section 16. Drainage arrows at high points and major grade changes 17. Existing and proposed easements 18. Emergency overflows should be labeled and shown with spot elevations and drainage arrows. Emergency overflows must be established for catch basins in the street and in rear yards. Areas along rear lot lines which are below emergency overflows elevations shall be designated as drainage easement on the final plat. 19. Wetland boundaries must be accurately shown 20. Development plan must be signed by a registered Land Surveyor or Engineer. 21. All trees within the subdivision that are to be preserved shall be fenced with a snow fence at the drip line to prevent grading, compaction, or storage of equipment, debris or materials. Staff shall inspect the fencing prior to grading. Cutting of trees between April 15 and July 15 shall not be permitted. The Operator shall take other measures deemed appropriate by the Sherburne County Forester to control oak-wilt, such as, but not limited to: debarking or destroying fallen diseased trees prior to April 15, not leaving roots exposed and avoiding mechanical damage on remaining trees. E-1 EXHIBIT F Purposely left blank H-1 EXHIBIT G Consent of Mortgagee I-1 EXHIBIT H Summary of Payments Due ;$38,100.00 ;City Fees escrow deposit ;Section 8 (01) ------------------- ;$41,000.00 ;Grading/ Erosion Control/ As built escrow ;Section 8 (05) 1$13,735.00 ;Water Availability Charge !Section 8 (06) ----------------+------ ------------------- --------------+ 1$9,266.00 ;Surface Water Management Fee ;Section 8 07 + - -----------------------------------------+ ;$42,093.47 ;Park Dedication Fee ;Section 11 ;$144, "Total -------------------------------------------------------------------------------------------------------------------- J-1 Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N DEVELOPER/OWNER PAXMAR 5160 VIKING BOULEVARD NW ANOKA, MN 55303 763-753-6176 CONTACT: KEVIN CLARK DON JENSEN CIVIL ENGINEER SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: NATE HERMAN, PE LANDSCAPING SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: JOSH MCKINNEY, RLA SURVEYOR SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: RICK BLOM, RLS for Site Development Plans River Park Fourth Addition PAXMAR Elk River, Minnesota Presented by: NO SCALE VICINITY MAP SITE CONSULTANT CONTACT LIST: C1.01TITLE SHEET SHEET INDEX SHEET DESCRIPTION C1.01 TITLE SHEET C2.01 BOUNDARY AND TOPOGRAPHIC SURVEY C2.02 BOUNDARY AND TOPOGRAPHIC SURVEY C2.03 BOUNDARY AND TOPOGRAPHIC SURVEY C6.01 OVERALL UTILITY PLAN C6.02 SANITARY SEWER AND WATER MAIN PLAN AND PROFILE C6.03 SANITARY SEWER AND WATER MAIN PLAN AND PROFILE C6.04 STORM SEWER PLAN AND PROFILE C6.05 STORM SEWER PLAN AND PROFILE C6.06 STORM SEWER PLAN AND PROFILE C7.01 STREET PLAN AND PROFILE C7.02 STREET PLAN AND PROFILE C9.01 CONSTRUCTION DETAILS C9.02 CONSTRUCTION DETAILS C9.03 CONSTRUCTION DETAILS L1.01 SOUTH LANDSCAPE PLAN L1.02 NORTH LANDSCAPE PLAN GEOTECHNICAL HAUGO GEOTECHNICAL 13570 GROVE DRIVE #278 MAPLE GROVE, MN 55311 651-554-4829 CONTACT: JOHN T. CARLSON, PE ClientProjectDesigned:Drawn:DateSubmittal / RevisionNo.CertificationSheet TitleSummaryRevision HistorySheet No.RevisionProject No.Approved:Book / Page:Phase:Initial Issue:ByPAXMARRIVER PARKFOURTH ADDITION,ELK RIVER, MNNRHNRH/JSODSFINALPAX 20460Registration No.Date:I hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly licensedprofessional ENGINEER under the laws of the state of Minnesota.If applicable, contact us for a wet signed copy of this plan which is availableupon request at Sambatek's, Minnetonka, MN office.08/08/201647982Nathan R. Herman08/08/2016NRH/JSOCITY SUBMITTALNOT FOR CONSTRUCTION0SCALE IN FEET200400OUTLOT A, RIVER PARK, SHERBURNE COUNTY, MINNESOTAOUTLOT C, RIVER PARK SECOND ADDITION, RIVER PARK SECOND ADDITION, SHERBURNE COUNTY, MINNESOTADESCRIPTION1. Subject property's addresses and property identification numbers are as followed: Outlot A, River Park: unassigned, Elk River, MN 55330, its PID is 75-761-0010. Outlot C, River Park Second Addition: unassigned, Elk River, MN 55330, its PID is 75-799-0030.2. The bearing system is based on the Sherburne County coordinate system, NAD83 (1986 Adjust), an assumed bearing ofNorth 89 degrees 12 minutes 41 seconds West for the north line of Northeast Quarter, Section 36, Township 33, Range26. The originating monuments utilized to establish the horizontal position of this survey was the Northeast corner andthe Northwest corner of said section.3. This survey of lands are located in Sections 25, 35, and 36, Township 33, Range 26, City of Elk River, Sherburne County,Minnesota.4. The site elevations are based on MN/DOT Geodetic Stations:Fence MN141- which has an elevation of: 932.642 feet (NAVD88)Power AZ- which has an elevation of: 902.630 feet (NAVD88)5. The gross area of the subject property is 66.134 Acres or 2,880,817 Square Feet.PARCEL AREA INFORMATION:OUTLOT A: 57.185 ACRES OR 2,491,004 SQUARE FEETOUTLOT C: 8.949 ACRES OR 389,813 SQUARE FEET TOTAL: 66.134 ACRES OR 2,880,817 SQUARE FEET6. The subject property is zoned PUD, per the City of Elk River's zoning map dated 02/20/2015.7. There are no buildings on the subject property.8. A Gopher State One Call (GSOC) request was placed on 06/21/2016 for utility locates on this site and assigned GSOCTicket No. 161730250 and 161730251. The surveyor makes no guarantees that the underground utilities shown hereoncomprise all such utilities in the area, either in service or abandoned. Utility suppliers often do not respond to theserequests in the field but may provide maps, plans, and drawings in lieu of physical location. Utility information shownhereon is a compilation of the provided map information and those visible utilities and marked utilities which werelocated during the survey field work. The surveyor further does not warrant that the underground utilities shown hereonare in the exact location as indicated, although they are located as accurately as possible from the available information.The surveyor has not physically located the underground utilities. Pursuant to MS 216.D contact Gopher State One Call at(651-454-0002) prior to any excavation.9. Ground elevation data has been supplemented by LiDAR data obtained from MNTopo on 12/17/2015. Sambatekcollected field data on storm water ponds.10. Legal descriptions as shown hereon were obtained from the deed provided by the client, document no. 819090.11. This survey was prepared utilizing the First American Title Insurance Company, Title Commitment No. 537575,bearing effective date of 04/27/2016.12. The subject property lies within Flood Plain Zone X- 'Areas determined to be outside the 0.2% annual chancefloodplain', Zone X- 'Areas of 0.2% annual chance flood', Zone AE 'Base Flood Elevation determined', and RegulatoryFloodway, as depicted by shape files provided by FEMA, FIRM Map No. 27141C0385F dated 11/16/2011.13. Field work was completed on 06/24/2016.SURVEY NOTESVICINITY MAP1340181ST AVE NW169TWIN LAKES RDTWIN LAKESPKWYSITE191ST AVEC2.01BOUNDARY ANDTOPOGRAPHIC SURVEYC2.03C2.02 LIGHTSANITARY SEWERSTORM SEWERWATERMAINUNDERGROUND ELECTRICGUY ANCHORUTILITY POLEGUARD POSTUNDERGROUND COMMON TRENCHGAS METEROVERHEAD WIREBUILDING LINECONCRETE CURBBITUMINOUS SURFACECONCRETE SURFACEWET LANDSIGNPOND / WATER LINESOIL BORINGS BYNORTHERN TECHNOLOGIES INC.DECEMBER, 2003TREE LINEFOUND MONUMENTFOUND COUNTYCAST IRON MONUMENTEASEMENT LINESET MONUMENTMARKED LS 21729COUNTY SECTION LINEUNDERLYING / ADJACENT LOTTIE LINEBOUNDARY LINETRANSFORMERGAS METERCOMMUNICATIONS MANHOLEELECTRIC MANHOLEGAS MANHOLEELECTRIC METERTELEPHONE PEDESTALCABLE TV BOXGATE VALVE / HYDRANTSANITARY MANHOLESTORM MANHOLESTORM CATCH BASINFLARED END SECTIONSPOT ELEVATIONCONTOURRIGHT-OF-WAY LINELEGENDGRAVEL SURFACERIP RAPMAILBOXOUTLOT COUTLOT ACURB STOP ClientProjectDesigned:Drawn:DateSubmittal / RevisionNo.CertificationSheet TitleSummaryRevision HistorySheet No.RevisionProject No.Approved:Book / Page:Phase:Initial Issue:ByPAXMARRIVER PARKFOURTH ADDITION,ELK RIVER, MNNRHNRH/JSODSFINALPAX 20460Registration No.Date:I hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly licensedprofessional ENGINEER under the laws of the state of Minnesota.If applicable, contact us for a wet signed copy of this plan which is availableupon request at Sambatek's, Minnetonka, MN office.08/08/201647982Nathan R. Herman08/08/2016NRH/JSOCITY SUBMITTALNOT FOR CONSTRUCTION0SCALE IN FEET50100OUTLOT COUTLOT AC2.02BOUNDARY ANDTOPOGRAPHIC SURVEY ClientProjectDesigned:Drawn:DateSubmittal / RevisionNo.CertificationSheet TitleSummaryRevision HistorySheet No.RevisionProject No.Approved:Book / Page:Phase:Initial Issue:ByPAXMARRIVER PARKFOURTH ADDITION,ELK RIVER, MNNRHNRH/JSODSFINALPAX 20460Registration No.Date:I hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly licensedprofessional ENGINEER under the laws of the state of Minnesota.If applicable, contact us for a wet signed copy of this plan which is availableupon request at Sambatek's, Minnetonka, MN office.08/08/201647982Nathan R. Herman08/08/2016NRH/JSOCITY SUBMITTALNOT FOR CONSTRUCTION0SCALE IN FEET100200OUTLOT DOUTLOT AC2.03BOUNDARY ANDTOPOGRAPHIC SURVEY SCALE IN FEET 0 200100 C6.01OVERALL UTILITY PLAN Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N LEGEND EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER D S S FUTURE D S S 1.THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE SPECIFICATIONS. 1.1.ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY REQUIREMENTS. 1.2.CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE THE LIABILITY OF CONTRACTOR. 1.3.A MINIMUM VERTICAL SEPARATION OF 18 INCHES AND HORIZONTAL SEPARATION OF 10-FEET BETWEEN OUTSIDE PIPE DIAMETERS IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN (BUILDING, STORM AND SANITARY) CROSSINGS. 2.ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN. 2.1.ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. 2.2.ALL SANITARY SEWER TO BE PVC SDR-35, UNLESS NOTED OTHERWISE. 2.2.1.ALL SANITARY SEWER SERVICES TO BUILDING SHALL BE PVC SCH 40 CONFORMING TO ASTM D2665. 2.3.ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, UNLESS NOTED OTHERWISE. 2.3.1.ALL WATERMAIN TO HAVE 7.5-FEET OF COVER OVER TOP OF WATERMAIN. 2.3.2.PROVIDE THRUST BLOCKING AND MECHANICAL JOINT RESTRAINTS ON ALL WATERMAIN JOINTS PER CITY STANDARDS. 2.4.ALL STORM SEWER PIPE TO BE SMOOTH INTERIOR DUAL WALL HDPE PIPE WITH WATER TIGHT GASKETS, UNLESS NOTED OTHERWISE. 2.2.1.ALL STORM SEWER PIPE FOR ROOF DRAIN SERVICES TO BUILDING SHALL BE PVC SCH 40 CONFORMING TO ASTM D2665. 2.3.RIP RAP SHALL BE Mn/DOT CLASS 3. 3.COORDINATE ALL BUILDING SERVICE CONNECTION LOCATIONS AND INVERT ELEVATIONS WITH MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION. 4.ALL BUILDING SERVICE CONNECTIONS (STORM, SANITARY, WATER) WITH FIVE FEET OR LESS COVER ARE TO BE INSULATED FROM BUILDING TO POINT WHERE 5-FEET OF COVER IS ACHIEVED. 5.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. 6.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. 7.ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH THE SOD. 8.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. 9.ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND SOIL INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY: COMPANY: HAUGO GEOTECHNICAL ADDRESS: 13570 GROVE DRIVE #278, MAPLE GROVE, MN 55311 PHONE: 651-554-4829 DATED: 6/6/2016 CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT. 10.EXISTING TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND/OR ADJACENT TO THE PROJECT ARE OF PRIME CONCERN TO THE CONTRACTOR'S OPERATIONS AND SHALL BE A RESTRICTED AREA. CONTRACTOR SHALL PROTECT TREES TO REMAIN AT ALL TIMES. EQUIPMENT SHALL NOT NEEDLESSLY BE OPERATED UNDER NEARBY TREES AND EXTREME CAUTION SHALL BE EXERCISED WHEN WORKING ADJACENT TO TREES. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT OPERATION OF THE CONTRACTOR'S EQUIPMENT, CONTRACTOR SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TREE TRIMMING SERVICE TO TRIM THE TREES PRIOR TO THE BEGINNING OF OPERATION. SHOULD CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS, THE BROKEN LIMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY LASTING DAMAGE TO THE TREE. NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER. COSTS FOR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONSTRUCTION AND NO SPECIAL PAYMENT WILL BE MADE. 11.CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN STRUCTURES TO ______________. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING REVIEW. 12.CONTRACTOR AND MATERIAL SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR EACH STORM SEWER STRUCTURE. 13.FOR EROSION CONTROL MEASURES, PLEASE REFER TO SHEETS C5.01-C5.12 OF THE OVERALL SITE GRADING, DRAINAGE & EROSION CONTROL PLANS. UTILITY CONSTRUCTION NOTES THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. MISKE MEADOWS SCALE IN FEET 0 10050 C6.02SANITARY SEWER AND WATER MAIN PLAN AND PROFILE IVANHOE STREET Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N LEGEND EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER D S S FUTURE D S S 900 910 920 930 940 950 890 900 910 920 930 940 950 890 SCALE IN FEET 0 10050 C6.03SANITARY SEWER AND WATER MAIN PLAN AND PROFILE IVANHOE STREET Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N LEGEND EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER D S S FUTURE D S S 900 910 920 930 940 950 890 900 910 920 930 940 950 890 7 2 3 4 6 5 5610 6 7 9 8 OUTLOT H INFILTRATION BASIN 11 BTM:922.5 OUT: 923.0 HWL: 925.1 EOF: 928.5 3+004+005+006+007+000+00 1+00 2+003+00 3+78.50 0+00 1+00 1+98.61 FUTURE 188TH AVEN U E N W 1 2 OUTLOT F OUTLOT G 1 2 3 4 5 INFILTRATION BASIN 9 BTM:930.5 OUT: 931.0 HWL: 933.5 EOF: 934.5 OUT H W L 8+009+0010+0011+0012+000 + 0 0 1 + 0 0 2+003+003+43.440+000+31.34 0+ 0 0 1+ 0 0 2+00 2+37.13 FUTU R E 1 8 8 T H L A N E NW FU T U R E 1 8 8 T H A V E N U E N W SCALE IN FEET 0 10050 C6.04STORM SEWER PLAN AND PROFILE 900 910 920 930 940 950 890 900 910 920 930 940 950 890 STORM 3400 STORM 3400 STORM 2200 STORM 2200 SCALE IN FEET 0 10050 STORM 1604-1600 (1605-1602)STORM 1607-1603 STORM 1604-1600 STORM 1607-1602 LEGEND EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER D S S FUTURE D S SIVANHOE STREETIVANHOE STREETClient Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N 910 910 910 920 930930 920 3 4 2 OUTLOT D OUTLOT E2WBP WBP WBP WBP UT I L I T Y E A S E M E N T W E T L A N D WETLAND BUFFER SIGN (TYP) B O T O U T INFILTRATION BASIN 8 BTM: 919.0 OUT: 920.0 HWL: 922.3 EOF: 922.5 H W L 13+0014+0015+0016+000+00 0+42.17 0+001+001+56.92F U T U R E JO H N S O N S T R E E T N W 1 3 1 4 2 8 8 7 4 2 3 OUTLOT D 24INFILTRATION BASIN 6 BTM:931.5 OUT: 932.0 HWL: 934.2 EOF: 938.0 HWL BOT OUT 15+0016+0017+0018+0019+0020+000+ 0 0 1+002+00 3+00 3+58.81 0+000+31.40NWFUTU R E 190TH A V E N U E N W 910 920 930 940 950 960 900 910 920 930 940 950 960 900 SCALE IN FEET 0 10050 C6.05STORM SEWER PLAN AND PROFILE STORM 1501-1500 LEGEND EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER D S S FUTURE D S S STORM 3200 STORM 1004-1000 STORM 1005-1003 STORM 1005-1003 STORM 1004-1000IVANHOE STREETIVANHOE STREETSCALE IN FEET 0 10050 Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N STORM 1501-1500 STORM 3200 190TH AVENUE NW 1 2 3 4 5 6 7 3INFILTRATION BASIN 5 BTM: 926.5 OUT: 927.5 HWL: 932.3 EOF: 934.0 BOT OUT HWL1+002+000+ 0 0 1+00 2+00 3+004+005+006+006+39.54FUTURE GRANT STREET NW1 4 1 5 6 3 2 2 3 4 51 3WBP WBP GRANT STRGRANT STREET NWBOT OUT HWL 22+0023+0024+0025+0026+00HWL 0+001+002+002+99.100+00 1+00 2+00 3+003+92.343+004+005+006+00INFILTRATIONBASIN 7BTM:930.0OUT:931.0HWL:933.2FUTURE IVANHOE DRIVE NWFUTURE 190T H A V E N W 910 920 930 940 950 960 900 910 920 930 940 950 960 900 SCALE IN FEET 0 10050 C6.06STORM SEWER PLAN AND PROFILE SCALE IN FEET 0 10050 STORM 1304-1300 LEGEND EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER D S S FUTURE D S S STORM 910-900 STORM 3300IVANHOE STREETSTORM 1304-1300 STORM 910-900 Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N CONNECT TO EXISTING CATCH BASIN IE=953.32 (FIELD VERIFY) STORM 3300 SCALE IN FEET 0 10050 C7.01STREET PLAN AND PROFILE IVANHOE STREET Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N LEGEND EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER D S S FUTURE D S S 910 920 930 940 950 960 900 910 920 930 940 950 960 900 SCALE IN FEET 0 10050 C7.02STREET PLAN AND PROFILE IVANHOE STREET 910 920 930 940 950 960 900 910 920 930 940 950 960 900 Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N LEGEND EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER D S S FUTURE D S S Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N C9.01CONSTRUCTION DETAILS NOTE: DETAIL MODIFIED BY SAMBATEK 10' DRAINAGE & UTILITY EASEMENT NOTE: DETAIL MODIFIED BY SAMBATEK 10' DRAINAGE & UTILITY EASEMENT PROPERTY LINE PROPERTY LINE NOTE: DETAIL MODIFIED BY SAMBATEK 10' DRAINAGE & UTILITY EASEMENT EXTEND TO DRAINGE & UTILITY EASEMENT LINE *OR APPROVED EQUAL * Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N C9.02CONSTRUCTION DETAILS Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 08/08/201647982 Nathan R. Herman 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N C9.03CONSTRUCTION DETAILS NOTE: ALL TRUNCATED DOMES SHALL BE RED IN COLOR.NOTE: ALL TRUNCATED DOMES SHALL BE RED IN COLOR. SCALE IN FEET 0 ##### Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N Joshua J. McKinney Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional LANDSCAPE ARCHITECT under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 5/30/1653234 L1.01SOUTH LANDSCAPE PLANJJM TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL QTY BE Aesculus x arnoldiana `Autumn Splendor` / Autumn Splendor Buckeye B & B 2.5"Cal 7 CA Cornus alternifolia / Pagoda Dogwood B & B 2"Cal 7 HT Crataegus crus-galli `Inermis` / Thornless Hawthorn B & B 2.5"Cal 5 BOULEVARD TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL QTY SO Quercus bicolor / Swamp White Oak B & B 2.5"Cal 8 BL Tilia americana `Boulevard` / Boulevard Linden B & B 2.5"Cal 5 PE Ulmus americana `Princeton` / American Elm B & B 2.5"Cal 7 GROUND COVERS CODE BOTANICAL NAME / COMMON NAME QTY TUR MN Turf Seed MN 33-361 / Stormwater Basin Seed Mix 10,782 sf WB- MIX Turf Seed MN 34-261 / Wetland Buffer Seed Mix 27,187 sf TUR MN3 Turf Seed MN 35-241 / Upland Seed Mix 4,818 sf PLANT SCHEDULE SOUTH LANDSCAPE GENERAL NOTES: 1.THE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF THE WORK. 2.THE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES, REGULATIONS, AND PERMITS GOVERNING THE WORK. 4.THE CONTRACTOR SHALL PROTECT EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING CONSTRUCTION. DAMAGE TO SAME SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. 5.LOCATE AND VERIFY ALL UTILITIES, INCLUDING IRRIGATION LINES, WITH THE OWNER FOR PROPRIETARY UTILITIES AND GOPHER STATE ONE CALL 48 HOURS BEFORE DIGGING. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ANY DAMAGES TO SAME. NOTIFY THE LANDSCAPE ARCHITECT OF ANY CONFLICTS TO FACILITATE PLANT RELOCATION. 6.THE LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE. 7.THE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING OF WORK. 8.THE PLAN TAKES PRECEDENCE OVER THE LANDSCAPE LEGEND IF DISCREPANCIES EXIST. QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. 9.THE SPECIFICATIONS TAKE PRECEDENCE OVER THE PLANTING NOTES AND GENERAL NOTES. 10.EXISTING TREES AND SHRUBS TO REMAIN SHALL BE PROTECTED TO THE DRIP LINE FROM ALL CONSTRUCTION TRAFFIC, STORAGE OF MATERIALS ETC. WITH 4' HT. ORANGE PLASTIC SAFETY FENCING ADEQUATELY SUPPORTED BY STEEL FENCE POSTS 6' O.C. MAXIMUM SPACING. 11.LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON-SITE WILL NOT BE ALLOWED. 12.CONTRACTOR SHALL REQUEST IN WRITING, A FINAL ACCEPTANCE INSPECTION. PLANTING NOTES: 1.NO PLANTS SHALL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. 2.A GRANULAR PRE-EMERGENT HERBICIDE SHALL BE APPLIED TO ALL PLANT BEDS AT THE MANUFACTURERS RECOMMENDED RATE PRIOR TO PLANT INSTALLATION. 3.ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK," ANSI-Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS. 4.OVERSTORY TREES SHALL BEGIN BRANCHING NO LOWER THAN 6' ABOVE PAVED SURFACES. 5.ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL, FREE OF PESTS AND DISEASE AND BE CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE LANDSCAPE LEGEND. 6.PLANT MATERIALS TO BE INSTALLED PER PLANTING DETAILS. 7.ALL TREES MUST BE STRAIGHT TRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS SPECIFIED. 8.THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION. 9.NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT. 10.ALL PLANT MATERIAL QUANTITIES, SHAPES OF BEDS AND LOCATIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT SPACING SHOWN AND ADJUSTED TO CONFORM TO THE EXACT CONDITIONS OF THE SITE. THE LANDSCAPE ARCHITECT SHALL APPROVE THE STAKING LOCATION OF ALL PLANT MATERIALS PRIOR TO INSTALLATION. 11.ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS SPECIFIED. 12.MULCH: SHREDDED HARDWOOD MULCH, CLEAN AND FREE OF NOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL, IN ALL MASS PLANTING BEDS AND FOR TREES, UNLESS INDICATED AS ROCK MULCH ON DRAWINGS. SUBMIT SAMPLE TO LANDSCAPE ARCHITECT PRIOR TO DELIVERY ON-SITE FOR APPROVAL. DELIVER MULCH ON DAY OF INSTALLATION. USE 4" FOR SHRUB BEDS, AND 3" FOR PERENNIAL/GROUND COVER BEDS, UNLESS OTHERWISE DIRECTED. 13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES AND PLANTING SOIL QUANTITIES TO COMPLETE THE WORK SHOWN ON THE PLAN. 14.USE ANTI-DESICCANT (WILTPRUF OR APPROVED EQUAL) ON DECIDUOUS PLANTS MOVED IN LEAF AND FOR EVERGREENS MOVED ANYTIME. APPLY AS PER MANUFACTURER'S INSTRUCTION. ALL EVERGREENS SHALL BE SPRAYED IN THE LATE FALL FOR WINTER PROTECTION DURING WARRANTY PERIOD. 14.PLANTING SOIL FOR TREES, SHRUBS AND GROUND COVERS: FERTILE FRIABLE LOAM CONTAINING A LIBERAL AMOUNT (4% MIN.) OF HUMUS AND CAPABLE OF SUSTAINING VIGOROUS PLANT GROWTH. IT SHALL COMPLY WITH MNDOT SPECIFICATION 3877 TYPE B SELECT TOPSOIL. MIXTURE SHALL BE FREE FROM HARDPACK SUBSOIL, STONES, CHEMICALS, NOXIOUS WEEDS, ETC. SOIL MIXTURE SHALL HAVE A PH BETWEEN 6.1 AND 7.5 AND 10-0-10 FERTILIZER AT THE RATE OF 3 POUNDS PER CUBIC YARD. IN PLANTING BEDS INCORPORATE THIS MIXTURE THROUGHOUT THE ENTIRE BED IN A 6" LAYER AND ROTO-TILLING IT INTO THE TOP 12" OF SOIL AT A 1:1 RATIO.ANY PLANT STOCK NOT PLANTED ON DAY OF DELIVERY SHALL BE HEELED IN AND WATERED UNTIL INSTALLATION. PLANTS NOT MAINTAINED IN THIS MANNER WILL BE REJECTED. 15.ALL PLANTS SHALL BE GUARANTEED FOR TWO COMPLETE GROWING SEASONS (APRIL 1 - NOVEMBER 1), UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR AND PLANTS. 16.CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 3 DAYS PRIOR TO PLANNED DELIVERY. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 24 HOURS IN ADVANCE OF BEGINNING PLANT INSTALLATION. 17.SEASONS/TIME OF PLANTING AND SEEDING: NOTE: THE CONTRACTOR MAY ELECT TO PLANT IN OFF-SEASONS ENTIRELY AT HIS/HER RISK. DECIDUOUS 17.1.POTTED PLANTS: 4/1 - 6/1; 9/21 - 11/1 17.2.DECIDUOUS /B&B: 4/1 - 6/1; 9/21 - 11/1 17.3.EVERGREEN POTTED PLANTS: 4/1 - 6/1; 9/21-11/1 17.4.EVERGREEN B&B: 4/1 - 5/1; 9/21 - 11/1 17.5.TURF/LAWN SEEDING: 4/1 - 6/1; 7/20 - 9/20 17.6.NATIVE MIX SEEDING: 4/1 - 7/20; 9/20-10/20 18.MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE. PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE WATERING, CULTIVATING, MULCHING, REMOVAL OF DEAD MATERIALS, RE-SETTING PLANTS TO PROPER GRADE AND KEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE RESPONSIBILITIES. HOWEVER, THE CONTRACTOR SHALL CONTINUE TO BE RESPONSIBLE FOR KEEPING THE TREES PLUMB THROUGHOUT THE GUARANTEE PERIOD. 19.ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL LANDSCAPE LEGEND SPECIFICATIONS. 20.WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS ONCE A WEEK. IN EXTREMELY HOT, DRY WEATHER, WATER MORE OFTEN AS REQUIRED BY INDICATIONS OF HEAT STRESS SUCH AS WILTING LEAVES. CHECK MOISTURE UNDER MULCH PRIOR TO WATERING TO DETERMINE NEED. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER. 21.ALL BOULEVARD TREES SHALL RECEIVE A TREEGATOR BAG WATERING SYSTEM TO BE REFILLED TO MEET THE WATERING NEEDS OF THE TREE. NOTES SCALE IN FEET 0 10050 Client Project Designed: Drawn: Date Submittal / RevisionNo. Certification Sheet TitleSummaryRevision History Sheet No.Revision Project No. Approved: Book / Page: Phase: Initial Issue: By PAXMAR RIVER PARK FOURTH ADDITION, ELK RIVER, MN NRH NRH/JSO DS FINAL PAX 20460 08/08/2016 NRH/JSO CITY SUBMITTAL NOT FO R C O N S T R U C T I O N Joshua J. McKinney Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional LANDSCAPE ARCHITECT under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 5/30/1653234 L1.02NORTH LANDSCAPE PLANJJM TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL QTY BE Aesculus x arnoldiana `Autumn Splendor` / Autumn Splendor Buckeye B & B 2.5"Cal 10 CA Cornus alternifolia / Pagoda Dogwood B & B 2"Cal 8 HT Crataegus crus-galli `Inermis` / Thornless Hawthorn B & B 2.5"Cal 6 BOULEVARD TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL QTY SG Acer freemanii `Sienna Glen` / Sienna Glen Maple B & B 2.5"Cal 12 SO Quercus bicolor / Swamp White Oak B & B 2.5"Cal 8 BL Tilia americana `Boulevard` / Boulevard Linden B & B 2.5"Cal 14 PE Ulmus americana `Princeton` / American Elm B & B 2.5"Cal 8 GROUND COVERS CODE BOTANICAL NAME / COMMON NAME QTY TUR MN Turf Seed MN 33-361 / Stormwater Basin Seed Mix 15,097 sf TUR MN3 Turf Seed MN 35-241 / Upland Seed Mix 6,785 sf PLANT SCHEDULE NORTH LANDSCAPE TREE PLANTING DETAIL NTS PROVIDE & INSTALL RODENT PROTECTION 1/2" HARDWIRE CLOTH, MESH CYLINDER, 8" DIA OR GREATER X 36" HT.. STAKE IN PLACE INSTALL TREE WITH ROOT FLARE VISIBLE AT TOP OF THE ROOT BALL. REMOVE SOIL IN LEVEL MANNER FROM TOP OF ROOT BALL TO EXPOSE 1ST 1/2" OR LARGER MAIN ORDER ROOT IF NEEDED. SET ROOT BALL WITH MAIN ORDER ROOT 1" ABOVE ADJACENT GRADE. DO NOT COVER TOP OF ROOT BALL WITH SOIL. PLACE NO MULCH IN CONTACT WITH TREE TRUNK REMOVE BURLAP, TWINE, ROPE AND WIRE FROM TOP HALF OF ROOT BALL BUILD 4" HIGH EARTH SAUCER BEYOND EDGE OF ROOT BALL EDGE CONDITION VARIES PLACE ROOT BALL ON UNDISTURBED OR COMPACTED SOIL SCARIFY SIDES OF TREE PIT WITH SPADE BY HAND TO BIND WITH PREPARED SOIL PLANTING SOIL, REFER TO SPECIFICATIONS, COMPACT TO 85% OF MAX. DRY UNIT WEIGHT ACCORDING TO ASTM D 698 TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT DIG PLANTING PIT 4" TO 6" DEEPER THAN ROOT BALL UNDISTURBED SUBGRADE NOTE: CONTRACTOR SHALL MAINTAIN TREES IN A PLUMB POSITION THROUGHOUT THE WARRANTY PERIOD. IF STAKING IS REQUIRED BY SITE CONDITIONS, CONTRACTOR TO USE 2 OR 3 STAKE METHOD WITH 1" WEBBING AROUND TRUNK OF THREE (NO WIRE OR CABLING TO BE USED) WRAP TREE TRUNKS ONLY UPON APPROVAL BY LANDSCAPE ARCHITECT 1 1 1 ✓ :FgZLL M.9t,.tL.69N Z. 66.0, r•————————— TI-1 00 22 ——————It.—z".F---—————————----- ——————— — U MN A )IUVd SDVI NIMI 0 "e, g 7, 0 F- 0 u gig S 0 ,Z, 4, A 1131AWI Md IWI S 11=—3 ------ VOMOL M.91,LJ.62N :F9V9 M.90.Z9.69N ltoeeo .6, I/L uo Z. �jz 4 21 Nil A CO 0 LLE ————— z r 10 47 E z es Z6C 3 1 el 91 lz,g a I 3.1",76()9Z f- 1-OIN" ca Vz 9- a VL ON Z E 3.,,Z,IVZ' LON 6C,60Z 2 9.M69N 09 AAS1.11.69N M. 6z00.£95 E Lu E O A n z z Z 0- LL 0 0 E rC w wZ �zz JW UO - Nz- Z o°a 41 gyp' `Z� ro \N 22es ab. _- I y�� /'� M.`.. '� JPS .�'�d E• 06t IN Q s} NN W 3.85.9 I O "' 1 1 7 orr�aosrl � r� „I L_941C1=ICS II$ aL-61 I„ I• - ^ - - orlr-t6'ffl M.9v.[0.iB- I �Ip I/ N l JIa nl I N - rl� I L_Ob'LZl-3,46,f4S9$_� ul N 9 a =r o a orL_______ I ^Ip ____J JII � Ie N ryo6L'BfL M,SO,L49BN -lam L r v ori�,' b,.I- L 60'OiL 3,i0_94.6B5 Jor� or -- W v ' vl C o Im F,♦_____ for y0 22 w a ml _______d- to f(os4 r _J I rl Ir s orr—oo°bi m:fo.ib.e9ry-1 fL'- 3,f0,9---Jar /o�V of loo m r— �I I I ^rL___ J Al ^' 1 " r 00'abl M.ie,Le.eBN � � w I 1 ! 3 1 M w L_OL_BLL-3_ig96AI9 Joie z n o I$ o H _ m IN ry N N l I^ I^ I T ti I o1 I gl N gl '^ L J ^I rn r——mo'obi M,fb,L4eBBN—� Z I I Q L—�L6f l-3,f0,96.695—_J ------------ n - > L.--- i F of ml af'14!_--_J I m Z I tY w wZ �zz J W �zo HO Nw¢ U� Z O U PoaF jooss Zb'bCl 3w60 LLS � •^o<L p•1� IN� L- _SCI 3_ZCO •` �< � / SZ,L4ZBN--i mli^ ,sr m/ vla I� I -- m: 00'Sfl 3,62,SZ,S95-J. •^ M,Ob,S0.L9N o ----- ---- �� ------ � 9 w str_____________ N^ 6SS I^ Z I NL_00'SSl 3_09._LOS i °�� fl'LSl M.Ob,S0,G9N W of n n1 I 3,O9s0.L9s Jsr °L_________J O �l0'Ozl%n.os.5 = 1I 1 sr 0.G9N-I 2ml o I C4 '�ry m/ Id I I^ h � �^ L_aa stl 3=0b,S0,L95 J n m e ____________J Im 3 M1 2�� 69'S9l M,Ob,SO.LBN 7 i ,sr I le L_0058 3 09,5 r r--- ------ W �r, C7;:- Ss, g� of of o 9 UO a LL H•.- "NN L_aosfl 3,oa,saLes_lr 3ilby�8g r----------err Y// •xdC�p gl I S ^ ¢22 ml 00'Sfi 3.Ob,SO.GBS 1 sr W N nyK iqa \` � 1�l 4• Cgsry`ov sn o gz - w �'ng yO NN o�<ff�s\c J�rc S I I � o� 12 1 sib! h n;;;; husput Vnvnv--� wn 0 1-7 - 0 ---- -T 1 Nil 10m; LAMM, AS,; knows int;i;;Oon; w;o; Z goix "1111m lay innng cum; Ou"arygo Him o din! Witmwo mi smang Uzi -11 LU 0 —j ;J; LL r) IQ 06r 41tv CL u ,7 LU > LU L ori-----_—__,—J I � � I oriI L r- ---------- All E-j ism 111 w; I i v: I n I I a No Wass homm cog CC w < 131HIH I HUH111 HIM 111HHII 111H MIN mmum ymnuf m ply amm! W! PHIM PHIPHIH:v H H 2-2-H H 1 MUM K— W.H" WW 1 mmw 1 4mons. 11 11 in;0 N a 1; wa...... all, 55HINII MR 8HHH1 HUI mis"I wwwomm pow"! m !I;- pill SHMM WAR MHAIP KM MHO HHHHO 1 x OD r) LU - ----o _I F ------ L----------- 0 -j U. NV --------- ----- L-----------J, MIS F---------- - < m o LU ftv > LU I L --- � City"f EIE liver 13065 Orono Parkway Elk River,1,4N 55330 July 12,2016 Paxmar Via Email: don.)ensen@paxmar.com ATTN: Don Jensen 3495 Northdale Blvd #210 Coon Rapids,MN 55448 RE: River Park Fourth Addition—Preliminary and Final Plat Comment Letter Dear Mr.Jensen, Staff conducted a review of the materials submitted on July 30, 2016. The following comments and recommendations are intended to bring the project in line with current city requirements and should be addressed on future plans. It is helpful to include a response letter to the comments below. Unaddressed comments will be incorporated into recommended conditions for Final Plat approval. General Comments 1. Cluster all mailboxes 2. All corner lots must maintain a buildable area of 50 feet wide for all areas within approved setbacks. 3. All single-family lots shall be a minimum of 70 feet wide at the setback line. Please amend block two to reflect comments two and three. 4. Is the end use of the parcels along 188th Ave single-family uses outside of an HOA? 5. Two overstory trees in the boulevard area and one additional tree in the front yard of each single-family home are required. Engineering and Stormwater 6. Final plans should fully detail proposed street and utility improvements on plan profile sheets. 7. Power poles are going to look out of place on a large hill. Work with power supplier to lower the poles so they will meet adjacent grades. 8. All slopes intended to be maintained in ponding or other public spaces shall not exceed a 3:1 slope (Horizontal:vertical) 4:1 is preferred. 9. Temporary cul-de-sacs are required on all street ends. Phone: 763.635.1000 Fax: 763.635.1090 P O W E B E 0 B r www.ci.elk-river.mn.us [NAtURE] 10. As shown this plan proposes a dead end in excess of the allowable 700-foot city standard. The new connection must be made out to County Road 40 through Misky Meadows before building will be allowed along Ivanhoe Street south of Station 15+00. 11. All Emergency Overflows (EOF) must be protected with drainage and utility easements 12. All adjacent grading in Misky Meadows effecting backyard drainage, EOFs, etc. must be completed before building construction will be allowed on the parcels in this development. 13. Provide additional detail in final plans showing intersection grades and drainage. 14. Adjacent downstream utilities needed in I\Esky Meadows must be shown as proposed within this plan. In some instances these ae shown as existing infrastructure on this plan but those facilities are not in place nor have they been reviewed or included in approved plans. 15. Detail the intension of the existing stormwater infrastructure north and west of CB 281. Remove,replace, or modify as needed to provide only needed functioning infrastructure at the end of this project. 16. Standard Plates for pedestrian ramps shall be replaced with current MnDOT plates that meet ADA standards. Red truncated domes shall be used. 17. All sidewalk shall be placed on a 4-inch aggregate base. 18. Standard details for sewer and water services should be modified to identify the curb stop and stubs being installed to the back side of the 10-foot front yard easement. 19. Engineering reserves the right to continue our review and provide additional comments as identified. 20. River Park Third Addition NPDES permit may need to include this development under `common development.' 21. Add pipe capacity and corresponding modeled cfs for all proposed stormwater pipe/routing. 22. A MIDS report is needed. 23. NPDES erosion and sediment control BMPs need to be shown in accordance with infiltration basin requirements. 24. 45' setback requirement for all structures must be met from the OHW. Also, 1' of clearance from EOF and all proposed low openings is required. 25. Label appropriate elevations and EOF details for the two existing wet ponds. 26. A 50 foot natural buffer or (if a buffer is infeasible on the site) provide redundant sediment controls when a surface water is located within 50 feet of the project's earth disturbances and stormwater flows to the surface water. Environmental 27. The flood zone labels are switched for Zones AE and Zones X. Please correct on plans. 28. The wetland along block 9 should have a 45 ft. easement,not 25. The lots should be pushed back at least 25 ft. from the wetland boundary so that the buffer will remain as outlot. The buildable areas should reflect the 45 ft. buffer strip setback easement. 29. The pond on lots 1 and 2,block 9, do not appear to have the 25 ft. buffer easement and buildable areas do not reflect the 45 ft. structure setback. Again,lots should be reduced so that the 25 ft. buffer is in the oudot. This allows for future maintenance access. 30. Vegetation to be planted in 25 ft. buffer areas should be native wetland buffer mix. 31. The 25'wetland buffer must be signed at each property line or every 200 feet,whichever is less. If you have any questions I can be reached at 763.635.1035. Please address these comments on future plans submitted to the city. Sincerely, Zack Carlton Planning Manager zcarlton@ElkRiverMN.gov SambatekEngineering I Surveying I Planning I Environmental Memorandum DATE: Monday,August 08,2016 TO: Zach Carlton,City of Elk River FROM: Dwayne Sikich,Sambatek SUBJECT: Response to City Comments for River Park Preliminary Plan Review (07/30/16 plan set),issued on July 12,2016 General Comments 1. Cluster all mailboxes Cluster mailbox location shown on landscape plan,location subject to change with approval of USPS. 2. All corner lots must maintain a buildable area of 50 feet wide for all areas within approved setbacks. Implemented. See Final Plat Setback Exhibit,Block 2 was re-designed based on dimension sketch provided by Planning Dept. 3. All large single-family lots shall be a minimum of 70 feet wide at the setback line. Please amend block two to reflect comments two and three. Implemented. See Final Plat Setback Exhibit,Block 2 was re-designed based on dimension sketch provided by Planning Dept. 4. Is the end use of the parcels along 188th Ave single-family uses outside of an HOA? Yes,all lots fronting on 188th Avenue are FUTURE 65'-70'single family lots and do not require an HOA. 5. Two overstory trees in the boulevard area and one additional tree in the front yard of each single- family home are required.A minimum of one overstory and one ornamental tree per lot are shown on the landscape plans per Sec 30-934,(c). Except on Block 2,this is matching Miske Meadows. Engineering and Stormwater 6. Final plans should fully detail proposed street and utility improvements on plan profile sheets. The submitted plan set contains utility and street plan & profile sheets. 7. Power poles are going to look out of place on a large hill. Work with power supplier to lower the poles so they will meet adjacent grades. The site grading near the power poles has been revised significantly to reduce the appearance of the power poles sitting up on unsightly hills,see sheets C4.04 and C4.05 of Site Grading,Drainage & Erosion Control Plans for Miske Meadows and River Park Fourth Addition. Developer meeting scheduled with XCEL transmission on future amended grades. River Park Fourth Addition July 26,2016 Page 2 8. All slopes intended to be maintained in ponding or other public spaces shall not exceed a 3:1 slope (horizontal:vertical) 4:1 is preferred. Agree,there are no slopes greater than 3:1 throughout the mass grading plan.The slopes surrounding Infiltration Basin 8 are 4:1,see sheets C4.04 and C4.05 of Site Grading,Drainage & Erosion Control Plans for Miske Meadows and River Park Fourth Addition. 9. Temporary cul-de-sacs are required on all street ends. Per agreement with Engineering,all future intersecting roads with Ivanhoe Street will end at the curb radius;the only proposed temporary cul-de-sac is at the south end of Ivanhoe Street. 10. As shown this plan proposes a dead end in excess of the allowable 700-foot city standard. The new connection must be made out to County Road 40 through Miske Meadows before building will be allowed along Ivanhoe Street south of Station 15+00. Issue being worked on by Paxmar and the City regarding lots south of 15+00 once construction commences on 190th Avenue NW. Terms of such agreement will be spelled out in the Development Agreement. 11. All Emergency Overflows (EOF) must be protected with drainage and utility easements All emergency overflows are located with drainage and utility easements as indicated on the Final Plat 12. All adjacent grading in Miske Meadows effecting backyard drainage, EOFs, etc. must be completed before building construction will be allowed on the parcels in this development. PAXMAR understands that ponding and drainage needed specific to lots in question for certificate of occupancy,not building permit issuance.River Park Fourth and adjacent lots within Miske Meadows will be mass graded at the same time. All storm sewer for each block within River Park Fourth will be constructed and outleted into completed Infiltration Basins 8 or 11,or into temporary HDPE pipes to temporary sedimentation basins within Miske Meadows. 13. Provide additional detail in final plans showing intersection grades and drainage. See plan view of the Street plan and Profile sheets for curb elevations at each intersection. Additional detail may be added prior to Construction Documents. 14. Adjacent downstream utilities needed in Miske Meadows must be shown as proposed within this plan. In some instances, these are shown as existing infrastructure on this plan but those facilities are not in place nor have they been reviewed or included in approved plans. All storm sewer within River Park Fourth will be constructed and outleted into completed Infiltration Basins 8 and 11 or into temporary HDPE pipes to temporary sedimentation basins within Miske Meadows. See Storm Sewer Sequencing Exhibit for additional clarification. 12800 Whitewater Drive, 11 Minnetonka,MN 55 343 1 763.476.6010 River Park Fourth Addition July 26,2016 Page 3 15. Detail the intension of the existing stormwater infrastructure north and west of CB 281. Remove, replace, or modify as needed to provide only needed functioning infrastructure at the end of this project. The existing catch basin,storm pipe and outlet control structure will be removed.Current stormwater design requirements do not allow the(re-)use of the exiting storm infrastructure. The OCS structure may be salvaged by the excavation contractor for future use offsite. 16. Standard Plates for pedestrian ramps shall be replaced with current MnDOT plates that meet ADA standards. Red truncated domes shall be used. Page 1 and 2 of MnDOT Standard Plan 5-297.25 Pedestrian Curb ramp Details have replaced the City of Elk River Ped.Ramp detail in the plan set. Red domes are noted below the detail. 17. All sidewalk shall be placed on a 4-inch aggregate base. The typical street section detail indicates a 4"aggregate base is required under all sidewalks. We have also added the same requirement in the Division —Site Work, 02520 Concrete Sidewalk and Driveway specification section 18. Standard details for sewer and water services should be modified to identify the curb stop and stubs being installed to the back side of the 10-foot front yard easement. Standard sewer and water service details have been modified to end construction at the front drainage and utility easement rather than at the right-of-way. 19. Engineering reserves the right to continue our review and provide additional comments as identified. Understood. 20. River Park Third Addition NPDES permit may need to include this development under `common development.' River Park Third Addition will be entered as `common development'when the online NPDES application for River Park Fourth and Miske Meadows application is submitted.Permit number pending. 21. Add pipe capacity and corresponding modeled cfs for all proposed stormwater pipe/routing. See attached Storm Sewer HydrFlow Summary Report. 22. A MIDS report is needed. The MIDS Report is contained in the Storm Water Report submitted on 07/26/2016 for both Miske Meadows and River Park Fourth. 12800 Whitewater Drive, 11 Minnetonka,MN 55343 1 763.476.6010 River Park Fourth Addition July 26,2016 Page 4 23. NPDES erosion and sediment control BMPs need to be shown in accordance with infiltration basin requirements. See Erosion Control Phase I and II Plans of Site Grading,Drainage & Erosion Control Plans for Miske Meadows and River Park Fourth Addition and Storm Sewer Sequencing Exhibit. 24. 45' setback requirement for all structures must be met from the OHW. Also, 1' of clearance from EOF and all proposed low openings is required. The 45'structure setback requirement is no longer need because the existing ponds within Block 6 are being filled in and replaced with Infiltration Basin 8. All building low openings are a minimum 1.0 feet above emergency overflows,typical design of this project is 1.5 feet above the the ECF. 25. Label appropriate elevations and EOF details for the two existing wet ponds. The two existing wet ponds within Block 6 are being filled in and replaced with Infiltration Basin 8. 26.A 50 foot natural buffer or (if a buffer is infeasible on the site) provide redundant sediment controls when a surface water is located within 50 feet of the project's earth disturbances and stormwater flows to the surface water. Redundant sediment controls to be installed per Erosion Control Phase I and 11 Plans of Site Grading,Drainage & Erosion Control Plans for Miske Meadows and River Park Fourth Addition Environmental 27. The flood zone labels are switched for Zones AE and Zones X. Please correct on plans. FEMA Zones have been verified and the two labels corrected in the Boundary and Topographic Survey. 28. The wetland along block 9 should have a 45 ft. easement, not 25. The lots should be pushed back at least 25 ft. from the wetland boundary so that the buffer will remain as oudot. The buildable areas should reflect the 45 ft. buffer strip setback easement. It is our understanding that staff will allow the homes along the wetland to be constructed as designed with original River Park development. 29. The pond on lots 1 and 2, block 9, do not appear to have the 25 ft. buffer easement and buildable areas do not reflect the 45 ft. structure setback. Again, lots should be reduced so that the 25 ft. buffer is in the oudot. This allows for future maintenance access. Maintenance access has been provided to all existing ponds and proposed infiltration basins 12800 Whitewater Drive, 11 Minnetonka,MN 55343 1 763.476.6010 River Park Fourth Addition July 26,2016 Page 5 30. Vegetation to be planted in 25 ft. buffer areas should be native wetland buffer mix. MNDOT Seed Mix 35-241 has been specified in the 25 foot buffer areas on the landscape plans. 31. The 25'wetland buffer must be signed at each property line or every 200 feet,whichever is less. Wetland Buffer signs are indicated on sheets C4.04 and C4.05 of Site Grading,Drainage & Erosion Control Plans for Miske Meadows and River Park Fourth Addition. 12800 Whitewater Drive, 11 Minnetonka,MN 55343 1 763.476.6010 4% �3(z Oj 41 65 263 :� 99/ L-L --------- 43 FC)F CQ 64 ion cu • ---92 187th, cd CL 00 ION CO rVOO M a- -0 r< Ox L. C: E SB (nit? APP co 0 gmq) a) ? > 2.7 A RES I— LAI A�x III Cld CL LA R Ln lir RIVER FIRE Memorandum REscuE a�RE DEPARTMENS POLICE To: Zachary Carlton, Planning Manager From: Elk River Public Safety Date: August 11, 2016 Subject: Road Development around Twin Lakes Thank you for the opportunity to give input in regards to the proposed road development to connect the River Park Subdivision with the Twin Lakes Estates Subdivision. As you know,we are dedicated to public safety from both law enforcement and fire service perspectives. Having only one access point for this large of a development,as well as future developments,is not practical or beneficial to the public that live in these areas or for emergency response to the area. We all agree that public safety would be improved by connecting the subdivision from multiple directions rather than just one side. Having only one access point could potentially delay response times or could interfere with emergency operations. Our recommendation is that Ivanhoe be connected to Twin Lakes Parkway, allowing further access to the area for everyone. Twin Lakes Elementary School Daniel T. Collins Principal 10051 191 st.Ave. NW _ Elk River, MN 55330 763.274.7242 doniel.collins@lsd728.org ties.e1kriver.11<12.mmus August, 2016 Re: Road Development around Twin Lakes Hello Zack, I want to thank you for coming out to Twin Lakes and showing me the up and coming developments surrounding our school. Thanks for showing me the maps and giving me a rough timeline of events. This will be very useful information as we prepare for the future. After you left I reviewed the maps and do want to give you a little feedback about the roads. Currently we have one road into this area for the schools and the surrounding development. I feel strongly that it would be important as you move forward to connect Ivanhoe to Twin Lakes Parkway Rd and put in sidewalks with possibly a bike path. Several points why I believe this; • This would give the area two routes of entry as exits. • This would alleviate some of the congestion that happens before and after school on 191St Ave and onto Cleveland. • Safety as it gives public services another entry. • Access for kids to walk or ride bike to school. • Gives Trout Brook families an easier way to the school. Of course when they start on the Big part of Miske Meadows it'll be very important to punch in the 190'h Ave and other roads that will connect to Ivanhoe. Thanks again for including me in this conversation! Daniel T. Collins INDEPENDENT SCHOOL DISTRICT 728 Our mission is to educate, inspire empower PAAr 8/11/16 Paxmar requirements to move forward with final plat of River Park 4th • Up to 15 building permits to be issued, the remainder held until DA and surety are sent to the city for the improvement of 1901h St. through Miske Meadows • 5 model permits to be given in River Park 4th • Surety for River Park 4th will not be reduced when improvements are installed and accepted, but will remain in full for the city to draw upon and improve 190th street to a rural road section, if Paxmar does not improve 190th by 11/30/17 • Paxmar and city to enter into Development Agreement, final plat and post surety for Miske Meadows addition to include 190th by 5/31/17 Alan Roessler President 3495 Northdale Blvd.NW Suite 210 Coon Rapids, M7V 55448