Loading...
8.0. PRSR HANDOUT 08-10-2016 River Main Street Upper Fountain Temporary Fence C i i I p+� Existing V' ,i ori ar Stairs ,t (.oi��� !/ - , / a New Upper ;. -s- ' . 4' K /Terrace -j a+ a, 4e4 t ,' •.. r Expanded a r `New Retaining Wall ,- r 4a Seating 'al • • 4. —CI - _ --r"kt♦ .. is • .p.' New Stairway I v Lower Parking Lot Closed T with Landings '_ ii Expanded Stage .00` This Fall for Construction i t 00 'r: New Stage " l ` "' Access Trail - II .. to %` _.. to Existing Shelter- -_. i 00 to to % - i Mississippi River ©© Landscape Architect: BKBM : Civil Engineer: Electrical Engineer: Contractor: mu Hoisington Koegler Group,Inc ROM Engineers et-II EDI-Engineering Design Initiative Sunram Construction • Construction begins on August 22, 2016. • Substantial completion by October 1, 2016. I ■ Final completion in the Spring of 2017. ■ Begining August 22 the lower city parking lot will be closed to provide a staging area for construction. A construction fence will be installed between the Elk River Lutheran Church and the city parking lots, as well as aroud the top of the existing plaza to prevent access to the construction site. ■ Once complete this expansion will nearly double the seating capacity for the summer concert series and provide an exceptional venue for weddings. If you have any questions,please contact Parks and Recreation Director Michael Hecker at 763.635.1161 or mhecker@ElkRiverMN.gov r City of Elk River