Loading...
4.7. SR 09-06-2016Request for Action To Item Number Mayor and City Council 4.7 Agenda Section Meeting Date Prepared by September 6, 2016 Consent Agenda Michael Hecker, Parks and Recreation Director Item Description Reviewed by Rivers Edge Commons Park Additional Design Cal Portner, City Administrator Fees Reviewed by Action Requested Approve, by motion, the additional design and engineering fees for the Rivers Edge Commons Park Expansion Project Background/Discussion On July 6, 2015, the Council approved HKGi to perform professional design services for the basic design phase of the Rivers Edge Commons Park expansion as shown in the Phase 1 diagram. During discussions last fall with the City Council, the scope of the project expanded to include additional elements such as the west staircase, upper plaza, site lighting, and an expanded stage. Each of these additional design elements involved design time for the plans and related details, related technical specifications, coordination of alternate related language in the plan set and bid forms, review of shop drawings for the additional elements, and ongoing coordination for pricing and product options. The design services were required to complete the construction plans and bid documents that were advertised and then presented to City Council for construction approval on April 4, 2016. City Council provided direction at the November 2 work session to proceed with the bidding of the construction documents for the phase one basic design and additional elements. Financial Impact The additional design and engineering fees for the additions billed to date is $21,952, projected outstanding balance is $2,000 with a total amount not to exceed $24,000. The basic design service contract is $46,700. This makes the total project costs of $70,700 for design, engineering and planning services for the construction of the Rivers Edge Commons Park Expansion. Attachments  Rivers Edge Commons Park Expansion Phase One Diagram  Rivers Edge Commons Park Expansion Phase One with Additions Diagram Version 4.15.15Elk River Commons Park Expansion - Phase 1 diagram failing retaining wall PHASE 1: Replace pavement for stage Keep 12ft grassy slope access paver walk Provide paver walk seatinggrade hill & add Remove alley, Provide PHASE 1: ADD:Expanded stage area PHASE ONE: WITH ADDS ADD: Stairway Edge of existing seating PHASE 1 BASE: Remove alley, grade hill & add seating Decorative railing ADD:Upper plaza Stair handrails with optional LED lighting ADD: Decorative PHASE 1 BASE: park lighting 12 ft wide access Install upper block wall, and low maintenance shrub bed Keep existing lower block wall PHASE 1 BASE: Replace Future support building location Future trail location failing retaining wall DRAFT: 10.28.15