5.6. SR 01-10-2005 Item 'If 5 . 6 . MEMORANDUM TO: Mayor and City Council FROM: Pat Klaers, City Administrator Phil Hals, Street Superintendent Bill Maertz, Direc~rks and Recreation Michele McPhers~irector of Planning DATE: January 10, 2005 SUBJECT: Public Works Master Plan Background: Since 1999, staff has been working on a Public Works Master Plan in order to accommodate building, staffing, and equipment needs for the continued growth of the city. The building, staffIng, and equipment needs are linked to the adopted Comprehensive Plan that indicates a maximum population at build-out of approximately 35,000 to 40,000 people. Attachments: . April 30, 2001 City Council Meeting Minutes Proposal from HR Green to Complete Master Grading/Drainage Plan Total Property Acreage Proposed Master Plan Winter Vehicle Storage (2004), Existing Building Tempered Vehicle Storage, Proposed Phase 1 Interior Remodeling, Proposed Phase II - Lower Level Breakroom Remodeling, Proposed Phase II - Upper Level . . . . . . . Existing Conditions: As the Council is aware, the existing Public Works facility is located west of County Road 1 at the County Road 77 intersection. The Public Works site is comprised of 38.3 acres, of which 14.3 is useable due to the presence of wetlands and athletic facilities. The Public Works site is used for the Public Works shop (office, mechanics, storage, work space, breakroom), a fuel dispensing island, outdoor storage, and the leaf, brush and oil drop off areas. Also, three baseball fields (Oak Knoll 1, 2 & 3) are located on City property and are part of the larger Oak Knoll complex, which includes two soccer fields and the varsity baseball field located along County Road 1. Memo to the Mayor and City Council Public Works Master Plan January I 0, 2005 Page 2 Future Public Works Master Plan Staff has collaborated to identify long-term public works facility needs based on a 35,000 to 40,000- target population for the City. Analyzing other cities' public works facilities for square footage comparisons, staff has determined the following needs regarding building, square footage, and staffing levels. Storage Needs: · Salt/ sand storage - · Cold storage - · Tempered storage- 8,000 sq. ft. 10,000 sq. ft. 50,000 sq. ft. StaffIng Levels: · Parks Department - 8 · Streets Department - 14 · Mechanics - 5 Public Works Benchmark Comparisons City Population Infrastructure Building Square Footage Staffing levels Parks Streets Heated Cold Salt Parks Street Repair (miles) Elk River, 20,000 40 135 18,400 2,700 5 9 3 2004 Elk River, 40,000 68,400 10,000 8,000 8 14 5 2025 Stillwater 25,000 45,000 10,000 Fridley 28,000 38 125 16,000 8 3 Inver Grove 31,053 24 140 36,500 10,000 20,000 6 9 2 Heights Cottage 31,437 164 48,580 6,024 8,000 9 9 4 Grove Roseville 35,000 32 120 79,264 12,000 3,000 6 9 2 Minnetonka 51,000 44 253 82,881 6,000 9,000 8 19 5 Maple Grove 58,000 45 204.39 70,000 10,000 12 15 5 Coon Rapids 62,295 57 176.4 70,000 5,000 8,400 12 12 6 Plymouth 69,000 276 100,000 7 16 4 Currently, City equipment is stored primarily outside during the summer months. In winter, park maintenance and miscellaneous unneeded street equipment are stored off-site in four locations, two of which are water tower bases. This requires that if a particular piece of equipment is needed during the winter due to, for example, a water main break, staff must determine where the piece of equipment is stored and hope that the access to the base of the water tower has been plowed on a regular basis. The Utilities are also tightening security and would prefer that non-utility equipment not be stored within their facilities. Also, during the winter in order to ensure that snow plow equipment is ready and not snow covered, a careful jigsaw puzzle of parking has been established to ensure that equipment is "ready to go" if a snowfall occurs. The other two sites include Fire Station #2, and the pole barn on the EDA/Brown property. The pole barn in all likelihood will be removed in 2005/06 with the development of the City's business park. Memo to the Mayor and City Council Public Works Master Plan January I 0, 2005 Page 3 The above conditions have led staff to identify the need for cold and tempered storage. Cold storage is unheated, but covered and would be utilized for the storage of barricades, traffic control signs, manhole castings, etc. to be accessed quickly and easily especially if a water main or other emergency were to occur and barricades and traffic control signs were needed at a moment's notice. Currently these items are stored outside and are subject to the elements. Tempered storage would be used for equipment/vehicles and would be heated to approximately 550, which would again eliminate the need for the careful jigsaw puzzle of parking that currently occurs with the existing building. This would allow the existing building to be utilized for summer equipment storage maintaining all of the equipment on-site and under cover, which will prolong the life span of the equipment. In addition to the cold storage noted above, the salt storage building is an immediate replacement request. This is due to the condition of the existing storage building, which is nearing collapse, and the changes in salt storage requirements by the EP A/MPCA. These storage requirements require mixing and storage to occur under cover to eliminate salt-laden water run-off into adjacent water bodies / wetlands. Components. Budget. and Phasing Plan: The phasing plan and budget for the Public Works Master Plan is noted in the chart below. The total cost to fill the storage needs is $3.5 million in 2004 dollars over the next 5-10 years. These amounts include dollars for re-working the compost site and completing an interior remodel of the lower level of the existing Public Works building. The components of the interior remodel include an expanded sign-making area, new offices for the Street Superintendent, Street Foreman, Park Foreman, relocated receptionist facilities and the creation oflocker facilities for staff. Public Works Master Plan Phasing and Budget Item Square Footage Year Estimated Funding Source Amount Prepare Master $38,000 Government Grading Plan Buildings Fund Prepare Building $5,000 Government Plans and Specs Buildings Fund Salt/Sand Storage 8,000 2005 $150,000 Government Buildings Fund Cold Storage 10,000 2005 $125,000 Government Buildings Fund Compost 2005 $155,000 Government Relocation Buildings Fund Parking Lot & Government Driveway 2005 $79,000 Buildings Fund Improvements . Tempered As soon as Storage #1 30,000 Funding is $1,500,000 To be Identified and Determined Available To Be Interior Remodel 2008-09 $120,000 Determined I I Memo to the Mayor and City Council Public Works Master Plan January I 0, 2005 Page 4 Public Works Master Plan Phasing and Budget Item Square Footage Year Estimated Funding Source Amount Tempered 20,000 To be $1,100,000 To be Storage #2 Determined Determined Mechanics To be To be Expansion Determined $200,000 Determined Totals $3,472,000 ($473,000) Government Buildings Fund ($2,999,000) To be Determined Yard Waste Disposal/Composting The composting operation is comprised of two parts: 1) yard waste drop off and 2) compost creation. Currently at the Public Works site residents can drop off branches, leaves, and grass clippings (yard waste). The branches are then ground and the leaves and grass clippings are hauled to Hillside City Park south of County Road 12 to be composted, which takes up to four years depending on conditions. Given the residential developments around Hillside City Park, the Parks and Recreation Director would like to utilize the composting area for a neighborhood park in addition to the mountain bike trails that are maintained by the BLAST group. In 2001, the City Council authorized construction of Fields 5 and 6 at the Youth Athletic Complex (YAC) in anticipation of the Public Works expansion. Originally, it was thought that Oak Knoll #3 would be needed for the construction of the cold storage and tempered storage buildings. In preparing the long range (20 year) Master Plan and evaluating a number of site layout scenarios, it is logical to place the buildings closer together for ease of vehicular movement, creation of a working "yard" and ease of screening. As a result, Oak Knoll #3 became the site of a relocated and larger yard waste drop off site. The Master Plan includes an expanded composting drop-off and processing area, which is flexible enough to respond to changes in the program, should they occur in the future. In order to implement the proposed Master Plan, Oak Knoll #3 would need to be discontinued. In preparing the Public Works Master Plan, staff assumed that the City Council would like to continue to offer compost drop-off as a core service to City residents. Therefore, to improve the aesthetic appearance and efficiency of the operation, staff recommends relocating the composting from its current position to the area occupied by Oak Knoll #3. If the City ever chooses to discontinue compo sting services, the area can be easily utilized for another building or the storage of other items such as stockpiles of topsoil, sealcoat rock, or recycled materials on a project basis. Staff continues to work with the County regarding the City's composting operation, but at this time that County has not made any decisions regarding costs to utilize the VONCO II landfill in Becker, which has been authorized to accept compost. Rebecca Haug, Environmental Technician will have provided a composting update to the Council prior to consideration of this item at the workshop meeting. A follow up worksession to more fully discuss yard waste disposal and composting is recommended. Memo to the Mayor and City Council Public Works Master Plan January I 0, 2005 Page 5 Requested Action Staff requests that the City Council consider the following actions: 1. Provide feedback, or if appropriate, approve the Public Works Master Plan. Feedback could include requesting that an independent third party evaluate staff's evaluation of future storage needs and proposed Master Plan layout. 2. Provide feedback or if appropriate, approve the closure of Oak Knoll #3 and authorize the reconfiguration of the compost drop-off and processing operation in 2005. 3. Authorize preparation of a Master Grading Plan as submitted by HR Green. 4. Authorize staff to process a conditional use permit for construction of a salt/ sand and cold storage buildings in 2005. City Council Minutes April 30, 2001 Page 7 INTERVIEW CANDIDATES. COUNCILMEMBER DIETZ SECOND THE MOTION. THE MOTION CARRIED 4-0. COUNCILMEMBER DIETZ MOVED TO AUTHORIZE ST F TO ADVERTISE FOR A PART TIME OFFICE ASSISTANT OSITION. COUNCILMEMBER TVEITE SECONDED THE M ION. THE MOTION CARRIED 4-0. Phil Hals informed the City Cou1J,cil that due to shop move and expansion proposed to take place, he would like to use esent employees to temporarily fill the need for a third mechanic and to adverti III November or December for a third mechanic to be hired in January. Th ouncil concurred and will discuss this proposal during consideration 0 e 2002 budget. cil on the status and need for part time summer workers. COUNCILM ER DIETZ MOVED TO AUTHORIZE THE STREET SUPERIN NDENT TO REHIRE DARWIN SCHUUR, SARA HOPKO, JERE PIPENHAGEN AND PAUL KOHLER AND TWO NEW PE LEAS PART TIME SUMMER WORKERS. COUNCILMEMBER ITE SECONDED THE MOTION. THE MOTION CARRIED 4-0. 2. Roadside Mower COUNCILMEMBER DIETZ MOVED TO ADVERTISE FOR BIDS FOR THE ROADSIDE MOWER AND TRACTOR WITH THE ENTIRE AMOUNT TO COME FROM COUNCIL CONTINGENCY FUND. COUNCILMEMBER TVEITE SECONDED THE MOTION. THE MOTION CARRIED 4-0. 3. Mechanic Area Phil Hals discussed the proposed mechanical shop relocation. He noted that staff is proposing to relocate the mechanic shop to the western end of the building. He noted that the cost for the expansion is $80,000. COUNCILMEMBER TVEITE MOVED TO APROVE MECHANIC SHOP EXPANSION IN THE AMOUNT OF $80,000 WITH $70,000 TO COME FROM THE STREET RESERVE FUND AND $10,000 FROM THE 2001 GENERAL FUND. COUNCILMEMBER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 4-0. 4. Break Room Move and Expansion Phil Hals indicated that the Street employees have outgrown the existing break room. He explained that the proposed plans include the expansion of the break room to the mezzanine area. He noted that after this expansion a new workstation for the Street Department Office Assistant is possible. City Council Minutes April 30, 2001 Page 8 COUNCILMEMBER TVEITE MOVED TO AUTHORIZE EXPENDITURES IN THE AMOUNT OF $42,000 FOR BREAK ROOM IMPROVEMENTS PLUS $3,000 FOR THE OFFICE ASSISTANT FURNITURE. COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED 4-0. 5. Area Mater Plan 2002 - Future Plans Phil Hals reviewed the Public Works Area Master Plan which includes a 14,000 square foot cold storage building, a winter salt/ sand storage building, relocating some electrical feeder lines, refencing the yard area and expanding the yard into the area now used for Oak Knoll Ball Field III. He noted that two baseball fields would be constructed at the Y AC that will replace the Oak Knoll field. Phil indicated that options for a brush and compost drop-off site are also being considered. Councilmember Dietz noted that he would like to see the Oak l<noll Field remain. The City Administrator noted that this might not be possible due to the long term expansion needs of the Street Department. Councilmember Dietz requested the staff to completely study the issue before considering removing the Oak l<noll Field. Tree Program Phil Hals updated the Council on the Tree Program. He noted that this year has been the most successful to date. Phil requested the Council to authorize him to provide 90 more coupons for trees, which would meet the limit of $9,000 in the budget. The Council authorized the superintendent to use up to 90 more coupons. 6. Other Business The City Administrator updated the Council on the flooding status of the Elk River. 7. Adjournment There being no further business, Mayor Klinzing adjourned the meeting of the Elk River City Council at 10:30 p.m. joncllLL vWui :fj(L Sandra Peine City Clerk MEMO To: Michele McPherson Public Works Site Master Plan January 5, 2005 ~oward R. Green Company From: Subject: Date: John Anderson As requested we have estimated engineering costs associated with developing a master site and grading plan for the expansion of the Public works facility located at 19000 Proctor Avenue. This estimate was based on the Master Plan dated 1/10/2005. Based on our estimates the engineering cost for budgetary purposes to use for this work is $38,000. ,. ~ C:\Documents and Settings~anders\My Documents\mem 1-5-05 public works.doc d ~~ ?='> ~n >~ nC0 g;m C/)~ en ~ ;!!;~ =6 . ~~ . 6) . ~ ~ , ~)\)V EXISTING CONDITIONS DATE: 1/10/2005 DRAWN BY: CML SCAlE: NOT TO SCALE SHEET PUBLIC WORKS 19000 PROCTOR 1 " . o ~ ~ ~ 'l "'*I::: f"Tl N, o 'l "'*I::: f"Tl -"' , o "'*I:::'l -" f"Tl 0' o . r !! t . .~ r:.-. . .I =z5 ~ !. ~._.~._.f :;;; :;;0 (/) =< I . I . i ~L\)C?! , ~> PROPOSED MASTER PLAN - PUBLIC WORKS 19000 PROCTOR DATE: 1/10/2005 DRAWN BY: CML SHEET SCALE: NOT TO SCALE 1 ::::0 o )> ~O o c: 00 ~::::o ~)> o fT1 ::::0 DOOR 10 DOOR 9 I I I I I L____~ o o o ;0 OJ ----, I [TRUCK ____-.J DOOR 8 I I I I L___-.J ;:: Clr'l >0 ;o:J: D >> ClZ r'ln U1 II I I I I L___-.J 1---- TRUd*! I L____ o o o ;0 -...J -i ;::0 )> ("") A r f"T1 Vl UJ TRUCK TRUCK D [t I PICKupl 1 TON. DUMP VEHICLE STORAGE WINTER (EXISTING BUILDING 2004) PUBLIC WORKS 19000 PROCTOR o o o ;;0 <.n ----, ~ I L+DER ____-.J I I METAL RACK o o o ;;0 (,J ----, I 1. ~ON I ____-.J o o o ;;0 N ----, I LQ~DER -.J ==1 , STORAGE RACK 81 ~J.D'1 5200 ____-.J TRUCK LOADER o "Tl "Tl n r'l o "Tl "Tl n r'l DATE: 1/10/20005 DRAWN BY: CML SCALE: NOT TO SCALE Z9 SHEET 1 EJ 200'-0" [lION. DUMP. 1 I iJ.D.5200. .1 IJ) -1-1 Orrl /O~ )>""'0 C)rrl rrl/O rrl :::tt:::0 --" PHASE I TEMPERED VEHICLE STORAGE 19000 PROCTOR ~ ~ ~ ~ \/ I PICK. Upl L~ L~ c I ~ II I L CDrrl ex ilJ) 0-1 zz GJGJ I a c ~ U1 o I o DATE: 1/10/2005 DRAWN BY: CML SCAlE: 1/32" = 1'-0" SHEET Al I I I --~ i -----___-1_ -~I- --I II [,I ~U LJ I -~ ~~~ ~ m ~~~ "l ~~ ~~ II ~~ n ~~ ~~ --I I I I --~ ~ ~Il ~ ~!" "'~!, u~ ~~ ~I I i~ I ~ I ~~"l 8 ~~ ~ i~~ jJ PAllET ""'" WORK TAIllE (04'X8j ~ H~ I I ~J ~~3 ~ I ~ ~ """"-, 0: I: :0: ~..g I ,~i1i '" ~ ~ c;; . -v ,~ PHASE II-LOWER LEVE OFFICE EXP ANSION/REMODEL 19000 PROCTOR DATE: 1/10/2005 DRAWN BY: CML SHEET SCALE: 3/32" = 1'-0" Al o ~~" ~' f' hi .. ~! ( ~ ) " ( ~ ~I~ ~I~ ~ I ~ ) PHASE II-UPPER LEVEL BREAK ROOM EXPANSION 19000 PROCTOR DATE: 1/10/2005 DRAWN BY: CML SCALE: 3/32" = 1'-0" SHEET A2