Loading...
8.2. SR 10-03-2016 ��i Eof lk — - Request for Action River To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General Business October 3, 2016 Steve Benoit,Recreation Manager Item Description Reviewed by Orono Park Skate Park Project Michael Hecker, Parks and Recreation Director Reviewed by Cal Portner, City Administrator Action Requested Adopt,by motion,the Orono Park Skate Park design. Background/Discussion Spohn Ranch Skateparks, the firm retained to design the Orono Park Skate Park, has completed the latest draft of the proposed park. The plan was developed from community feedback received at two workshop meetings and a Facebook Page designed specifically for the skate park project. Overall the design has been well received by potential users of the park. The park utilizes a concrete design with features highly desired by skaters that focused on what is considered to be good flow. Also, the park utilizes a design intended to compliment surrounding features of Orono Park. Council adoption of the design is required before the construction documents can be produced. The skate park project has been approved to be included with park improvements to be funded as part of the $30 million Community Center referendum this November. Financial Impact Construction cost: $370,187 Attachments ■ Design Schematic A ■ Design Schematic B ■ Design Schematic C ■ Design Schematic D ■ Construction Budget POWERED 9r UREI i `ter � � • .000I Alf Y" 1 • 1 _ ♦�-M . ��� � "Ire• ♦ a 4 1 4. me _ b r r,L•. r i,"''7!`•;'fir _ SKATEPARK DESIGN BY ORONO PARK ■� SKATE■ COPYRIGHT 2016 y, •. OF r ORONO PARK SKATEPARKDESIGN BY SKATEPARK SPOHN RANCH COPYRIGHT 2016 CITY OF ELK RIVER,MN _ T- AIL ORONO PARK SKATEPARKDESIGN BY SPOHN RANCH SKATEPARK COPYRIGHT 2016 - CITY OF ELK RIVER,MN ORONO PARK SKATEPARKDESIGN BY SPOHN RANCH SKATEPARK CITY OF ELK RIVER,MN rie am DESIGN. BUILD. COME TOGETHER. SPOHN RANCH S K A T E P A R K S CONSTRUCTION COST ESTIMATE ORONO PARK SKATEPARK- ELK RIVER, MINNESOTA JULY 21, 2016 MOBILIZATION /GENERAL REQUIREMENTS ITEM QUANTITY CREW MOBILIZATION 1 (LUMP SUM) EQUIPMENT&GEAR MOBILIZATION 1 (LUMP SUM) FUEL&MISCELLANEOUS SUPPLIES 40 WORKING DAYS TEMP FENCING 600 LINEAR FEET TEMP DUMPSTER 2 MONTHS TEMP RESTROOM 2 MONTHS SITE STAKING&LAYOUT 1 (LUMP SUM) PUNCH LIST, CLEAN-UP&DE-MOBILIZATION 2 WORKING DAYS ESTIMATED COST $25,000.00 STEEL FABRICATION ITEM QUANTITY CNC-CUT SCREEDS 1 (LUMP SUM) HOT-DIP GALVANIZED STEEL COPING 228 LINEAR FEET HOT-DIP GALVANIZED STEEL ANGLE 193 LINEAR FEET HOT-DIP GALVANIZED STEEL GRIND RAILS 3 RAILS SHIPPING 1 (LUMP SUM) FIELD WELDING 1 (LUMP SUM) ESTIMATED COST $28,020.00 SPOHN RANCH, INC. I P 626-330-5803 F 626-330-5503 1 W SPOHNRANCH.COM E INFO@SPOHNRANCH.COM 1 6824 S CENTINELA AVE. LOS ANGELES, CA 90230 rie am DESIGN. BUILD. COME TOGETHER. SPOHN RANCH S K A T E P A R K S SITE PREPARATION & EARTHWORK ITEM QUANTITY MEDIUM-SIZE TREE REMOVAL 2 TREES LARGE-SIZE TREE REMOVAL 1 TREE STRIP GRASS&TOPSOIL 8,763 SQUARE FEET HAULING&DISPOSAL 1 (LUMP SUM) SCARIFY SUB-GRADE 8,763 SQUARE FEET MOISTURE CONDITION SUB-GRADE 8,763 SQUARE FEET COMPACT SUB-GRADE 8,763 SQUARE FEET IMPORT&PLACE BASE COURSE 112 CUBIC YARDS CUTTING/SHAPING FOR>2.5 SKATE FEATURES 1,643 SQUARE FEET CUTTING/SHAPING FOR<2.5'SKATE FEATURES 839 SQUARE FEET ESTIMATED COST $51,942.00 DRAINAGE ITEM QUANTITY 4"PVC LINE 250 LINEAR FEET TRENCH EXCAVATION 250 LINEAR FEET TRENCH BEDDING 250 LINEAR FEET TRENCH BACKFILL 250 LINEAR FEET TRENCH COMPACTION 250 LINEAR FEET ZURN 415B FLOOR DRAIN 2 DRAINS CATCH BASIN 2 CATCH BASINS MISC. FITTINGS&SUPPLIES 1 (LUMP SUM) ESTIMATED COST $7,080.00 SPOHN RANCH, INC. P 626-330-5803 F 626-330-5503 1 W SPOHNRANCH.COM E INFO@SPOHNRANCH.COM 1 6824 S CENTINELA AVE. LOS ANGELES, CA 90230 rie am DESIGN. BUILD. COME TOGETHER. SPOHN RANCH S K A T E P A R K S CONCRETE ITEM QUANTITY CONCRETE FLATWORK 4,956 SQUARE FEET ENTRY SIDEWALK 433 SQUARE FEET CONCRETE LEDGES&MANUAL PADS 140 CUBIC FEET CURVED CONCRETE LEDGES&MANUAL PADS 367 CUBIC FEET CONCRETE BANKS 965 SQUARE FEET SHOTCRETE 2,136 SQUARE FEET CONCRETE TURNDOWN WALLS 6 SQUARE FEET SAW CUT CONTROL JOINTS 700 LINEAR FEET EXPANSION JOINT FOAM 150 LINEAR FEET CAULKING FOR JOINTS 850 LINEAR FEET ESTIMATED COST $213,145.00 ADD-ALTERNATES ITEM ESTIMATED COST INTEGRAL COLOR FOR FLATWORK $13,000.00 LIGHTING $15,000.00 TURF RESTORATION&LANDSCAPING $10,000.00 SPOHN RANCH, INC. I P 626-330-5803 F 626-330-5503 1 W SPOHNRANCH.COM E INFO@SPOHNRANCH.COM 1 6824 S CENTINELA AVE. LOS ANGELES, CA 90230 r! tt DESIGN. BUILD. COME TOGETHER. SPOHN RANCH S K A T E P A R K S TOTAL ESTIMATED COSTS ITEM QUANTITY MOBILIZATION/GENERAL REQUIREMENTS $25,000.00 STEEL FABRICATION $28,020.00 SITE PREPARATION&EARTHWORK $51,942.00 DRAINAGE $7,080.00 CONCRETE $213,145.00 +ADD-ALTERNATES $38,000.00 +PERFORMANCE/PAYMENT BOND $7,000.00 TOTAL ESTIMATED COST $370,187.00 ASSUMPTIONS • HIGHLIGHTED ITEMS ARE OPPORTUNITIES FOR IN-KIND MATERIAL/SERVICE DONATIONS TO REDUCE COST • CLIENT TO CAP/CUT IRRIGATION PRIOR TO CONSTRUCTION • CLIENT TO PROVIDE TEMPORARY ACCESS TO WATER&POWER SOURCE FOR CONSTRUCTION USE • CLIENT TO RELOCATE TRAIL MAP • ESTIMATE ASSUMES PERMIT FEES WILL BE WAIVED • ESTIMATE DOES NOT INCLUDE TESTING FEES SPOHN RANCH, INC. I P 626-330-5803 1 F 626-330-5503 1 W SPOHNRANCH.COM E INFO@SPOHNRANCH.COM 1 6824 S CENTINELA AVE. LOS ANGELES, CA 90230