4.5. SR 10-03-2016 Eclty1� ,.,�� Request for Action River To Item Number Mayor and City Council 4.5 Agenda Section Meeting Date Prepared by Consent October 3,2016 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Rivers Edge Commons Park Construction Change Cal Portner, City Administrator Order Reviewed by Action Requested Approve,by motion, change order requests for the construction of the Rivers Edge Commons Park Expansion. Background/Discussion After Sunram Construction conducted demolition of the old alleyway to the lower parking lot,it was discovered that due to the number of utilities below the alley the proposed stormwater plan needed to be modified. The proposed design included new stormwater services in the alleyway and connecting into the existing stormwater infrastructure. Due to the utilities,it was determined that this design could not be conducted without substancial relocation of the existing utilities. HKGi and Sunram proposed and alternate design redirecting the stormwater through the upper parking lot. Additionally,it was determined that the existing manhole and sump was undersized and highly degraded and required replacement in order to adequately meet the expected discharge of water from the alley and upper parking lot. This redesign included additional pipe,upgrading the existing manhole to a 60 inch sump and adding a skimmer device. The change order amount will be $13,315.00 that will be paid for from contingency and the stormwater fund. Financial Impact There is no impact to the city General Fund. Attachments ■ Change Order POWERED 6T AR Change Order 3 OWNER City of Elk River LANDSCAPE ARCHITECT Hoisington Koegler Group inc. CONTRACTOR Sunrarn Construction THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES;CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. PROJECT: Elk River-Rivers Edge Park Expansion CHANGE ORDER NUMBER: 3 DATE: 9,2'0.16 PROJECT NO: HKGl 015-032 TO CONTRACTOR: CONTRACT DATE: 4.,22.16 Sunrarn Construction 20010 75th Ave N,Corcoran,MIN 55340 The Contract is changed as follows: (see sheet 2) Not valid until signed by the Owner,Landscape Architect and Contractor. The ohginaI(Contract Sum)was $ 301,854,010 Net change by previously authorized Change Orders $ 58,450.00 The(Contract Sum)prior to this Change Order was $ 360,304.00 The(Contract Sum) will be,-CHANGED by the Change Order in the amount of $ 13,3:15:0:0] The new(Contract Sum) including this Change Order wifl be $ 373,619.00 This Change Order DOES NOT EFFECT Contract Time The date of Substantial Completion as of the date of this Change Order therefore is 10.3,0.16 LANDSCAPE ARCHITECT CONTRACTOR OWNER Hoisington Koegler Group inc. Sunram Construction City of Elk River 123 North 3rd Street,Suite 100 20010 75th Ave N,Corcoran,MN 55340 13065 Orono Parkway,EN River,MIN 55330 Minneapolis,Minnesota 55401 (Pnn!Rame) (print name) (print name) (signature and date) (signature and date) (signature and date) page 1 of 2 Summaof Change Order No.3 - 9.20.16 You are directed to make the following changes in the Contract Documents., Descriptions: Unit Qty UnitCost Total 1. Eliminate bid item: CONSTRUCTION NEW ST MH LS -1 $ 5,800,00 $ (5,800.00) OVER EXISTING PIPE 2.ADD 12" HDPE PIPE LF 70 $ 39.00 $ 2,730.00 3. CB#5,at lower parking lot Replace,inadequate MH with new 60"includes removal of existing MH #5 and installation of a new 60-4020 LS 1 $ 17,000.00, $ 17,000.00 CBMH with a 4'sump, 3067V casting and a Snout Skimmer/BMP device. 4, Bid item qty changes estimated for alley grade changes for CB#3 relocation(final will measure infield) a. CURB REMOVAL LF 10 $ 7,50 $ 75.00 b. NEW CURB LF 10 $ 31.00 $ 310.00 5. Eliminate bid item: ROCK CONSTRUCTION ENTRANCE LS -1 $ 1,0001.00 $ (1,000m) Net Contract change for Change Order $ 13,315.00 page 2 of 2