4.5. SR 10-17-2016Request for Action
To Item Number
Mayor and City Council 4.5
Agenda Section Meeting Date Prepared by
Consent October 17, 2016 Justin Femrite P.E., City Engineer
Item Description Reviewed by
BNSF Agreement for Crossing Surface Cal Portner, City Administrator
Improvements
Reviewed by
Action Requested
st
Approve, by motion, the attached agreement with the BNSF for concrete plank replacement at the 171
Avenue crossing.
Background/Discussion
BNSF has prepared and delivered the attached agreement for work associated with replacement of the
st
concrete crossing planks at the 171 Avenue crossing. The charges for work associated are 50% our
responsibility. This maintenance will not affect the quiet zone at this crossing.
Financial Impact
The agreement details Elk River’s cost at $67,406.00. The costs will be funded through our pavement
management fund.
Attachments
Grade Crossing Signal Installation Agreement
CROSSING SURFACE INSTALLATION AGREEMENT
BNSF File No.: BF10009482
Mile Post 36.75
Line Segment 25
U.S. DOT Number 917432K
Staples Subdivision
This Crossing Surface Installation Agreement (hereinafter called, this “Agreement”) is entered
into effective as of , 20__, by and between City of Elk River (hereinafter called,
“AGENCY”) and BNSF Railway Company (hereinafter called, “BNSF”).
WHEREAS, BNSF operates a freight transportation system by rail with operations throughout the
United States and Canada; and
WHEREAS, AGENCY desires to replace the existing Main 2 concrete crossing surface at 171st
St with a new concrete crossing surface;
NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties
contained herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as
follows:
1. BNSF Work. The Company will install a new concrete crossing surface for a width of
10 feet from the edge of the pavement on the south side of the tracks to the edge of the pavement on the
north side of the tracks. The new crossing surface will adequately cover all vehicular driving lanes at
171st St. The Company will perform all necessary track upgrades to accommodate the new crossing
surface.
2. Payment; Invoicing. Upon execution of this Agreement by both parties hereto,
Company will send Agency an invoice detailing the total amount owed by Agency for the new crossing
surface. Company shall send to Agency a final invoice upon completion and Agency shall pay the final
invoice within 30 days of receipt.
Agency’s ESTIMATED total cost for the new crossing surface is sixty-seven thousand four hundred and
six and No/100 Dollars ($67,406.00).
3. Maintenance of the Crossing Surface. After installation of the new crossing surface is
completed, BNSF will maintain, at its own cost and expense, the crossing surface, against normal wear
and tear, in a satisfactory manner for the expected life of the crossing surface. Notwithstanding the
preceding sentence, BNSF shall be entitled to receive any contribution toward the cost of such
maintenance made available by reason of any existing or future laws, ordinances, regulations, orders,
grants, or other means or sources.
4. Vehicular Traffic during Installation. The AGENCY shall provide, at its own cost and
expense, all necessary barricades, lights or traffic control devices for detouring vehicular/pedestrian
traffic at the 171st St Street crossing during installation of the new crossing surface.
5. Drainage. The AGENCY agrees to allow BNSF to drain water from the 171st St Street
crossing area into existing AGENCY storm sewers, if such storm sewers are available. Drain pipes and
filter fabric necessary for such drainage will be furnished and installed by BNSF.
6. Roadway Surfacing Work. The AGENCY agrees to provide, at its sole cost and
expense, enough asphalt to cover the distance between the existing roadway surface at 171st St Street and
the new crossing surface on both sides of the track as well as the area between the tracks. The principal
elements of AGENCY’s Work are as follows:
(a) Installation of a pavement marking stop bar in accordance with the Manual on Uniform
Traffic Control Devices (hereinafter called, “MUTCD”);
(b) Installation of advance warning signs in accordance with the MUTCD;
(c) Job site cleanup including removal of all construction materials, concrete debris, surplus
soil, refuse, contaminated soils, asphalt debris, litter and other waste materials to the
satisfaction of BNSF.
7. Contractor Requirements: AGENCY must require its contractor to comply with the
obligations set forth in this Agreement, including Exhibit C and Exhibit C-1, and incorporate in each
prime contract for construction of the Project, or the specifications therefor, the provisions set forth in
Exhibit C and Exhibit C-l, attached hereto and by reference made a part hereof.
No work shall be commenced within BNSF’s right of way until the AGENCY’s contractor shall have (i)
executed and delivered to BNSF an agreement in the form of said Exhibit C-1 and (ii) delivered to and
secured BNSF’s approval of the required insurance.
8. Term. This Agreement begins on the effective date set forth above and remains in effect
until completion of all work contemplated in this Agreement and AGENCY’s payment of the amounts set
forth in Section 2 above.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by
its duly qualified and authorized officials as of the day and year first written above.
BNSF Railway Company:
By:
Printed Name:
Title:
AGENCY:
City of Elk River
By:
Printed Name:
Title:
EXHIBIT "C"
CONTRACTOR REQUIREMENTS
1.01 General:
• 1.01.01 The Contractor must cooperate with BNSF RAILWAY COMPANY,
hereinafter referred to as "Railway" where work is over or under on or adjacent to
Railway property and/or right-of-way, hereafter referred to as "Railway Property",
during the construction of 171st St Crossing Surface.
• 1.01.02 The Contractor must execute and deliver to the Railway duplicate copies
of the Exhibit “C-1” Agreement, in the form attached hereto, obligating the Contractor
to provide and maintain in full force and effect the insurance called for under Section
3 of said Exhibit “C-1”. Questions regarding procurement of the Railroad Protective
Liability Insurance should be directed to Rosa Martinez at Marsh, USA, 214-303-
8519.
• 1.01.03 The Contractor must plan, schedule and conduct all work activities so as
not to interfere with the movement of any trains on Railway Property.
• 1.01.04 The Contractor's right to enter Railway's Property is subject to the
absolute right of Railway to cause the Contractor's work on Railway's Property to
cease if, in the opinion of Railway, Contractor's activities create a hazard to
Railway's Property, employees, and/or operations. Railway will have the right to stop
construction work on the Project if any of the following events take place: (i)
Contractor (or any of its subcontractors) performs the Project work in a manner
contrary to the plans and specifications approved by Railway; (ii) Contractor (or any
of its subcontractors), in Railway’s opinion, prosecutes the Project work in a manner
which is hazardous to Railway property, facilities or the safe and expeditious
movement of railroad traffic; (iii) the insurance described in the attached Exhibit C-1
is canceled during the course of the Project; or (iv) Contractor fails to pay Railway
for the Temporary Construction License or the Easement. The work stoppage will
continue until all necessary actions are taken by Contractor or its subcontractor to
rectify the situation to the satisfaction of Railway’s Division Engineer or until
additional insurance has been delivered to and accepted by Railway. In the event of
a breach of (i) this Agreement, (ii) the Temporary Construction License, or (iii) the
Easement, Railway may immediately terminate the Temporary Construction License
or the Easement. Any such work stoppage under this provision will not give rise to
any liability on the part of Railway. Railway’s right to stop the work is in addition to
any other rights Railway may have including, but not limited to, actions or suits for
damages or lost profits. In the event that Railway desires to stop construction work
on the Project, Railway agrees to immediately notify the following individual in
writing:
• 1.01.05 The Contractor is responsible for determining and complying with all
Federal, State and Local Governmental laws and regulations, including, but not
limited to environmental laws and regulations (including but not limited to the
Resource Conservation and Recovery Act, as amended; the Clean Water Act, the
Oil Pollution Act, the Hazardous Materials Transportation Act, CERCLA), and health
and safety laws and regulations. The Contractor hereby indemnifies, defends and
holds harmless Railway for, from and against all fines or penalties imposed or
assessed by Federal, State and Local Governmental Agencies against the Railway
which arise out of Contractor's work under this Agreement.
• 1.01.06 The Contractor must notify (Agency) at and Railway's
Manager Public Projects, telephone number 763-782-3492 at least thirty (30)
calendar days before commencing any work on Railway Property. Contractor’s
notification to Railway must refer to Railway's file .
• 1.01.07 For any bridge demolition and/or falsework above any tracks or any
excavations located with any part of the excavations located within, whichever is
greater, twenty-five (25) feet of the nearest track or intersecting a slope from the
plane of the top of rail on a 2 horizontal to 1 vertical slope beginning at eleven (11)
feet from centerline of the nearest track, both measured perpendicular to center line
of track, the Contractor must furnish the Railway five sets of working drawings
showing details of construction affecting Railway Property and tracks. The working
drawing must include the proposed method of installation and removal of falsework,
shoring or cribbing, not included in the contract plans and two sets of structural
calculations of any falsework, shoring or cribbing. For all excavation and shoring
submittal plans, the current “BNSF-UPRR Guidelines for Temporary Shoring” must
be used for determining the design loading conditions to be used in shoring design,
and all calculations and submittals must be in accordance with the current “BNSF-
UPRR Guidelines for Temporary Shoring”. All submittal drawings and calculations
must be stamped by a registered professional engineer licensed to practice in the
state the project is located. All calculations must take into consideration railway
surcharge loading and must be designed to meet American Railway Engineering
and Maintenance-of-Way Association (previously known as American Railway
Engineering Association) Coopers E-80 live loading standard. All drawings and
calculations must be stamped by a registered professional engineer licensed to
practice in the state the project is located. The Contractor must not begin work until
notified by the Railway that plans have been approved. The Contractor will be
required to use lifting devices such as, cranes and/or winches to place or to remove
any falsework over Railway's tracks. In no case will the Contractor be relieved of
responsibility for results obtained by the implementation of said approved plans.
• 1.01.08 Subject to the movement of Railway's trains, Railway will cooperate with
the Contractor such that the work may be handled and performed in an efficient
manner. The Contractor will have no claim whatsoever for any type of damages or
for extra or additional compensation in the event his work is delayed by the Railway.
1.02 Contractor Safety Orientation
• 1.02.01 No employee of the Contractor, its subcontractors, agents or invitees
may enter Railway Property without first having completed Railway’s
Engineering Contractor Safety Orientation, found on the web site
www.contractororientation.com. The Contractor must ensure that each of its
employees, subcontractors, agents or invitees completes Railway’s
Engineering Contractor Safety Orientation through internet sessions before
any work is performed on the Project. Additionally, the Contractor must
ensure that each and every one of its employees, subcontractors, agents or
invitees possesses a card certifying completion of the Railway Contractor
Safety Orientation before entering Railway Property. The Contractor is
responsible for the cost of the Railway Contractor Safety Orientation. The
Contractor must renew the Railway Contractor Safety Orientation annually.
Further clarification can be found on the web site or from the Railway’s
Representative.
1.3 Railway Requirements
• 1.03.01 The Contractor must take protective measures as are necessary to keep
railway facilities, including track ballast, free of sand, debris, and other foreign
objects and materials resulting from his operations. Any damage to railway facilities
resulting from Contractor's operations will be repaired or replaced by Railway and
the cost of such repairs or replacement must be paid for by the Agency.
• 1.03.02 The Contractor must notify the Railway's Division Engineer Keith Jones at
(763) 782-3479 and provide blasting plans to the Railway for review seven (7)
calendar days prior to conducting any blasting operations adjacent to or on Railway's
Property.
• 1.03.03 The Contractor must abide by the following temporary clearances during
construction:
15’-0” Horizontally from centerline of nearest track
21’-6” Vertically above top of rail
27'-0" Vertically above top of rail for electric wires carrying less than 750
volts
28'-0" Vertically above top of rail for electric wires carrying 750 volts to
15,000 volts
30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to
20,000 volts
34'-0" Vertically above top of rail for electric wires carrying more than
20,000 volts
• 1.03.04 Upon completion of construction, the following clearances shall be
maintained:
25’ Horizontally from centerline of nearest track
23’ 6” Vertically above top of rail
• 1.03.05 Any infringement within State statutory clearances due to the Contractor's
operations must be submitted to the Railway and to the (Agency) and must not be
undertaken until approved in writing by the Railway, and until the (Agency) has
obtained any necessary authorization from the State Regulatory Authority for the
infringement. No extra compensation will be allowed in the event the Contractor's
work is delayed pending Railway approval, and/or the State Regulatory Authority's
approval.
• 1.03.06 In the case of impaired vertical clearance above top of rail, Railway will
have the option of installing tell-tales or other protective devices Railway deems
necessary for protection of Railway operations. The cost of tell-tales or protective
devices will be borne by the Agency.
• 1.03.07 The details of construction affecting the Railway's Property and tracks not
included in the contract plans must be submitted to the Railway by (Agency) for
approval before work is undertaken and this work must not be undertaken until
approved by the Railway.
• 1.03.08 At other than public road crossings, the Contractor must not move any
equipment or materials across Railway's tracks until permission has been obtained
from the Railway. The Contractor must obtain a "Temporary Construction Crossing
Agreement" from the Railway prior to moving his equipment or materials across the
Railways tracks. The temporary crossing must be gated and locked at all times when
not required for use by the Contractor. The temporary crossing for use of the
Contractor will be constructed and, at the completion of the project, removed at the
expense of the Contractor.
• 1.03.09 Discharge, release or spill on the Railway Property of any hazardous
substances, oil, petroleum, constituents, pollutants, contaminants, or any hazardous
waste is prohibited and Contractor must immediately notify the Railway's Resource
Operations Center at 1(800) 832-5452, of any discharge, release or spills in excess
of a reportable quantity. Contractor must not allow Railway Property to become a
treatment, storage or transfer facility as those terms are defined in the Resource
Conservation and Recovery Act or any state analogue.
• 1.03.10 The Contractor upon completion of the work covered by this contract,
must promptly remove from the Railway's Property all of Contractor's tools,
equipment, implements and other materials, whether brought upon said property by
said Contractor or any Subcontractor, employee or agent of Contractor or of any
Subcontractor, and must cause Railway's Property to be left in a condition
acceptable to the Railway's representative.
1.4 Contractor Roadway Worker on Track Safety Program and Safety
Action Plan:
• 1.04.01 Each Contractor that will perform work within 25 feet of the centerline of a
track must develop and implement a Roadway Worker Protection/On Track Safety
Program and work with Railway Project Representative to develop an on track safety
strategy as described in the guidelines listed in the on track safety portion of the
Safety Orientation. This Program must provide Roadway Worker protection/on track
training for all employees of the Contractor, its subcontractors, agents or invitees.
This training is reinforced at the job site through job safety briefings. Additionally,
each Contractor must develop and implement the Safety Action Plan, as provided for
on the web site www.contractororientation.com, which will be made available to
Railway prior to commencement of any work on Railway Property. During the
performance of work, the Contractor must audit its work activities. The Contractor
must designate an on-site Project Supervisor who will serve as the contact person
for the Railway and who will maintain a copy of the Safety Action Plan, safety audits,
and Material Safety Datasheets (MSDS), at the job site.
• 1.04.02 Contractor shall have a background investigation performed on all of its
employees, subcontractors and agents who will be performing any services for
Railroad under this Agreement which are determined by Railroad in its sole
discretion a) to be on Railroad’s property, or b) that require access to Railroad
Critical Infrastructure, Railroad Critical Information Systems, Railroad’s Employees,
Hazardous Materials on Railroad’s property or is being transported by or otherwise
in the custody of Railroad, or Freight in Transit involving Railroad.
The required background screening shall at a minimum meet the rail industry
background screening criteria defined by the e-RAILSAFE Program as outlined at
http://www.e-railsafe.com, in addition to any other applicable regulatory
requirements.
Contractor shall obtain written consent from all its employees, subcontractors or
agents screened in compliance with the e-RAILSAFE Program to participate in the
Program on their behalf and to release completed background information to
Railroad’s designee. Contractor shall be subject to periodic audit to ensure
compliance.
Contractor subject to the e-RAILSAFE Program hereunder shall not permit any of its
employees, subcontractors or agents to perform services hereunder who are not first
approved under e-RAILSAFE Program standards. Railroad shall have the right to
deny entry onto its premises or access as described in this section above to any of
Contractor's employees, subcontractors or agents who do not display the authorized
identification badge issued by a background screening service meeting the
standards set forth in the e-RAILSAFE Program, or who in Railroad's opinion, which
may not be unreasonable, may pose a threat to the safety or security of Railroad's
operations, assets or personnel.
Contractors shall be responsible for ensuring that its employees, subcontractors and
agents are United States citizens or legally working in the United States under a
lawful and appropriate work VISA or other work authorization.
1.5 Railway Flagger Services:
• 1.05.01 The Contractor must give Railway’s Roadmaster Dustin Karraker
(telephone (320) 259-3235) a minimum of thirty (30) calendar days advance notice
when flagging services will be required so that the Roadmaster can make
appropriate arrangements (i.e., bulletin the flagger’s position). If flagging services
are scheduled in advance by the Contractor and it is subsequently determined by
the parties hereto that such services are no longer necessary, the Contractor must
give the Roadmaster five (5) working days advance notice so that appropriate
arrangements can be made to abolish the position pursuant to union requirements.
• 1.05.02 Unless determined otherwise by Railway’s Project Representative,
Railway flagger will be required and furnished when Contractor’s work activities are
located over, under and/or within twenty-five (25) feet measured horizontally from
centerline of the nearest track and when cranes or similar equipment positioned
beyond 25-feet from the track centerline could foul the track in the event of tip over
or other catastrophic occurrence, but not limited thereto for the following conditions:
• 1.05.02a When, upon inspection by Railway’s Representative, other conditions
warrant.
• 1.05.02b When any excavation is performed below the bottom of tie elevation, if,
in the opinion of Railway's representative, track or other Railway
facilities may be subject to movement or settlement.
• 1.05.02c When work in any way interferes with the safe operation of trains at
timetable speeds.
• 1.05.02d When any hazard is presented to Railway track, communications,
signal, electrical, or other facilities either due to persons, material,
equipment or blasting in the vicinity.
• 1.05.02e Special permission must be obtained from the Railway before moving
heavy or cumbersome objects or equipment which might result in
making the track impassable.
• 1.05.03 Flagging services will be performed by qualified Railway flaggers.
• 1.05.03a Flagging crew generally consists of one employee. However,
additional personnel may be required to protect Railway Property and
operations, if deemed necessary by the Railways Representative.
• 1.05.03b Each time a flagger is called, the minimum period for billing will be the
eight (8) hour basic day.
• 1.05.03c The cost of flagger services provided by the Railway will be borne by
(Agency). The estimated cost for one (1) flagger is approximately
between $800.00-$1,600.00 for an eight (8) hour basic day with time
and one-half or double time for overtime, rest days and holidays. The
estimated cost for each flagger includes vacation allowance, paid
holidays, Railway and unemployment insurance, public liability and
property damage insurance, health and welfare benefits, vehicle,
transportation, meals, lodging, radio, equipment, supervision and other
costs incidental to performing flagging services. Negotiations for
Railway labor or collective bargaining agreements and rate changes
authorized by appropriate Federal authorities may increase actual or
estimated flagging rates. THE FLAGGING RATE IN EFFECT AT THE
TIME OF PERFORMANCE BY THE CONTRACTOR HEREUNDER
WILL BE USED TO CALCULATE THE ACTUAL COSTS OF
FLAGGING PURSUANT TO THIS PARAGRAPH.
• 1.05.03d The average train traffic on this route is 61 freight trains per 24-hour
period at a timetable speed 60 MPH and 15 passenger trains at a
timetable speed of 79 MPH.
1.6 Contractor General Safety Requirements
• 1.06.01 Work in the proximity of railway track(s) is potentially hazardous where
movement of trains and equipment can occur at any time and in any direction. All
work performed by contractors within 25 feet of any track must be in compliance with
FRA Roadway Worker Protection Regulations.
• 1.06.02 Before beginning any task on Railway Property, a thorough job safety
briefing must be conducted with all personnel involved with the task and repeated
when the personnel or task changes. If the task is within 25 feet of any track, the job
briefing must include the Railway's flagger, as applicable, and include the
procedures the Contractor will use to protect its employees, subcontractors, agents
or invitees from moving any equipment adjacent to or across any Railway track(s).
• 1.06.03 Workers must not work within 25 feet of the centerline of any track without
an on track safety strategy approved by the Railway’s Project Representative.
When authority is provided, every contractor employee must know: (1) who the
Railway flagger is, and how to contact the flagger, (2) limits of the authority, (3) the
method of communication to stop and resume work, and (4) location of the
designated places of safety. Persons or equipment entering flag/work limits that
were not previously job briefed, must notify the flagger immediately, and be given a
job briefing when working within 25 feet of the center line of track.
• 1.06.04 When Contractor employees are required to work on the Railway Property
after normal working hours or on weekends, the Railway's representative in charge
of the project must be notified. A minimum of two employees must be present at all
times.
• 1.06.05 Any employees, agents or invitees of Contractor or its subcontractors
under suspicion of being under the influence of drugs or alcohol, or in the
possession of same, will be removed from the Railway's Property and subsequently
released to the custody of a representative of Contractor management. Future
access to the Railway's Property by that employee will be denied.
• 1.06.06 Any damage to Railway Property, or any hazard noticed on passing trains
must be reported immediately to the Railway's representative in charge of the
project. Any vehicle or machine which may come in contact with track, signal
equipment, or structure (bridge) and could result in a train derailment must be
reported immediately to the Railway representative in charge of the project and to
the Railway's Resource Operations Center at 1(800) 832-5452. Local emergency
numbers are to be obtained from the Railway representative in charge of the project
prior to the start of any work and must be posted at the job site.
• 1.06.07 For safety reasons, all persons are prohibited from having pocket knives,
firearms or other deadly weapons in their possession while working on Railway's
Property.
• 1.06.08 All personnel protective equipment (PPE) used on Railway Property must
meet applicable OSHA and ANSI specifications. Current Railway personnel
protective equipment requirements are listed on the web site,
www.contractororientation.com, however, a partial list of the requirements
include: a) safety glasses with permanently affixed side shields (no yellow lenses);
b) hard hats; c) safety shoe with: hardened toes, above-the-ankle lace-up and a
defined heel; and d) high visibility retro-reflective work wear. The Railway’s
representative in charge of the project is to be contacted regarding local
specifications for meeting requirements relating to hi-visibility work wear. Hearing
protection, fall protection, gloves, and respirators must be worn as required by State
and Federal regulations. (NOTE – Should there be a discrepancy between the
information contained on the web site and the information in this paragraph,
the web site will govern.)
• 1.06.09 THE CONTRACTOR MUST NOT PILE OR STORE ANY MATERIALS,
MACHINERY OR EQUIPMENT CLOSER THAN 25'-0" TO THE CENTER LINE OF
THE NEAREST RAILWAY TRACK. MATERIALS, MACHINERY OR EQUIPMENT
MUST NOT BE STORED OR LEFT WITHIN 250 FEET OF ANY HIGHWAY/RAIL
AT-GRADE CROSSINGS OR TEMPORARY CONSTRUCTION CROSSING,
WHERE STORAGE OF THE SAME WILL OBSTRUCT THE VIEW OF A TRAIN
APPROACHING THE CROSSING. PRIOR TO BEGINNING WORK, THE
CONTRACTOR MUST ESTABLISH A STORAGE AREA WITH CONCURRENCE
OF THE RAILWAY'S REPRESENTATIVE.
• 1.06.10 Machines or vehicles must not be left unattended with the engine running.
Parked machines or equipment must be in gear with brakes set and if equipped with
blade, pan or bucket, they must be lowered to the ground. All machinery and
equipment left unattended on Railway's Property must be left inoperable and
secured against movement. (See internet Engineering Contractor Safety Orientation
program for more detailed specifications)
• 1.06.11 Workers must not create and leave any conditions at the work site that
would interfere with water drainage. Any work performed over water must meet all
Federal, State and Local regulations.
• 1.06.12 All power line wires must be considered dangerous and of high voltage
unless informed to the contrary by proper authority. For all power lines the minimum
clearance between the lines and any part of the equipment or load must be; 200 KV
or below - 15 feet; 200 to 350 KV - 20 feet; 350 to 500 KV - 25 feet; 500 to 750 KV -
35 feet; and 750 to 1000 KV - 45 feet. If capacity of the line is not known, a
minimum clearance of 45 feet must be maintained. A person must be designated to
observe clearance of the equipment and give a timely warning for all operations
where it is difficult for an operator to maintain the desired clearance by visual means.
1.7 Excavation:
• 1.07.01 Before excavating, the Contractor must determine whether any
underground pipe lines, electric wires, or cables, including fiber optic cable systems
are present and located within the Project work area. The Contractor must
determine whether excavation on Railway’s Property could cause damage to buried
cables resulting in delay to Railway traffic and disruption of service to users. Delays
and disruptions to service may cause business interruptions involving loss of
revenue and profits. Before commencing excavation, the Contractor must contact
BNSF’s Field Engineering Representative Kris Swanson (763-782-3492). All
underground and overhead wires will be considered HIGH VOLTAGE and
dangerous until verified with the company having ownership of the line. It is the
Contractor's responsibility to notify any other companies that have
underground utilities in the area and arrange for the location of all
underground utilities before excavating.
• 1.07.02 The Contractor must cease all work and notify the Railway immediately
before continuing excavation in the area if obstructions are encountered which do
not appear on drawings. If the obstruction is a utility and the owner of the utility can
be identified, then the Contractor must also notify the owner immediately. If there is
any doubt about the location of underground cables or lines of any kind, no work
must be performed until the exact location has been determined. There will be no
exceptions to these instructions.
• 1.07.03 All excavations must be conducted in compliance with applicable OSHA
regulations and, regardless of depth, must be shored where there is any danger to
tracks, structures or personnel.
• 1.07.04 Any excavations, holes or trenches on the Railway's Property must be
covered, guarded and/or protected when not being worked on. When leaving work
site areas at night and over weekends, the areas must be secured and left in a
condition that will ensure that Railway employees and other personnel who may be
working or passing through the area are protected from all hazards. All excavations
must be back filled as soon as possible.
1.8 Hazardous Waste, Substances and Material Reporting:
• 1.08.01 If Contractor discovers any hazardous waste, hazardous substance,
petroleum or other deleterious material, including but not limited to any non-
containerized commodity or material, on or adjacent to Railway's Property, in or
near any surface water, swamp, wetlands or waterways, while performing any work
under this Agreement, Contractor must immediately: (a) notify the Railway's
Resource Operations Center at 1(800) 832-5452, of such discovery: (b) take
safeguards necessary to protect its employees, subcontractors, agents and/or third
parties: and (c) exercise due care with respect to the release, including the taking of
any appropriate measure to minimize the impact of such release.
1.9 Personal Injury Reporting
• 1.09.01 The Railway is required to report certain injuries as a part of compliance
with Federal Railroad Administration (FRA) reporting requirements. Any personal
injury sustained by an employee of the Contractor, subcontractor or Contractor's
invitees while on the Railway's Property must be reported immediately (by phone
mail if unable to contact in person) to the Railway's representative in charge of the
project. The Non-Employee Personal Injury Data Collection Form contained herein
is to be completed and sent by Fax to the Railway at 1(817) 352-7595 and to the
Railway’s Project Representative no later than the close of shift on the date of the
injury.
NON-EMPLOYEE PERSONAL INJURY DATA COLLECTION
(If injuries are in connection with rail equipment accident/incident, highway rail grade crossing accident or automobile
accident, ensure that appropriate information is obtained, forms completed and that data entry personnel are aware that
injuries relate to that specific event.)
Injured Person Type:
Passenger on train (C) Non-employee (N)
(i.e., emp of another railroad, or, non-BNSF emp involved in vehicle accident, including
company vehicles)
Contractor/safety sensitive (F) Contractor/non-safety sensitive (G)
Volunteer/safety sensitive (H) Volunteer/other non-safety sensitive (I)
Non-trespasser (D) - to include highway users involved in highway rail grade crossing accidents who did not
go around or through gates
Trespasser (E) - to include highway users involved in highway rail grade crossing accidents who went
around or through gates
Non-trespasser (J) - Off railroad property
If train involved, Train ID:
Transmit attached information to Accident/Incident Reporting Center by:
Fax 1-817-352-7595 or by Phone 1-800-697-6736 or email to: Accident-Reporting.Center@BNSF.com
Officer Providing Information:
(Name) (Employee No.) (Phone #)
REPORT PREPARED TO COMPLY WITH FEDERAL ACCIDENT REPORTING REQUIREMENTS AND PROTECTED FROM
DISCLOSURE PURSUANT TO 49 U.S.C. 20903 AND 83 U.S.C. 490
NON-EMPLOYEE PERSONAL INJURY DATA COLLECTION
INFORMATION REQUIRED TO BE COLLECTED PURSUANT TO FEDERAL REGULATION. IT SHOULD BE USED FOR COMPLIANCE WITH FEDERAL REGULATIONS ONLY AND IT IS NOT
INTENDED TO PRESUME ACCEPTANCE OF RESPONSIBILITY OR LIABILITY.
1. Accident City/St: 2. Date: Time:
County: 3. Temperature: 4. Weather:
(if non BNSF location)
Mile Post / Line Segment:
5. Driver’s License No (and state) or other ID:
SSN (required):
6. Name (last, first, mi):
7. Address:
City:
St:
Zip:
8. Date of Birth:
and/or Age:
Gender:
(if available)
Phone Number: Employer:
9. Injury: 10. Body Part:
(i.e., Laceration, etc.) (i.e., Hand, etc.)
11. Description of Accident (To include location, action, result, etc.):
12. Treatment:
First Aid Only
Required Medical Treatment
Other Medical Treatment
13. Dr. Name: Date:
14. Dr. Address:
Street: City: St: Zip:
15. Hospital Name:
16. Hospital Address:
Street: City: St: Zip:
17. Diagnosis:
REPORT PREPARED TO COMPLY WITH FEDERAL ACCIDENT REPORTING REQUIREMENTS
AND PROTECTED FROM DISCLOSURE PURSUANT TO 49 U.S.C. 20903 AND 83 U.S.C. 490
EXHIBIT "C-1"
Agreement Between
BNSF RAILWAY COMPANY
and the
CONTRACTOR
Railway File:
Agency Project:
(hereinafter called “Contractor”), has entered into an agreement (hereinafter called
“Agreement”) dated _, 201_, with The City of Elk River for the performance of certain
work in connection with the following project: 171st St Crossing Surface Rehab. Performance of such
work will necessarily require Contractor to enter BNSF RAILWAY COMPANY (hereinafter called
"Railway") right of way and property (hereinafter called "Railway Property"). The Agreement provides
that no work will be commenced within Railway Property until the Contractor employed in connection
with said work for The City of Elk River (i) executes and delivers to Railway an Agreement in the form
hereof, and (ii) provides insurance of the coverage and limits specified in such Agreement and
Section 3 herein. If this Agreement is executed by a party who is not the Owner, General Partner,
President or Vice President of Contractor, Contractor must furnish evidence to Railway certifying that
the signatory is empowered to execute this Agreement on behalf of Contractor.
Accordingly, in consideration of Railway granting permission to Contractor to enter upon Railway
Property and as an inducement for such entry, Contractor, effective on the date of the Agreement,
has agreed and does hereby agree with Railway as follows:
1) RELEASE OF LIABILITY AND INDEMNITY
Contractor hereby waives, releases, indemnifies, defends and holds harmless Railway for all
judgments, awards, claims, demands, and expenses (including attorneys' fees), for injury or
death to all persons, including Railway's and Contractor's officers and employees, and for loss
and damage to property belonging to any person, arising in any manner from Contractor's or
any of Contractor's subcontractors' acts or omissions or any work performed on or about
Railway’s property or right-of-way. THE LIABILITY ASSUMED BY CONTRACTOR WILL
NOT BE AFFECTED BY THE FACT, IF IT IS A FACT, THAT THE DESTRUCTION,
DAMAGE, DEATH, OR INJURY WAS OCCASIONED BY OR CONTRIBUTED TO BY THE
NEGLIGENCE OF RAILWAY, ITS AGENTS, SERVANTS, EMPLOYEES OR OTHERWISE,
EXCEPT TO THE EXTENT THAT SUCH CLAIMS ARE PROXIMATELY CAUSED BY THE
INTENSIONAL MISCONDUCT OR GROSS NEGLIGENCE OF RAILWAY.
THE INDEMNIFICATION OBLIGATION ASSUMED BY CONTRACTOR INCLUDES ANY
CLAIMS, SUITS OR JUDGMENTS BROUGHT AGAINST RAILWAY UNDER THE FEDERAL
EMPLOYEE'S LIABILITY ACT, INCLUDING CLAIMS FOR STRICT LIABILITY UNDER THE
SAFETY APPLIANCE ACT OR THE LOCOMOTIVE INSPECTION ACT, WHENEVER SO
CLAIMED.
Contractor further agrees, at its expense, in the name and on behalf of Railway, that it will
adjust and settle all claims made against Railway, and will, at Railway's discretion, appear and
defend any suits or actions of law or in equity brought against Railway on any claim or cause
of action arising or growing out of or in any manner connected with any liability assumed by
Contractor under this Agreement for which Railway is liable or is alleged to be liable. Railway
will give notice to Contractor, in writing, of the receipt or dependency of such claims and
thereupon Contractor must proceed to adjust and handle to a conclusion such claims, and in
the event of a suit being brought against Railway, Railway may forward summons and
complaint or other process in connection therewith to Contractor, and Contractor, at Railway's
discretion, must defend, adjust, or settle such suits and protect, indemnify, and save harmless
Railway from and against all damages, judgments, decrees, attorney's fees, costs, and
expenses growing out of or resulting from or incident to any such claims or suits.
In addition to any other provision of this Agreement, in the event that all or any portion of this
Article shall be deemed to be inapplicable for any reason, including without limitation as a
result of a decision of an applicable court, legislative enactment or regulatory order, the parties
agree that this Article shall be interpreted as requiring Contractor to indemnify Railway to the
fullest extent permitted by applicable law. THROUGH THIS AGREEMENT THE PARTIES
EXPRESSLY INTEND FOR CONTRACTOR TO INDEMNIFY RAILWAY FOR RAILWAY’S
ACTS OF NEGLIGENCE.
It is mutually understood and agreed that the assumption of liabilities and indemnification
provided for in this Agreement survive any termination of this Agreement.
2) TERM
This Agreement is effective from the date of the Agreement until (i) the completion of the
project set forth herein, and (ii) full and complete payment to Railway of any and all sums or
other amounts owing and due hereunder.
3) INSURANCE
Contractor shall, at its sole cost and expense, procure and maintain during the life of this
Agreement the following insurance coverage:
A. Commercial General Liability insurance. This insurance shall contain broad form
contractual liability with a combined single limit of a minimum of $2,000,000 each
occurrence and an aggregate limit of at least $4,000,000 but in no event less than the
amount otherwise carried by the Contractor. Coverage must be purchased on a post
2004 ISO occurrence form or equivalent and include coverage for, but not limit to the
following:
♦ Bodily Injury and Property Damage
♦ Personal Injury and Advertising Injury
♦ Fire legal liability
♦ Products and completed operations
This policy shall also contain the following endorsements, which shall be indicated on the
certificate of insurance:
♦ The definition of insured contract shall be amended to remove any exclusion or other
limitation for any work being done within 50 feet of railroad property.
♦ Waver of subrogation in favor of and acceptable to Railway.
♦ Additional insured endorsement in favor of and acceptable to Railway.
♦ Separation of insureds.
♦ The policy shall be primary and non-contributing with respect to any insurance
carried by Railway.
It is agreed that the workers’ compensation and employers’ liability related exclusions in the
Commercial General Liability insurance policy(s) required herein are intended to apply to
employees of the policy holder and shall not apply to Railway employees.
No other endorsements limiting coverage as respects obligations under this Agreement may be
included on the policy with regard to the work being performed under this agreement.
B. Business Automobile Insurance. This insurance shall contain a combined single limit of at
least $1,000,000 per occurrence, and include coverage for, but not limited to the following:
♦ Bodily injury and property damage
♦ Any and all vehicles owned, used or hired
The policy shall also contain the following endorsements or language, which shall be
indicated on the certificate of insurance:
♦ Waiver of subrogation in favor of and acceptable to Railway.
♦ Additional insured endorsement in favor of and acceptable to Railway.
♦ Separation of insureds.
♦ The policy shall be primary and non-contributing with respect to any insurance
carried by Railway.
C. Workers Compensation and Employers Liability insurance including coverage for, but not
limited to:
♦ Contractor’s statutory liability under the worker’s compensation laws of the state(s)
in which the work is to be performed. If optional under State law, the insurance must
cover all employees anyway.
♦ Employers’ Liability (Part B) with limits of at least $500,000 each accident, $500,000
by disease policy limit, $500,000 by disease each employee.
This policy shall also contain the following endorsements or language, which shall be
indicated on the certificate of insurance:
♦ Waiver of subrogation in favor of and acceptable to Railway.
D. Railroad Protective Liability insurance naming only the Railway as the Insured with
coverage of at least $2,000,000 per occurrence and $6,000,000 in the aggregate. The
policy Must be issued on a standard ISO form CG 00 35 12 04 and include the following:
♦ Endorsed to include the Pollution Exclusion Amendment
♦ Endorsed to include the Limited Seepage and Pollution Endorsement.
♦ Endorsed to remove any exclusion for punitive damages.
♦ No other endorsements restricting coverage may be added.
♦ The original policy must be provided to the Railway prior to performing any work or
services under this Agreement
♦ Definition of “Physical Damage to Property” shall be endorsed to read: “means direct
and accidental loss of or damage to all property owned by any named insured and
all property in any named insured’ care, custody, and control arising out of the acts
or omissions of the contractor named on the Declarations.
In lieu of providing a Railroad Protective Liability Policy, Licensee may participate (if available) in
Railway’s Blanket Railroad Protective Liability Insurance Policy.
Other Requirements:
Where allowable by law, all policies (applying to coverage listed above) shall contain no
exclusion for punitive damages.
Contractor agrees to waive its right of recovery against Railway for all claims and suits against
Railway. In addition, its insurers, through the terms of the policy or policy endorsement, waive
their right of subrogation against Railway for all claims and suits. Contractor further waives its
right of recovery, and its insurers also waive their right of subrogation against Railway for loss
of its owned or leased property or property under Contractor’s care, custody or control.
Allocated Loss Expense shall be in addition to all policy limits for coverages referenced above.
Contractor is not allowed to self-insure without the prior written consent of Railway. If granted
by Railway, any self -insured retention or other financial responsibility for claims shall be
covered directly by Contractor in lieu of insurance. Any and all Railway liabilities that would
otherwise, in accordance with the provisions of this Agreement, be covered by Contractor’s
insurance will be covered as if Contractor elected not to include a deductible, self-insured
retention or other financial responsibility for claims.
Prior to commencing services, Contractor shall furnish to Railway an acceptable certificate(s)
of insurance from an authorized representative evidencing the required coverage(s),
endorsements, and amendments. The certificate should be directed to the following address:
BNSF Railway Company
c/o CertFocus
P.O. Box 140528
Kansas City, MO 64114
Toll Free: 877-576-2378
Fax number: 817-840-7487
Email: BNSF@certfocus.com
www.certfocus.com
Contractor shall notify Railway in writing at least 30 days prior to any cancellation, non-
renewal, substitution or material alteration.
Any insurance policy shall be written by a reputable insurance company acceptable to Railway
or with a current Best’s Guide Rating of A- and Class VII or better, and authorized to do
business in the state(s) in which the service is to be provided.
If coverage is purchased on a “claims made” basis, Contractor hereby agrees to maintain
coverage in force for a minimum of three years after expiration, cancellation or termination of
this Agreement. Annually Contractor agrees to provide evidence of such coverage as required
hereunder.
Contractor represents that this Agreement has been thoroughly reviewed by Contractor’s
insurance agent(s)/broker(s), who have been instructed by Contractor to procure the insurance
coverage required by this Agreement.
Not more frequently than once every five years, Railway may reasonably modify the required
insurance coverage to reflect then-current risk management practices in the railroad industry
and underwriting practices in the insurance industry.
If any portion of the operation is to be subcontracted by Contractor, Contractor shall require
that the subcontractor shall provide and maintain insurance coverage(s) as set forth herein,
naming Railway as an additional insured, and shall require that the subcontractor shall
release, defend and indemnify Railway to the same extent and under the same terms and
conditions as Contractor is required to release, defend and indemnify Railway herein.
Failure to provide evidence as required by this section shall entitle, but not require, Railway to
terminate this Agreement immediately. Acceptance of a certificate that does not comply with
this section shall not operate as a waiver of Contractor's obligations hereunder.
The fact that insurance (including, without limitation, self-insurance) is obtained by Contractor
shall not be deemed to release or diminish the liability of Contractor including, without
limitation, liability under the indemnity provisions of this Agreement. Damages recoverable by
Railway shall not be limited by the amount of the required insurance coverage.
In the event of a claim or lawsuit involving Railway arising out of this agreement, Contractor
will make available any required policy covering such claim or lawsuit.
These insurance provisions are intended to be a separate and distinct obligation on the part of
the Contractor. Therefore, these provisions shall be enforceable and Contractor shall be
bound thereby regardless of whether or not indemnity provisions are determined to be
enforceable in the jurisdiction in which the work covered hereunder is performed.
For purposes of this section, Railway shall mean “Burlington Northern Santa Fe LLC”, “BNSF
Railway Company” and the subsidiaries, successors, assigns and affiliates of each.
4) SALES AND OTHER TAXES
In the event applicable sales taxes of a state or political subdivision of a state of the United
States are levied or assessed in connection with and directly related to any amounts invoiced
by Contractor to Railway (“Sales Taxes”), Railway shall be responsible for paying only the
Sales Taxes that Contractor separately states on the invoice or other billing documents
provided to Railway; provided, however, that (i) nothing herein shall preclude Railway from
claiming whatever Sales Tax exemptions are applicable to amounts Contractor bills Railway,
(ii) Contractor shall be responsible for all sales, use, excise, consumption, services and other
taxes which may accrue on all services, materials, equipment, supplies or fixtures that
Contractor and its subcontractors use or consume in the performance of this Agreement, (iii)
Contractor shall be responsible for Sales Taxes (together with any penalties, fines or interest
thereon) that Contractor fails to separately state on the invoice or other billing documents
provided to Railway or fails to collect at the time of payment by Railway of invoiced amounts
(except where Railway claims a Sales Tax exemption), and (iv) Contractor shall be responsible
for Sales Taxes (together with any penalties, fines or interest thereon) if Contractor fails to
issue separate invoices for each state in which Contractor delivers goods, provides services
or, if applicable, transfers intangible rights to Railway.
Upon request, Contractor shall provide Railway satisfactory evidence that all taxes (together
with any penalties, fines or interest thereon) that Contractor is responsible to pay under this
Agreement have been paid. If a written claim is made against Contractor for Sales Taxes with
respect to which Railway may be liable for under this Agreement, Contractor shall promptly
notify Railway of such claim and provide Railway copies of all correspondence received from
the taxing authority. Railway shall have the right to contest, protest, or claim a refund, in
Railway’s own name, any Sales Taxes paid by Railway to Contractor or for which Railway
might otherwise be responsible for under this Agreement; provided, however, that if Railway is
not permitted by law to contest any such Sales Tax in its own name, Contractor shall, if
requested by Railway at Railway’s sole cost and expense, contest in Contractor’s own name
the validity, applicability or amount of such Sales Tax and allow Railway to control and conduct
such contest.
Railway retains the right to withhold from payments made under this Agreement amounts
required to be withheld under tax laws of any jurisdiction. If Contractor is claiming a withholding
exemption or a reduction in the withholding rate of any jurisdiction on any payments under this
Agreement, before any payments are made (and in each succeeding period or year as
required by law), Contractor agrees to furnish to Railway a properly completed exemption form
prescribed by such jurisdiction. Contractor shall be responsible for any taxes, interest or
penalties assessed against Railway with respect to withholding taxes that Railway does not
withhold from payments to Contractor.
5) EXHIBIT “C” CONTRACTOR REQUIREMENTS
The Contractor must observe and comply with all provisions, obligations, requirements and
limitations contained in the Agreement, and the Contractor Requirements set forth on Exhibit
“C” attached to the Agreement and this Agreement, including, but not be limited to, payment of
all costs incurred for any damages to Railway roadbed, tracks, and/or appurtenances thereto,
resulting from use, occupancy, or presence of its employees, representatives, or agents or
subcontractors on or about the construction site. Contractor shall execute a Temporary
Construction Crossing Agreement or Private Crossing Agreement
(http://www.bnsf.com/communities/faqs/permits-real-estate/), for any temporary crossing
requested to aid in the construction of this Project, if approved by BNSF.
6) TRAIN DELAY
Contractor is responsible for and hereby indemnifies and holds harmless Railway (including its
affiliated railway companies, and its tenants) for, from and against all damages arising from
any unscheduled delay to a freight or passenger train which affects Railway's ability to fully
utilize its equipment and to meet customer service and contract obligations. Contractor will be
billed, as further provided below, for the economic losses arising from loss of use of
equipment, contractual loss of incentive pay and bonuses and contractual penalties resulting
from train delays, whether caused by Contractor, or subcontractors, or by the Railway
performing work under this Agreement. Railway agrees that it will not perform any act to
unnecessarily cause train delay.
For loss of use of equipment, Contractor will be billed the current freight train hour rate per
train as determined from Railway's records. Any disruption to train traffic may cause delays to
multiple trains at the same time for the same period.
Additionally, the parties acknowledge that passenger, U.S. mail trains and certain other grain,
intermodal, coal and freight trains operate under incentive/penalty contracts between Railway
and its customer(s). Under these arrangements, if Railway does not meet its contract service
commitments, Railway may suffer loss of performance or incentive pay and/or be subject to
penalty payments. Contractor is responsible for any train performance and incentive penalties
or other contractual economic losses actually incurred by Railway which are attributable to a
train delay caused by Contractor or its subcontractors.
The contractual relationship between Railway and its customers is proprietary and confidential.
In the event of a train delay covered by this Agreement, Railway will share information relevant
to any train delay to the extent consistent with Railway confidentiality obligations. The rate
then in effect at the time of performance by the Contractor hereunder will be used to calculate
the actual costs of train delay pursuant to this agreement.
Contractor and its subcontractors must give Railway’s representative (Kristopher Swanson) (4)
weeks advance notice of the times and dates for proposed work windows. Railway and
Contractor will establish mutually agreeable work windows for the project. Railway has the
right at any time to revise or change the work windows due to train operations or service
obligations. Railway will not be responsible for any additional costs or expenses resulting from
a change in work windows. Additional costs or expenses resulting from a change in work
windows shall be accounted for in Contractor’s expenses for the project.
Contractor and subcontractors must plan, schedule, coordinate and conduct all Contractor's
work so as to not cause any delays to any trains.
IN WITNESS WHEREOF, each of the parties hereto has caused this Agreement to be executed by its
duly authorized officer the day and year first above written.
BNSF Railway Company
By: By:
Printed Name:
Title:
Name:
Manager Public Projects
Accepted and effective this day of 20__.
Contact Person:
Address:
City:
State: Zip:
Fax:
Phone:
E-mail: