Loading...
4.4. SR 11-07-2016 Eclty1� ,.,�� Request for Action River To Item Number Mayor and City Council 4.4 Agenda Section Meeting Date Prepared by Consent November 7,2016 Tim Sevcik, Parks Superintendent Item Description Reviewed by Change Order: Rivers Edge Commons Park Michael Hecker, Parks and Recreation Director Construction Electrical Upgrade Reviewed by Cal Portner, City Administrator Action Requested Approve,by motion, a Change Order for Rivers Edge Commons Park electrical conduit installation. Background/Discussion During the October 3, 2016, Council meeting, staff presented Change Order #4 to the Rivers Edge Commons Park expansion project to install electrical conduit for future lighting upgrades. Staff discussed the possibility of Elk River Municipal Utilities conducting the work; however their workload would not permit. Council directed staff at the October 3, 2016, Council meeting to proceed with Sunram Construction to have the electrical conduit installed within the park in the amount of$4,000 from the project contingency. Currently there is $14,975 remaining in contingency funds for this project. Financial Impact There is no impact to the General Fund; $4,000 of contingency funds from this project would be utilized. Attachments ■ Electrical New Layout Plan POWERED 6T AR i CN I �%I z M azN a z W c II U J W W , I O I � m H 1 � :o z xo00 Elm HH �� ��e ao,� 40 0 -awgi _ = _ 7 7 - Z 62 � I I I j I j I 7 I f 1 I I II co I ' a I I 7 I I o - I co 'm 302 I c3o I o Q o OW� U w zo I n Change Order 4 OWNER City of Elk River LANDSCAPE ARCHITECT Hoisington Koegler Group inc, CONTRACTOR Sunrant Construction THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES:CONSULTATION' iTH AN ATTORNEY IS ENCOURAGED y'YfTH RESPECT TO ITS COMPLETION OR MODIFICATION. PROJECT: Elk River-Rivers Edge Park Expansion CHANGE ORDER NUMBER: 4 DATE: 10.4.16 PROJECT N0: HKGI 015-032 TO CONTRACTOR: CONTRACT DATE: 4.22.16 5unram Construction 20010 75th Ave IN,Corcoran,MN 55340 The Contract is changed as follows: (see sheet 23 Not vatid until signed by the Owner,Landscape Architect and Contractor. The odg;na€(Contract Sum)was $ 301,854.00 Net change by previously authorized Change Orders $ 71,765.00 The(Contract Suri)prior to this Change Order was $ 373,619,00 The(Contract Sum) will be_CHANGED by the Change Order in he amount of L 4000.00 The new(Contract Sum) including this Change Order will be $ 377,619.00 Thfs Change Order DOES NOT EFFECT Contract Time The date of Substantial Compfetion as of the date of ibis Change Order therefore fs 10.30.16 LANDSCAPE ARCHITECT CONTRACTOR OWNER Hoisington Koegfer Group inc, sunram Construction City of Elk River 123 North 3rd Street,Suite 100 20010 75th Ave N,Corcoran,PIN 55340 13005 Orono Parkway.Elk River,MN 55330 Minneapolis,Minnesota 55401 Army Bower IAfirrnameJ n tpritr!narnei ff3nnt Mme; CAL-via i'• C' t� nri�a -41 9't' 10.4.9 6 (signature and da e) signature and date) (signature and date) page 1 of 2 Et Summary of Change Order No.4 - 10.4,16 You are directed to.make the following changes in the Contract Documents: Descriptions: Unit Qty UnitCost Total I. Provide and place electrical conduit for future lighting and wiring LS 1 S 4,000.00 4,000.00 as per drawing E2 dated 9.30.16 Net Contract change for Change Order $ 4,00-0-0-01 page 2 of 2 i i Kao C �b� �.. i f t • '., � t^:-w-x.,• - of OE lavoul Plan ' lasldscapeAmhifM. RIVERS EDGEE �t ` aot m EXPANSION MIAmingfon KwglrGTmp Inc. City of Elk River �. City of EIk Rivarrc}.IY�39tl �� P.4.arw Ry'.re AtjM MVNa10L SLn_wLi'r» h^ tmm: �..�, ,....-- .��...._:..� ,..�.....,..�.,...__....... ,..mss_-..�....,..�.,,.. -- EaECTRK:AI NEwlxv6U7PiAN 3'