Loading...
6.1.C. ERMUSR 12-13-2016 4. h Elk Riv Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: December 13, 2016 6.1c SUBJECT: Staff Update DISCUSSION: • Had nine new services. • Continue working on collecting data with the GPS for our ArcView maps as time permits. • Continue the tear down of the old infrastructure in the River Ranch development. • We have all the wire installed on feeder 42 line extension. We have to finish making up the switchgear cabinets. • Installed the primary, transformer and street lights for Heritage Maples Senior Living building located on the south side of HWY 10 west of Waco Street. • Installed five new pedestals for the West Oaks 9th Addition; this was originally plotted for townhomes and was changed to single family homes. • Nystrom is building a new office on Quantrelle Avenue in Otsego. Michels Corporation is installing the wire and we are setting the switchgear, box pads, transformers and street lights. • Started rebuilding Presidential Estates and will continue to work on this project until the frost puts a stop to it. Next spring we plan to resume and complete the project. • Began replacing some LED light fixtures on Jackson Avenue, School Street and Twin Lakes Road. • Put a new service in for the weigh station on Hwy 10 in the territory we recently acquired from Connexus. • Replaced a three phase transformer at Plaisted Companies Peat Plant as they had backed into it with their pay loader. P O W E 6 E U B Y ® Page 1 of 1 NATURE PowerReliablPublic Provider Poweneo To Soave 1nR