6.2. SR 11-27-2000
.
.
.
ITEM 6.2.
Howard R. Green Company
CONSULTING ENGINEERS
November 20, 2000
File: 806610J-0325
Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
PO Box 490
Elk River, MN 55330-0490
RE: AUBURN STREET
Dear Council Members:
As directed by the City Council at the July 24, 2000 meeting, City staff convened a meeting to
discuss possible improvements that could be made to the Auburn Street area to address citizen
complaints concerning speed and volume of traffic. The meeting was held on August 17, 2000.
Staff members in attendance included the following:
Pat Klaers, City Administrator
Tom Zerwas, Chief of Police
Jeff Beahen, Assistant Chief of Police
Bruce West, Fire Chief
Michele McPherson, Director of Planning
Phil Hals, Street Superintendent
Terry Maurer, City Engineer
Items which were discussed and a brief summary of the discussion are as follows:
1. 193rd Avenue/Auburn Street Intersection
In the various public meetings that have been held, there has been a number of concerns
voiced regarding the speed of traffic around this corner and the traffic cutting the corner,
essentially going into the wrong lane, to maintain their speed around the corner. For several
years, this has been a 90 degree corner with no development on the east or south legs.
Recently, the developer of this area began construction on Woods at Hillside Phase II,
which will create an east leg of 193rd Avenue at this intersection. Discussion was held at our
staff meeting concerning two potential solutions here. The first was constructing medians on
193rd Avenue to force the traffic to stay in its own lane through the turn and/or creating an
all-way stop situation once the east leg of 193rd Avenue is constructed. Concern was voiced
by Phil Hals and myself regarding the median issue in that a short median will be difficult to
plow around, and in relatively deep snowfalls, will be essentially hidden from traffic and/or
snowplow equipment. It was the consensus of the group that an all-way stop situation will
provide a means to slow traffic at the intersection, therefore causing it to stay in the
appropriate lane, not cutting the corner.
Ltr-112000-City Council.doc
1326 Energy Park Drive. St. Paul, MN 55108 . 651/644-4389 fax 651/644-9446 toll free 888/368-4389
.
Honorable Mayor and City Council
November 20, 2000
Page Two
2. Installation of a "choker" along Auburn Street
As the Council will recall, the packet from the July 24, 2000 meeting included several traffic
calming ideas. Creating "chokers" along the street was one of these. A choker is a
relatively long area, approximately 200 feet in length, where the street is narrowed,
essentially choking it down creating a situation where the motoring public will tend to drive
slower. The concern with Auburn Street and trying to construct a choker mid-block between
193rd Avenue and 196th Avenue is that the street is only 32 feet wide. In constructing a
choker, the street could not be narrowed below 24 to 26 feet in width, or it will cause an
unsafe condition for two-way traffic. Narrowing Auburn Street by three feet on either side
would not provide the motoring public the perception that the street is getting substantially
narrower. It will also be difficult to accomplish because of the developed nature of Auburn
Street with driveways and front lawns established. It would be very difficult to create the
choker situation without major disruption to some of the driveways and front lawns along this
area. It was the consensus of the group that in other major plats where one roadway has a
wider width (36 to 40 feet) for carrying major volumes of traffic, designing a choker into the
project in the initial construction stages would work rather well.
.
3. Gateway
From the July 24, 2000 packet, the Council will recall that a gateway is a narrowing with
potentially some monumentation at the entrance to a street, essentially creating the same
effect as a choker, but at one end or the other of a street segment. The concern here is very
similar to the choker discussion above in that the street really is not wide enough to create a
significant impact in developing a gateway at either the south or the north end. Also, it
would be difficult to construct after the fact, with all of the properties developed along
Auburn Street. Once again, the committee felt that gateways were appropriate in
developing plats and should be considered in the future.
4. Sidewalks
The committee discussed constructing a sidewalk on either or both the east or west side of
Auburn Street. As the Council will recall, there was a number of concerns about small
children living adjacent to Auburn Street. If the adjacent residents felt a sidewalk was
appropriate as a means for pedestrian movements and/or children to play with bicycles and
such, a sidewalk could be constructed. It is always difficult to build a sidewalk after all of the
driveways are established, since the driveways generally have a straight grade from the
back of curb up to the garage elevation. When a sidewalk is interjected five to seven feet
back from the curb along this driveway, a relatively flat area needs to be provided for the
sidewalk. This has the effect of steepening the driveway grade from that point up to the
garage. We have not done a detailed analysis, but it can be assumed that to construct a
sidewalk along Auburn Street on either or both sides, numerous driveways will have to be
cut back substantially and the grades steepened. The committee felt that this option should
be only undertaken if the neighborhood indicates a majority in support of sidewalk
installation.
.
Ltr-112000-City Council.doc
Howard R. Green Company
CONSULTING ENGINEERS
.
Honorable Mayor and City Council
November 20, 2000
Page Three
5. Traffic Cutting Corner at Auburn Street/196th Avenue Intersection
The committee discussed the concern raised at the informational hearing regarding traffic
cutting the corner on sodded lawns at the intersection of Auburn Street and 196th Avenue.
The committee felt that perhaps a barrier type of concrete curb and gutter could be installed
in this corner area, replacing the surmountable curb currently in that location. The
committee also felt that an even better method of combating this type of vehicle movement
would be to create some type of landscape element at the corner that would essentially
prohibit any kind of vehicle cutting the corner.
6. Speed dips
Speed dips were discussed by the committee once again. As the Council will recall, speed
dips or speed humps were discussed nearly two years ago when this issue first appeared.
The consensus of the committee was that speed dips or speed humps would cause
significant maintenance concerns together with potential street drainage concerns, and
should only be used as a last resort. As the Council will recall, the neighborhood was
against the installation of speed dips or humps when they were originally proposed by the
Police Department and authorized by the City Council.
.
In conclusion, the committee felt that on the Auburn Street issue, installation of an all-way stop
sign at Auburn Street and 193rd Avenue together with potentially installing a landscape
component or barrier curb at the intersection of Auburn Street and 196th Avenue may address
many of the vehicle driving behavior complaints. We have done numerous traffic counts over
the years, and have determined that the volume of traffic and/or cut-through traffic in the Hillside
area was not exorbitant for the design of Auburn Street. Staff has worked with the developer of
the Hillside Estates area to ensure that the further development of the area in the northwest
corner of the development will not complicate the Auburn Street issue further. We are working
with the developer to ensure that there are other means of ingress and egress to these
developing areas other than Auburn Street.
The committee did feel that the issues raised by the Auburn Street residents should be
considered in all future large-scale developments in that main ingress and egress routes should
be identified and all relevant design issues used to mitigate the future affect of traffic volume on
the abutting residents.
If you have any questions regarding these issues, I will be in attendance at the November 27,
2000 City Council meeting.
Sincerely,
Howard R. Green Company
~"C;;;;ptl/camJ
Terry J. ~a'urer, P.E.
.
Ltr-112000-City Council.doc
Howard R. Green Company
CONSULTING ENGINEERS