Loading...
4.9. SR 12-11-2000 r~1 -\) ( ~ . City of ~ Elk Item # 4.9 MEMORANDUM TO: Mayor and City Council Sandra Peine, City Clerk # December 11, 2000 FROM: DATE: SUBJECT: 2001 Fee Schedule REQUEST: To review the proposed 2001 fee schedule. . BACKGROUND: Fees for services are reviewed yearly to ensure that fees are sufficient to cover services rendered. Department heads have reviewed fees relating to their perspective departments. The fee schedule is attached. The schedule reflects the proposed changes. Proposed changes are reflected in the attached schedule. ACTION REQUESTED: The Council is requested to review the changes. Following Council review, and recommendation, staff will prepare a resolution reflecting the new fees. The resolution will be presented to the Council on December 18. s: \ council \feememoc.doc . 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330. TDD & Phone (763) 441-7420 · Fax (763) 441-7425 Item # 4.9 MEMORANDUM TO: Mayor and City Council FROM: Sandra Peine, City Clerk k December 11,2000 DATE: SUBJECT: 2001 Administration Fee Increases Listed below are the proposed amendments to the 2001 fee schedule relating to the administration department. . Video Operator This covers costs incurred by the video operator, use of the video equipment, janitorial service, and use of council chambers. City Flag This has been deleted. At this time we do not have any city flags. We will be proposing a new flag when the brand/communication plan is complete. Surface Water Management Impact Fee This fee increases by 3% annually as established by Resolution 94-110. Transient Merchant License Staff is proposing to increase this fee due to the staff time it takes to process these licenses and the time spent responding to complaints. . 13065 Orono Parkway. P.O. Box 490. Elk River, MN 55330. TDD & Phone (763) 441-7420. Fax (763) 441-7425 - Administration Fee Increase Memo Page 2 of2 --------------------------------------------------- . Permit Current Fee Recommended 2001 Fee Video Operator $40/hr. ($80 minimum) $50/hr. City Flag $32.00 Eliminate SWM - Residential $73.02 $75.21 (rural) SWM - Residential $146.07 $150.45 (urban) SWM - multifamily, $876.41/acre $902.70/acre commercial, industrial Transient Merchant $50/year $100/year s: \ council \ feemem2.doc . . r I -\) ( ~ . City of 1f Elk Item # MEMORANDUM TO: FROM: Mayor and City Council Michele MCPherso~or of Planning DATE: December 11,2000 SUBJECT: 2001 Fee Increases The Park and Recreation Commission has been reviewing park dedication and park facility use fees for recommendation to the City Council. The Park and Recreation Commission recommends the following: 1. Residential Park Dedication fee increase of $70 to $1,470.00 per dwelling unit, a proposed increase of 5%. . 2. A park facility use fee for open park shelters of $20 for Elk River residents and $40 for non-residents; also a fee for enclosed park shelters of $40 for Elk River residents and $80 for non-residents. The Commission is also reviewing a sliding scale deposit for the use of Woodland Trails Park by community groups and non-728 District schools. This recommendation will be brought to the Council in January for consideration. If you have any questions regarding the recommended fees, I will be in attendance at the December 18th City Council meeting. . S:\PLANNING\MICHMC\MEMOS\PARKFEES.DOC 13065 Orono Parkway. P.O. Box 490. Elk River, MN 55330. TDD & Phone (763) 441-7420. Fax (763) 441-7425 . City of ~ Elk Memorandum TO: MAYOR AND CITY COUNCIL FROM: STEPHEN ROHLF, BUILDING AND ZONING ADMINISTRATOR DATE: DECEMBER 11, 2000 ""5r<... SUBJECT: BUILDING AND ZONING RELATED FEES The Building and Zoning Department is proposing increases to several of the fees charged for various permits because they currently do not cover the city's cost of administering those permit. Building and Zoning staff are proposing that where a minimum fee for a permit is identified, that minimum is $45. Additionally, enforcement of the new state energy code necessitates the creation of two new types of permits. The city now requires permits for window replacement and residing. Staff recommends the fee for these permits be set at the minimum rate of $45. . Currently, a "Street Disruption Permit" is used when city R-O- W is crossed to hook-up a structure to city sewer and water and also for the placement of main utility lines, which involves the disruption of the city R-O-W for long distances. The scope and issues associated with these types of jobs are different enough that staff is recommending they are covered under three separate types of permits. A "Street Disruption Permit" will still be used for the major utility work; a "Utility Hook-up Permit" will be used for hooking- up a structure up to gas, phone, etc.; and a "Sewer and Water Hook-up Permit" will be used for those utilities. Separating these permits also avoids confusion regarding who inspects the work. Other changes include rewording the title of a couple permits fees to avoid confusion on what type of work is covered. Lastly, the section in Exhibit D of the 2000 Fee Schedule that talks about plumbing alterations and repairs is not used. Staff recommends it be eliminated. The Building and Zoning Department's recommended changes to the City of Elk River's 2001 Fee Schedule are as follows: Permit Street Disruption Permit (Utility work running laterally along city streets. for this permit.) Current fee Recommended Fee $35 $100 A $5,000 letter of credit is also required . s: \b&z\stever\cc5 .doc 13065 Orono Parkway. P.O. Box 490. Elk River, MN 55330. TDD & Phone (763) 441-7420. Fax (763) 441-7425 . Permit Current fee Recommended Fee Utility Hook-up Permit $35 $45 (Was covered under Street Disruption Permit - $5,000 letter of credit in favor of the city is required.) Sewer and Water Hook-up Permit $35 $45 (New category - was covered under Street Disruption Permit - $2,000 bond in favor of the city is required.) Changes to Exhibit A Minimum Fee for Fuel-Gas Piping Permit $18 $45 Changes to Exhibit B Min. Fee for Heating, Vent. & Air Con. Permit $18 $45 Changes to Exhibit C Fences over 6 feet in height $15 $45 (These permits involve secretarial time to process, Planning Department review for setbacks and other compliance issues, structural analysis for wind load, and inspections. Fences over 6 feet in height are typically not used in residential areas because of the setback requirements. State surcharge is also applied to these permits) . Fireplaces & Wood Stoves to read: $20 $45 Solid Fuel Burning Appliances (Fifteen dollars was charged for permits where an existing chimney is used. Staff is recommending that these permits are $45 also. State surcharge is applied to these permits. ) Garages and Basement Finish to read: Garages, Outbuildings and Basement Finish (Staff is not recommending a change to the fee for these permits, but rather is recommending the word "Outbuilding" be added to the title to clarify that pole barns and sheds are included) Re-roof $35 $45 (The commercial/industrial permit fee is not proposed to be increaseed. State surcharge is applied to these permits) Swimming Pools (State surcharge is applied to these permits) $35 $45 . 3 Season Porches to read: 3 Season and Screen Porches (Staff is not proposing a permit fee increase, but rather is clarifying how screened porch permits are charged) s: \b&z\stever\cc5 .doc . Permit Current fee Recommended Fee Moving Structures Moving Structures In $150 $150 (In addition, structures moved in are required to get a building permit for the foundation. The fee for the permit is based on table 1A of the Uniform Building Code. If these structures undergo remodeling, staff recommends that the building permit include this work based on a valuation of $10 per square foot.) Moving Structures Out to read: Moving Outbuildings Out $35 $45 Moving Houses Out $35 $150 (Staff is recommending that structures being moved out be divided into two categories, houses and outbuildings. Staff recommends that the permit fee for moving garages out be increased to the recommended minimum permit fee of $45 to cover the cost of processing the permit, notification of various Departments and the inspection of the property after the structure is removed. Moving a house involves more detail, such as verifying that the well and septic are properly abandoned. Therefore, staff is recommending a greater increase in the permit fee.) Window Installation (new permit) $0 $45 . Residing (new permit) $0 $45 Changes to Exhibit D Minimum Fee for a Plumbing Permit $24 $45 Utility Hook-up Permit Building Sewer Plant $18 Curb Stop Water Connection $21 Abandoning or Replacing Water Service $21 Storm Sewer Connection $18 (Staff is recommending that this section be eliminated from Exhibit D.) Alterations, Repairs (plumbing) (This section is not needed and staff is recommending it be eliminated from Exhibit D.) . s: \b&z\stever\cc5 .doc . CITY OF ELK RIVER 20001 FEE SCHEDULE ASSESSMENT SEARCH CERTIFiCATION........ ANIMAL LICENSES Cat..................................................... .. Dog..................................................... . Duplicate Cat or Dog License................. Residential Kennel.................................. Commercial Kennel................................ AUDIOIVISUAL Dubbing Police Audio Tapes................... Dubbing Audio Tapes............................. Dubbing Video Tapes ............................ Video Operator..................................... BUILDING PERMIT Industrial, commercial, multifamily residential, single family homes, and additions............................................ .. . State Residential Contractor License Search............................................... ... Miscellaneous Building Permits................. Heating, Ventilation and Air Conditioning. Gas Fitting Permit Fee............................. Gas Fitter's License................................. Plumbing Permit..................................... $15/each $5/2 years $10/2 years $2 each $50/year $75/year $20/tape $lO/tape $30/tape $4G/50 hour - ($80 minimum) State permit fee, UBC Table lA, plus 65% plan check fee (valuation based on current State of MN building valuation data) $5/permit City permit fee schedule Exhibit C plus State Surcharge City permit fee schedule Exhibit B-1 .5% City permit fee schedule Exhibit A $35/year City permit fee Schedule D - $8/fixture BURNING PERMITS Residential Special Burning Permit............. $10 each Residential Special Burning Permit to Clear Land..... ...... ......... ...... ......... ............ ....... $25 each Residential Special Burning Permit - Daytime Hours......................................... $25 each COMMUNITY PROFILE............................... $.20 each COPiES.............................................. ..... $.15 each CUPS - ELK RIVER $2.25 each . DOCUMENTS Audit.................................................. ... Budget........ ........ ... ...... . .................. ....... City Code. ......... .... ...... .......................... Housing Maintenance Ordinance............ Meeting Packets..................................... Microfilm Document................................ Sign Ordinance....................................... $0 $0 $75 each $5 each $5/packet $l/page $5 each . Subdivision Ordinance............................. Zoning Ordinance................................... FALSE ALARMS Fire........................................................ . Other.... . .. ... . ........ ............... ................... . flAG (Clt'!)......................................... .. GARBAGE HAULER LICENSE........................ GRADING PERMIT..................................... LABOR RATE - Research. Computer Services. Etc............................................ . LIQUOR LICENSE Club..................................................... .. Intoxicating On Sale................................. Intoxicating Sunday On Sale..................... Investigation Fee Corporation......................................... . Single.................................................. . 3.2% Beer Off Sale.......................... 3.2% Beer On Sale......................... Set Up.................................................... Wine..................................................... . Temporary Non-Intoxicating..................... Temporary Intoxicating............................ Premises Extension Permit (on-sale)............ MAPS Aerial Photos........................................... Aerial Topography Maps.......................... Large Base, Zoning, or Land Use Map........ Medium Base or Zoning Map.................... Medium Base Ward Map.......................... Copies of Maps from Xerox Machine MARKETING BROCHURE............................ MASSAGE ESTABLlSHMENT..... ...... ...... ....... Initial Fee (Includes Investigation Fee) Single............................................... ... Corporation...................................... ... Partnership......................................... .. Renewal Fee........................................... . MASSAGE THERAPiST.............................. Initial Fee (Includes Investigation Fee)...... Renewal Fee.......................................... $5 each $25 each $150 for the 41h alarm. $50 for each successive alarm thereafter $50 for 51h alarm $32 each $60 1 sl truck plus $15 each additional truck $50 plus city consultant fees if required to process application $15/hr (15 minutes minimum) . $300/year $4.000/year $200/year $250 $150 $75/year $225/year $75/year $650/year $20/day $20/day $25 $6/sheet $15/per acre $3 each $2 each $2 each $2 each $3 each $200 $300 $300 $150 $150 $100 2 . MECHANICAL AMUSEMENT Mechanical Rides................................... Pin Ball Games................. ..... ....... .......... Pool Tables (Coin Operated)................... Video Games......................................... MINERAL EXTRACTION.............................. PARK DEDICATION FEE (Resolution 95-89) Residential............................................ .. Commercial......................................... ... Industrial............................................... .. PARK AND GAZEBO RESERVATION FEE o 100 People........................................... 101 250 People........................................ 251 500 People.. .................................. .... Oyer 500 People...................................... Large Community Events.......................... . PARK USE FACILITY FEE - OPEN SHELTERS Elk River Residents Non-residents PARK USE FACILITY FEE - ENCLOSED SHELTERS Elk River Residents Non-residents PARKING FINES (Resolution 97-30) Overtime Parking.................................... Prohibited/Improper Parking.................... No Parking 2 a.m. to 6 a.m....................... Winter Parking Ordinance........................ Other. . ..... . ..... . ... .............. . ...... ...... ..... ..... Fire Lane/Hydrant.................................... Handicap Parking Only............................ PARKING STICKERS Railroad Parking Lot................................. Commuter Parking................................... Duplicate (for lost stickers) PAWN SHOPS........................................... Investigation Fee................................... ... . PINS $15/per establishment plus: $15/ride $15/machine $15/table $15/game $20/acre to be actively mined in forthcoming year or not reclaimed $5/acre approved but not actively mined (to be amended 3/99) $-+-,400 $1 A70/dwelling unit $3,000/acre $2,000/acre ~ ~ $-l-OO ~ ~ (Deposits are refundable if the shelter and surrounding area are cleared of refuse and debris prior to leaving the area.) $20.00 $40.00 $40.00 $80.00 $10 $15 $15 $15 $15 $20 $200 $12/space (3 stiCkers/space maximum) $12/space (2 stickers/space) $l/sticker $12,000/year $1,500 3 . . . Plastic - Elk River....................................... $.35 each Metal - Elk River........................................ 2.50 each RENTAL DWELLING LICENSE......................... $12/dwelling unit SEPTIC INSTALLATION AND REPAIR.............. SEWER AVAILABILITY CHARGE (SAC) (Plant replacement interceptor) ................ SEWER AND WATER HOOK-UP PERMIT SIGN PERMITS Up to 100 square feet............................... 101-300 square feet.................................. Over 300 square feet................................ Yearly Advertising Structure (Billboard) Inspection............................................ ... SOLID WASTE FACILITY LICENSE.................. $60 $1,300 $45 plus ($2,000 bond in favor of the city) $30 $90 $150 $10 $2,000 plus cost of reviewing license. Amount of annual cost incurred by the city for monitoring and inspecting the facility plus the license. STREET DISRUPTION/UTILITY HOOKUP PERMIT.. ~ $100 plus 1$5,000 letter of credit in favor of the city) SURFACE WATER MANAGEMENT IMPACT FEE. (3% annual increase) (Resolution 94-110) TOBACCO............................................ ... TRANSIENT MERCHANT LICENSE.................. UTILITY HOOK-UP PERMIT WATER ACCESS CHARGE (WAC)................. (Contact Municipal Utilities - 441-2020) WATER CONNECTION CHARGE................... (Contact Municipal Utilities - 441-2020) $~ 75.21/residentiallot (rural) $~ 150.45/residentiallot (urban) $~ 902.70/acre (multifamily, commercial. and industrial) $100/year $aG 100/year $45 PLUS ($5,000 letter of credit in favor of the city) $300 $1,050 ZONING/PLANNING APPLICATIONS Administrative Subdivision......................... $150 plus Park Dedication if applicable Conditional Use Permit Commercial/Industrial............................ $300 4 . . . Residential............................................ . Amendments and renewals requiring public hearings...................................... Easement Vacation.............. ............... ..... General Zoning Requests.......................... Land Use Plan Amendment....................... Nonconforming Sign Alteration.................. Ordinance Amendment..... ...... ... ...... ....... Plats..................................................... .. Permitted Home Occupations................... Planned Unit Development (PUD)............... Site Plan Review................. ...... ......... ....... Variance............................................... .. Zone Change..... .............. ......... ....... ....... $100 $75 $150 $50 $300 $110 $300 $500 + $5/lot for each lot over 50 $15 Charge for whatever planning applications are needed for the PUD, Le. CUP, Rezoning, etc. $250 $150 $250 s: \documen t \resol uti \0 lfees. docs: \ documont\resoluti\ OOfees .doc 5 . . . EXHIBIT A CITY OF ELK RIVER FUEL-GAS PIPING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any fuel-gas piping, shall require the payment by the applicant for such permit of fees in the amount herein provided. Minimum Fee In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00 $45.00). Basic Fees (A) The fees for all fuel-gas piping permits shall be computed on the basis of the number of fuel-gas appliances. The fee for each appliance so provided for shall, except as hereinafter otherwise specifically provided, be Six Dollars ($6.00) for each fuel-gas appliance. (B) Where any such permit is issued for roughing-in of fuel-gas lines for future appliances, a fee of Six Dollars ($6.00) shall be charged for each line or lines. (C) In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance and future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the main fuel-gas supply in the building shall be charged. (D) For the purpose of this article, a gas appliance shall be taken to mean a furnace, range, water heater, dryer, fireplace, barbecue, etc. s: \b&z \ord - fuel. doc 6 . . . EXHIBIT B CITY OF ELK RIVER HEATING, VENTILATION AND AIR CONDITIONING PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, connections or appendages, shall require the payment by the applicant for such permit of fees in the amount herein. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less that $18.00 $45.00. MAXIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be more than $100.00 for a single family home. PERMIT FEE FOR HEATING. VENTILATION AND AIR CONDITIONING APPLIANCE ITEMS. CONNECTIONS OR APPENDAGES For any permit for the installation, alteration or repair of the above- referenced items, the fee shall be one and one-half percent (1.5%) of the valuation of the work or as calculated under the Uniform Mechanical Code, whichever is greater. \ \elkriver\sys \shrdoc \b&z \heatvent.doc 7 . . . EXHIBIT D CITY OF ELK RIVER PLUMBING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any plumbing work, fIxture, or device, shall require the payment by the applicant for such permit of fees in the amount herein provided. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Twenty-Four Dollars ($21.00) $45.00 BASIC FEES (A) The fees for all plumbing permits shall be computed on the basis of the number of fIxture openings, plumbing fIxtures, or devices provided for in such permits, whether subsequently so installed or not, and the fee for each fIxture so provided for shall, except as hereinafter otherwise specifIcally provided, be Eight Dollars ($8.00) for each fIxture installed or replaced or set only (no waste or vent piping), the fee for each such fIxture shall be Eight Dollars ($8.00). (B) Where any such permit is issued for roughing in plumbing openings only, providing for certain proposed fIxtures, which are to be installed or set later, a fee of Eight Dollars ($8.00) shall be charged for each such opening, which fee shall be in addition to the fee charged for other plumbing work included in the same permit. (C) For the purpose of this article, a plumbing fIxture shall be taken to mean and include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor drain, or any other plumbing device arranged to be connected with the sewer or plumbing system, either directly or indirectly, and required to be trapped. CITY UTILITY HOOK UP PERMIT Building Sev.Ter Plant............................................................................. $18.00 Curb Stop 'Vater Connection Permit.....................................................$21.00 ^ 1-. ..J. R" UT C . n . $()l nn uUanuonlng or epalnng.. ater ~erVlCe rermlt.................................. .a .vv Storm Sewer Connection Permit and Inopection Fee............................$18.00 10 . . . ...^...LTERATIONS, REPAIRS For each permit for the alteration or repairing of exioting plumbing work not includod above, the fee ohall be Six Dollaro and Twenty five Conto ($6.25) f-or the firot Fiyo Hundred DOllaro ($500.00) or fraction thereof in tho ootimatod eoot of ouch propooed work. For each additional Five Hundred Dollaro ($500.00) or fraction thereof in ouch eotimated coot, Six Dollaro and T\venty five Cento ($6.25) ohall be addod to the above deocribed fee for ouch permit. \ \elkriver\sys \shrdoc \b&z \ord-plum.doc 11 . . . EXHIBIT C CITY OF ELK RIVER MISCELLANEOUS PERMIT FEES Decks $8.00 per square foot for valuation for permit fee; plus state surcharge. Plan check is included with this price. Fences Under 6 feet no charge Over 6 feet - $15.00 $45.00 plus state surcharge Fircplaces and lVood Stoves Solid Fuel Burnin!! Appliances $20.00 $45/00 plus state surcharge $15.00 pluG Gtate Gurcharge for a burning appliance inotalled into an exiGting chimney. Gara!!es. Outbuildings, and Basement Finish $10.00 per square foot for valuation, use building permit fee plus state surcharge. Plan check is included with this price. Re-roof Residential - $35.00 $45.00 plus state surcharge. Commercial/Industrial - $.50 per square foot for valuation for permit fee plus state surcharge. Swimming Pools $35.00 $45.00 plus state surcharge 3 Season and Screen Porches $40.00 x square footage = valuation for permit fee plus state surcharge. Plan check is included with this price. Movin!! Structures Moving structures in - $150.00 plus state surcharge (Note: in addition, a building permit is required for foundation and remodeling of structures moved !ill s:\b&z\fees.doc 8 . . . MOTling otructureo out $35.00 permit fee Moving Outbuildings Out - $45.00 Moving Houses Out - $150.00 Window installation - $45.00 permit fee Residing - $45.00 permit fee s:\b&z\fees.doc 9