Loading...
4.7. SR SR 12-18-2000 . City of ~ Elk Item # 4. 7 . MEMORANDUM TO: Mayor and City Council FROM: Sandra Peine, City Clerk DATE: December 18, 2000 SUBJECT: 2001 Fee Schedule REQUEST: Adoption of the 2001 fee schedule. . BACKGROUND: At the December 11, 2000, Council meeting, the Council reviewed the proposed 2001 fees. During review of the proposed fees, the Council had some questions on the proposed park dedication fee increase and the proposed fees for park shelters. A representative from the Park and Recreation Commission will be present at the December 18th Council meeting to answer questions pertaining to these two issues. ACTION REQUESTED: Adoption of the attached resolution setting the 2001 fees for services. s: \ council \feememo3.doc . 13065 Orono Parkway. P.O. Box 490. Elk River, MN 55330. TDD & Phone (763) 441-7420. Fax (763) 441-7425 "'(/ -'\j ( )j . City of ~ Elk Item # MEMORANDUM TO: FROM: Mayor & City Council Michele MCPherso~ctor of Planning DATE: November 20, 2000 SUBJECT: Park and Recreation Commission Fees Request The Park and Recreation Commission would like the City Council to consider the following changes to the City's fee structure for 2001. Park Dedication . The Commission is proposing a five percent increase of the residential park dedication fee from $1,400.00 to $1,470.00 per dwelling unit. This is a $70.00 increase. Much of the fund's balance is due to residential development, which provides places for people to live. Those residents in turn utilize the parks and playgrounds that are developed through the use of the funds. As of November 30,2000, the City spent $110,679.88 on capital outlays in parks while taking in $161,560.00 in cash. The Commission will be reviewing its 2001 budget in January, and it is anticipated that a similar amount may be recommended to be spent next year. It is staff and the Commission's opinion that a small increase each year is easier to sell than a larger increase every 3-5 years. For commercial and industrial properties, however, it is recommended to increase the amount every three years due to the large beginning amount ($2,000.00 or $3,000.00 per acre). Shelter Fees Currently, the City requires only a deposit for the use of the City's various park shelters, which is returned if the shelter and the surrounding area are left in good condition. Staff and the Commission are recommending that a change to this policy be considered. The following fee structure is proposed: . Open park shelters: $20 for Elk River residents $40 for non-residents; Enclosed park shelters: $40 for Elk River residents $80 for non-residents 13065 Orono Parkway. P.O. Box 490. Elk River, MN 55330. TDD & Phone (763) 441-7420. Fax (763) 441-7425 . . . Memo to the Mayor & City Council/December 18, 2000 Park Fees 2001 Page 2 There was discussion at the December 11, 2000 meeting regarding the use of the shelters by non-residents. Community Recreation schedules use of the facilities and as of October 12, 2000, 160 reservations had been made. Of those reservations, 32 were made by either Community Recreation or ECFE. Eight had been made by the Chamber of Commerce for the July 4th Celebration. Of the remaining 120 reservations, 19 were with non-residents, although many appear to have some tie to Elk River, for example the Handke Staff picnic was scheduled by a person from S1. Michael. Woodland Trails Park The Commission is also recommending a use fee for non-district schools for the use of Woodland Trails Park for cross-country ski team practices of $50.00 per date of use. The Commission has also established a policy that limits the dates available for practice in order to protect the resource. That policy is attached for your review. Also for Woodland Trails Park, the Commission is recommending a deposit for the use of the park: 0-25 People 25-100 People 101-250 People 251-500 People Over 500 People, Community Events $50.00 $100.00 $150.00 $300.00 $500.00 Recommendation Staff and the Park and Recreation Commission recommend that the City Council implement the above fee changes for 2001. . . . OUT OF TOWN SKI TEAM PRACTICE POLICY FOR WOODLAND TRAILS PARK Out of town high school cross-country ski teams may request practice dates at Woodland Trails Park with the following restrictions: 1. Requests for practice dates must be made 5 business days before the date of the requested use. 2. Out of town teams may practice two days each month for the months of December, January, and February. 3. A maximum of two out of town teams may practice per week. 4. Only one out of town team may practice per day. 5. Practices will be limited to Monday through Thursday on open dates listed below. Open practice dates for 2000-2001: Dates subject to 24-hour cancellation notice. December: 11, 12, 26, 27, 28 January: 1,10,11,24,25,29,30,31 February: 1,5,6,7,8,14 . . . RESOLUTION 00- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ADOPTING FEES FOR SERVICES FOR 2001 WHEREAS, fees for services are reviewed annually to ensure that fees are sufficient to cover services rendered; and WHEREAS, the council has reviewed the fees charged for services; and WHEREAS, the attached fee schedule reflects the fees that will be charged for services rendered by the city of Elk River in the year 2001. NOW, THEREFORE, BE IT RESOLVED, that the attached fee schedule is effective for the year 2001. Passed and adopted by the City Council of the City of Elk River this 18th day of December, 2001. Stephanie A. Klinzing, Mayor ATTEST: Sandra A. Peine, City Clerk S: \DOCUMENT\RESOLUTI\feeresoJ.doc . . . CITY OF ELK RIVER 20001 FEE SCHEDULE ASSESSMENT SEARCH CERTIFiCATION........ ANIMAL LICENSES Cat. .. .. . . .. . .. .. . .. . .. . . .. . .. . .. .. . .. . .. . .. . .. . .. . . . . .. .. Dog...................................................... Duplicate Cat or Dog License... ... ... ... ..... Residential Kennel... ... ... ... ... ... ... ... ... ... .... Commercial Kennel... . .. ... .. . .. . .. . ... ... ... .. ... AUDIO/VISUAL Dubbing Police Audio Tapes................... Dubbing Audio Tapes...... .. .... ...... .. .... .. ... Dubbing Video Tapes ............................ Video Operator...... ... .. . .. . ... ... . .. ... ... .. . .... BUILDING PERMIT Industrial, commercial, multifamily residential, single family homes, and additions............................................. . State Residential Contractor License Search. .. . .. . .. . .. .. . .. . . .. . .. . .. .. . .. . .. . .. . .. . . .. .. ... Miscellaneous Building Permits...... ...... .. ... Heating, Ventilation and Air Conditioning. Gas Fitting Permit Fee...... ...... .. ....... ... ..... Gas Fitter's License... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Plumbing Permit... ...... ... ... ... ... ... ... ... ... .... $15/each $5/2 years $10/2 years $2 each $50/year $75/year $20/tape $lO/tape $30/tape $4G/50 hour - ($80 minimum) State permit fee, UBC Table 1A plus 65% plan check fee (valuation based on current State of MN building valuation data) $5/permit City permit fee schedule Exhibit C plus State Surcharge City permit fee schedule Exhibit B - 1.5% City permit fee schedule Exhibit A $35/year City permit fee Schedule D - $8/fixture BURNING PERMITS Residential Special Burning Permit... .. . .. . .. .. $10 each Residential Special Burning Permit to Clear Land... ... . .. ... .. . ... ... . .. . .. ... .. . .. . .. . ... ... .. . ... .. . $25 each Residential Special Burning Permit - Daytime Hours... . .. . .. . .. .. . .. . ... ... ... .. . .. . .. . .. ... $25 each COMMUNITY PROFILE............................... $.20 each COPIES. .. ... . .. . .. .. . .. . . . . ... . .. . .. .. . .. . '" . .. . .. . .. ... $.15 each CUPS - ELK RIVER $2.25 each DOCUMENTS Audit ..................................................... Budget. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . City Code.. . . .. . .. .. . .. . .. . .. . . .. . .. .. . .. . . .. .. . . .. . .. . Housing Maintenance Ordinance... ... ... ... Meeting Packets..................................... Microfilm Document... . .. . .. ... .. . ... ... ... ... .. ... $0 $0 $75 each $5 each $5/packet $1 /page . . . Sign Ordinance......... .. . .. . ... . .. . .. ... . .. . .. . .. . .. Subdivision Ordinance... .. . ... ... . .. .. . .. . . .. ... .. Zoning Ordinance......... .. . ... ... . .. ... ... ... ..... FALSE ALARMS Fi re . .. . .. . .. . .. . .. .. . .. . . .. .. . . .. .. . .. . .. . .. . .. . .. . .. . .. . .. . Other. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FLft.G CCilY)... .. . ... . .. ... . .. . .. .. . .. . ... . .. . .. . .. . . .. GARBAGE HAULER LICENSE.. . .. . .. . .. . .. . ... .. . .. . GRADING PERMIT... ... ... ... ... ... ...... ... ... ... .... LABOR RATE - Research. Computer Services. Etc...... ........................... ... ... ..... LIQUOR LICENSE Club....................................................... Intoxicating On Sale.. . .. . ... . .. . .. . .. . .. . .. . .. . .. . .. Intoxicating Sunday On Sale..................... Investigation Fee Corporation.. . . .. .. . . .. .. . .. . .. . .. . . .. .. . .. . .. . .. . .. . Single... .. . .. . ... . .. . .. ... ... .. . .. . .. . .. . .. . .. . .. . .. . .. . 3.2% Beer Off Sale... ... ......... ... ........ 3.2% Beer On Sale.. .... .. .... .... .. ....... Set Up.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Wine...................................................... Temporary Non-Intoxicating..................... Temporary Intoxicating... ... ... ... ... ... ... ... .... Premises Extension Permit (on-sale). . . . . . . . . . . . MAPS Aerial Photos... .. . ... . .. . .. . .. . .. .. . .. . ... . .. ... . .. .... Aerial Topography Maps.......................... Large Base, Zoning, or Land Use Map........ Medium Base or Zoning Map.................... Medium Base Ward Map.......................... Copies of Maps from Xerox Machine MARKETING BROCHURE...... .. . ... .. . .. . .. . .. . .. .. MASSAGE ESTABLISHMENT... . .. . .. ... . .. . .. . .. . .. Initial Fee (Includes Investigation Fee) Single.................................................. Corporation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Partnership... ...... ... ... ......... ... ................ Renewal Fee... ... .. . ... .. . ... . .. . .. ... ... . .. . .. . .. . .. . MASSAGE THERAPIST... . .. .. . ... ... ... .. . .. . .. . .. . Initial Fee (Includes Investigation Fee)...... $5 each $5 each $25 each $150 for the 4th alarm, $50 for each successive alarm thereafter $50 for 5th alarm $32 oach $60 1 st truck plus $15 each additional truck $50 plus city consultant fees if required to process application $15/hr (15 minutes minimum) $300/year $4,000/year $200/year $250 $150 $ 75/year $225/year $75/year $650/year $20/day $20/day $25 $6/sheet $15/per acre $3 each $2 each $2 each $2 each $3 each $200 $300 $300 $150 $150 2 . . . Renewal Fee... ... ... ... ... ... ... . .. . .. ... ... ... . .. . .. $100 MECHANICAL AMUSEMENT Mechanical Rides... ... . .. .. . .. . .. . ... .. . .. . .. . .. .., Pin Ball Games....................................... Pool Tables (Coin Operated)................... Video Games......................................... MINERAL EXTRACTION.. . .. . ... . .. . .. .. . .. . ... . .. ... PARK DEDICATION FEE (Resolution 95-89) Residential. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Commercial.......................................... .. Industrial......... ........................ ................ P......RK .A.ND GAZEBO RESERV ATleN FEE o 100 Pooplo...... . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . 101 250 Pooplo... .. . .. ..... . . .. . .. . .. . .. . .. . .. . .. . .. .. 251 500 Pooplo........... ... ... ... ... ... ... ... ... ..... Ovor 500 Pooplo. .. . .. . .. . . . .. . .. . ... .. . .. . .. . .. . .. ... Largo Community Evonts.... ... . .. ... ... .. . .. . .. .. PARK USE FACILITY FEE - OPEN SHELTERS Elk River Residents Non-residents PARK USE FACILITY FEE - ENCLOSED SHELTERS Elk River Residents Non-residents PARKING FINES (Resolution 97-30) Overtime Parking... . .. . .. . .. ... .. . .. . ... ... ... ... .. . Prohibited/Improper Parking...... ... ... ..... ... No Parking 2 a.m. to 6 a.m....................... Winter Parking Ordinance... . .. . .. ... ... ... ... .. . Other.. . .. . .. . . .. .. . .. . . .. . .. . .. .. . .. . .. . .. . .. . .. . .. . .. . .. . Fire Lane/Hydrant... ......... ............ ... ... ...... Handicap Parking Only... .. .... ..... .... .. .... .. .. PARKING STICKERS Railroad Parking Lot... ... ... ... ... ...... ... ... ... ... Commuter Parking. .. . .. . .. .. . .. . .. . .. . .. . .. . .. . .. ... Duplicate (for lost stickers) PAWN SHOPS........................................... Investigation Fee... ......... ... ... ... ... ... ... ... ..... $15/per establishment plus: $15/ride $15/machine $15/table $15/game $20/acre to be actively mined in forthcoming year or not reclaimed $5/acre approved but not actively mined (to gO smended J/99) $+AOO $1,470/dwelling unit $3,000/acre $2,000/acre sao m ~ ~ $aGO (Doposits aro rofundablo if tho sholtor and surrounding area are cloarod of rofuso and dobris prior to loaving tho aroa.) $20.00 $40.00 $40.00 $80.00 $10 $15 $15 $15 $15 $20 $200 $12/space (3 stickers/space maximum) $12/space (2 stickers/space) $1 /sticker $12,000/year $1,500 3 . . . PINS Plastic - Elk River....................................... $.35 each Metal - Elk River... .. .... .... .. .... .. .... .. ...... ...... . 2.50 each RENTAL DWELLING LICENSE......................... $12/dwelling unit SEPTIC INSTALLATION AND REPAIR.............. SEWER AVAilABILITY CHARGE (SAC) (Plant replacement interceptor)................ SEWER AND WATER HOOK-UP PERMIT SIGN PERMITS Up to 100 square feet.. .... ... ... ... .. . ... ... ... .... 101-300 square feet...... ...... ... ................... Over 300 square feet. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Yearly Advertising Structure (Billboard) Inspection.. . .. . .. . . .. . .. . .. . .. .. . .. . .. . .. . .. . .. . .. . .. .. . $60 $1,300 $45 plus ($2,000 bond in favor of the city) $30 $90 $150 $10 SOLID WASTE FACILITY LICENSE.................. $2,000 plus cost of reviewing license. Amount of annual cost incurred by the city for monitoring and inspecting the facility plus the license. STREET DISRUPTION/UTILITY HOOKUP P&RMIT.. $J5 $100 plus ($5,000 letter of credit in favor of the city) SURFACE WATER MANAGEMENT IMPACT FEE. (3% annual increase) (Resolution 94-110) TOBACCO............................................. .. TRANSIENT MERCHANT LICENSE.................. UTILITY HOOK-UP PERMIT WATER ACCESS CHARGE (WAC)................. (Contact Municipal Utilities - 441-2020) WATER CONNECTION CHARGE................... (Contact Municipal Utilities - 441-2020) $~ 75.21 /residentiallot (rural) $+4em 150.45/residentiallot (urban) $37eA+ 902. 70/acre (multifamily, commercial, and industrial) $lOO/year $aG 100/year $45 PLUS ($5,000 letter of credit in favor of the city) $300 $1,050 ZONING/PLANNING APPLICATIONS Administrative Subdivision......................... $150 plus Park Dedication if applicable Conditional Use Permit 4 . . . Commercial/Industrial... ... . .. . .. ... . .. . .. . .. . .. . Residential. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Amendments and renewals requiring public hearings...................................... Easement Vacation.................................. General Zoning Requests.......................... Land Use Plan Amendment............... ........ Nonconforming Sign Alteration.................. Ordinance Amendment........................... Plats.................................................... ... Permitted Home Occupations................... Planned Unit Development (PUD)............... Site Plan Review....................................... Variance................................................ . Zone Change.......................................... $300 $100 $75 $150 $50 $300 $110 $300 $500 + $5/lot for each lot over 50 $15 Charge for whatever planning applications are needed for the PUD, i.e. CUP, Rezoning, etc. $250 $150 $250 5 . . . EXHIBIT A CITY OF ELK RIVER FUEL-GAS PIPING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any fuel-gas piping, shall require the payment by the applicant for such permit of fees in the amount herein provided. Minimum Fee In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen DollarD ($18.00). Forty-five Dollars ($45.00). Basic Fees (A) The fees for all fuel-gas piping permits shall be computed on the basis of the number of fuel-gas appliances. The fee for each appliance so provided for shall, except as hereinafter otherwise specifically provided, be Six Dollars ($6.00) for each fuel-gas appliance. (B) Where any such permit is issued for roughing-in of fuel-gas lines for future appliances, a fee of Six Dollars ($6.00) shall be charged for each line or lines. (C) In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance and future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the main fuel-gas supply in the building shall be charged. (D) For the purpose of this article, a gas appliance shall be taken to mean a furnace, range, water heater, dryer, fireplace, barbecue, etc. s: \b&z\ord-fuel.doc 6 . . . EXHIBIT B CITY OF ELK RIVER HEATING, VENTILATION AND AIR CONDITIONING PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, connections or appendages, shall require the payment by the applicant for such permit of fees in the amount herein. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less that $45.00 than $18.00. MAXIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be more than $100.00 for a single family home. PERMIT FEE FOR HEATING. VENTILATION AND AIR CONDITIONING APPLIANCE ITEMS. CONNECTIONS OR APPENDAGES For any permit for the installation, alteration or repair of the above- referenced items, the fee shall be one and one-half percent (1.5%) of the valuation of the work or as calculated under the Uniform Mechanical Code, whichever is greater. \ \ elkriver \ svs \ shrdoc \ b&z \ heatven t.doc 7 . EXHIBIT C CITY OF ELK RIVER MISCELLANEOUS PERMIT FEES Decks $8.00 per square foot for valuation for permit fee; plus state surcharge. Plan check is included with this price. Fences Under 6 feet no charge Over 6 feet - $15.0015.00 plus state surcharge Firc Places and 1Veed St-evcsSolid Fuel Burning ADDliances $20.0015.00 plus state surcharge $15.00 plus state surcharge for a burning appliance inotalled into an mristing ehimney. . Garages. Outbuildings. and Basement Finish $10.00 per square foot for valuation, use building permit fee plus state surcharge. Plan check is included with this price. Re-roof Residential - $35.0015.00 plus state surcharge. CommerciallIndustrial - $.50 per square foot for valuation for permit fee plus state surcharge. Swimming Pools $35.0015.00 plus state surcharge 3 Season and Screen Porches $40.00 x square footage = valuation for permit fee plus state surcharge. Plan check is included with this price. Moving Structures . 8 . . . Moving structures in - $150.00 plus state surcharge (Note: in addition. a building permit is required for foundation and remodeling of structures moved in) MOT ling Strueturos out $35.00 pormit foo Moving Outbuildings Out - $45.00 Moving Houses Out - $150.00 Window Installation - $45.00 Residing - $45.00 9 . EXHIBIT D CITY OF ELK RIVER PLUMBING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any plumbing work, fixture, or device, shall require the payment by the applicant for such permit of fees in the amount herein provided. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Twenty Four DollaFEi $21.00Forty-five Dollars ($45.00). BASIC FEES (A) . The fees for all plumbing permits shall be computed on the basis of the number of fixture openings, plumbing fixtures, or devices provided for in such permits, whether subsequently so installed or not, and the fee for each fixture so provided for shall, except as hereinafter otherwise specifically provided, be Eight Dollars ($8.00) for each fixture installed or replaced or set only (no waste or vent piping), the fee for each such fixture shall be Eight Dollars ($8.00). (B) Where any such permit is issued for roughing in plumbing openings only, providing for certain proposed fixtures, which are to be installed or set later, a fee of Eight Dollars ($8.00) shall be charged for each such opening, which fee shall be in addition to the fee charged for other plumbing work included in the same permit. (C) For the purpose of this article, a plumbing fixture shall be taken to mean and include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor drain, or any other plumbing device arranged to be connected with the sewer or plumbing system, either directly or indirectly, and required to be trapped. CITY UTILITY HOOK UP PERMIT Building Se~l:er Plant.............................................................. .$18.00 . Curb Stop 'N ater Connection Permit......................................... ..$21.00 10 . . . ~^...bandoning or Repairing V/ater Service Permit.......................... .$21.00 Storm Se~.~lOr connection Permit and Inspection Fee......................$18.00 ALTERf~TIONS, REP~^...IRS For each permit for the alteration or repairing of mristing plumbing ~.vork not included abo".Te, the fee shall be Six Dollars and Tv:onty fi~le cents ($6.25) for the first Fbe Hundred Dollaro (500.00) or fraction thereof in the eotimated cost of such proposed work. For each additional Five Hundred Dollars ($500.00) or fraction thereof in such estimated cost, Six Dollars and Twenty fiye Cents ($6.25) ohall be added to the abo~le described fee for such permit. \ \ elkriver\sys \ shrdoc\b&z\ord-plum.doc 11