Loading...
4.12. SR 01-17-2017 Eclty1� ,.,�� Request for Action River To Item Number Mayor and City Council 4.12 Agenda Section Meeting Date Prepared by ConsentJanuary 17, 2017 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Change Order Rivers Edge Commons Park Cal Portner, City Administrator Construction Parking Lot Reviewed by Lori Ziemer, Finance Director Action Requested Approve,by motion, a change order for Rivers Edge Commons Park. Background/Discussion The contractor for the Rivers Edge Commons Park construction completed the paving of the upper parking lot in late November. The original scope was to install about 1,020 square feet of asphalt,but due to the poor condition of the pavement, the contractor had to install 3,800 square feet of bituminous pavement and patching for $17,097. The existing bituminous was substantially thinner than the specified bituminous in the project plan. During preparation,the asphalt broke up substantially more than expected and to get a clean parking lot patch the contractor had to cut out a larger area than planned, correct soils and repave. The contractor also had some additional work related to the stone and storm water that will be paid for from the project contingency of about$6,524. Completion of this project in the spring includes irrigation,railings and the installation of sod and plantings. The contract must be done by the end of May of 2017. Financial Impact This will be a total change order of$23,621 that will not affect the General Fund. The amount of$6,524 will come from the current project contingency and the $17,097 will come from the Street Improvement Reserve Fund. This will leave us about$10,435 in contingency to complete the project. Attachments ■ Change Order POWERED 6T Template Updoted 4/14 INAWRE1 Change Order 5 OWNER City of Elk River LANDSCAPE ARCHITECT Hoisington Koegler Group Inc. CONTRACTOR Sunram Construction THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. PROJECT: Elk River - Rivers Edge Park Expansion CHANGE ORDER NUMBER: 5 DATE: 1.12.17 PROJECT NO: HKGI 015-032 TO CONTRACTOR: CONTRACT DATE: 4.22.16 Sunram Construction 20010 75th Ave N, Corcoran, MN 55340 The Contract is changed as follows: (see sheet 2) Not valid until signed by the Owner, Landscape Architect and Contractor. The original (Contract Sum) was $ 301,854.00 Net change by previously authorized Change Orders $ 75,765.00 The (Contract Sum) prior to this Change Order was $ 377,619.00 The (Contract Sum) will be- CHANGED by the Change Order in the amount of $ 23, 620.96 The new (Contract Sum) including this Change Order will be $ 401,239.96 This Change Order DOES NOT EFFECT Contract Time The date of Substantial Completion as of the date of this Change Order therefore is 10.30.16 LANDSCAPE ARCHITECT CONTRACTOR Hoisington Koegler Group inc. Sunram Construction OWNER City of Elk River 123 North 3rd Street, Suite 100 20010 75th Ave N, Corcoran, MN 55340 13065 Orono Parkway, Elk River, MN 55330 Minneapolis, Minnesota 55401 (printname) (printname) (printname) l t` (signature and date) (signature and date) page 1 of 2 (signature and date) Summary of Change Order No.5 -1.14.17 You are directed to make the following changes in the Contract Documents: Descriptions: Unit Qty UnitCost Total CB cover switch LS 1 $ 292.91 $292.91 Remove Pavers and Bituminous Areas Sy 31 $2.95 $91.45 Remove Curb LF 27 $7.50 $202.50 Salvage Light Pole EA -4 $265.00 -$1,060.00 Concrete Curb LF 32 $31.00 $992.00 Concrete Curb Flat Curb LF 4 $31.00 $124.00 Concrete 6 Inch Reinforced -Stage Misc, Walks SF 158 $14.20 $2,243.60 Bituminous Pavement and Patching SF 2780 $6.15 $17,097.00 Install Stone Bench LF 73 $60.00 $4,380.00 Reinstall Salvaged Split Rail Fencing LF -55 $13.50 -$742.50 Net Contract change for Change Order $23, 620,96 page 2 of 2