6.1. SR 01-25-1999
rCI ~'\)
( );
!l}{
ITEM 6.1.
River
MEMORANDUM
TO:
Mayor and City Council
FROM:
Sandra Peine, City Clerk
DATE:
January 22, 1999
SUBJECT: 1999 Fee Schedule
The City reviews its fees for services on a yearly basis to ensure that
fees charged are sufficient to cover services rendered. The fees are
adopted by the Council by resolution on a yearly basis.
.
Presented for Council consideration are the 1998 fees and the
proposed 1999 fees. If a change is recommended by staff, the 1998 fee
will have a line through it and the new proposed fee will be
indicated in red.
Listed below is a general explanation of the proposed fee
amendments.
AudiolVideo......Dubbing audio and video tapes takes several hours
per tape. The Police Department has been charging the proposed fee
of $20 for audio tapes and $30 for video tapes. Staff is proposing to
increase the fees being charged by the administrative department to
be consistent with the police department.
Video Eauipment/Operator.....An increase is proposed to cover the
cost of upkeep and maintenance of the audio video equipment.
Currently four hours of use would cost $125. Four hours of use at
the proposed increase would cost $160.
Building: Permits...See attached memo from Cliff Skogstad.
Documents....It is proposed to add the copying of plat maps and
maps from the Map Maker Xerox machine to the fee schedule.
.
Liauor...It is proposed to add a Premises Extension Permit to the fee
schedule. A Premises Extension allows liquor establishments to
extend their licensed premises to sell liquor (i.e. an outdoor event).
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420. Fax: (612) 441-7425
.
Park Dedication Fees...See memo from City Administrator.
Park Reservation Fees.....It is proposed to restructure the way in
which deposits are made to reserve park shelters. The current
structure charges certain organizations different fees. The new
structure will be based on the approximate number of individuals at
the site. Deposits are returned if the site is cleaned of refuse and
debris after the event. It is also proposed to add the Gazebo to the
Park Reservation Fees.
Parkine: Fines.....It is proposed to increase the parking fines by $5.
Surface Water Manae:ement Impact Fee... This fee is increased 3%
annually which is consistent with Resolution 97-110 (attached).
Tobacco... The City's tobacco ordinance was amended last year. Due
to State mandates it was necessary to increase the tobacco fee to
cover the cost of compliance.
.
ACTION REQUESTED:
Following Review of the proposed fee schedule, it is recommended
that the 1999 Fee Schedule be approved by Resolution.
\ \elkriver\sys \shrdoc \council\feememo.doc
.
rCI ~'\)
( );
tl}{
Item #6.1.
River
MEMORANDUM
TO:
Mayor & City Council
FROM:
Pat Klaers, City Administrator
DATE:
January 25, 1999
SUBJECT: 1999 Fee Schedule
Annually, the city clerk discusses fees with other municipalities in order to
ensure that our fees are in the appropriate ranges. Additionally, the League
of Minnesota Cities annually provides a license and fee survey for
municipalities. Regarding the 1999 fee proposal, I would like to comment on
three areas of concern and interest. Most of the other proposed changes are
rather routine.
.
PARK DEDICATION FEES
The fee resolution proposal includes no change in the park dedication fee. A
request for this increase will be coming in the next few months, and the
council can consider this issue separate from the attached fee schedule. The
reason for the delay is that the city is awaiting the results of a survey done
by a consulting firm on behalf of the city of St. Cloud. The survey will
hopefully help us justify a proposed change. The council should note that a
substantial change is being proposed based on the preliminary information
that has been obtained on what other cities are charging residential
development on a per lot basis. The more difficult issue that the Park and
Recreation Commission is trying to work through is how to obtain
appropriate park areas in plats, and equate this land area to a dollar value
that is consistent with the per lot fee. Currently, almost all developers want
to pay a per lot fee rather than give land for parks. The current ordinance
calls for up to 10 percent of the land being dedicated for parks. This 10
percent guideline is almost universal with municipalities.
.
A substantial increase in park dedication fees is a tough issue for all parties.
The city needs adequate funds to make improvements, and also needs
adequate land in residential developments for parks. On the other hand, the
fees cannot be so high that it is detrimental to the development. An
additional point of view is that if fees are high, it may lead to higher quality
development as the cost of residential lots increase.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425
. SURFACE WATER MANAGEMENT IMPACT FEE
The city has wrestled with how to fund surface water management (SWM)
improvements for the past six years or so. The issue really came to a head
when the city financed large storm sewer pipe improvements for the upgrade
of the Highway 101110/169 interchange. Other major SWM improvements
have followed along with the adoption of a city wide surface water
management plan. The city's system is interrelated with the county ditch
system, and the pipes underneath Highway 169/10 are actually part of the
county ditch system. As an additional note, the city and county have had
special legislation passed which allows the city to take over county ditches
upon mutual agreement by both parties. We have not needed this law to
date, but we have done things with the county such as the work on Ditch 10
west of 169 (Hohlen property), whereby the ditch was abandoned and the
surface water was channeled through a system of pipes and a relocated ditch
under city jurisdiction.
.
The city finances the vast majority of its SWM expenses with tax levy money.
A relatively small portion of the total SWM money comes from developers
and development projects. However, developers and development projects
are required to finance their own internal SWM system which, ultimately,
feeds into the trunk system. Information that the city has obtained from
other developing municipalities indicates that our charges to developers are
much lower than comparable communities. This simply means that the
taxpayer has to fund more for the city SWM trunk system. The resolution
approved a few years ago calls for an annual 3 percent increase in the fees on
development projects. Once, a few years ago, the council jumped that to 10
percent, but since then it has reverted back to 3 percent increases. Based on
the East Elk River SWM needs, the city will either have to do a 20 year bond
to finance activities and/or look at a significant increase in the annual SWM
tax levy.
This issue is really a capital improvement program discussion item, but I
wanted to let the council know about my on-going concern regarding
adequate funding of our trunk SWM needs and this low development SWM
fee.
BUILDING PERMITS
The city has always followed the state building code and, when appropriate,
formally adopts the updated version of the state code. Municipalities are
usually 2 to 3 years behind in the adoption of the state code. For example, in
. late 1996, the city adopted the 1994 code. Today in 1999, we are looking at
.
.
.
adopting the 1997 uniform building code. The "delay" has to do with the
timing for state approval of the updated codes.
Consistent with city adoption of this code, for the past 10 years or so the city
has also been adopting the permit pricing schedule. This eliminates any
issue of being arbitrary when dealing with builders, and puts us on an even
basis with our neighboring development communities such as Ramsey,
Andover, Champlin, Maple Grove, etc. As noted in the building official's
memo, this will be the first increase in three years in the permit pricing
schedule, and the increase will be approximately 11 percent. In very general
terms, this cost is typically passed on the new homeowner.
The building permit and other growth related revenues (especially plan check
fees) are at the highest level ever in the 1999 municipal budget. The city is
gradually becoming dependent on these revenues to finance our building
inspection department. Without the adopted increase in the permit schedule,
we run the risk of falling short of our budgeted amount, therefore causing the
taxpayers to pick up this expense for building inspection (plus some
engineering and planning) services. Once again, the City Council may have a
concern regarding the cost of development in the community, and whether or
not higher fees impact the quality of residential development or has any
impact in slowing down the rate of residential development.
From a municipal finance point of view, it is important for us to adopt the
scheduled permit pricing fee which is an 11 percent increase over the existing
schedule. The adoption of this fee schedule allows us to be consistent with
neighboring communities.
.
.
.
CITY OF ELK RIVER 1998 FEE SCHEDULE
WITH PROPOSED CHANGES FOR 1999
ASSESSMENT SEARCH CERTIfiCATION........
ANIMAL LICENSES
Cat.......................................................
Dog......................................................
Duplicate Cat or Dog License.................
Residential Kennel..................................
Commercial Kennel................................
AUDIO/VISUAL
Dubbing Audio Tapes.............................
Dubbing Video Tapes............................
Video Operator.....................................
BOWLING ALLEY LICENSE.........................
BUILDING PERMIT
Industrial. commercial, multifamily
residential, single family homes, and
additions............................................. .
State Residential Contractor license
Search................................................ ..
Miscellaneous Building Permits.................
Heating, Ventilation and Air Conditioning.
Gas Fitting Permit Fee.............................
Gas Fitter's License.................................
Plumbing Permit......... .................. ..........
$15/ea.
$5/2 years
$10/2 years
$2
$50/year
$ 75/year
$S20/tape (must provide own tape}
$.:J-Q30/tape (must provide own tape}
$75 1st 1".:0 hours then $25/hour ($75
minimum}$40/hr - ($80 minimum I
$5/lane
State permit fee, UBC Table 1A plus 65%
plan check fee (valuation based on
current State of MN building valuation
data}
$5/permit
City permit fee schedule Exhibit C plus
State Surcharge
City permit fee schedule Exhibit B
City permit fee schedule Exhibit A
$24/year
City permit fee Schedule 0
COMMUNITY PROfiLE............................... $.20 each
CUPS. ELK RIVER $2.25/ea.
DOCUMENTS
Audit .....................................................
Budget.................................................. .
City Code. ................... .......... .... ............
Copies.................................................. .
Copies - Plat Maps (11 xl 71
Copies - Xerox Map Maker
Housing Maintenance Ordinance............
Meeting Packets................... ............. .....
Microfilm Document................................
$0
$0
$75
$.15 each
11
$2
$5
$7/packet
$l/page
.
.
.
Sign Ordinance....................................... $5
Subdivision Ordinance............................. $5
Zoning Ordinance................................... $25
FALSE ALARMS
Fire.........................................................
Other..................,.................................. .
FLAG. (Citvl............................................
$150 for the 4th alarm, $50 for each
successive alarm thereafter
$50 for 5th alarm
$32 each
GARBAGE HAULER liCENSE........................ $60 1st truck plus $15 each additional truck
GRADING PERMIT..................................... $25 plus city consultant fees if required to
process application
LIQUOR LICENSE
Club...................................................... ..
Intoxicating On Sale.................................
Intoxicating Sunday On Sale.....................
Investigation Fee
Corporation......................................... .
Single...................................................
Non-Intoxicating Off Sale..........................
Non-Intoxicating On Sale..........................
Set Up.....................................................
Wine.......................................................
Temporary Non-Intoxicating.....................
Temporary Intoxicating.............................
Premises Extension Permit (on-salel
MAPS
Aerial Photos...........................................
Aerial Topography Maps..........................
Large Base, Zoning, or Land Use Map........
Medium Base or Zoning Map....................
Medium Base Ward Map..........................
Copies of maps from Xerox Machine
MARKETING BROCHURE... ................ ..... ....
MASSAGE ESTABLISHMENT........................
Initial Fee (Includes Investigation Fee)
Single................................................ ..
Corporation....................................... ..
Partnership............. ................. ........ .....
Renewal Fee...........................................
MASSAGE THERAPIST. .............................
Initial Fee (Includes Investigation Fee)......
Renewal Fee..........................................
$300/year
$4,000/year
$200/year
$250
$150
$75/year
$225/year
$75/year
$650/year
$20/day
$20/day
~
$6/sheet
$15/per acre
$3 each
$2 each
$2 each
$2 each
$3 each
$200
$300
$300
$150
$150
$100
.
MECHANICAL AMUSEMENT.......................
Mechanical Rides...................................
Pin Ball Games.......................................
Pool Tables (Coin Operated)...................
Video Games.........................................
$35/ride
$35/machine
$35/table
$35/game
MINERAL EXTRACTION.............................. $20/acre to be actively mined in
forthcoming year or not reclaimed
PARK DEDICATION FEE (Resolution 95-89)
Residential............................................ ..
Commercial.......................................... ..
Industrial............................................... ..
.
PARK AND GAZEBO RESERVATION FEE
Residents............................................... .
,^,rts Counoil......................................... ...
Community Eduoation.......................... ...
School District...................................... ..,
Large Community Events.........................
0-100 People
101-250 People
251-500 People
Over 500 People
PARKING FINES (Resolution 97-30)
Overtime Parking....................................
Prohibited/Improper Parking....................
No Parking 2 a.m. to 6 a.m.......................
Winter Parking Ordinance........................
Other..................................................... .
Fire Lane/Hydrant....................................
Handicap Parking Only............................
PARKING STICKERS
Railroad Parking Lot.................................
Commuter Parking. ............................. .....
PAWN SHOPS....... .... ........ ........................
Investigation Fee......................................
$5/acre approved but not actively mined
$650/dwelling unit
$2,000/acre
N/A
$aG
$-lOO
$-lOO
$-lOO
UOO
~
ill
$200
$500
(Deposits are refundable if the shelter and
surrounding area are cleared of refuse
and debris prior to leaving the area.)
$$10
$-1415
$-1415
$+015
$-1415
$+$20
$200
$12/space (3 stickers/space maximum)
$12/space (1 sticker per space)
$12,000/year
$1,500
PINS
Plastic - Elk River....................................... $.35 each
Metal- Elk River........................................ 2.50 each
. RENTAL DWELLING L1CENSE......................... $12/ dwelling unit
. SEPTIC INSTAllATION................................ $60
SEPTIC REPAIR................. ..... .......... .......... $30
SEWER AVAilABILITY CHARGE (SAC)
(Plant replacement interceptor)................ $1,300
SIGN PERMITS
Up to 100 square feeL.............................
101-300 square feet............................. .....
Over 300 square feeL..............................
Yearly Advertising Structure (Billboard)
Inspection.............. ........... .......... ............
SOLID WASTE FACILITY LICENSE..................
STREET DISRUPTION/UTILITY HOOKUP PERMIT. $25
.
SURFACE WATER MANAGEMENT IMPACT FEE
(3% annual increase) (Resolution 94-110)
$30
$90
$150
$10
$2,000 plus cost of reviewing license.
Amount of annual cost incurred by the
city for monitoring and inspecting the
facility plus the license.
$e&8d70.89 /residentiallot (rural)
$~141.82/residentiallot (urban)
$826.10850.88/acre (multifamily,
commercial, and industrial)
TOBACCO............................................... $~1 OO/year
TRANSIENT MERCHANT L1CENSE.................. $50/year
WATER ACCESS CHARGE (WACl................. $300
(Contact Municipal Utilities - 441-2020)
WATER CONNECTION CHARGE................... $1,050
(Contact Municipal Utilities - 441-2020)
WETLAND DRAINING OR FilLING PERMIT....... $75 plus consultant fees if required to
process application
.
ZONING/PLANNING APPLICATIONS
Administrative Subdivision,........ ................
Conditional Use Permit
Commercial/lndustrial.......................... ..
Residential............................................ .
Amendments and renewals requiring
public hearings....................... ........... ....
Easement Vacation.. ................................
General Zoning Requests..........................
land Use Plan Amendment.......................
$150 plus Park Dedication if applicable
$300
$100
$75
$150
$50
$300
.
.
.
Nonconforming Sign Alteration..................
Ordinance Amendment...........................
Plats..................................................... ..
Permitted Home Occupations...................
Planned Unit Development (PUD)...............
Site Plan Review.......................................
Variance............................................... ..
Zone Change. ........................... ..............
\ \elkriver\sys \shrdoc \document\resoluti\98fees.doc
$110
$300
$500 + $5/lot for each lot over 50
$15
Charge for whatever planning
applications are needed for the PUD, i.e.
CUP, Rezoning, etc.
$250
$150
$250
.
.
.
EXHIBIT A
CITY OF ELK RIVER
FUEL-GAS PIPING PERMIT FEES
The Chief Building Inspector, before issuing any permit for the installation of
any fuel-gas piping, shall require the payment by the applicant for such
permit of fees in the amount herein provided.
Minimum Fee
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than Eighteen Dollars ($18.00).
Basic Fees
(A)
The fees for all fuel-gas piping permits shall be computed on the basis of the
number of fuel-gas appliances. The fee for each appliance so provided for
shall, except as herinafter otherwise specifically provided, be Six Dollars
($6.00) for each fuel-gas appliance.
(B)
Where any such permit is issued for roughing in of fuel-gas lines for future
appliances, a fee of Six Dollars ($6.00) shall be charged for each line or lines.
(C)
In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance and
future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the
main fuel gas supply in the building shall be charged.
(D)
For the purpose of this article, a gas appliance shall be taken to mean a
furnace, range, water heater, dryer, fIreplace, barbecue, etc.
s:\b&z\ord-fuel.doc
ORD-fueUbz
.
.
.
EXHIBIT B
CITY OF ELK RIVER
HEATING, VENTILATION AND AIR CONDITIONING
PERMIT FEES
FEES REQUIRED
The Chief Building Inspector, before issuing any permit for the installation,
alteration, or repair of any heating, ventilation, and air conditioning
appliance items, connections or appendages, shall require the payment by the
applicant for such permit of fees in the amount herein.
MINIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less that $18.00.
MAXIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be more than $100.00 for a single family home.
PERMIT FEE FOR HEATING. VENTILATION AND AIR
CONDITIONING APPLIANCE ITEMS. CONNECTIONS OR
APPENDAGES
For any permit for the installation, alteration or repair of the above-
referenced items, the fee shall be one percent (1%) of the valuation of the
work or as calculated under the Uniform Mechanical Code, whichever is
greater.
\ \elkriver\svs\shrdoc\b&z\heatvent.doc
.
.
.
EXHIBIT C
CITY OF ELK RIVER
MISCELLANEOUS PERMIT FEES
Decks
$8.00 per square foot for valuation for permit fee; plus state surcharge. Plan
check is included with this price.
Fences
Under 6 feet no charge
Over 6 feet - $15.00 plus state surcharge
Firevlaces and Wood Stoves
$20.00 plus state surcharge
$15.00 plus state surcharge for a burning appliance installed into an existing
chimney
Garaees and Basement Finish
$10.00 per square foot for valuation, use building permit fee plus state
surcharge. Plan check is included with this price.
Re-Roof
Residential- $35.00 plus state surcharge. CommerciallIndustrial - $.50 per
square foot for valuation for permit fee plus state surcharge.
Swimmine Pools
$35.00 plus state surcharge
3 Season Porches
$40.00 (x) square footage = valuation for permit fee plus state surcharge.
Plan check is included with this price.
Movine Structures
Moving structures in - $150.00 plus state surcharge
Moving structures out - $35.00 permit fee
\ \elkriver\sys \shrdoc \b&z \fees. doc
.
EXHIBIT D
CITY OF ELK RIVER
PLUMBING PERMIT FEES
The Chief Building Inspector, before issuing any permit for the installation of
any plumbing work, fixture, or device, shall require the payment by the
applicant for such permit of fees in the amount herein provided.
MINIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than Eighteen Dollars ($18.00)
BASIC FEES
(A)
The fees for all plumbing permits shall be computed on the basis of the
number of fixture openings, plumbing fixtures, or devices provided for in such
permits, whether subsequently so installed or not, and the fee for each fixture
so provided for shall, except as hereinafter otherwise specifically provided, be
Six Dollars ($6.00) for each fixture installed or replaced or set only (no waste
. or vent piping), the fee for each such fixture shall be Six Dollars ($6.00).
(B)
Where any such permit is issued for roughing in plumbing openings only,
providing for certain proposed fixtures, which are to be installed or set later,
a fee of Six Dollars ($6.00) shall be charged for each such opening, which fee
shall be in addition to the fee charged for other plumbing work included in
the same permit.
(C)
For the purpose of this article, a plumbing fixture shall be taken to mean and
include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor
drain, or any other plumbing device arranged to be connected with the sewer
or plumbing system, either directly or indirectly, and required to be trapped.
CITY UTILITY HOOK-UP PERMIT
.
Building Sewer Plant......... ..... ........ ...................... ............. .................... $18.00
Curb Stop Water Connection Permit....... ............................ .................. $21.00
Abandoning or Repairing Water Service Permit.................................. $21.00
Storm Sewer Connection Permit and Inspection Fee............................$18.00
City of Elk River
Plumbing Permit Fees-Exhibit D
Page 2
.
ALTERATIONS. REPAIRS
For each permit for the alteration or repairing of existing plumbing work not
included above, the fee shall be Six Dollars and Twenty-five Cents ($6.25) for
the first Five Hundred Dollars ($500.00) or fraction thereof in the estimated
cost of such proposed work. For each additional Five Hundred Dollars
($500.00) or fraction thereof in such estimated cost, Six Dollars and Twenty-
five Cents ($6.25) shall be added to the above described fee for such permit.
.
\ \elkriver\sys\shrdoc\b&z\ord-plum.doc
.
rCI ~'\)
( );
!l}{
MEMORANDUM
River TO:
Mayor and City Council
tl
FROM:
Cliff Skogstad, Building Official
DATE: December 7,1998
SUBJECT: Adoption of the Minnesota State Building Code
Once again, it is time to adopt the Minnesota State Building Codes. This adoption
process takes place approximately every three years. The reason for these code changes
is to update all applicable codes to today's technology.
Provided for you with this memo is a list of codes staff is recommending to adopt. This
list of codes is all part of adopting the Minnesota State Code. The only change from the
previous code change is the use of the 1997 Uniform Building Code and having the re-
roof chapter part ofthe body of the code and not an appendix chapter.
.
With the adoption of the 1997 State Code a couple of changes will take place. The first
change will be that the 1997 code will allow designers a broader field of code design
such as sprinkling a building and exiting related issues. One of the significant changes
will be the adoption of Table lA in regards to permit pricing. Using the 1994 Table lA
for a $100,000 home, the permit price is $1,476.75. Using the 1997 Table lA with that
same valuation, the permit fee would be $1,639.69. This illustrates an increase of
$162.94, which is approximately an 11 % increase.
After talking with several municipalities, I have found that all of them have adopted the
1997 Table lA. The areas that have not adopted the 1997 table are the out state or non-
metro areas. The last substantial increase for permits was on October 16, 1996 when the
City adopted the 1994 building code.
The next perceived code change will be approximately in the year 2001. I might add that
this will be the last time we will be adopting the Uniform Building Code. The next time
codes will be adopted we will be using the International Building Code. This will be a
significant change for building officials and designers.
Therefore, at this time staff is requesting council approval for the adoption of the State of
Minnesota Building Codes as outlined in this memo.
If you have any questions prior to the meeting, please contact me at 441-4903.
.
s :\b&z\c1 ift\97 code. doc
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425
.
CHAPTER 10
BUILDING AND LAND DEVELOPMENT
SECTION 1000 - STATE BUILDING CODE
1000.00 - ADOPTION OF THE STATE BUILDING CODE
1. Those portions of the Minnesota state Building Code, as
amended, 1997 Edition, with Appendixes as set forth below are
hereby adopted as the Building Code of the City of Elk River as
follows:
The Minnesota state Building Code includes the
following chapter of Minnesota Rules:
i. 1300 Minnesota Building Code
ii. 1301 Building Official certification
iii. 1302 state Building Construction Approvals
iv. 1305 Adoption of the 1997 Uniform Building Code
including
Appendix Chapters:
a. 3, Division I, Detention and Correctional
Facilities
12, Division II, Sound Transmission
Control
15, Reroofing
16, Division I, Snowload Design
29, Minimum Plumbing Fixtures
31, Division II, Membrane Structures
Elevators and Related Devices
Adoption of the 1996 National Electrical
A.
.
b.
c.
d.
v.
vi.
e.
f.
1307
1315
Code
1325
1330
1335
1340
1346
Code
1350
1360
1361
1370
4715
7670
vii.
viii.
ix.
x.
xi.
xii.
xiii.
xiv.
xv.
xvi.
xvii.
Solar Energy Systems
Fallout Shelters
Floodproofing Regulations
Facilities for the Handicapped
Adoption of the 1991 Uniform Mechanical
Manufactured Homes
Prefabricated Buildings
Industrialized/Modular Buildings
Storm Shelters (Manufactured Home
Minnesota Plumbing Code
Minnesota Energy Code
Parks)
2. Enforcement. Enforcement of the Building Code shall be
as established by the Uniform Building Code, 1997 Edition. The
Building Code shall be enforced within the incorporated limits
of the city. The city Council shall designate the Building
Official for the City of Elk River.
.
..
.
3.
Permits, Inspections, Fees, and Surcharge
A. Permits, Inspections, and Fees. Permits,
inspections, and collection of fees shall be as provided
by the Uniform Building Code, 1997 Edition. The Council
shall establish the fees and charges from time to time by
resolution.
B. Surcharge. In addition to the required permit fee,
the applicant shall pay a surcharge to be remitted to the
Minnesota Department of Administration as prescribed by
Minnesota Statutes 1984, section 16B.70.
4. Violations and Penalties. The violations of this section
shall be a misdemeanor. Each day that a condition in violation
of this section shall continue shall constitute a separate
offense.
.
.
\ \elkriverlsyslshrdoc\b&z\cliff\chaptl O.doc
.
INFORMATION
GOLUTION~
A RESOLUTION OF THE CITY OF ELK RIVER
A RESOLUTION ESTABLISHING
THE SURFACE WATER MANAGEMENT
IMPACT FEE RATES
WHEREAS, the City of Elk River has a need for surface water
management throughout the community; and
WHEREAS, the City of Elk River has completed a surface water
management study; and
WI;iEREAS, the surface water management study has assisted the City in
.~:
determining which drainage improvements are necessary to
help eliminate the most urgent surface water management
problems; and
.
WHEREAS, the City has determined to fund the surface water
management improvements through a variety of funding
sources including a Surface Water Management Impact Fee;
and
WHEREAS, the City has determined that this Surface Water Management
Impact Fee should be collected from the property owner at the
time of platting, or in the case of existing lots, at the time of
issuance of a building permit.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City
of Elk River J\1innesota:
1. The Surface Water Management Impact Fee for all rural
(non-city sewer and water) single-family residential lots
shall be $60.00 in 1994. On January 1 of each succeeding
year, the rate shall increase three percent (3%).
2. The Surface Water Management Impact Fee for all urban
(city sewer and water) single-family residential lots shall
be $120 in 1994. On January 1 of each succeeding year,
the rate shall increase by three percent (3%).
.
3. The Surface Water Management Impact Fee for all non-
single-family residential property shall be $720 per acre
.
.
.
in 1994. On January 1 of each succeeding year, the rate
shall increase by three percent (3%).
Passed and adopted by the City Council of the City of Elk River this 24th day
of October, 1994.
(;? /9- oJ--
<.,. ( 11 / /f I. (,.J.-tt'_4.
/Henlj7 A. Duitsman, Mayor
ATTEST:
d---L // --Jlw<~,--,y
Sandra A. Thackeray, City Clerk ./
.
RESOLUTION 99-_
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ADOPTING FEES FOR SERVICES FOR 1999
WHEREAS, the council reviewed the fees charged for services on a yearly basis to
ensure that the fees charged reflect services rendered; and
WHEREAS, the costs incurred to process various licenses, services, zoning, and
planning requests have been reviewed by the City Council.
NOW, THEREFORE, BE IT RESOLVED that the attached fee schedule reflects
the fees charged for services rendered by the City of Elk River in 1999.
Passed and adopted by the City Council of the City of Elk River this 25th day of
January, 1999.
Stephanie A. Klinzing, Mayor
. ATTEST:
Sandra A. Peine, City Clerk
\ \elkriver \sys \shrdoc \documen t \resol uti \fees.doc
.