The City of Elk River is proposing to fill 4.3 acres of wetland to accommodate the
extension of Tyler Street from County Road # 13 south to 171 st Avenue. This new road
will ultimately connect to US Trunk Highway 10 via an existing improvement to 171 st
Avenue.
The project includes, the creation of 7.5 acres of new wetland and 6.5 acres of public
value credit that will be used as replacement for the wetland filled. The attached maps
show the locations where wetland will be filled and created for the project.
. FINDINGS
MSA, Consulting Engineers delineated the wetland in question.
The Technical Evaluation Panel was convened on this issue on 9/24/98 and again to
review modifications to the plans on 10/15/98.
The plan by the City of Elk River to fill and replace wetlands was found acceptable by
the Technical Evaluation Panel after modifications.
On October 23, 1998, the city sent out combined notification ofthe proposed filling and
replacement plan to the necessary agencies.
Responding to concerns raised by several governmental agencies, city staff met on site
with the US Fish & Wildlife Service, Minnesota Pollution Control Agency, Minnesota
Department of Natural Resources, Board of Soil and Water Resources, and the Soil and
Water Conservation District on November 5, 1998.
Modifications to the plans were made and mailed to all interested parties on December 8,
1998.
.
The modified plans have been found acceptable by all agencies including the US Army
Corps of Engineers.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425
. RECOMMENDATION
Staff recommends approval of the proposed filling and mitigation plan for this
project with the following stipulations:
1. That a restrictive covenant and drainage and utility easement be recorded on the
mitigation areas.
.
.
.
J
WETLAND 1M PAC AREA 12
2,718.1 m2(0.2718 hectares)
29.257 ft2(0.67 acres)
ROAD
NO. 12
.....
...
~
~
iE
~
HILlSIDE
WETLAND IMPACT AREA U1A
1,885.9 m2(0.1884 hectares)
20,300 ft2(0.466 acres)
CITY PARK
WETLAND IMPACT AREA U3
1,1806.2m2(0.1806 hectares)
19,442 ft2(0.4463 acres)
WETLAND IMPACT AREA D
170.7 m2 (0.0171 hectares)
1,837 ft2(0.042 acres) -
I
WETLAND IMPACT AREA A
9,209.6 m2 (0.9210 hectores)
99,131 ft2 (2.276 acres)
~
o
HORIZ (M)
1: 10,000
400
rbNc:rd R G-een Compcny
CONSULTfilG ENGINEERS
AST ELK RIVER IMPROVEMENT
WETLAND IMPACTS
(SOUTH OF CSAH 12)
CEMVP-CO-R (98-06729-GAE)
EXHIBIT
5
r.: t:~ " , ,~
.,~ , ~:,.;, .~
WETLAND IMPACT AREA H
1,509.7 m2(0.1510 hectares)
16,251 ft2(0..37.3 acres)
I
. WETLAND IMPACT AREA H2
102.201 m2 (0.01Q2 hectares)
1,100 ft2 (0.025 dcres)
WETLAND IMPACT AREA H4
896.716 2 (0.0897 hectares)
9,652 ft2 0.222 acres)
COUNTY ROAD NO. 12
r;!
~
! HILLSIDE
CITY PARK
o
ER220-CSAH1J_METPN
I-b.iva'd R G'een Coo1pcny
CONSULTING ENGI~ERS
AST ELK RIVER IMPROVEMENTS
WETLAND IMPACTS
(NORTH OF CSAH 12)
CEMVP-CO-R (98-06729-GAE)
~
HORIZ (M)
1: 10,000
400
EXHIBIT
6
WETLAND REPLACEMENT AREA M1)
82..3 m2(0.0082 hectares)
886 ft2(0.020 acres)
PRIVATE) I
WETLAND REPLACEMENT AREA (M2)
.364.3 m2(0.0.364 hectares)
.3921 ft2(0.090 acres) I
J
......
...
111I ~LL~DE
WETLAND REPLACEMENT AREA M5
1046.8 m2(0.1047 hectares)
11,268 ft2c0.259 acres)
WETLAND REPLACEMENT AREA (M6)
150.3.2 m2(0.150.3 hectares) CITY PARK
16,180 ft2c0..371 acres)
I I
WETLAND REPLACEMENT AREA M7A)
1478.1 m2(0.1478 hectares)
15,911 ft2(0..365 acres)
/
OAD
~
f'~
%
~~..
SOUTH POND PUBLIC VAL E CREDITS-
2
5908.4 m (0.5908 hectares)
6.3,598 ft2 (1.460 acres 0
UPLAND BUFFER AREA M7A
2644.2 m2(0.2644 hectares)
28,46.3 ft2(0.65.3 acres)
UPLAND BUFFER AREA (M4)
\4595.2 m2(O.4595 hectares) \.
49,464 ft2(1.1.36 acres)
WETLAND R~PLACEMENT AREA (M4)
14,2.32.9 m (1.4232 hectares)
15.3,207 ft2(.3.517 acres)
~~~RD
UPLAND BUFFER AREA (M7)
6692.4 m2(0.6692 hectares)
~ 72,0.39 ft2(1.654 acres)
~
;
ri>
\J\
ri>
\!:!
~
:2
WETLAND REPLACEMENT AREA (M7)
2895.0 m2(0.2895 hectares)
31.16.3 ft2(0.715 acres)
ER220- TYl METAPN
L
~
o
HORIZ (M)
1: 10,000
400
AST ELK RIVER IMPROVEMENT
WETLAND MITIGATION
(SOUTH OF CSAH 12)
I-bJvaU R Geen ComPaly
CONSULT",,, ENGINEERS CEMVP-CO-R (98-06729-GAE)
EXHIBIT
8
UPLAND BUFFER AREA (M8)
4150.9 m2(0.4151 hectares)
44,681 ft2c1.026 acres)
I
WETLAND REPLACEMENT AREA M8
6327.2 m2(0.6327 hectares)
68,108 ft2(1.564 ceres)
ER220-CSAH13_METAPN
EAST ELK RIVER
WETLAND MITIGATION
(NORTH OF CSAH 12)
CEMVP-CO-R (98-06729-GAE)
f-bNa'd R. C?teen Cornpcrly
CONSULTING ENGINEERS
COUNTY ROAD NO. 12
.....
~
~
~ HILLSIOE
......
CITY PARK
~
o
HORIZ (M)
1: 10,000
400
EXHIBIT
9