4.0. SR 02-23-1999
rCI ~\)
( )j
tfl<
Item #4.
MEMORANDUM
TO:
Mayor & City Council
FROM:
Pat Klaers, City Administrator
DATE:
February 23, 1999
SUBJECT: Joint Meeting
A joint meeting between the Sherburne County Board and the City Council is
scheduled for 6 p.m., Tuesday, February 23, 1999, in the Elk River City Hall
Training Room.
As the city has two new elected officials, it is appropriate to begin the meeting
with introductions.
.
Attached for your review and information is the minutes from the last joint
meeting between the county and the city which was held on Monday, March
30, 1998. Some of the topics discussed at that joint meeting are again on this
agenda.
Some of the topics for the joint meeting are set up so that the county can take
the lead in the discussion and, on the other hand, some of the topics are set up
so that the city can take the lead in the discussion. In between are some items
which I anticipate will receive almost equal participation by both city and
county representatives. Following is a brief summary of some of the issues
which will be discussed on Tuesday, February 23, 1999.
4.1. Northstar Corridor Project
I anticipate that the county will take the lead in the discussion of this
project.
.
The biggest issue for the city appears to be related to the siting of a
depot location and obtaining an understanding of the parking needs
associated with the Elk River depot. If a depot is to be in the downtown
area, this will have a tremendous impact on business owners and on the
future of the downtown. We cannot "wipe out" half the downtown to
create the depot and parking lot. We may also need to look at a safer
way to get pedestrian traffic across the tracks.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 . Fax: (612) 441-7425
. 4.2. Enerl!'V City
The city will take the lead on this discussion item. Please see the
attached material from B/Z Administrator Steve Rohlf.
4.3. Government Center and Jail Construction Project
The county will take the lead in updating the city on the status of this
construction project and some of the site improvements associated with
the expansion.
4.4. County Roads in Elk River
Please see the attached memo from B/Z Administrator Steve Rohlf on
this topic.
County Roads 12/13
.
The city and county staffs have been working on the reconstruction of
County Road 12 and the realignment of County Road 13 for the past
year or so. These two county road projects are so interrelated, it is
difficult to separate them out and call them separate projects. City staff
is proposing some financial participation in these county road projects
without acknowledging acceptance or agreement with the county cost
participation policy.
The city engineer was hired by the county to do some preliminary work
on the County Road 12 reconstruction. The work from the city engineer
has been completed and this project is now entirely in the county
engineer's control. In this regard, it is likely that the county engineer
will take the lead in the discussion of this item.
County Roads 33/77
.
The city and the county have jointly worked on the reconstruction of
County Roads 33 and 77. This is directly related to the gravel mining in
the area and the ultimate desire to lower these two roads (and to
facilitate the gravel miners opportunity to remove the gravel which is
underneath the county roads). If this cooperative working relationship
does not work out, the county would end up with two roads which have
virtual drop offs into gravel pits. I don't think that anyone views this as
an appropriate situation from a safety point of view or from a future
.
land use point of view. Progress has been slow, but everyone seems to
be cooperating to achieve the common goal of lowering the elevation of
these county roads.
County Road 1 & 77 Intersection
Warrants for the County Road 1 & 77 signal were completed a number
of years ago and the results of the study indicated that once residential
development was nearly completed, the signal in this intersection would
be necessary. It is appropriate for the county to take the lead in
discussing this item and advise us as to their long range plans for a
signal at this intersection.
4.5. School Liaison Prol!'ram
City, county, and school representatives met to discuss the school liaison
program on Tuesday, Februaryl6, 1999. A follow up meeting is
scheduled for Wednesday, February 24, 1999. The county sheriff and
Councilmembers Farber and Motin should be able to provide everyone
with an update on the status of the discussions. It appears that a joint
funding compromise may be able to be reached.
.
4.6. County Ditches and City Surface Water Manal!'ement (SWM)
Prol!'ram
Attached is some information from B/Z Administrator Steve Rohlf
regarding joint city/county work on Ditch 10.
4.7. Solid Waste Issues
Please see the attached memo from B/Z Administrator Steve Rohlf
regarding solid waste topics.
An important issue facing the city and county in 1999 relates to the
RDF tipping fee. The city has a contract with the county to dispose of
its residential waste at the RDF plant for an established per ton
amount. This established amount is $5/per ton more than last year and
is scheduled to go up by $5 increments for the next few years. This
ultimately would cause our city garbage rates to go up. However, this
may not be necessary if the garbage haulers can dispose of their waste
at the landfill for a lower fee. This will be discussed when the city
renews its garbage hauler contracts in October. The city is seriously
.
.
.
.
4.8.
concerned that our garbage rates will get to be substantially higher
than garbage rates in neighboring townships.
A couple of years ago the county added a $20 per household surcharge
on the property tax bill for garbage disposal expenses. As a result of
this tax levy the city reduced its garbage collection rates by $20/year to
the Elk River households. This property tax expense was removed for
1999, however, the city did not have to increase its garbage rates by $20
per year as we have a small reserve in our garbage fund which we are
spending down.
City garbage rates, destination of Elk River garbage, and the city/county
contract and tipping fee are all anticipated to be extensively discussed
this summer as city garbage hauler contracts come up for renewal in
October.
1999 Lel!'islative Session
There are a number of issues being discussed at the legislature which
impacts on both the city and county. The issues include the concern
which developed last year regarding the personal property taxes
associated with power plants. Both city and county staffs will update
the board and council on issues of mutual concern.
\ \elkriver\sys\shrdoc\council\jntmtgmm.doc
'.
.
.
.
SPECIAL JOINT MEETING OF THE ELK RIVER
CITY COUNCIL AND THE SHERBURNE COUNTY
BOARD OF COMMISSIONERS
HELD AT THE SHERBURNE COUNTY GOVERNMENT
CENTER - COMMISSIONERS BOARD ROOM
MONDAY, MARCH 30,1998
Council Present:
Mayor Duitsman, Councilmembers Dietz. Farber, Holmgren
and Thompson
Council Absent:
None
City Staff Present:
Terry Maurer. City Engineer; Steve Rohlf, Building and Zoning
Administrator; Pat Klaers, City Administrator
Commissioners Present:
Chair Nagorski, Commissioners Wergin, Engstrom, and
Johnson
Commissioners Absent:
Commissioner Friedl
County Staff Present:
Dave Loch, County Administrator; Dave Schwarting,
County Engineer
Call Meetina to Order and Consider Aaenda
Pursuant to due call and notice thereof. the joint meeting of the Elk River City
Council and the Sherburne County Board of Commissioners was called to order at
6:00 p.m. by Sherburne County Chair Nagorski.
It was the consensus of the County Board and the City Council that the agenda
was acceptable as distributed.
1.a. County State Aid Hiohwav # 12
The county has contracted with the city engineering firm. Howard R. Green
Company to provide engineering services for this county road reconstruction
project. City Engineer Terry Maurer reviewed the project. Current plans call for
the project to begin in 1998 and to be completed in 1999. One of the big issues
with this project moving forward in 1998 is the obtaining of right-of-way from the
abutting property owners.
2.
County Cost Sharina Policv
This new policy has a significant impact on the County Road 12 project. With
previous county road projects. there was no cost sharing required. Under this new
county policy the city is being requested to contribute approximately $325.000
into the project for the construction of the trail. median. and concrete curb and
gutter. It was noted that the county policy is generally modeled after existing
policies in counties which are mainly rural. In the city's analysis of cost sharing
.
.
.
Elk River City Council Minutes
March 30. 1998
Page 2
policies from urban counties, it is estimated that the city's contribution for the
trails. median, and curb and gutter would be significantly less and that the city
would be obligated for approximately $110,000 of the improvements. Even this
lower amount reflects a dramatic change from past practices in Sherburne
County.
Mayor Duitsman indicated that the City Council believes that the new county
policy is unfair as it relates to county roads in urban areas and that it needs to be
changed to address this situation. The Mayor further indicated that if there is not
a change in the county's policy for cost sharing on County Road 12, then this
project may have to be dropped.
No decision on cost sharing for County Road 12 was reached and the county
and city staffs were directed to work on an equable solution to this problem.
1.b. County State Aid Hiahwav # 1
County Engineer Dave Schwarting provided an update on the completion
timetable for this project. Concerns were expressed regarding the County Road
1 and County Road 77 intersection.
1.c.
Community Based Planning and County Transportation Plan
Dave Schwarting provided an update on the adopted (March 10, 1998) County
Transportation Plan. This plan includes a bridge crossing over the Elk River near
the western boundary of the city and an east/west collector route from Highway
1 69 to County Road 1.
Commissioner Wergin provided an update on the existing law and proposed
legislation regarding community based planning.
1.d. County Roads 77 and 33 Realianment
Dave Schwarting provided an update on the status of this project. It was noted
that the realignment is included in the County Transportation Plan and that the
gravel operators are hoping for construction activity in 1998 prior to their
relocation in 1999 out of this area and into another gravel pit in Elk River. An
important issue with this project is the relocation of NSP poles. A preliminary road
alignment needs to be accomplished soon and the staffs are planning to meet in
the next few weeks to work on this project.
1.e. Hiahwav 10 and Upland Avenue Intersection
City Engineer Terry Maurer provided an update on this project which is scheduled
to be completed in 1998. It was noted that the north leg of this project is a
County Road and the south leg is a city street. Concern was expressed about
increased traffic on County Road 44 and improvements that may be necessary
to handle pedestrian traffic and a higher volume of vehicle traffic on this county
road.
.
.
.
Elk River City Council Minutes
March 30. 1998
Page 3
Lt.
Other
The city engineer updated the Board on the planned signal in 1999 for 171 sl
Avenue and Highway 10.
The city engineer noted that city and county staffs are working on the turnback
of the north Highway 10 frontage road from the county to the city.
4. Business Center Drive Frontaae Road
The city engineer noted that this project is moving forward for construction in
1998. The city is currently out for bids on this project and the assessment hearing
will be scheduled in the near future.
3. Solid Waste Issues
Building and Zoning Administrator Steve Rohlf provided an update on the landfill
expansion plans and the city's concern over the county garbage ordinance.
5. Lake Orono
Steve Rohlf provided an update on the plans for improvements to Lake Orono. It
was noted that the lake will be drained for three months (August, September, and
October) for this sedimentation removal project. The county financial
participation in the project was requested by the Mayor.
6.
Leaislation on Power Plants
Commissioner Wergin provided an update on possible legislation which would
affect the tax base in the county and city as it relates to power plants. Nothing is
anticipated in 1998, but efforts will take place in 1999 to change the current
system.
7. Government Center Construction Proiect
County Administrator Dave Loch provided an update on this project which is
currently 30-40% complete. The target date for completion is January 1999. The
expansion of the jail is a recent change and is a $7 million expansion in addition
to the original construction project of $9 million. It was noted that a city
conditional use permit may be required for the expansion of the jail.
8. Other Issues
Dave Loch provided an update on the County Park Plan and Commission.
Steve Rohlf provided an update on the Energy City Program.
Dave Loch provided an update on the Northstar Corridor Project.
City Administrator Pat Klaers provided the City Council an update on the staff
assistance being provided to the city of St. Peter as a result of the tornadoes. The
.
SHERBURNE COUNTY BOARD/ELK RIVER CITY COUNCIL
2/23/99
Stephen Rohlf
Discussion Item #2 - Energy City
The Energy City project is ajoint effort between Minnesota's energy industries, the
Minnesota Environmental Initiative, and the City of Elk River. The purpose of the
project is to demonstrate that wise energy decisions can make economic sense. The
companies displaying energy efficient products and renewable energy technology in
Energy City are not only trying to prove their environmental benefits, but also that they
can be sustained in the marketplace. Energy City will be of great benefit to the economic
development of Sherburne County and the City of Elk River.
Energy City is building up momentum and getting national attention. Energy House I
received the top award in the nation for cold climate energy efficiency from the National
Association of Home Builder's Research Center. In addition, the Elk River Landfill Gas-
to-Electricity Project was named the 1998 Project ofthe Year by the United States
Environmental Protection Agency.
.
Energy House I is no longer available as a model, but Energy House II has already
opened. Another major Energy City project in 1999 will be the construction of one of the
world's largest wind generators. This single wind turbine will generate enough electricity
for approximately 250 homes. It is a significant demonstration because Elk River is at
the low end of the commercial wind resource.
Recently, Energy City met with Kurt Kragness of the Sherburne County Historical
Society. The proposed Heritage Center in Becker has potential to be an Energy City
demonstration site for energy efficient construction, heating, cooling, and
dehumidification. Also, Sherburne County's past and future is greatly entwined with
energy related issues (e.g. the first rural nuclear power plant and the RDF facility).
Hopefully, Energy City will be working with the Historical Society on energy related
displays for the Heritage Center.
.
.
.
.
SHERBURNE COUNTY BOARD/ELK RIVER CITY COUNCIL
2/23/99
Stephen Rohlf
Discussion Item #4 - Streets
(Co. Rd. #33 and Co. Rd. #77)
The lowering and realigning of County Roads #33 and #77 is proposed in the
transportation plans of both Sherburne County and the City of Elk River. The
reclamation and redevelopment of gravel mines in the area can not be logically
accomplished without this road work.
The timing of when to accomplish this work has been of issue, not whether or not it
should be done. Both the County Board and the City Council have agreed that it is
logical that the work on these roads is done while Barton Sand & Gravel is still mining in
the area and willing to participate in the construction.
City Staff and Engineer, the County Engineer, Barton Sand & Gravel, and Shiely Co.
have had several meetings on this issue. The last meeting was on August 4, 1998. At
that meeting, Dave Schwarting presented his preliminary alignments for these roads. It
was the consensus of the group that the final alignments of the roads be as close as
practical to the NSP power line in the area to minimize the unusable land between the
power line and roads.
The next step in the process is for Tiller to provide Mr. Schwarting with the elevations in
their pits so he can prepare his final road alignments. It was estimated that Tiller would
need approximately six months to gather the information. The next meeting on this
subject will likely take place soon.
Attached is a summary ofthe Sherburne County 1998 gravel tax collected. The majority
of the gravel tax collected in Sherburne comes from three companies: Barton Sand &
Gravel, Shiely Co., and Plaisted Companies. All three of these companies need to use the
roads in question to haul their product. Gravel tax is meant for the repair of roads
damaged by the mining. It seems a logical source of revenue for the County and City to
consider for a project involving County Roads #33 and #77.
.
.
.
SHERBURNE COUNTY
1998 GRAVEL TAX
COLLECTIONS
Bauerly Bros
Shiely Co
Granite City
Barton Sand & Gravel
Elwyn Manthei
Plaisted Companies
Midwest Asphalt Corp
DISTRIBUTION
County Road & Bridge
Towns & Cities
Big Lake Twp
Haven Twp
Livonia Twp
Elk River City
$0.00
$7,470.26
$319.56
$49,788.12
County Gravel Tax Reserve Fund
Balance in County Gravel Tax
Reserve Fund as of December 31,1998
ti~"'-""
$7,185.30
$62,329.36
$17,981.95
$70,603.28
$1,065.20
$19,543.96
$13,217.46
$191,926.51
$115,155.94
$57,577.94
$19,192.63
$202,402.16
71853Y
890419.44T
256885.00T
1008618.30T
15218.00T
279199.51T
188821.06T
.
SHERBURNE COUNTY BOARDIELK RIVER CITY COUNCIL
2/23/99
Stephen Rohlf
Discussion Item #6 - Ditches
The attached map shows a significant portion of County Ditch # 1 0 that will be taken over
by the City of Elk River in 1999. Another portion of County Ditch #10 that started at
Main Street west of US Trunk Highway 169 and connected to that portion of the ditch the
city is currently taking over, was replaced by city storm sewer a couple of years ago.
The special ditch legislation encouraged by Sherburne County and the City of Elk River
made this transfer of authority possible. City staff foresees a continued orderly transition
of authority from the county to the city as projects improve or modify the ditches.
.
.
.
.
.
Howard R. Green Company
CONSULTING ENGINEERS
February 4, 1999
File: 800110J-0064
Mr. Patrick Klaers
City Administrator
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: EAST ELK RIVER
COUNTY DITCH 10
Dear Mr. Klaers:
Steve Rohlf has been working with the County staff relative to County Ditch No. 10 within the
area of the proposed East Elk River improvements. On Wednesday, February 3, 1999, the
County Board had an item on their agenda to turn over a portion of County Ditch No. 10 to the
City of Elk River in accordance with the special legislation that was passed in 1995. The County
Board passed this item unanimously. The portion of the ditch that was turned over was from the
Mississippi River up through the railroad tracks then north to County Road 12 and southeasterly
to 175th Avenue. The attached map shows the area of the ditch that has been turned over to
the City of Elk River.
As you are aware, the City will be making improvements that will provide a storm sewer pipe
system in this area to replace the County ditch. It was felt that this is the best approach to
accomplishing the City's proposed storm sewer improvements while also deal with the proposed
developments of Elk River Crossing and the Vandenberg Industrial site.
I have also attached for your information a copy of the Sherburne County agenda item and
background information regarding this issue.
If you have any questions regarding this information, please contact me.
Sincerely,
HOWARD R. GREEN COMPANY
~~.
~
T:'rry J. aurer, P.E.
Attachments
oJprojJ110-0204.feb
1326 Energy Park Drive. St. Paul, MN 55108 . 651/644-4389 fax 651/644-9446 toll free 888/368-4389
@
o
g
~
ii::
.e,
1000
,
~01<1<t(,L
",,1<1<1'
~VVITION
.
SHERBURNE COUNTY BOARDIELK RIVER CITY COUNCIL
2/23/99
Stephen Rohlf
Discussion Item #7 - Solid Waste Issues
(Elk River Landfill)
Sherburne County staff and City of Elk River staff continue to work jointly on regulating
the landfill. The staffs have also taken great effort to coordinate the county's and city's
permits with the Minnesota Pollution Control Agency's (MPCA) permit. This
coordinated effort gives all three entities greater persuasive power with the landfill to
accomplish what needs to be done environmentally and also eliminates conflicting
requirements for the landfill's sake. The next major issue for the landfill that staffwill be
considering is a revision to their Industrial Waste Management Plan.
(SCORE)
The City of Elk River is working with the Cities of Big Lake, Becker, and Zimmerman
on an agreement to jointly own and use a large wood chipper. The large size of the
chipper makes it more efficient for these cities, but also puts it out of a single cities price
. range, were they to purchase it individually.
Sherburne County has awarded $35,000 a year for the next four years to be put toward the
purchase ofthis wood chipper. The City of Elk River wants to thank the Sherburne
County Board for this grant and looks forward to working with the county on other
landfill abatement projects in 1999.
[Tipping Fee at the Refuse Derived Fuel (RDF) Plant]
The city's contract with the county to dispose of its waste at the RDF Plant expires on
December 31, 1999. The current tipping fee of $46.00/ton that the city pays is proposed
to be raise to $51.00/ton in 2000 and $56.00/ton in 2001.
The city is concerned with the county meeting their tonnage quota at the RDF Plant, but
with private haulers receiving a much better rate at the landfill the new tipping fee rate
may be hard to economically justify to our residents. An option would be to let the
haulers dispose of the city's waste wherever they can find the best deal as long as it is
environmentally safe. The city's contract with the haulers is up for renewal in October.
.