Loading...
5.4 ERMUSR 03-13-2017 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Troy Adams, P.E.—General Manager John Dietz—Chair Daryl Thompson—Vice Chair Al Nadeau—Trustee MEETING DATE: AGENDA ITEM NUMBER: March 13, 2017 5.4 SUBJECT: Bids for 69kV Substation Transformer BACKGROUND: Approved with the 2017 budget was the addition of a new electric substation. This new substation will be located adjacent to our existing Waco Substation on the NW corner of County Road 35 and Zebulon Street NW. This substation will service load growth on the western side of Elk River which includes: • Electric service territory acquisition areas 3, 4, 5, 6, and 7. These acquisition areas comprise less than 50% of the load and customers associated with the 2015 electric service territory transfer agreement executed with Connexus Energy; • The Sherburne County Government Center expansion; • Capacity for potential future data center located adjacent to the Sherburne County Government Center; • Future emergency interconnection with the ERMU Otsego Substation. DISCUSSION: One of the larger components of the substation addition is the transformer. This transformer steps down the 69kV transmission system to ERMU's distribution voltage of 12.47kV. The cost of this transformer exceeds the threshold amount and is subject to competitive bidding law. The bid opening was March 6 and the bid tabulation is attached.All bids were within the expected range and approximately$250 less than peak quotes for the same transformer specification in 2007. The quotes and equipment specifications were reviewed by our substation engineering contractors at Great River Energy(GRE). The two lowest responsive bidders are effectively at the same price. However, there is a significant difference in delivery time. Because of this difference in delivery time and the indirect costs and system load operational coordination considerations associated with extending the construction schedule,the GRE engineers have recommended choosing the Waukesha transformer. Currently in the ERMU distribution system, riwEIEI ® / Ei Page l of 2 ATURE Reliable PiblicW Power Provider POWERED T O SERVE 107 four out of seven of our 69kV/20.47kV substation transformers are Waukesha transformers. The similarity in equipment of our substations is a value and safety adder. Also included in all of the quotes was the option to have a short circuit test conducted. The GRE engineers have recommend that we not conduct the test as the costs greatly exceed the value. ACTION REQUESTED: Staff recommends the Commission award the bid for the 69kV substation transformer per the bid package specifications to MC Sales for the Waukesha transformer with a 22-26 week delivery window for the amount$543,883. ATTACHMENTS: • 69kV Substation Transformer Bid Tabulation • Bid and Specification Analysis and Recommendation Letter 1 / Page 2 of 2 [POVEREI NATURE Reliable Ptblic� Power Provider POWERED T O S ERV E 108 asU U c _a U) L = a 06 0 m O O O N (n •O� CO O N `' O O co a) n' � M• O CO j LO CY N LO co LI) N Q 0 X N G) 69- 6R b9 N z M >S' a_ •� N co L UCCr3 1- v NOM CO N N 2 '5M coc`? 44- H 0_ N � CO 0 ca M Y al O O N co o U O > a) o C CO _ CO N- O Q CO N- N M N 69- 69 I- L �� Z > x Y LN L 0 a) O u) CO M o E co c N m d CO 0) <CO CO L L C) >Y CO O N � > Lo ( a) O O) Cl) � in CV O Es. N N 69- 694 U) Lf) cn • 4 C') X C cU) � (C) } O - N R E ) ` '-o N OC Y u) mo UN 12o as C d) v) o 2coOco > co DYa)a) 0 c ...r co O N O a 0 c C CO E N U O a (s ca = L r L = U 0 i > ca = ca a aa) c a' c 0 <Y I- 0 U CO = - > ,_ 0 ai L W m m Ute) m 2 t 0 a. v) Adams, Troy From: Newton,Jared GRE-MG <jnewton@GREnergy.com> Sent: Tuesday, March 07, 2017 11:21 AM To: Adams,Troy Cc: Fournier, Geralyn; O'Neill, Mike GRE-MG Subject: RE:Transformer bids Troy, After comparing the bids,the cost and warranty for the SPX Waukesha unit and the Delta Star unit are effectively the same. However the Delta Star unit has an additional 20 weeks delivery time. I think the SPX Waukesha unit is the best choice. I reviewed the SPX Waukesha bid,and it appears to be complete. It includes setting the transformer on the pad and field dressing the transformer. As we talked about yesterday,Waukesha will cover a crane to set the transformer on the pad. If the offload process becomes more involved,the additional cost will be on ERMU. This will be the same with all vendors. Let me know if you need additional review. Thanks, Jared Newton From: Fournier, Geralyn [mailto:GFournier@elkriverutilities.com] Sent: Monday, March 06, 2017 11:43 AM To: Newton,Jared GRE-MG <jnewton@GREnergy.com> Cc:Adams,Troy COOP-ERMU <tadams@elkriverutilities.com> Subject:Transformer bids EXTERNAL Jared, Troy asked that I scan these bids over to you for further review. Thanks, Geri Fournier I Purchasing Specialist 763.441.2020 w 1763.635.1324 d 1763.441.8099 f 13069 Orono Parkway, P.O. Box 430 1 Elk River I MN 155330-0430 riiittNii It Elk River 'itNATURE Municipal Utilities i PL)Atflkftt TO SfiittSir This email (including any attachments) may contain information that is private or business confidential. If you received this email in error,please delete it from your system without copying it and notify sender by reply email so that our records can be corrected. 1 110