Loading...
6.1c ERMUSR 03-13-2017 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: March 13, 2017 6.1c SUBJECT: Staff Update DISCUSSION: • Had six new services. • Continue working on collecting data with the GPS for our ArcView maps as time permits. • Continue tree trimming. • Continue rebuilding 165th Ave; this is in Area 2 that we acquired from Connexus. • Started ordering material for Waco 2 Substation. • Had a pre-construction meeting for Wildflower Meadows 6th Addition which consists of 24 residential lots in Otsego, and a pre-construction meeting for Miske Meadows development which consists of 86 residential lots in Elk River. • The City shop does D.O.T.'s for our trucks and trailers. They will be doing these during February, March and April. • Diversified did our annual inspections on the bucket and digger trucks. The inspections include: Visual/Operational, Magnetic Particle, Dielectric, Load and Acoustic Emission Testing. • We interviewed two applicants for the Locator position on February 24. We extended an offer to, which was accepted by Jon McLean. His first day will be March 13. E. Page 1 of 1 [ IVUIi1E Reliable Publicx Power Provider POWERED T o $ERV E 264