9.2. PRSR 03-09-2017 Item 9.2 City Elk Memorandum River To: Parks and Recreation Commission From: Tim Sevcik,Park Superintendent Date: March 2, 2017 Subject: Staff Report Hillside City Park Staff is wrapping up tree clearing operations at Hillside City Park with likely one week of work remaining. Due to the warm weather in February and the melting of the snow, staff was unable to continue burning brush on the property, thus the remaining brush will need to be hauled out of the forest and staged in the southern clearing in the event that conditions allow further burning. If brush cannot be burned,it will be chipped along with the logs generated from the removals by a contracted vendor. Bailey Point Nature Preserve Demolition of the old horse stable building at Bailey Point Nature Preserve was conducted the last week of February. Staff conducted the demolition internally resulting in minimal costs for asbestos testing and landfill fees. Total cost for this demo project is anticipated to be less than $1,500. Final grading and seeding of the site and the access trail to the barn will be conducted in the spring when conditions permit. Spring Clean-ups Staff has taken advantage of the unusually warm weather to begin spring clean-up activity in several of the city parks. Clean-ups will continue as time and weather permit. Additionally, several smaller projects are being conducted to spruce up facilities in preparation for the busy summer season. r'ivitREo oY N:\Departments\Parks and Recreation\Commission\Packets\2017\03-09-17 PRC Packet\9.2 Park Superintendents NATURE Report.docx