5.4. LIBSR 03-28-2017 5.4
Library Zones Report
Elk River Public Library Board
The Library Board serves in an advisory capacity to City of Elk River for issues related to the Elk River
Public Library grounds, the physical building and interior fixtures. The city is responsible for scheduling and
coordinating all work to be completed.
Updated:03-09-17
•
�//,U�k aka �„m:.enee.S� rm,�e„ �,,.m.w r s ._,��,._:... ,.-,.,k un , � � ,,.�,.,. ,. ..,� ,.. .. a„�,.ec ��.,�� i�,.. ,. .__ i/u :,�.�✓'�
Zone 1 Mary K. Entrance; butterfly New/Unassigned:
garden; windmill,
prairie grass; rain In Progress:
garden in parking lot, * Parking lot curbs/gutters—will do in 2017 when Orono
planter boxes for Pkwy redone (2/9/16)
Master Gardeners * LED light/bollard replacement—Parks will do in 2016
summer gardening (2/9/16)
program
Zone 2 Willie Front door, front New/Unassigned:
garden, concrete *
pathways, patio, flag In Progress:
turnaround *
Zone 3 Mary E. Rain garden, book New/Unassigned:
drop turnaround, *
employee parking lot; In Progress:
being a good neighbor * LED light/bollard replacement— Parks will do in 2016
(2/9/16)
* Remove tree stumps - Parks do in Spring 2017 (12-14-
16)
Zone 4 Mick Being a good neighbor, New/Unassigned:
grass & rock areas *
In Progress:
* Pressure wash discoloration on building facing Orono
Pkwy- Parks will do Spring 2017 (12-14-16)
Zone 5 Rita Rain garden, interior New/Unassigned:
and exterior building *
maintenance, interior In Progress:
furniture and shelving * Pressure wash cobwebs by fireplace and door- Parks
will do Spring 2017 (12-14-16)
To Purchase or Add to CIP:
1. Stand/sit desks
2. Permanent patio furniture
3. More comfortable chairs in Storytime area
4. Slatted room dividers by Info Desk and in Teen area where TV was mounted
5. Lounging space vs. table & uncomfortable chairs in Teen area
Other:
Friends of the Library inquired on purchasing a bench for the windmill garden. Tim Sevcik is
getting a price on a bench for them.