Loading...
4.6. SR 04-17-2017 EOty1� ,.,�� Request for Action River To Item Number Mayor and City Council 4.6 Agenda Section Meeting Date Prepared by Consent Aril 17, 2017 Justin Femrite, P.E., City Engineer Item Description Reviewed by Accept Bids and Award Contract for 2017 Trail Cal Portner, City Administrator Improvement Project Reviewed by Action Requested Approve,by motion, the low bid and authorize the execution of a contract with North Valley,Inc. for the construction of the 2017 Trail Improvement project. Background/Discussion Based on improvements detailed in the Parks Capital Improvement Plan to be completed in 2017, staff has developed plans, advertised and received bids for the construction of the 2017 Trail Improvement Project. Bids were received on April 10, 2017. There were a total of 4 bids received that ranged from $94,232.03 to $127,485.25. A tabulation of the bids is attached. The low bid was submitted by North Valley,Inc. Upon contract approval, staff will work with the North Valley to finalize a refined schedule for the work in 2017. Financial Impact The bids for this project came in below budget estimates for the work. Upon completion of this contract,parks staff will review the level of their budget to see if any additional maintenance type projects can be completed this summer. Attachments ■ Bid Tabulation ■ Project Location Figures (4) POWERED 6T AR 2017 Trail Improvements 04/10/2017 1:00 p.m. BID OPENING - UPPERTOWN CONFERENCE ROOM BIDDER BID BOND BID Northwest Asphalt, Inc. Allied Blacktop 1 Sunram Construction, Inc. Hardrives, Inc. North Valley, Inc. Sauter and Sons °� (10 BITUMINOUS FOG SEAL Mi ssi ssi ppi Ri ver TWIN LAKES RD NWMA IN ST NW TYLER ST NWZANE ST NW1 8 2 N D A V E N W 17 5 T H AV E N WLINE AVE NWIRVING AVE NW171ST AVE NW R AIL R O A D D R N WGATES AVE NW2N D ST NW TYLER DR NWS MI T H S T N WYALE ST NW4TH ST NW EVANS AVE NW173RD AVE NW ULYSSES ST NW183R D CIR N W 3R D ST NW 7TH ST NW 6 T H S T N W BALDWI N AVE NW5TH ST NW 181ST LN NW 5 1/2 ST NW 1ST ST NW POLK CIR NWPOLK DR NWCARSON AVE NWPARRISH AVE NWTYLER ST NWTWIN LAKES RD NWMAIN ST NW Ü 0 470 940 1,41 0 1,88 0235Feet 2017 Trail Improvements Type Fog Seal 10' BIT PATH WITH AGG. BASE "/ "/ 190TH CIR NW LOWELL ST NWÜ 0 25 50 75 10012.5 Feet "/ LEGEND INSTAL L CO NCRETE PED RAM P 10' BI TUMINOUS PATH 2017 Trail Improvements oilJ Q zoo .him O � c) 06 02 z (D_ Fn U) U) O U W U) Q s z � Ali 0 J Qz U) Q 1 1 1 I INSTALL BIT PATH WITH AGGREGATE BASE "/ "/ORONO PKWY NWCONCORD ST NWDENVER ST NWORONO RD NW 183RD AVE NWORONO PKWY NWÜ 0 25 50 75 10012.5 Feet "/ LEGEND INSTAL L CO NCRETE PED RAM P 10' BI TUMINOUS PATH 2017 Trail Improvements