Loading...
5.2. SR 04-12-1999 ITEM 15.2. . Howard R. Green Company CONSULTING ENGINEERS April 8, 1999 File: 801760J-0071 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: TRUNK HIGHWAY 10/171 ST AVENUE SIGNAL IMPROVEMENT Dear Council Members: We have tabulated the bids for the TH 10/171st Avenue Signal improvement opened on Tuesday, April 6, 1999, at 10:00 a.m. There were a total of four bidders. The names of the bidders and their total bid appear in the following table: . Accurate Electric, Inc. Killmer Electric, Inc. Ridgedale Electric, Inc. Design Electric, Inc. $169,221.26 173,832.03 179,726.72 190,570.00 The Engineer's Estimate for this project was approximately $183,000.00. Accurate Electric is approximately 8% under the Engineer's Estimate. Accurate Electric has not performed work in the City of Elk River previously; therefore, we contacted Tom Dumont, Assistant Traffic Engineer for MnDOT District 3, for a reference. Mr. Dumont indicated that Accurate Electric has done a substantial amount of work in the St. Cloud area and MnDOT has always found their work to be of good quality. Therefore, we would recommend award of the contract to Accurate Electric, Inc., in the amount of $169,221.26. Attached is a resolution for the City Council's consideration accepting the bid and authorizing the execution of the contract. We have had a brief discussion with Accurate Electric regarding the timing of this project. They have indicated that they would like to begin immediately and hope to have all the equipment available for installation within six to eight weeks. Therefore, it is anticipated the signal could be up and operational in early summer of 1999. If you have any questions, I will be in attendance at your April 12, 1999, City Council meeting. Sincerely, . Howard R. Green Company ~~-) < 'a.t?U/I/ Terry J. aurer, P.E. T JM:tw Attachment O:\PROJ\80 1760j\760-0803.apr99 .doc 1326 Energy Park Drive. St. Paul, MN 55108 . 651/644-4389 fax 651/644-9446 toll free 888/368-4389 . . . RESOLUTION 99 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE TH 10/171ST AVENUE SIGNALIZATION AND INTERSECTION GEOMETRICS IMPROVEMENT OF 1999 WHEREAS pursuant to Resolution 98-14, competitive bids were solicited and received for the TH 10/171st Avenue Signalization and Intersection Geometries improvement as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Accurate Electric, Inc., is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Accurate Electric, Inc., as is approved by the City Attorney for the completion of the TH 10/171st Avenue Signalization and Intersection Geometrics improvement according to the approved plans and specifications. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 12th day of April, 1999. Stephanie A. Klinzing, Mayor ATTEST: Sandra A. Peine, City Clerk \\SPNWFS\VOL 1 IDA TA \PROJ\80 1760j\ 760-0802.apr99 resol.doc