Loading...
7.2.A SR 06-19-2017City of Elk - River Request for Action To Item Number Mayor and City Council 7.2.A Agenda Section Meeting Date Prepared by Public Hearings June 19, 2017 Chris Leeseberg, Senior Planner Item Description Reviewed by Zone Change from C4 (Community Commercial) Zack Carlton, Planning Manager to I2 (Medium Industrial) Reviewed by Peter Beck, City Attorney Action Requested If City Council does not believe the zone change is consistent with the Comprehensive Plan, staff recommends denial, by resolution, the rezoning of certain property from C4 (Community Commercial) to I2 (Medium Industrial). 2. If City Council believes the zone change is consistent with the Comprehensive Plan, staff recommends approval, by ordinance, the rezoning of certain property from C4 (Community Commercial) to I2 (Medium Industrial). 3. The applicant may also extend, in writing, the review of their application to August 22, 2017, to allow further development of the master plan required for rezoning by the Comprehensive Plan. Background/Discussion Case No. ZC 17-03 The properties are zoned C4 (Community Commercial) and I2 (Medium Industrial) and the applicant is seeking approval of a Zone Change (ZC 17-03), a Conditional use Permit (CUP) to operate a bus, truck and implement storage, maintenance and repair facility (CU 17-08), and a Plat (P 17-03). The applicant's proposed project includes four parcels. The northern two parcels are currently zoned I2 (proper zoning for the proposed project) and the southern two parcels are zoned C4 (improper zoning for the proposed project). The applicant is requesting the two C4 zoned parcels be changed to an I2 zoning. Applicable Regulation In reviewing a proposed amendment, consideration shall be given to existing conditions within the area directly and indirectly affected by the proposal, the conservation of property values, the use to wbicb the property affected is being devoted at the time, and relevant provisions, if any, in the land use plan. The property is surrounded by industrial and commercially zoned properties, the same as Existing Proposed T r the subject property, with many of them containing legal non -conforming residential structures. Although the proposed zone change is consistent with the Land Use Plan, it is not consistent with the Comprehensive Plan, which through the Mississippi Connections Plan, requires working with property owners in the development of a master plan prior to rezoning the parcels. A master plan for the area has been developed in partnership with the applicant, but the application being reviewed tonight is not consistent with the master plan. Staff has been working diligently with the applicant to facilitate implementation of the master plan, but requires additional time to finalize negotiations with adjacent property owners. If the negotiations are not resolved, or stall, the obligation of the master plan to work with interested property owners would be met, and the current proposal could be approved. However, that standard has not yet been achieved. Analysis Comprehensive Plan The property has a land use designation of Mississippi Connections (Plan). The Plan states: Proctor and Quinn Avenue area is a relatively small area witb a variety of incompatible land uses including botb residential and beavy industrial. Higbivay 10 improvements will include Proctor Drive intersecting with Higbway 10 via an overpass. Tbir overpass will extend to the north, over the railroad tracks. Thin long elevated road will create a unique opportunity for the property in the area, altering visibility and access. Due to the area's proximity to the train tracks and Highavay 10 traffic, the Plan suggests business park uses and employment centers. Strategies of the Plan are: 1. Wlork with the development community to identi ft and explore market opportunities and the feasibility of redeveloping the area as a wbole. 2. ilork witb interested property owners in the development of a master plan prior to rezoning the parcels. 3. Establisb opportunities to construct community directional signage andgateway signage along Proctor Avenue. As indicated in the Plan, the rezoning of parcels cannot happen without the development of a master plan. Planning Commission Meeting Summary No one spoke for or against the request and staff has not received any comments since the Planning Commission meeting. During the Planning Commission meeting, staff reviewed the master plan and discussed the progress being made towards implementing the plan. The Planning Commission, with the understanding that discussions on implementation of the master plan would continue, unanimously recommended approval of the request. Additional information Since the Planning Commission meeting on April 25, 2017, staff has had discussions with legal counsel regarding the master plan language in the Plan. It has been affirmed, the Plan identifies the need for a master plan prior to rezoning. Based on this information, staff is recommending the zone change request be denied. N:\Public Bodies\Agenda Packets\06-19-2017\Final\7.2a sr.docx Staff has a strong desire to continue working with the applicant to facilitate the master plan, assemble the required properties, and demolish the required structures. Staff believes this can be accomplished within a timeframe that allows the applicant to maintain their desired construction start date of October 1, 2017, as well as provide for the orderly development of the area, benefiting the community as a whole. Staff has included three action items for the current zone change request, which are described below. 1) Deny the current zone change application. This option will provide the city with additional time to facilitate development of the master plan. Implementation of the master plan, which includes shifting the project to the north, still requires rezoning and a land use application could be submitted in July. 2) Approve the current zone change application. The current application isolates residential uses between industrial operations, does not create a plan for efficient development of the remaining parcels within the block, extends the timeline for implementation of the quiet zone (potentially costing additional taxpayer dollars), and does not allow for the county preferred location of a replacement for 6`h Street as part of future improvements to Proctor Avenue NW. 3) The applicant may extend, in writing, their application to allow further work to be completed on the implementation of the master plan. Financial Impact None Statutory Review Period Per State Statute 15.99 the required 60 -day review period ends on April 28, 2017. The application has been extended to June 27, 2017. Attachments ■ Resolution of denial for Item 7.1(A -C) ■ Location map ■ Applicants narrative ■ Ordinance amendment N:\Public Bodies\Agenda Packets\06-19-2017\Final\7.2a sr.docx Item 7.2 A -C Resolution 17 - A Resolution of the City of Elk River, Minnesota A Resolution Denying the Request for a Zone Change and a Conditional Use Permit to Change the Zoning and Allow a Truck Storage, Maintenance, and Repair Facility at 623 Proctor Avenue NW, 620 Quinn Avenue NW, 633 Proctor Avenue NW, AND 634 Quinn Avenue NW WHEREAS, Ken Beaudry currently owns and operates Beaudry Oil and Propane from two buildings located on separate but contiguous parcels on property at 711 Proctor Ave NW and 730 Quinn Ave NW; and WHEREAS, in addition to the two parcels with buildings, Mr. Beaudry owns a third contiguous parcel which is used for storage and parking; and WHEREAS, Mr. Beaudry uses a portion of the city's Quinn Ave right-of-way for parking, pursuant to a license agreement with the city; and WHEREAS, Mr. Beaudry also owns non-contiguous property to the south of his current operation and desires to expand his business by developing a truck storage, maintenance, and repair facility, with associated parking on those southerly parcels; and WHEREAS, on February 27, 2017, Mr. Beaudry, Annie Deckert, and Beaudry Oil and Propane, ("Applicant"), applied ("Application") for a Zone Change (Case No. ZC 17-03) to amend the zoning map from C-3 (Highway Commercial) to I-2 (Medium Industrial), a Conditional Use Permit to operate a truck storage, maintenance, and repair facility (Case No. CU 17-08), and a Preliminary and Final Plat of New Resources Addition (P 17-03) for properties located at 623 Proctor Ave NW, 620 Quinn Ave NW, 633 Proctor Ave NW, and 634 Quinn Ave NW; and WHEREAS, on March 13, 2017, city staff met with the Applicant to discuss the Application and the guidance provided within city plans to explore opportunities and the feasibility of redeveloping the area as a whole, and preparation of a master plan prior to rezoning the parcels. Preliminary master plan options were provided to the Applicant for their consideration; and WHEREAS, on March 20, 2017, city staff met with the Applicant to discuss alternatives to the master plan and provided additional options for consideration by the Applicant; and WHEREAS, on March 27, 2017, city staff received an email from the Applicant requesting to delay review of the Application for one month to provide the city an opportunity to explore city facilitation of the master plan presented on March 20, 2017; and WHEREAS, on March 28, 2017, the Planning Commission delayed action, at the Applicant's request, on the Application until April 25, 2017; and WHEREAS, the City Council held a work session on April 3, 2017, to discuss the master plan for the block, and provided staff with direction to perform appraisals on parcels needed for city facilitation of the master plan; and WHEREAS, the City Council opened and continued the public hearing for the Application on April 17, 2017, as action could not be taken without a recommendation from the Planning Commission; and WHEREAS, on April 24,2017, city staff received proposals from LHB to survey the properties included in the master plan and determine if the standards were met for establishment of a TIF district; and WHEREAS, on April 25, 2017, the Planning Commission reviewed the Application and recommended approval with an understanding that the Applicant was continuing to work with city staff to further develop and refine the master plan; and WHEREAS, on May 1, 2017, the HRA approved a $75,000 forgivable loan to the Applicant for the purposes of demolishing blighted structures within the master plan area, subject to a determination by the city that certain properties within the master plan area satisfy the conditions necessary to create a redevelopment TIF district; and WHEREAS, on May 5, 2017, city staff and the Applicant met to review the proposed master plan with Sherburne County Public Works staff to discuss future road projects and fit within the master plan; and WHEREAS, on May 15, 2017, the City Council continued the public hearing for the Applications to June 19, 2017, providing additional time to finalize the appraisals for properties needed to implement the master plan and finalize the TIF district; and WHEREAS, on May 15, 2017, the City Council also passed an interfund loan resolution authorizing advance of funds for purchase and demolition of the required properties and called a public hearing for July 3, 2017, to finalize the redevelopment TIF district; and WHEREAS, on June 5, 2017, the City Council held a closed meeting to discuss the appraisals for the properties needed to implement the master plan and directed staff to begin negotiations with the property owners; and WHEREAS, at the continued public hearing on June 19, 2017, and at the prior public hearings before the Planning Commission and the City Council the Applicant and all others wishing to speak were given numerous opportunities to present testimony to the Planning Commission and City Council; and WHEREAS, the City Council, at the conclusion of the June 19, 2017, continued public hearing on the Applicant's Application, made the findings set forth below; and N:\Public Bodies\Agenda Packets\06-19-2017\Final\7.2 a -c (attResolution of denial for all 3 applications.docx WHEREAS, the record in this matter shall include all of the materials submitted to the Planning Commission and City Council in connection with the ■ February 27, 2017, Zone Change application; and ■ February 27, 2017, Conditional Use Permit application; and ■ February 27, 2017, Preliminary and Final Plat applications including the staff reports and all attachments thereto, all other written materials submitted to the Planning Commission and City Council, and all staff presentations and other testimony taken at the public meetings considering the Zone Change, Conditional Use Permit, and Preliminary and Final Plats, all of which is incorporated in and made a part of the findings of fact and this resolution; NOW, THEREFORE, the City Council of the City of Elk River makes the following findings of fact and decision with respect to the February 27, 2017, Application by Ken Beaudry/Annie Deckert for a Zone Change and Conditional Use Permit to operate a truck storage, maintenance, and repair facility on properties located at 623 Proctor Ave NW, 620 Quinn Ave NW, 633 Proctor Ave NW, and 634 Quinn Ave NW. FINDINGS OF FACT The parcels at 623 Proctor Ave NW and 620 Quinn Ave NW encompass a portion of the land the Applicant desires to use for a truck storage, maintenance, and repair facility and are currently zoned C-4 (Community Commercial). The C-4 zoning district does not allow a truck storage, maintenance, and repair facility as a permitted or conditional use. Therefore, the parcels at 623 Proctor Ave NW and 620 Quinn Ave NW are required to be rezoned to I-2 (Medium Industrial) prior to approval of the Conditional Use Permit. 2. The City of Elk River Comprehensive Plan, adopted May 19, 2014, guides the properties included in the Application (the "Properties") in accordance with the Mississippi Connections Plan, Adopted November 19, 2012. 3. The Mississippi Connections Plan describes the Properties and the surrounding area as "a variety of incompatible land uses in both residential and heavy industrial," and "suggests business park uses and employment centers." 4. The Mississippi Connections Plan also includes strategies for implementation of the Plan, two of which state: a. Work with the development community to identify and explore market opportunities and the feasibility of redeveloping the area as a whole. b. Work with interested property owners in the development of a master plan prior to rezoning the parcels. 5. On February 27, 2017, the Applicant submitted a Zone Change application, Case No. ZC 17-03, Conditional Use Permit application, Case No. CU 17-08, and N:\Public Bodies\Agenda Packets\06-19-2017\Final\7.2 a -c (attResolution of denial for all 3 applications.docx Preliminary and Final Plat applications, Case No P 17-03. The applications were deemed complete and scheduled for review by the Planning Commission and City Council. 6. On March 13, 2017, in accordance with the Comprehensive Plan and the strategies recommended in the Mississippi Connections Plan, city staff met with the Applicant to discuss the Application and a proposed master plan for the project area and the block described in the Mississippi Connections Plan. Preliminary sketches for a master plan were reviewed, and provided to the Applicant for review. The Applicant reviewed the preliminary master plan sketches and again met with city staff on March 20, 2017, to discuss their conclusions. The preliminary sketch did not work for the Applicant, but the Applicant described an alternative of shifting the current site plan to the north, all for a more efficient utilization of space within the master plan area and improving long-term development potential. A revised master plan illustrating the Applicant's alternative was prepared by the city and provided to the Applicant. 8. On March 27, 2017, the Applicant requested a one month delay in the review of the Application to allow the city to explore facilitation of the revised master plan proposal. On April 3, 2017, the City Council directed city staff to proceed with the work necessary to facilitate the development of the Applicant's proposed facility, consistent with the revised master plan. 10. Following City Council approval to proceed, city staff has diligently proceeded with the many tasks required to implement the revised master plan and facilitate the Applicant's proposed project, including: a. Receiving proposals and engaging a consultant to determine if the master plan area meets the standards for establishment of a redevelopment TIF district. b. Seeking and receiving approval from the HRA for a $75,000 forgivable loan to the Applicant for demolition of blighted structures in the master plan area. c. Meeting with Sherburne County Public Works staff to coordinate future improvements to Proctor Avenue and the TH 10/ Proctor Avenue intersection with the master plan. d. Seeking and receiving City Council approval of an interfund loan resolution authorizing an advance of funds for purchase and demolition of properties within the master plan area. e. Proceeding with negotiations to acquire the required properties into the master plan area. f. Scheduling a public hearing for July 3, 2017, to approve a TIF District so that acquisition of the required properties may continue. 11. At the present time it is expected that the TIF District will be in place and that the properties required for the Applicant's project to proceed in accordance with the N:\Public Bodies\Agenda Packets\06-19-2017\Final\7.2 a -c (attResolution of denial for all 3 applications.docx revised master plan will be acquired, the buildings on the properties demolished, and the properties transferred to the Applicant for redevelopment consistent with the revised master plan by August 31, 2017. 12. In spite of these efforts to facilitate the development of the Applicant's project in a manner that is consistent with the city's Comprehensive Plan, the Applicant has requested that the Applicant's original February 27, 2017, application be approved by the City Council. 13. Zone change applications are reviewed by the Planning Commission and City Council and are evaluated based on consistency with the adopted Comprehensive Plan. 14. Conditional Use Permits are reviewed in accordance with the following criteria, as identified in section 30-654 of the Elk River City Code. (1) Will not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience or general welfare of the neighborhood or the city. (2) Will be consistent with the comprehensive plan. (3) Will not impede the normal and orderly development and improvement of surrounding vacant property. (4) Will be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. (5) Will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. (6) Will not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. (7) Will fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. 15. Plats are reviewed in accordance with the following criteria, as identified in section 30-375 of the Elk River City Code. (1) The proposed subdivision is consistent with the zoning regulations (article VI of this chapter) and conforms in all respects with all requirements of this Code, including the zoning regulations and this article. N:\Public Bodies\Agenda Packets\06-19-2017\Final\7.2 a -c (attResolution of denial for all 3 applications.docx (2) The proposed subdivision is consistent with all applicable general and specialized city, county, and regional plans, including, but not limited to, the city's comprehensive development plan. (3) The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and drainage are suitable for the type and density of development and uses contemplated. (4) The proposed subdivision makes adequate provision for water supply, storm drainage, sewage transportation, erosion control and all other services, facilities and improvements otherwise required in this article. (5) The proposed subdivision will not cause substantial environmental damage. (6) The proposed subdivision will not conflict with easements of record or with easements established by judgment of a court. (7) The proposed subdivision will not have an undue and adverse impact on the reasonable development of neighboring land. (8) The proposed subdivision is not premature. A subdivision is premature if any of the following exists: a. Lack of adequate stormwater drainage. b. Lack of adequate roads. c. Lack of adequate sanitary sewer systems. d. Lack of adequate off-site public improvements or support systems. 16. The Applicant's project, as proposed in the February 27, 2017, Application, is inconsistent with the City of Elk River Comprehensive Plan, which calls for the redevelopment of this area of the city as a whole and for the development of a master plan prior to the rezoning of individual parcels. Accordingly, the proposed rezoning for the project is inconsistent with the Comprehensive Plan and must be denied. 17. The Applicant's project, as proposed in the February 27, 2017, Application is not a permitted or conditional use in the existing zoning district and must be denied if the property is not rezoned. 18. The Applicant's project, as proposed in the February 27, 2017, Application, does not meet the criteria for approval of a Conditional Use Permit because it is inconsistent with the City of Elk River Comprehensive Plan, and it will impede and prevent the orderly redevelopment of the surrounding area pursuant to the revised master plan. 19. The Applicant's project, as proposed in the February 27, 2017, Application, does not meet the criteria for approval of a Plat because it is inconsistent with the City N:\Public Bodies\Agenda Packets\06-19-2017\Final\7.2 a -c (attResolution of denial for all 3 applications.docx of Elk River Zoning Code, is inconsistent with the City of Elk River Comprehensive Plan, and it will have an undue and adverse impact on the reasonable development of neighboring land pursuant to the revised master plan. 20. Development of the Applicant's project consistent with the revised master plan would merely move the Applicant's project to the north without reducing the size of the proposed building or functionality of the building and site plan. However, moving the project to the north, consistent with the revised master plan, would allow for redevelopment of this area of the city as a whole, and would allow the city to develop a functional street system to serve this area of the city. Therefore, moving the Applicant's project to the north, as proposed in the revised master plan, would be consistent with the city's comprehensive plan and would meet the criteria for approval of a rezoning and a conditional use permit. DECISION Therefore, the City Council of the City of Elk River: a.) Denies the February 27, 2017, Application for a Zone Change at 623 Proctor Ave NW and 620 Quinn Ave NW because the proposed rezoning and project are insistent with the City of Elk River Comprehensive Plan. b.) Denies the February 27, 2017, Application for a Conditional Use Permit to develop a truck storage, maintenance, and repair facility because the proposed use is not allowed in the current zone, and does not meet the criteria for approval of a Conditional Use Permit c.) Denies the February 27, 2017, Application for a Preliminary and Final Plat of the properties at 623 Proctor Ave NW, 620 Quinn Ave NW, 633 Proctor Ave NW, and 634 Quinn Ave NW plat and develop a truck storage, maintenance, and repair facility because the proposal is inconsistent with the Comprehensive Plan, and does not meet the criteria for approval of a plat as described in city ordinances. Passed and adopted this 19"' day of June 2017. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk N:\Public Bodies\Agenda Packets\06-19-2017\Final\7.2 a -c (attResolution of denial for all 3 applications.docx Z: '*or , - .J Beaudry Plat, Zone. Change, CtT Case No: P |7-0 3 Z C 17-03 CU |7-08 Project Narrative- Rezoning — Truck Shop Detailed description/scope of project. What is being proposed? BACKGROUND OF COMPANY Beaudry Oil & Propane is a local, family owned business that has been in the petroleum business since 1981. Founded by Ken and Carrie Beaudry, it began with one truck and one employee; today Beaudry Oil employs over 50 full time employees. In 1987, the company started delivering propane, and over the years, has added lubricant products, their own brand of diesel and oil, and propane cylinder exchange. Today, Beaudry Oil is a leading fuel company that delivers millions of gallons of petroleum across the state of M N. Truck Shop is a division of Beaudry Oil, and is 100% owned and operated by Ken Beaudry. Established on February 20, 2017, this business will provide minor repair for Beaudry Oil & Propane fleet (not open to the public), which includes oil changes, replacing tires, changing brakes, minor service, light maintenance, cleaning and detailing. Their new facility is anticipated to generate nearly $11,000 in additional revenue each year upon project completion. PROPOSED PROJECT Mr. Beaudry is proposing a redevelopment project on four sites immediately west of Beaudry Oil on CR 1/ Proctor: 0 634 Quinn (owns) • 620 Quinn * 633 Proctor • 623 Proctor (owns) Pending approval, Mr. Beaudry intends to acquire the two remaining properties; he has purchase agreements pending for both properties. He intends to build an approximately 7,216 sf facility to operate a light maintenance facility for his existing company fleet The facility will be used for minor repair for Beaudry Oil & Propane fleet (not open to the public), which includes oil changes, replacing tires, changing brakes, minor service, light maintenance, cleaning and detailing. There will be no heavy motor overhauls or outside storage. Per the city on 1-11-17, this use falls under "bus, truck and implement storage, maintenance and repair", which is a conditional use in the 1-2 zoning district. The goal is to get vehicles in and out of the facility as quickly as possible. Approximately 224 sf will be used for office, and there will be approximately 1,600 sf of mezzanine for storage on the northern quarter of the building. There will be three overhead doors on the west end of the building, and three on the east. The proposed facility will be a block building, and approximately 20'-22' high. The new facility is anticipated to generate nearly $11,000 in additional revenue each year upon project completion, in addition to creating five new jobs averaging $23.20/VICETVED FEB 2 7 2017 rp 4 Q X in• C3- 1: ro Ln 0 a I` 0 rD n m r -r N_ r -r S rD n m v 0 0 3 m n c VI (D O_ Ln m Q v Q n� n m 3 m n O N ro 0 rD q O m O O` flu n m 0 CL ro ro 0 m O r^' O n v Q Q CD tn m 3 rD rD (D ro CD Z) Ln T O C ro rD Q M C rD O B ro r -r O O C a, n m N cu ZI O- 0 cu z Q n m N GQ O 0 O c r -r• CD 0 m 0 ro O c• ro v 0 CL O z Z' m C rD r 7 V) m rD h 0 r O 3 rD rD as 0- 0 n �c m 0 Q n O C O �C m (D m N O N W I (D c D a 7 m rD Lnv c• m m D P. wel 0 C v n m v m as c Q m Q LnL r) O 0 0 m n 0 7 O N V V Q n v 0 CL S m 3 m 0 'o O ro Q_ O m' n n 0 v�• m O_ O 0 c cas (D `n 3 ro 0 0 m 0 O al n ro Ln ill N n C O rn a m Ln Ln m fl_ O 7 CD ui 77 rD n Z- rD Ln R O m n r -r Ci T m 0 C O n w� rD w 7 0- m a w -5. w 0 A rD C rD D O 7 w C w m �G O_ O n w co M w C CL -2 O c zy n cn O a w O a m m a O -C rD m n O 3 a ED D w m FD' C rD 3' c qq S (D rD LAO C n m LAO m Ln 3 w r -r m v x m C a Q c "t3 O n n O CD o' D a - M V Ln n O \ • • • CD v x 0- w Ln3 0 r�D w 7 a O C m n m w x CD O O ro 0 c w n m II to Lo 00 N w --j Drn z r� v, o :3 zF< rD m ro — cC w GQ e m o - Cu cm un Ln 70 rD (D n cr aj ,WF S1 _ rr T p O 0' w O = O 7 O a r O c C UG O Q O` n 7• z � rD o a m m D w a 0 m in O 4 �* O O ° O q m C O O m C (D -0 � X._ x (D o 3 3 \ ° ¢ c 3 E f° m UQ 00 o D -< °tr� m c v rro C Lc). Z�- N C rD m. N O 0 0 -U, ° .t o o w ro m _tj O= O a C o rt _. m C rD ro o. r+ � rD rD ;T { 0r �_ — w D CL r r c" a _ O O tri C n N w a? rD VE < n N m rt . O 0 N. m rD � m n C r^ w � � zT m rD r�r S •C 0- C O w N O rD rn n m c m cr ro w :' m a m 0 rrb rb � ro � (D n � rD O w O Q 3 D rr c o m C O n p v O C C rD U O W (D U9 r^ LA m w s s^`is n S •c c � a 't5 D m rD m � r+ ° s (D O_ Q CDC � 7 C cm N NLn m L 3 w zF w ul O C rc, c 3 S L m CL O w w L m fD C .0 w ami Ln � r -r a m � "1 m rr, rr (D rD n n Q � n m N � O p Z a m c CL n iv DU � C v, • C2 70 rD w CL n N Ul O rn rD �. m VT o 7 m ;° n D D LM rD CL N C CL m 0- 0 .L+ O O m m n r -i n 7• z � M vs o a m �• � c � r -h in O 4 �* O O ° O q m C O O m C (D -0 � v o ¢ � O ro ro n O S rp c v c v rro Lc). Z�- iver Ordinance 17 - An Ordinance Amending the City of Elk River Zoning Map to Rezone Certain Property from C4 to 12. Case No. ZC 17-03 The City Council of the City of Elk River does hereby ordain as follows: SECTION 1. That the duly adopted Zoning Map of the City of Elk River is hereby amended to rezone the property described on attached Exhibit A to I2 (Medium Industrial). SECTION 2. That the rezoning approved by this Ordinance is based on the following findings: 1. The rezoning is consistent with the City of Elk River Land Use Plan adopted as part of the City of Elk River Comprehensive Plan. SECTION 3. That this ordinance shall take effect upon adoption and be published as provided by law. Passed and adopted by the City Council of the City of Elk River this 19th day of June, 2017. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk Last Updated March 2014 Pnw€REO 0 NATURE] Exhibit A W W IN z z 0 6th ST W Q 5th ST Last Updated March 2014 I I p 0 w I R I D 0 AfU Zone Change Preliminary Plan Conditional Use Permit Beaudry s 7544) 10070%, 75z 03•i)[159 — Ao 7 5 . AW -04i' 0 1 16. ti . " # y 6 a[ R 0* 75�4A2-0L170 � 75-41 My 14 s wt1M' BeaudrAT Plat, Zolle CLhaiige, CUP Case N: P 17-03 ZC 1-3 Eli. U 17-08 River Intro ■ Present all three applications ■ Act on all three separately ■ Approvals to operate a bus, truck and implement storage, maintenance and repair facility Zone Change Background ■ Zoned I2 (use allowed) and Zoned C4 (use not allowed) ■ Change all to I2 Comprehensive Plan Mississippi Connections -Strategies: 1. Work with the development community to identify and explore market opportunities and the feasibility of redeveloping the area as a whole. 2. Work with interested property owners in the development of a master plan prior to rezoning the parcels. Planning Commission ■ No one spoke for or against the ZC request ■ Have not received any comments since the PC meeting ■ The PC, with the understanding that discussions on implementation of the master plan would continue, unanimously recommended approval of the request Planning Commission ■ Since PC meeting, staff consulted with legal counsel ■ The comp plan identifies the need for a master plan prior to rezoning ■ Staff continues to have a strong desire to work with the applicant on all three applications to facilitate the master plan, assemble the required properties, and demo the required structures 0 Oct 11 2017 per applicant -believe can be maintained Zone Change Action Requested ■ If not consistent with Comp Plan/Miss. Connections? ■ Deny ZC by resolution ■ If consistent with Comp Plan/Miss. Connections? ■ Approve ZC by ordinance ■ Applicant may extend application in writing —Aug 22 ■ Allow further development of master plan CUP Background ■ Construct a 7,216 square foot one story facility ■ To operate a bus, truck and implement storage, maintenance and repair facility ■ Outdoor parking for 28 delivery vehicles ■ Expansion of existing operation north of site 66 66 -i 6s i N �,I •'`'`,ate• •�-.........--------------- __ l A. i n ...._...-. h ♦-......� Cr1Vlt •• ernAro+Gl,s <v1 S -ao7wEx5 OARACF TNH-908.28 5 07'W 0 PLAT ____------------ " 89' .72 MEAS, •' " .- r -----------------------------g—_ --------- ..� 84.6 PLAT , x.x .,.. r SB9'�'14'W 183.3{ MEAS. ---. I' - _ 7S- 90E YAAfl 81.R BANG 9E TBAe1i IINF I 1 CAT W� w O ILII I,1 I z a o Lot I d I + s 1.56 Acres � I � � � a PROPOSED _ U 'I ONF, STORY BUIDINGLo v, 'Y+ t!F7 Block 7.116 1 c' U - I T,-.a.,-BGro BC 90657 12 -- ---- --- + ----- r.-------�--- J 1 a 4 75' W. - YARD BIIIOMG SFTSAc Wr — q _ -- I n1 >-- wPAWNG -EM Aix VreE _________________________ L---------- ------------ _________ _1___-_______ NIS_Ary RS�xGtxlC �--' S89'32'51"W 363.50 MEAS. - 1 40,11 I I 362.5 PLAT I 1,112 �o-+ro OTu TS-sq-OT+O GI I I I I 86 ( r17 I I I I/\1 rl �P/\A Ilia A r\r\1�I`r/\al V/1/ FJ F� 1 1 7 i 1 1 1 1 1\! J 1 1 11 11 1 11 11\I Ir r. l I. I I a� a� �_ , ♦� I• .� I est t_� r,i I I. a/ I r i i iai / 70 m777777 V 775'402-0070,'k 75-999-0003 75-402 050 i-402-0064 75403TF071) L - L --6TH ST NVY AAL T NW Transportation/Circulation ■ Access via Quinn Avenue ■ Adequate on site circulation ■ Proctor — dedicated right turn lane for Hwy 10 ■ 6t1' Street — will be cul-de-sac ■ The county's preferred roadway location is within the south side of the subject site 0 Master plan moves subject site north OFT pl, clift m m m A IR JIK IR JR IIK in 75-999-0003 75-442-0850 i-402-0064 ek .6 75 400 L - L 75-443-0060 75403-0050 lotr 75-410-0735 low --`6TH ST NW lIr MIR i1-410!408150' 75-002-0040 T TNVI I M.'" I 75407-0-070 z LL LL 75443-0060 75_403-0050 41*1 5-410-0735 F—M 5—iW-5— 75 02-0043 ram ............... 75-410 850 75 02-0040 7 715 75"I 0-0745 75-410-0744 5-41 7 0 5TH S T NUJ Parking ■ 28 trucks ■ 4 public parking ■ Complies 66 I I � Y T. 910.88 �I a z LU 0 d l 04 r zI . r I �I 1� �t 66 -i 6s i N �,I •'`'`,ate• •�-.........--------------- __ l A. i n ...._...-. h♦-......� Cr1Vl7. •• ernAro+al,s <v1 S -ao7wEx5 OARACF TNH-908.28 5 07'W 0 PLAT ____------------ " 89' .72 MEAS, •' " .- r -----------------------------g-- --------- ..� 84.6 PLAT , x.x .,.. r SB9'�'14'W 183.3{ MEAS. ---. I' - _ 75- MF Yh D VABING j1;TBAe1i IINF I 1 s-•aT-oo: 11 I Rr CAT ti I I T c� rco � I Lot � � -- - �,bb II � � i WIZ N a � � Z I z ao I I I C 1 s PROPOSED L56 Acres 0 Q _ ONF, STORY BUIDING ` I ;I n �,,,+ I --____ __�►- Black -7 I 1 L 1 � � I '° o cn UC 7,116 3P 17 ` I ' 1 ITE 90687 :I +—— — — ———' ----�--- J 1 12 a 4 75' WE Y/RO RI7:pNG SF TBheII irtf — q >-- 10'PARKINGSC-- - _________________________ L___________________.______________ _________ _1 ___________ NIS_Ary RS�xGtxlC �'--' S89'32'51"W 363.50 MEAS. I I I �362.5 PLAT � I rc tln.ex I �o-+ro-oTu TS-sq-OT+p I I I I I 86 ( rlt I I I I/at rt -I'iaa 1, �• a r♦r♦7ry�r /wll V/1/ FJ F� 1 1 7 i 1 1 1 1 1\! J 1 1 11 11 1 11 11\I Ir r. I I. I I a� a� �_ , ♦� I• .� I est t_� r,i I I. a/ I r i i iai / Landscaping ■ 28 trees required ■ 6 shown II Northwood Maple k� I It �e awl. Barring t�ltftl p i i taw.o r•,.s- � d i _` ardwaedrnukhnifabrk ; sad t04.6 RAT I ---- ---- --- -_-- __ —� a6! O6'1 a'w 16f fA MIA6. 21 NPE YARD 5LMJ:IiNG gree ACK UNE Sod Spring Snow Crab=- - i T - TNS 9t0.8fr� I — --- � - -1� ! Ed I .�_ sst.u6lroroD.rny — -- - - latuatn Blare Nbp!! 314" Gnnite rock" 6 K.F. Feather Reed Grass i -- - R -6 "of Coneflower ---- W 6Dwf.Bush Noneysuctde L c. ;,. 12 Shasta Daisy W r p 70 T *a"* 1 RWerBirch (hamp v` - N $ Q I 3RertahsanceSptrea - 3Decorative Boulders 10 Alylne Cunam i I Little Princess Spires eat 7K.F. Feather Reed Grass m ZW- A '- 56' '. 12'-4 2 Center Glow Nlnebark Colorado Spruce .._3Seagreen)unlper } 7-W —' 1 2 Goldmound Spires .a. O y ONE 4*Crrn" CULGnO u ro,r6 SGuaaf 'EE* — � o 2 DecGrafhe Boulder Northwood Maple 1 P-- � 77-Z't3E rn$5-pLoi6rNG SE*DAAGK L►+€ i - -- - -- - - .. JII ,J sod Sod Umf sod baa sa 81'w f6f.SP Hens I 10 Red Twig Dogw6od fb7PLAT 6 NardwaodMulch m. rcn tont n I • - mft"_ :Ai r TNN -978-26 €� a I a B4dc F 4 I 1 Q 'd p�{� • OC i a 1 Sod TT IKa e a i on n aoala r c aoa.er Master Plan ■ Ongoing discussions prior to April 25, 2017, PC meeting ■ Shifts the project north ■ Moves the future east/west street connection south of the revised subject site (county preferred) ■ Provides Proctor Ave access to five southern parcels OFT pl, clift m m m A IR JIK IR JR IIK in 75-999-0003 75-442-0850 i-402-0064 ek .6 75 400 L - L 75-443-0060 75403-0050 lotr 75-410-0735 low --`6TH ST NW lIr MIR i1-410!408150' 75-002-0040 T TNVI +I 75-999-4403 NJ M 7513'11=04' 75-442-0850 Ap 75-402-0484 41 x, 75-043-0474A z 75-133-7405 I e L' Arm i 75403-0060 75-043-4454 75-410-0735 1 --. ----- �i�.t . � � ! �r.: � i v_.: -_. e � :. � •� X02-4043 75-949 OOOe r' ti z j^e r A + 75442-0044 75-W24)070 R a 41 •-G?45 75-410-0740 ■ . �:��^ . -- I 75-41 0 a_' i ♦ ' "` L ' I 'a 75 10-0745 in Wpm^, r 75 410-0 34 I, I i tiTH tiT NVJ 5TH S F NW rE c.= Planning Commission ■ No one spoke for or against the CUP request ■ Have not received any comments since the PC meeting ■ The PC, with the understanding that discussions on implementation of the master plan would continue, unanimously recommended approval of the request Planning Commission ■ Since PC meeting, staff consulted with legal counsel ■ The Plan identifies the need for a master plan prior to rezoning ■ NoZC=No CUP CUP Requirements ■ Staff's analysis of the application shows non-compliance with 3 of the 7 criteria required for approval of the CUP. ■ #2 —Not consistent with Comp Plan ■ #3 —Orderly development could be impeded ■ #7 —Doesn't comply with all requirements of Code — C4 CUP Action Requested ■ If not consistent with Comp Plan/Miss. Connections or Z C denied? ■ Deny CUP by resolution ■ If consistent with Comp Plan/Miss. Connections and ZC approved? ■ Approve CUP by motion with conditions outlined ■ Applicant may extend application in writing -Aug 22 0 Allow further development of master plan Preliminary Plat Background ■ Proposed Plat — 1.51 acres (.05 for R.O.W.) ■ Meets dimensional requirements --------- I �a IpI aP�r l{ IyI Ii Lyrio9tnv.L—G--aruwae SG.�� S `` t 1 =.•"•vi—'i` �a�_ 'I ~-_X—i.r$r _ `• teaa a.__- _•. -- _ ,ln x -W --r•••~_%_ I .-. II1 vxw FA_ TYYfl tUAP .-_-_ _ THH-M26 ELK z S--�----_—_— 'G72 PMlAar IL `, > r --- ________L__ w569T06`14'w 18456{ PLAT E% MA f 69•O7'w --= -----1 163.MEAS. N I r FE ia y a I� Ym.t r EX, HOUSE � . � T • ` 11 y ' f " ` 5 — \\ "' I . ! T '4' L. rs 1T T 1 OEx. HSE. THH 940.6b •'7 ( 44 C o 70 w a0 i,•°g_ _ �'. LLI LLJa;f��1 I ' vvs.e , SVae w METfoe - 11 • ! ��°•--s+i...olay -� Av van a° �Ya, r:14 I 1X- _��\ • �;ti - "]"rc 'i,.•� ! — I 8 y .�� �•�T� yr— am' `ter .—�-~—.�i''.J" ^moi' i rL�°`n `` 1~ W! [j nl•a»a'vueu,[«w...1....,l.n.. ���F a.R ____.w.s-��I i aero aS Qfll Z I .oa QI w r MiuJ ll, \I P tev{e .vona , \ 1 .. Vo —_ I Lot , ,— , L a I ss' �eaal I I I L, I ,— •�`="-_-- ^"` Block 1 6*i a N I..I a .,n '`� '�'a� I. .11 • • �'w O Q F�Neln u"ne°Y °abhMo wla Zz. @ x eons } l iG7 CJ E%. HSE_ �sw I I � Olws kms --k Iwn0. k brA r H prh e« mwvamml CS'� C ` PI<.Ile µp +I.mvw RL.S. 1a06a. C 1 � _ Ice r i4,• 9.0 ior.e i eoe !e I f JT / a.> �� �f I I 1 ! — aaa— — S — — — — — ——)—gIL-I i yl i I I — — — P — —Ix, ri' 90E YIAO MdQl10 ifiT6ASM UNE % . 901:a — — — {X.` — J Ma.l MOeel[Ct: Q C hl RRR L i. Ex. HOUSE EX _s + —j_____________ __ _ /C____ �aµ� sw.w.aa lea 6e401 O �� I I I • ,1 '_ tna) sera+4a e _ 569•32'61•w 363. MEAS. z mv,a 1 r `tI j 1p 3625 PUT IAO19` m `J 1 I i eCr.4 I r°"� a 0e4 6nr ap] rII91M1 >uj 6 otl1 I i Ni. I 046 Mi\ 99 Mw ~ L am. i g w 66 I eralwu I a weX. vv Aee« S a } o: r I I I I + ; I • r L . Lr I ' r♦ ' I 'wl W�wL Whn Awroee at a, un*ons s1®mswN a Lor a o w,prpLa i — — �— — — — — — --- — weomsn. Na s ar me —at aE n.c revcv. S I . Iii I I L.{e! a..anPu°e d Lel. I .ne e. A[ EM. BVEnrvH ON ar 1O1 a �l I • ft C AVDIidNe11ewY1910N N". a Oac RLYAL I Yarrbvma avo{l. Y]nnnaL. I{ I Ho eww t We TwOm—WE' No. / I I � I FIieEA, ea..�...• Caunllleanc.aa. /" 8 Planning Commission ■ No one spoke for or against the request ■ Have not received any comments since the PC meeting ■ The PC, with the understanding that discussions on implementation of the master plan would continue, unanimously recommended approval of the request Planning Commission ■ Since PC meeting, staff consulted with legal counsel ■ The Plan identifies the need for a master plan prior to rezoning ■ Consistency with Comp Plan? Plat Requirements ■ Staff's analysis of the application shows non-compliance of 3 of the 8 regulations required for approval of a plat. ■ #1 —Inconsistent with zoning regulations ■ #2 —Conflicts with Comp Plan ■ #7 —Without master plan, may have undue or adverse impacts Plat Action nequesteci ■ If PP not consistent with Comp Plan/Miss. Connections? ■ Deny PP by resolution ■ If PP consistent with Comp Plan/Miss. Connections? ■ Approve PP by motion with conditions outlined and adopt by resolution the FP ■ Applicant may extend application in writing -Aug 22 ■ Allow further development of master plan r,xtension ■If anything falls through and master plan looks like it will not happen... ■ The council can review the applications at the next available meeting and act on it as submitted Financing ■Amanda and Mikaela will discuss TIF f t'J ccy or ! � TT: r � �--- � .�. � Y d •-- w Elk River Irr T 1 � �• ; r, ,. � '� � ',•4 �' ��' ! ti �• � Le Bend • f �` ----. �: � U f n � �, �. .,::� � q.r City Limits 0 Urban Service Area 7.11 Parcels (1-24-2017) Park Areas 11 40;\ rpt 620 6 r � kfit s'o 6'rNSiNiN 6thlSTNw 3 0 0 z w w w o Redevelopment 131511" 11 #24 City of Elk Rive a a a Disclaimer: rnis drawing is legally neither a rerorded mai rvey and is not Intended to be used as one. This 0 194 Feet drawing is a compilahen of records, intormatinn, and data located in various clay, county, and state offices, and other 0 Bolton & Menk, Inc - Web GIS 5/15/2017 11:06 AM sources affecting he area shaven, and is to be used for re'er,rer'ihjPf�sonly.es h P n. in.,r<� .ai•;P i. —n aiaed� ■ The Increment generated by the Beaudry Project will be utilized for city acquisition, demolition and site prep cost for 706 Quinn and 709 Proctor ■The Increment generated by the Beaudry Project will not be enough to cover all of these costs ■ The Increment generated by the future development along 6th Street is based on assumptions consistent with the current market conditions. ■ Future increment from the 6th Street project will be used to pay back interfund loan from the city Action Requested ■ We have not fulfilled our obligation to the comp plan ■ Negations with 3 properties in process ■ TIF -July 3 ■ Proposal does not meet comp plan ■ Master plan not implemented yet ■ Should be denied or extended by applicant in writing Actions nequestea ■ Act on the Zone Change Request ■ Act on the Conditional Use Permit ■ Act on the Preliminary and Final Plats 70 m777777 V 775'402-0070,'k 75-999-0003 75-402 050 i-402-0064 75403TF071) L - L --6TH ST NVY AAL T NW I M.'" I 75407-0-070 z LL LL 75443-0060 75_403-0050 41*1 5-410-0735 F—M 5—iW-5— 75 02-0043 ram ............... 75-410 850 75 02-0040 7 715 75"I 0-0745 75-410-0744 5-41 7 0 5TH S T NUJ +I 75-999-4403 NJ M 7513'11=04' 75-442-0850 Ap 75-402-0484 41 x, 75-043-0474A z 75-133-7405 I e L' Arm i 75403-0060 75-043-4454 75-410-0735 1 --. ----- �i�.t . � � ! �r.: � i v_.: -_. e � :. � •� X02-4043 75-949 OOOe r' ti z j^e r A + 75442-0044 75-W24)070 R a 41 •-G?45 75-410-0740 ■ . �:��^ . -- I 75-41 0 a_' i ♦ ' "` L ' I 'a 75 10-0745 in Wpm^, r 75 410-0 34 I, I i tiTH tiT NVJ 5TH S F NW rE c.=