Loading...
4.3. SR 07-03-2017 EGty1� ,.,�� Request for Action River To Item Number Mayor and City Council 4.3 Agenda Section Meeting Date Prepared by ConsentJuly 3, 2017 Justin Femrite, P.E., City Engineer Item Description Reviewed by Change Order No. 1 for 2017 Street Improvement Cal Portner, City Administrator Project Reviewed by Action Requested Approve,by motion, Change Order No. 1 for the 2017 Street Improvement project. Background/Discussion Extremely competitive pricing realized on the 2017 Street Improvement contract has allowed staff to review and consider moving forward future scheduled maintenance projects. We reviewed all segments of roadways scheduled for maintenance in 2019 and are recommending moving two project areas ahead for maintenance under this year's contract. The project areas are as follows: ■ Palmer 1"Addition—The segment of Riverview Drive in this development is proposed to receive minor patching, an edge mill and overlay (1.5 inches of new bituminous pavement). ■ Nordic Woods — The streets in this development are recommended to receive minor curb patching, an edge mill and overlay (1.5 inches of new bituminous pavement). Financial Impact Change Order No. 1 will increase the 2017 Street Improvement contract by$101,722.24 to a total of $3,879,357.22. Additionally, the change will result in $15,258.60 of increased engineering and testing costs. If the change is approved, the project will still remain below our projected investment level of $4,480,000 as detailed in the Capital Improvement Plan. Attachments ■ Change Order No. 1 POWERED 6T Template Updoted 4/14 INAMIRE1 Change Order No. 1 Date of Issuance: July 3, 2017 Owner: City of Elle River Contractor: North Valley, Inc. Engineer: Hakanson Anderson Project: 2017 Street Improvements The Contract is modified as follows upon execution of this Change Order: Description: Construct bituminous overlay on Riverview Drive, 194th Lane, Albany Circle, Zumbro Street, Boston Street, Albany Street, and 195th Avenue including associated milling, curb replacement, traffic control, etc. All additional work is local funding. Attachments: Plan Sheets C01 and CO2 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES [note changes in Milestones if applicable] Original Contract Price: Original Contract Times: Substantial Completion: September 30,2017 $ 3,777,635.22 Ready for Final Payment: June 1, 2018 [Increase] of this Change Order: [Increase] of this Change Order: Substantial Completion: 14 calendar days $ 101,722.24 Ready for Final Payment: No change Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: October 14, 2017 $ 3,879,357.46 Ready for Final Payment: June 1, 2018 RECOMMENDED: ACCEPTED: ACCEPTED: By: Engineer Owner(Authorized Contractor(Authorized Title: Project Engineer Title: Title: Date: June 28, 2017 Date: Date: Page 1 of 1 23' 7' 7' 2� % MIN. 2% MIN. 1.5" TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA240C) EXISTING BITUMINOUS PAVEMENT 1" TAPER MILL -7' WIDE (BOTH SIDES) TYPICAL TAPER MILL AND OVERLAY SECTION 1 RIVERVIEW DRIVE 01 No SLALE GENERAL NOTES: 1. BITUMINOUS QUANTITY INCLUDES APPROXIMATELY 30 TONS FOR SKIM PATCHING (1" THICKNESS) OVER AREAS WITH ALIGATOR CRACKING. ... .1 .e���„ .....� v...... .w.���.���.��. ... ..w.. "... uxwu m: SHEET y'M11°,,; ^°;,,°;; E�,,;,° „; wa TAE I� Hakanson Anderson 2017 STREET IMPROVEMENT PROJECT CONSTRUCTION PLAN col .t me 5,° of Mmneaoa. ° �A,qp. Civil Engineers ona Land Surveyors S.A.P. 204-113-016 S.A.P. 204-149-001 CHANGE ORDER N0. 1 OF TAE 3601 Thurston Ave., Anoka, Minnesota ss3o3 S.A.P. 204-129-001 S.A.P. 204-154-001 RIVERVIEW DRIVE HAN M. HS N, . armR 763-427-5860 FAX 763-427-0520 CO2 Date 6/21/17 U_ No. 43381 SIAN ww.hokoneon—ond—on.00m S.A.P. 204-131-003 CITY OF ELK RIVER, MINNESOTA SHEETS 30'-31.5' 7' 7' 2Y. MIN. 2Y MIN. 1.5" TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA240C) EXISTING BITUMINOUS PAVEMENT CONCRETE CURB 1.25" TAPER MILL -7' WIDE (BOTH SIDES) CONCRETE CURB & GUTTER & GUTTER TYPICAL TAPER MILL AND OVERLAY SECTION BOSTON STREET, ALBANY CIRCLE, ALBANY STREET, 1 195TH AVENUE, ZUMBRO STREET CO2 NO SCALE 1.5" MILL) 1.5" TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA240C) EXISTING BITUMINOUS PAVEMENT 1.25" TO 1.5" MILL MILL AND OVERLAY SECTION 2 194TH LANE (ELK LAKE ROAD TO 200' EAST) CO2 NO SCALE GENERAL NOTES: 1. CONCRETE CURB AND GUTTER REPLACEMENT WILL BE MARKED IN THE FIELD. 2. REMOVAL OF SOIL AND/OR SOD CLUMPS BEHIND THE CURB IS INCIDENTAL TO REMOVAL. 3. ADJUST ALL MANHOLES AND VALVE BOXES WITH PAVING ADJUSTMENT RINGS/RISERS PRIOR TO PAVING. M701 RI PROVCMENT AREA ,y m° E ,,° °" ,,,„, ,, , AE Hakanson Anderson 2017 STREET IMPROVEMENT PROJECT CONSTRUCTION PLAN coi of ,n° s,a °, M ".,°7a°"°” N. CiAl Engineers and Land S—ey— S.A.P. 204-113-016 S.A.P. 204-149-001 CHANGE ORDER N0. 1 OE TAE 7-�---- 3601 Thurston Ave., Anoka, Minnesota 55303 S.A.P. 204-129-001 S.A.P. 204-154-001 NORDIC WOODS AND No HILLS armor ■ ■ ■ 763-427-5860 FAX 763-427-0520 CO2 67917n u., d33R1 ANN www.hakansan—and...On.— S.A.P. 204-131-003 CITY OF ELK RIVER, MINNESOTA sHEE.: