Loading...
8.1. SR 07-03-2017 EOty1� ,.,�� Request for Action River To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business July 3, 2017 RaeAnn Gardner, Communications Coordinator Item Description Reviewed by Wayfinding Signage Program Tina Allard, City Clerk Reviewed by Cal Portner, City Administrator Action Requested 1. Approve,by motion, the quote for a park signage design change in the amount of$1,250. 2. Approve,by motion, the type of stone to be used in the bidding process. 3. Approve,by motion, expenditures of up to $200,000 per year from the GRE Fund for the next three years for the wayfinding plan. Background/Discussion Council approved the Wayfinding Master Plan on May 16, 2016. At the last discussion about wayfinding, Council requested design changes to certain park signage. Visual provided a quote of$1,250. Council has two choices on stone for the project: 1. Natural Stone Veneer that is cut and fits the specs of the Wayfinding Master Plan. 2. Natural Field Stone requiring modifications to the existing design and additional engineering design standards to support the structure due to the size and weight of natural field stone. Financial Impact Council consensus is to us the GRE Fund for the Wayfinding Master Plan. Currently the fund has $1.6 million and receives $200,000 annually. The bid request will include costs for 2, 4, and 6 years for the initial sign package. Attachments ■ Quote from Visual Communications ■ May 31, 2017,Wayfinding Signage Bid Clarification Memorandum POWERED 6T AR i Visual Communications 475 Cleveland Avenue North, Suite 223, Ivy League Place, Saint Paul, MN 55104 14 June 2017 Sign Design RaeAnn Gardner Communications Coordinator City of Elk River 13065 Orono Parkway Elk River, MN 55330 Wayfinding RE: Revisions to Signage Master Plan Construction Documents dated 4/25/2017 Dear Ms. Gardner: It was a pleasure speaking with you regarding the design and construction documentation Consultation revisions required for two specific signs. This proposal addresses the following services: Design and Construction Specification • Provide updated designs for two signtypes eliminating all rock bases. Specification Revise dates on 24 pages. • Provide PDF Files for transfer. • Provide Q?A review and comment as required per vendor questions. Identity Design Fees plus expenses (mileage) $1,250.00 Thank you for this wonderful opportunity to provide our services. Sin ly, 651.644.4494 Richard M. Visual Corr Fax: 651.644.4289 ° Principal vl@visualcomm.com www.visualcomm.com 11FP 1 N Inc. 0 .. s' City or Memorandum Elk r To: Cal Portner, City Administrator From: RaeAnn Gardner, Communications Coordinator Tina Allard, City Clerk Date: May 31, 2017 Subject: Wayfinding Signage Bid Clarification Information The City Council has discussed wayfinding for over four years which began when consistent wayfinding signage was outlined in the 2013 Visioning Plan under the Beautification Goal. During this time, a number of major signage projects were planned,budgeted, approved by the Council, and postponed by staff until the final plan was complete. They include: ■ Directional signage to the Youth Athletic Complex ■ Entrance signs and informational kiosks for the following parks • Hillside City Park • Woodlands Trails Regional Park • Dave Anderson Athletic Complex (currently has temporary signage) • Bailey Point Nature Preserve (currently has temporary signage) • William H. Houlton Conservation Area (currently has temporary signage) ■ Downtown signage as part of the Mississippi Connections Plan ■ Northstar Station directional signage The Wayfinding Master Plan included four large entrance monuments,in which the Council has expressed consensus to use the GRE Fund. The projected cost per monument was planned in the CIP and budgeted at$80,000 each. The fund currently has more than enough balance to fund the 2-year plan. The GRE Fund receives annual revenue from Great River Energy based upon the tonnage of garbage burned at the RDF plant. A part of the rationale for negotiating this "Host Fee" was for city beautification projects to offset the effects of having a garbage burner in town. The last RFP proposed a work project over two years because funds were available, the projects were previously planned, and additional construction mobilization costs are lower. During the design phase of the Master Plan, there was much discussion about the type of rock used for the signage. Two options were used in the bidding process. POWERED 6T N:APublic Bodies\Agenda Packets\07-03-2017\Final\x8.1 ot2 2017 Wayfinding 1N1emo.docx INAMERE] Option 1— Cultured Stone This option required a field stone-style product. Cultured stone is man-made or manufactured. Option 2—Natural Field Stone This option required modifications to the existing design requiring additional engineering design standards to support the structure due to the size and weight of natural field stone. This option also required the contractor to pick the stone from an Elk River location. When the bids were opened, only 3 of the 5 companies bid on Option 2 (natural field stone). Possible reasons this option may not have been bid by all bidders: 1. The stone was required to be picked from an Elk River pit and could not be cut. 2. Engineering standards required to support the structure 3. Some companies manufacture in an indoor, climate-controlled environment where they ensure a consistent, square and level product prior to onsite installation. With the natural field stone option they would need to build the signs onsite. Graphic House Inc. Graphic was the low bidder under Option #1 (cultured stone). Their product was not a cultured stone product but rather a real field stone with a veneer that is cut. Description Cost Each Quantity Total Primary Gateway Sin with one Tier of Stone 36,055.67 4 144,222.68 Primary Vertical Park (double-faced) 21,983.34 5 109,916.70 Secondary Vertical Park double-faced 14,277.43 10 142,274.30 4-Sided Kiosk 14,876.79 5 74,383.95 Tertiary Park on Pole 2,093.20 14 29,304.80 Downtown Primary Direction Sin 1,876.79 5 9,383.95 Single Parking Signs 1,048.55 7 7,339.85 Parking Sign Employees Only 1,048.55 1 1,048.55 Welcome Signage 2,159.06 19 41,022.14 Grand Total 558,896.92 Nordquist Sign Company Nordquist was the low bidder under Option #2, the natural field stone. Description Cost Each Quantity Total Primary Gateway Sin with one Tier of Stone $47,979 4 $191,916 Primary Vertical Park double-faced 27,279 5 136,395 Secondary Vertical Park double-faced 11,750 10 117,500 4-Sided Kiosk 20,070 5 100,350 Tertiary Park on Pole 2,010 14 28,140 Downtown Primary Direction Sin 1,265 5 6,325 Single Parking Signs 1,090 7 7,630 Parking Sin Employees Only 1,215 1 1,215 Welcome Signage 2,548 19 48,412 Grand Total $637,883.00 N:APublic Bodies\Agenda Packets\07-03-2017\Final\x8.1 ot2 2017 Wapfinding 1N1emo.docx Counselor Beck recommends refusing the current bids and updating the proposal. Staff would like Council's consensus on the following: 1. Timeline of the plan, such as 3-5 years. 2. Breakdown of signs to complete in each year. 3. Natural field stone (can't be cut or broken?) or natural field stone veneer 4. Direction on the current bids. It should be noted the time length and amount of sign projects selected will affect bid prices. Fewer signs and a longer timeline will cost more money in the long term. N:APublic Bodies\Agenda Packets\07-03-2017\Final\x8.1 ot2 2017 Wapfinding 1N1emo.docx