3.6. SR 06-28-1999 rll ---\.) ( ); tli{ **Item 3.6.** River MEMORANDUM TO: Pat Klaers City Administrator FROM: Darrell Mack WWTF Superintendent DATE: June 22, 1999 SUBJECT: Emergency Power Supply For Lift Stations . Mter meeting with utilities manager Bryan Adams, it appears that in a major power outage the utilities generating facility will be able to supply power to the wastewater treatment facility. The generating facility would not be able to supply power to any lift stations except on a four hour rotation, which is not often enough to prevent sewage backups. To keep the collection system from backing into homes we need four additional generators. Three generators would be set up at stations that cannot be down for any length of time and one generator would be used to keep the rest of our stations pumped down. The following quotes were received with Ziegler Power Systems being the lowest: Ziegler Power Systems $57,430 Katolight $59,300 Cummins North Central $64,118.40 Long Lake Tractor $90,210 (price does not include sales tax) Used New New New Even with Ziegler quoting used generators, I feel they are a best buy for a couple of reasons: 1) they have been checked out and repairs were made if they were needed, 2) they are set up for all 3 voltages that we have in Elk River, which makes them a lot more versatile and can be used at other locations. The other generators that were quoted can be wired for all 3 voltages, but at an additional cost. . Because no single generator is over $25,000, we do not have to go through the bid process. Therefore, it is my recommendation to purchase the generators quoted by Ziegler Power Systems. 13065 Orono Parkway. P.O. Box 490 · Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425 A./ -'\( ( ?I 1:11< River MEMORANDUM TO: Patrick Klaers, City Administrator FROM: Terry Maurer, City Engineer 4' DATE: June 28,1999 SUBJECT: Clarifier Failure at Waste Water Treatment Plant This memo is a follow-up to Darrell Mack's memo dated June 14, 1999, regarding the primary clarifier failure at the Waste Water Treatment Plant. . As Darrell accurately points out in his memo, the treatment plant is designed for a capacity of 1.6 MGD, and the city's current average flow is just over .760 MGD. What Darrell's memo does not clearly state is that to handle the current flow, the city's Waste Water Treatment Plant relies on two primary clarifiers. With one clarifier out of service, the other one is overloaded during certain periods of the day. Clearly, if the plant flow was at a 1.6 MGD design, it would be overloaded 24 hours per day. Currently it is overloaded (according to Darrell's memo) for 16 hours out of a 24 hour period. One other issue I would like to point out is that summer is historically the higher flow season of the year. We can expect the flow at the Waste Water Treatment Plant to increase during the summer, and with the number of projects coming on line, it will increase even more. Based on these facts, I would recommend that the city deal with this clarifier failure as an emergency situation, and have new equipment installed as quickly as possible. If you have any questions regarding this issue, please feel free to contact me. . 13065 Orono Parkway · P.O. Box 490. Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425 r I ~( ( II City of ~' Ell{ River TO: MEMORANDUM Lori Johnson Finance Directo~ J .AJ1'1 Darrell Mack~P" I WWTF Superintendent FROM: DATE: June 14, 1999 SUBJECT: Primary Clarifier Failure As you know, our #1 Primary Clarifier Drive has failed and needs to be replaced ASAP. There are two reasons why we need to start the replacement process as soon as possible. First, our present plant capacity is 1.6 MGD and our average daily flow is .760 MGD in a 24-hour period, so during our peak flow period from 7:00 a.m. to 1:00 a.m., our #2 primary is overloaded which may cause permit violations due to low detention time. This does not allow adequate time for the solids to settle. Second, under the best conditions it will take three or four months to get the parts and have them installed. With our rapid growth, the longer it takes to fix this problem, our chances of permit violations will increase. s; \offsite \wwtp \clarfail.doc 13065 Orono Parkway · P.O. Box 490. Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425 . . .