Loading...
9.2. PRSR 07-12-2017 ...>.(4 ElkMemorandum Item: 9.2 River To: Parks and Recreation Commission From: Tim Sevcik,Park Superintendent Date: July 7, 2017 Subject: Staff Report Athletic Complexes The scoreboard project is complete at the Youth Athletic Complex and Oak Knoll Football Field. All seven scoreboards are installed and in operation and have been used by both baseball and softball and they are ecstatic with the addition to the complex. Staff is in the process of receiving quotes for replacement of the Dave Anderson Athletic Complex irrigation system. This system is over 30 years old and is no longer functional. While inspecting the well that supports the irrigation system,it was noted that the pump was undersized for the irrigation system as well. Staff is working with well contractors to upgrade the well components to a 10 horsepower pump to allow for sufficient irrigation for the athletic complex and for Orono Park. Staff anticipates receiving final costs by the end of July and hopes to replace the irrigation system yet this year. Trail Projects The trail projects along Orono Parkway and Joplin Street are complete. These two trails were paired with the road reconstruction projects. The contractor is looking to begin work on the remaining trail construction projects in the next several weeks beginning with the short trail segment at the library followed by the segment north of the high school and finally with the trail construction and reconstruction at Kliever Lake Fields. Barrington Park Playground Replacement of the Barrington Park playground is anticipated to begin on July 11,2017 with removal of the existing structure by Kids Around the World. The new playground is ordered and installation is anticipated to be conducted the week of July 24, 2017. The playground should be largely complete by early August. Trott Brook Farms Park Tennis court resurfacing is anticipated to begin the third week of July and should be completed in 1-2 days. Cracks on the courts will be grouted and sealed, the surface repainted and tennis and pickleball lines added. rM E 1 E / 11 N:\Departments\Parks and Recreation\Commission\Packets\2017\07-12-17 PRC Packet\9.2 Park Superintendents NATURE Report.docx