7.8. SR 07-17-2017City of
Elk az
—
River
Request for Action
To
Item Number
Mayor and City Council
7.8
Agenda Section
Meeting Date
Prepared by
Public Hearinj
17, 2017
Zack Carlton, Planning Manager
Item Description
Reviewed by
Zone Change, Conditional Use Permit, and
Chris Leeseber , Senior Planner
Reviewed by
Preliminary Plat: The Pines of Elk River
Cal Portner, City Administrator
Action Requested
Adopt, by motion, an ordinance amending the City of Elk River Zoning Map to rezone certain property
from Business Park to Planned Unit Development (PUD), with the following conditions:
1. A PUD agreement must be approved by the City Council prior to recording the Zone Change.
Approve, by motion, the Conditional Use Permit (CUP) establishing a residential PUD, with the
following conditions:
1. A PUD Agreement shall be developed and signed by both parties prior to issuance of a building
permit.
2. Landscape Plan must follow all standards described in Sec. 30-994 (h).
3. Continue to work with the city to ensure compliance with fire lane access requirements.
4. Update utility and grading plans to include grading elevations, emergency over flows, and
additional storm sewer at the existing curb line of 183Td Circle and the private street entrances.
5. Update final plans with current engineering details and standards.
6. Submittal of building plans to verify a garage size of at least 584 square feet or through a
combination of garage and storage areas.
7. Approval of a parking diagram illustrating a minimum of 1 off-street (Public ROW) parking space
per two units.
8. A homeowners association must be established, subject to review and approval of the city
attorney, and shall be responsible for all exterior building maintenance, landscaping, snow clearing,
and regular maintenance of private drives and driveways.
9. Submit elevations of townhome exteriors which demonstrate variation in building materials.
Twenty-five percent of the front building facade shall have an exterior finish of brick, stucco, or
natural/artificial stone.
10. All mailboxes shall be clustered.
Approve, by motion, the Preliminary Plat for The Pines at Elk River.
Background/Discussion
Case Nos. ZC 17-05, CU 17-17, & P 17-09
The applicant, Roger Derrick with the Pines at Elk River, LLC, purchased two adjoining parcels on 183Td
Circle NW and proposes to develop both parcels as 26 detached townhome units. The project will be
similar to the West Oaks project, which was also developed by Mr. Derrick. Some units will have the
P a w E R E U 6 Y
NaA f RE]
option for a walkout basement. Kliever Lake Fields and Miske Meadows have also included detached
townhome units similar to those proposed with this project.
Comprehensive Plan
The plan guides the area as Mixed Use allowing a mixture of housing, jobs and/or retail services uses
within close proximity to each other. The area also provides another setting for high density residential
land uses. The proposed use and rezoning is supported by the comprehensive plan. The applicant had
hoped to develop the area with higher density residential uses, but the road network does not support the
traffic generated by such a use.
Site Plan
The 26 townhome lots are laid out along two private streets (Xavier Circle and Yale Circle), both of
which access 183rd Circle NW. The parcels and placement of the homes have been planned to minimize
impacts to existing trees on the site, buffering the homes from view along Twin Lakes Road and 183rd
Circle. Each home will have driveway access to a private street, and no additional access points to public
rights-of-way are proposed.
Townhome standards require one-half guest parking space per unit in an off-street parking lot or private
drive. The private streets appear to provide this standard, but an exhibit demonstrating compliance must
be submitted.
The existing drainage pond on the south side of the site will be utilized for the development. The wetland
was not delineated as there is not any proposed development south of the drainage pond.
Engineering and Utilities
In conjunction with the tree preservation goals, minimal grading to the site has been proposed. Most of
the grading will take place in the center of the site, and the perimeters will be minimally changed.
Properties are graded to direct runoff to the private streets, which collect stormwater via catch basins, and
to the rear of the property. Stormwater collected in the streets is directed to the existing stormwater pond
which was constructed as part of the previous plats.
All homes will be served by city sewer and water.
Landscaping
The proposed landscape plan shows a number of trees along the private streets, and between the
townhomes. An updated landscaping plan demonstrating compliance with Sec. 30-994 (h) must be
submitted.
Parks
Park dedication was satisfied with previous plats in this area, and will not be collected as part of this
project.
Applicable Regulations
Zone Change
In reviewing a proposed amendment, consideration shall be given to existing conditions witbin the area directly and indirectly
affected by the proposal, the conservation ofproperty values, the use to wbicb the property affected is being devoted at the time,
and relevant provisions, if any, in the land use plan.
N:\Public Bodies\Agenda Packets\07-17-2017\Final\7.8 sr Pines at ER.docx
The proposed use complies with the guidance provided in the land use plan.
Conditional Use Permit/PUD
The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location:
1. mill not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate
vicinity or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the city.
The residential use will not detrimentally affect the use and enjoyment of adjacent properties.
2. mill be consistent with the comprehensive plan.
The property is guided for mixed use where residential uses are permitted. The use will be consistent
with the comprehensive plan.
3. mill not impede the normal and orderly development and improvement of surrounding vacant proper y.
The use will not impede the normal and orderly development and improvement of surrounding vacant
property.
4. mill be served adequately by and will not adversely affect essential public facilities and services including streets, police
and fire protection, drainage, refuse disposal, water and server systems, parks and schools; and will not, in particular,
create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares.
The use will be served adequately by and will not adversely affect essential public facilities and services
including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks
and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent
and neighboring public thoroughfares.
5. mill not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to
any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations.
The proposed residential use will not involve uses, activities, processes, materials, equipment, or
conditions that will be detrimental to other properties. The applicant has reviewed the proposal with
staff for traffic impacts and fit within the transportation plans for the area.
6. mill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance.
Grading is proposed to create minimal impacts to natural areas, and the use will not result in the
destruction of scenic or historic feature of major importance.
7. mill fully coVywith all other requirements of this Code, including any applicable requirements and standards for
the issuance of a license orpermit to establish and operate the proposed use in the city.
The use will fully comply with all other requirements of this Code, including any applicable
requirements and standards for the issuance of a license or permit to establish and operate the
proposed use in the city.
Additionally, Sec 30-1564 describes the standards for establishment of a PUD district.
1. Land will be Zoned into the PUD Zoning district only upon approval of a concept plan for the PUD, pursuant
to the procedure set forth in this section. A PUD will be authorized on land in a PUD Zoning district only upon
issuance of a conditional use permit, pursuant to the procedure set forth in this section.
A Conditional Use Permit will be issued in accordance with the above standards.
N:\Public Bodies\Agenda Packets\07-17-2017\Final\7.8 sr Pines at ER.docx
2. The uses allowed in a PUD shall be limited to land uses consistent with the city's comprehensive plan and land
use map, and to those uses identified in the conceptplan for the PUD Zoning district and the conditional use
permit for the PUD.
The comprehensive plan and land use map guide this area for mixed use, which includes
residential uses.
3. The area of land to be included in a PUD shall be in uniform control of the applicant.
The applicant will be in control of all parcels prior to recording the CUP and plat.
4. A PUD shall be designed to form a desirable unified environment within its proposed boundaries, including
uniform design elements, landscapin figbting and signage.
The PUD is designed as one project with uniform design elements throughout the project area.
5. A PUD shall not cause undesirable impacts on adjacent lands and land uses. In particular, uses on the PUD
perimeter shall be compatible with adjacent uses outside the PUD.
Adjacent land uses include single-family residential, commercial development, a senior facility,
and developable vacant land. All parcels are within the mixed use are guided by the
comprehensive plan. The PUD will not cause undesirable impacts on adjacent lands and land
uses.
6. A PUD shall be served by adequate transportation, water, sanitary sewer and drainage ystems.
The project area will be served by public services, and will not adversely impact transportation
networks within the area.
7. A PUD shall not adversely affect existing or proposed parks, schools, streets or other public facilities.
Existing public facilities are not impacted by the proposed project.
8. The council may establish varied and reasonable lot area, frontage, sideyard, and setback requirements for a
PUD and may authorize a density which it determines to be appropriate under the circumstances. Any permitted
density shall be consistent with the city's comprehensive plan and not adversely affect the public health, safety and
welfare.
The proposal is consistent with densities described in the comprehensive plan, setbacks from
public rights-of-way, and design standards for similar developments within city code.
9. More than one principal building may be constructed on a lot within a PUD if authori.Zed by the council.
Unless otherwise permitted by the council, a PUD shall comply with the schedules of dimensional regulations set
forth in this article, except that individual lots shall have no less than 80 percent of the minimum area for similar
uses.
The project does not conflict with standards described in city code.
Preliminary Plat
City ordinance section 30-375 outlines the required findings for approval of a Preliminary Plat.
7. The proposed subdivision is consistent with the honing regulations (article VI of this chapter) and conforms in all
respects with all requirements of this Code, including the honing regulations and this article.
The proposed subdivision requires approval of a rezoning application. Provided the zoning is
amended to PUD, the proposed subdivision is consistent with all zoning regulations.
N:\Public Bodies\Agenda Packets\07-17-2017\Final\7.8 sr Pines at ER.docx
2. The proposed subdivision is consistent with all applicable general and speciali.Zed city, county, and regional plans,
including, but not limited to, the city's comprehensive development plan.
The subdivision is consistent with all applicable plans.
3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to
erosion and siltation, susceptibility to flooding, and drainage are suitable for the type and density of development and
uses contemplated.
Specific concerns related to topography and density have been addressed through the design
process. Additional efforts to reduce impacts to existing trees have also been made.
4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage transportation,
erosion control and all other services, facilities and improvements otherwise required in this article.
The subdivision includes public utilities and stormwater infrastructure to meet city requirements.
Additional permits required to comply with erosion control standards are a required, and will be
secured prior to building permit issuance.
5. The proposed subdivision will not cause substantial environmental damage.
The subdivision will not cause substantial environmental damage.
6. The proposed subdivision will not conflict with easements of record or with easements established by judgment of a
court.
The site includes existing easements which must be vacated prior to recording the current plat
application.
7. The proposed subdivision will not have an undue and adverse impact on the reasonable development of neighboring
land.
The proposed subdivision will not impact reasonable development of neighboring land.
S. The proposed subdivision is not premature. A subdivision is premature if any of the following exists:
a. Lack of adequate stormwater drainage.
b. Lack of adequate roads.
c. Lack of adequate sanitary sewer systems.
d. Lack of adequate off-site public improvements or support systems.
The subdivision is not premature as the above conditions have been provided for.
In reviewing the standards for approval of a Zone Change, Conditional Use Permit, Planned Unit
Development, and Preliminary Plat, the proposal meets the standards and is recommended for approval.
Planning Commission
The Commission asked about traffic resulting from the proposed development. The city engineer
discussed traffic impacts with the applicant and based on the current application and planned changes to
traffic along Line Ave (cul-de-sac south of 5`'' Street) has no concerns for impacts.
One resident spoke during the public hearing and asked about stormwater treatment and traffic. All
stormwater will be treated on site according to our current standards.
N:\Public Bodies\Agenda Packets\07-17-2017\Final\7.8 sr Pines at ER.docx
The Planning Commission unanimously recommended approval.
Financial Impact
None
Attachments
■ Location Map
■ Applicant's Narrative dated May, 2017
■ Preliminary Plans dated May 19, 2017
■ Preliminary Plat
■ Tree Preservation Illustration
■ Ordinance
N:\Public Bodies\Agenda Packets\07-17-2017\Final\7.8 sr Pines at ER.docx
._ g
- �w® �:-�
� � �� � ��'
� , . ��; �.
L _ ,
r
®®— �__- al�- �e
mow® ��
� �®® � f ��
� '°
® �
`� r e
�� ' �
�` �', ��e
_'� A
iieS at LEIN IRLivei, LLC
5001 American Blvd W., 8501 ♦ Bloomington, MN 55437 ♦ 952.830.0161 x326 ♦ Fax: 952.831.1215
The Pines
NARRATIVE
May, 2017
Pines at Elk River, LLC, has purchased two adjoining parcels on 1831d Circle NW. We are
proposing to develop the property into 26 detached townhome lots. The Pines will be similar
to West Oaks in that each townhome will be detached and will offer buyers a choice of the
Bridgeport or Wellington designs, with and without sunrooms. Buyers can also choose their
homes to be slab -on -grade or have walk -out basements.
The property is heavily wooded with towering pines. We have designed several lot
plans in an attempt to limit the number of trees that must be removed for construction. That
effort has reduced our original 31 lot plan to 26 lots. This allows us to keep the development
on the flat part of the property, away from the hillsides, and limit the amount of roadway
needed.
We are all very excited about The Pines development and believe it will be a valuable
asset to the community. Thank you for considering our proposal.
Roger Derric
Chief Manager
THE PINES AT ELK RIVER P.U.D.
CITY OF ELK RIVER
SHERBURNE COUNTY, MINNESOTA
FOR
WASHINGTON STREET INVESTORS, LLC
PRELIMINARY
SITE, LANDSCAPING, UTILITY,
GRADING & EROSION CONTROL PLAN
SHERBURNE COUNTY, MINNESOTA
LALL 98 HOURS "C" DIGGING
GOPHER STATE ONE CALL
1111ETWIN CITY AREA 8580054 2
T— FPNO.ECT BEN
Liquor MNo 1 Mn— oan--
/ median l —A Highway -
.-In o/ SM ST NW ElewWan - w-' lee f.
TITLE & INDEX SHEET 1
SITE PLAN 2
LANDSCAPE PLAN 3
UTILITY PLAN 4
GRADING & EROSION CONTROL PLAN 5
DETAILS 6
SWPPP 7
Project
Locotion
LOCATION OF SWPPP REQUIREMENTS IN PROJECT PLAN
DESCRIPTION TITLE
I LOCATION
Erosion Control Details Erosion Control Details
Sheet 6
ErosionControl Gr.Cing Plan
Sheel 5
PROJECT
LOCATION
z I I
W I I
/ � I
MAIN ST NW
ff
Hk �
�I I
~ �r
qh. 2ND AVE NR
I I
N
L----zz� - - - -
�
SHERBURNE COUNTY NO SCALE
Section 35, Township 33 Range 26
VICINITY MAP
I
€SSB
gel:
eea��
pF -
ZV
W Z
W W
a �
Lua_
cc O z
oa
man
p J
� J
d Z v
w W
> Q,n W
Fr j z N
lY X
W W
Q W Z
zp`i3
d Z W
s J
W
Q F-
EE�
7
- — — Tso
5
10 � I
12 30
City of Elk River
Sherhuine County, MN
x
o BID
�®
SCALE IN FEET
SCALE: 1" = 50'
LEGEND
_- se=-- EXISTING CONTOURS
EXSTNG WETLANDS
E%STNG TREE
EXISTING TREE LK
• FOLND MONUMENT
FOUND CAST IRON MONUMENT
A EXISTING ELECTRIC BOX
M EXISTING TELEPHONE PEDESTAL
T SIGN
EXISTING POLE
r EXSTNG GUY ANCHOi
EXISTING FIRE HYDRANT
•
EXISTING MANHOLE
—» — E%ISTING STORM SEWER
EXSTNG WATERMAIN
EXISTING SANITARY SEWER
X EXISTING CATCH BASIN
► EXISTING FLARED END SECTION
EXISTING PVC FENCE
DENOTES OPEN WATER
DENOTES EXISTING ADJOINERS
- ------ DENOTES EASEMENTS
— — — — DENOTES BUILDING SETBACKS
Pederem 8 Aseodete$ ft
08
SlE2No /
City of Elk River
Sherhuine County, MN
so' D sD'
I 0 II I � � SGXL®T
iemzss SCALE: 1" = 50' \� v
4 ���El 1111 LEGEND
3 k' IE 1111
\� V — EXISTING CONTOURS
*ETL1 93 / \ `\� \ - •r� EXISTING TREE ^NDS g
�^+�+"�^ EXISTING TREE LINE
\ \\\ • FWND MONLAIENT A SETw
n \ m a N co w
L \u 14.. fWND CAST MONUMENTIRONMONUMENT
EXISTING ELECTRO BOX ekpS
E.
\ \ // D1 EXIST NO TELEPHONE PEDESTALopXe
T SIGN
ISTINC POLE n € W B
E-Er E%ST NG GUY ANCHOR 5B ob
VV
16 i1 mL65 \ \ +EXISTING FIRE HYDRANT 56.H 3
\ 17 / \_ "' \ ptx re\ \ \ EXISTING MANHOLE xx gg�
EXISTING STORM SEWER
EXISTING WATERUAN
EXISTING SANITARY SEWER
EXISTING CATCH BASIN
�I '➢9 EXISTING FLARED END SECTION O U
PROPOSED DECIDUOUS TREES 'm
I I I \
PROPOSED SHRUB
eST"m.z eB \ W
I TowNHDNE NDTE a Q_
\ \\ \ e •' \ \\ �e rx s.0 Mm�mx�m a,e p) utt P[oPosea m wan�n Loi. �p
V \ \ 8 1 cO
'� \�_ me.m ALSO: Mnmum One O Tree n [Ae By Q
\ \ / ALSb. Mnmum Fve (S) SN[xee Per I.wl Q
-E. N M \ SHRUB LAYOUT: SHRUB LAYOUT:
\ \IE
\ / SeH a Z Z
\ \ .\, E e e9e EEm.
v�LLj
�e ;
\ Y 1 d
IE r Y
w
3 5 aNZ
z o
11 71
w�Q�
HE 3No
7
Bopal Pederem 8 Awodete% kia
17
14
\-�E. 4-
�E)
City of Elk River
Sherhuine County, MN
o 5G'
SCALEFEET
SCALE: I" = 50'
LEGEND
EXISTING CONTOURS
EXISTING WETLANDS
4 EXISTING TREE
EXISTING TREE LINE
• f0 NG MONUMENT
SE MONUMENT
FOUND CAST IRON MONUMENT
EI EXISTING ELECTRIC BOX
m EXISTING TELEPHONE PEDESTAL
T SGN
r, E%ISTING POLE
r EX ST NG GUY ANCHOR
E%ISTING FIRE HYDRANT
• EX ST NG MANHOLE
» E%ISTING STORM SEWER
E%ISTING WATERMAIN
EXISTING SANITARY SEWER
R EXST NG CATCH BASIN
3' EX STING FLARED END SECTION
» PROPOSED STORM SEWER
> PROPOSED B" PVC SANITARY SEWER
PROPOSED B" DIP WATERMAIN
PROPOSED FIRE HYDRANT
• PROPOSED MANHOLE
w PROPOSED VALVE
■ PROPOSED CATCH BASIN
► PROPOSED FLARED END SECTION
Pederem 8 Aseodete$ ft
08
Z d
0
y Z
W W
as
cc
aQ
0 •n a
Ja
J
EC
LLJ
[r
EL, > J
>_PZ
Wcx
Q J <
wQ
w LL o z
z o
CL z J
LLJ}s W
H
E4o \
6 920.5 1
928.5
946.5
ibN
m� 5 $'°9s95
\ oy�0,
E.V / o� o b '15
\ 9 2•b S
16
1TEMPORARYROC 9 _
\ CONSTRUCTION ENTRANCE
\s;
TEMPORARY ROC
\ \ \\ \ CONSTRUCTION ENTRANCE \ 9
I 11
TYPICAL LOTS
LOT NLMBER
1 1`1 11 ROIDS ULDING REAR GROUND ELEVATION / 1 BULDING TYPE
SLD- DENOTES SPLIT ENTRY LOOK OU
B9B FB - DENOTES FULL BASEMENT
SLAB W = DENOTES SPLIT WALKOUT
F
B9& FWDD =DENOTES FULL WALKOUT
N 1 11 SLAB -DENOTES SLAB ON GRADE
AW41 \ ESTED GARAGE PAD ELEVATIDNS
ROPOSED HOME PAD
deV \m
., f [hiss \\
\E� E. ) \ \�
SE.
ds
IE
EX '5xD
I. Ce�nter•ocna ah I eenfine conatructidn Eperotidns to the cenatr.etien
2. All Rork .boll conform to the Mi—Pt, Pdl.tim Control Agwly s Storm Water
___1 ... tt.
_requ'rements Contractor -11 hton NDPS permt ono campy Rth .11
Pwmt requ rement.
B. ContrY ah n pP theatres . of east every ] day 'n 24 ho
of on mea. atwm. nDomogo, a t fence w o
w Dr_ cea ah rePo retl m e e y haPeet En a ev
e l th. tlergohe final M.bili..1ionoo d. Nota. xf s
Teem noti.. i ..Emitted to the NPCP.
4. All gredng opwol one .boll Ee cond.c d I, o manner to mnmxe the
montoned to conform Rth the atendord. W.Witd Ey th, (MPGA)
6. M Stnfo et9Ess nst.l d reds arse reetoretlnee any dmomtomeo
] All bil. troceeo a peva or eny her Efi ate oreos -11 Ee r Pm
J.
6. The sitesed1.cfdcilitie. for the project ...t Ee in.ol ed
prior to ohy vi. t. gradontrd ing PpaotiM. Contact the Soil and Wotert
Conserwtion District (SWCD) once ..id facilities ore ms.ftd ontl before any
Eroding con toe place.
9. The CEntroeter .hell Ee reapereiE. ler he r .11 .1 admen control
incWdiR .It fenc ontl holes, upon esloEli ment of Pamonent
in .bid rex..
ID. All oreos dist.med during con.tr.cton shell lb,, re.twed d sveu .toted
os p ... iEle. y fihi— oreos Moll he m,d,d ad nm ,h,d Rithih
]doys ofta An1. i . Eroding is completetl 4, accordance to Mn/Dot 25]5.
DDT ae
II me
revegetoeaeost
otea x etl m y tned,
ferttl'zeo t O'sc onchoreq ePa fd ox n9hscthetl
Seed m• 25-121 61 IE/oc
FM' z.r 22 5-26 SSD E/oc
MUeh TYDe I, 2 T/Ae
Pederem 8 Assodetm ft
08
Zti
0
yz
WWC
as
cc0
Fo
�
m •a
o J
J di z
o C7 Ja
w z
LLI N J
�� zQo
WW ��
rY >-0
Q J <v
W Q
W ILL.ozz
z o �:2o
W } Nwo
�v maw
SIEET NO,
City of Elk River
Sherbiuine Cotmry, MN
LEGEND
EXISTING CONTOURS
_962— PROPOSED CONTOURS
WE LANDS
— /-�
V EXISTING TREE
^ EXISTING TREE LINE
• FOLND MONUMENT
SET MONUMENT
FOLND CAST RON MONUMENT
LI EXISTNG ELECTRO 11m
50' 0 SO'
EXISTING TELEPHONE PEDESTAL
SCAL®IN T
I" = 50'
T \SCALE:
LET BOUNDARY
T SIGN
m� EXISTING POLE
1- EXISTING GUT ANCHOR
EXISTINGFIRE HYDRANT
w EXISTING VALVE
EXISTING MANHOLE
WI EXISTING CATCH BASIN
► EX ST NG FLARED END SECTION
—» EXISTING STORM SEWER
EXISTING WATERMAN
< EXISTNG SANTART SEWER
» PROPOSED STORM SEWER
IIIPROPOSED CATCH BASIN
► PROPOSED FLARED END
.. . . . . .. PROPOSED FILTER LOG
SECTION
PROPOSED SILT FENCE
PROPDSED DRAINAGE ARROW
PROPOSED INLET PROTECTION
I. Ce�nter•ocna ah I eenfine conatructidn Eperotidns to the cenatr.etien
2. All Rork .boll conform to the Mi—Pt, Pdl.tim Control Agwly s Storm Water
___1 ... tt.
_requ'rements Contractor -11 hton NDPS permt ono campy Rth .11
Pwmt requ rement.
B. ContrY ah n pP theatres . of east every ] day 'n 24 ho
of on mea. atwm. nDomogo, a t fence w o
w Dr_ cea ah rePo retl m e e y haPeet En a ev
e l th. tlergohe final M.bili..1ionoo d. Nota. xf s
Teem noti.. i ..Emitted to the NPCP.
4. All gredng opwol one .boll Ee cond.c d I, o manner to mnmxe the
montoned to conform Rth the atendord. W.Witd Ey th, (MPGA)
6. M Stnfo et9Ess nst.l d reds arse reetoretlnee any dmomtomeo
] All bil. troceeo a peva or eny her Efi ate oreos -11 Ee r Pm
J.
6. The sitesed1.cfdcilitie. for the project ...t Ee in.ol ed
prior to ohy vi. t. gradontrd ing PpaotiM. Contact the Soil and Wotert
Conserwtion District (SWCD) once ..id facilities ore ms.ftd ontl before any
Eroding con toe place.
9. The CEntroeter .hell Ee reapereiE. ler he r .11 .1 admen control
incWdiR .It fenc ontl holes, upon esloEli ment of Pamonent
in .bid rex..
ID. All oreos dist.med during con.tr.cton shell lb,, re.twed d sveu .toted
os p ... iEle. y fihi— oreos Moll he m,d,d ad nm ,h,d Rithih
]doys ofta An1. i . Eroding is completetl 4, accordance to Mn/Dot 25]5.
DDT ae
II me
revegetoeaeost
otea x etl m y tned,
ferttl'zeo t O'sc onchoreq ePa fd ox n9hscthetl
Seed m• 25-121 61 IE/oc
FM' z.r 22 5-26 SSD E/oc
MUeh TYDe I, 2 T/Ae
Pederem 8 Assodetm ft
08
Zti
0
yz
WWC
as
cc0
Fo
�
m •a
o J
J di z
o C7 Ja
w z
LLI N J
�� zQo
WW ��
rY >-0
Q J <v
W Q
W ILL.ozz
z o �:2o
W } Nwo
�v maw
SIEET NO,
P/L P/L
53'
I
12'6" 28' B -B 12'6"
-2R SLOPE I-29. SLOPE
2. DR —
DEFLECTOR PLATE
11EIFLI 'CENTER
1.5" BITUMINOUS WEAR COURSE
of FILTER AssEMRLv
(Mn DOT 2360 TYPE SP 9.5)
OVERFLOW 2 - TOP OF
URD BOX
2.13" BITUMINOUS BASE COURSE
(MnDOT 2360 TYPE SP 9.5)
6" CLASS 5 GRAVEL BASE (MIN.)
OPOMJNOFF
Io" FILTER A MEULv
CLEAR ROCK (}/4" TO 11/2
12 TH 4" PVC OVERFLOW PIPE
-TEP 18" MINIMUM WITH I/2" PERFORATION5
WITH SEDIMENT
w
S
COMPACTED SUBGRADE
% Sop
MOUNTABLE CONCRETE CURB AND GUTTER
NOTE: PLACE TACK COAT BETWEEN COURSES
Pbl uw
o
TYPICAL STREET SECTION -PRIVATE STREET
o /y
B• MIN.
_
SEDIMENT ME H
111
8
FILTERED WATER (I/2"W6v 1.
.I
9
a
u`
6B"R
/2"R
2" TO 3' WASHED ROCK
qua
o u 'S J
TOP BIT. MAT 28"R
AS SPECIFIED BY MnOOT
WIMCO MOOELp CG 3061
3/6" 1/2.. _
HIGH FLOW CARE OR EQUAL
c€aB
o
BASE
0b
-
10 2"
=•zg.
DD6
RSTANDARD
: 3/2DD6
: 3/2G06
gg�pp
PLATE
NO.
CATCH BASIN
STANDARD
PLATE
ND'
CATCH BASIN
STANDARD
PLATE
NO.
'T' z B
a u
_•i f
-
MOUNTABLE CONCRETE CURB & GUTTER
E91
ROCK CONSTRUCTION ENTRANCE
E3
INLET PROTECTION
E3
SEDIMENTATION BARRIER
Z
River
Rro r
2511
Rro r
2510
ALL CONSTRUCTION TO CONFORM TO
o 0 IN
W Z
THECITY OF ELK RIVER'S STANDARD
Ir
SPECIFICATIONS AND DETAILS- IF
CONFLICTS BETWEEN DETAILS AND
LM W
�
ECIA1CNT
SPECIFICATIONS OCCUR THE CITY OFa
J KAP -AAP
R
ICoNs mES,1_8 "" 91Rf•1 aNu PERN rEw:TAnON
ELK RIVER'S SPECIFICATIONS AND
DETAILS SUPERSEDE SPECIFICATIONS
Note:
mss—
-
F UO z -
EITEND CUT Tothe
AND DETAILS PROVIDED.
Change of Coverage: For construction projects wnere
m*er+ernrvx }
¢ Tn L
Q _
LMSTxc uouw
r�
F�
owner r op,Changes, (e.g.. on original
al veloper sells portion of the property to vo
homebuiltlers or sells the entire site to o new ow er)
the cu ent owner ontl the n w owner operotorn shall
submitro complete permit motlificolion oan o form
provided by the commis ner. The form must be
submitted prior to the ne owne operator
SECTION R -R
A
Q o -
m J - -�
ting c nstr-ti- CtiVityro site o
A A
s slater than 30 tlays after laking o ership of the
R/W
£ 40 HOLD DOWN
prroperty. Theo ner shall provitle a SWPPP to the n
and operolor that speciticolly Oddr.-BS the ew
remaining Construction activity.
STILL
R 00
0 J
TYPICAL SWALE
4o 12VET
O
d Z N
W O
EROSION CONTROL FENCE
ec uITE H xia-rem A
FUTURE SURFACE ELEV. AT HOUSE
GRADING GRADE
TOPSOIL
�TQ 15
LOT LINE £ STOLKPI E £
U.I RSI -'D, pros)
PLAN
_
ovm or
W
Y Z
J
W w_ F
ROPEK-"SILT STOP' FABRIC
r.z•.r o
COMPACTED FILL (IF REO'D)
TOP OF STABLE SUBSOIL
TYPICAL FULL BASEMENT (FB) OR SPLIT LOOKOUT
is aiP-rem
��FLTE
H- Y W
Q W N
Z
w
STAKES O 9' O.C. '
aro,a,LE rmae
W o
Z O Q
<%ROCK
�8ACKF
2
CLmN+D
INIEI
2 UJI
EXISTING CRWND
CONSTRUCTION
ENTRANCE
SECTION A—A
H U 3 0
T .
6
EMBANKMENT
B" SEDIMENT � �
CONTROL LOGS
SILT FENCE
BACK OF CURB
3/2oa6
STANDARD
_ ¢ STREET _ _
TEMPORARY SEDIMENT CONTROL
HOUSE PAD GRADING DETAIL
SINGLE LOT EROSION CONTROL PLAN
RIP -RAP INSTALLATION
PLATE
No.
7
17
2505
GENERAL INFORMATION
This Storm..ter Pollution Prevention Pl.n is prepared in rordonce to
the Notional Pollutant Disch.rgs Elimination System Permits No. AN
R1000D01 for storm water discharges o cited with ronsiruc lion activity.
Project Nome: THE PINES AT ELK RIVER P.U.D.
Location: 183RD CIRCLE NW, Elk River, MN.
City: Elk River, AN
Lot/Long: 45.3040/-93.5498
THECr'atiES of Construction Activity
THE PINES AT ELK RIVER P.U.D. tonsisis of grotling, utilities, ate
hose and bituminous surfacing, storm water management, and turf turf
establishment.
PROJECT CONTACTS
Washington e
glon Street Investors ontl the Contractor or responsible for
implement of the SWPPP and the insl"Il.tion, inspection, and
ointenonce of the er n prevention and sediment control BMP's
before ontl during constgluction.
ENGINEER and SWPPP DESIGNER (Exp 2018):
Jeff Swanson
Bogart, Pederson & Associates
13076 First Street
Becker, MN 53308-9322
(763) 262-8822
CONTRACTOR:
Not yet identified
DESIGN CALCULATIONS:
See drainage calculations. Provided by Bogart, Pederson & Assoc.
Design calculations include soil types over the site.
NARRATIVE
Description of Construction Activity.
THE PINES AT ELK RIVER P.U.D. consists of grading, utilities, aggregate
base and bituminous surfacing, stormwoter management, and turf
establishment.
Project Duration: Anticipated 90 Days Potential
Dischorges: Sediment resulting from construction operations.
Are. to be Disturbed: 5.0 Acres
Pre—Construction Impervious Area: 0.0 Acres
Post Construction Imaervi"us Area: 1.71 Acres
New Impervious Area: 1.71 Acres
RECEIVING WATERS
Receiving Waters Within One Mile:
Troll Brook is not o special or impoiretl water
Mississippi River is o special and on impaired water
PLANS AND SPECIFICATIONS
Theplan sheets of this plan set indicate the following items:
The project location and construction limits.
Existing and final grades. Tributory are. dividing lines and direction of 71D. for all pre
an at post—construction stormwoter runoff drainage or provitletl in the dr—age
role ul.lions. Drainage calculations are provided upan rson request by BeBogart, Ped &
Assoc.
Locations of impervious surfaces.
Locations of areas not to be disturbed (e.g., buffer zones, wetlontls, etc.).
Steep slope locations.
Loco ions of all temporary and permanent erosion and sediment control BMP's to be
installed on the project.
The detail sheets indicate erosion
and sediment Control BMPS to be installed on the
P
roject. Estimated quantities "(Dre ontl sediment control features for this project
ore indicated in the plans ontl in the bid proposal form D1 the Project Manual.
I. Infiltration area shall be staked off during construction to restrict heavy equipment
troffic from compacting native soils.
2. Install appropriate temporary erosionControl devices to prevent sediment from leaving
or entering the pr.ctice during construction.
3. Construct and vegetate bioretenti.n device following stabilization of contributing
tlroinoge are..
4. Grading of the infiltration basin shall be accomplished using IDw—impost earth—moving
equipment to prevent compos lion of the underlying soils. Small hacked dozers and
bobcats with runner tracks are recommended.
5. Excovole the infiltration basin to the specified depth (elevation). It is recommended
that all
sub material below the specified elevation shall be undisturbed.
5. In the event that sediment is introduced into the bmp during or immediately following
ovation, this material shall be removed from the practice prior to continuing
construction.
7. Remove temporary erosion control devices after the contributing drainage are. is
.tlequ.tely vegel.ted.
Down gradient silt fence ontl sediment log installations are to be inplace prior to
the cam mentem enc of any earthwork operations.
Topsoil is to be windrowed "long the construction limits and placed os slope
dressing immediately following completion of the grading operations, os the grading
operations proceed.
Topsoil placement along the embankment slopes though the wetlontls are. is to
be spread by o low impact c ..ler tractor operating up and down the slopes so
as to provide track prints parallel with the contours.
Installation of Mn/DOT Category 3 Erosion Control Blanket along the embankment
Slopes adjacent the wetlontls are..
All temporary soils stockpiles will require an effective m of sediment control
such o n erosion control Dl.nkel Lovering or silt fenced nstallation along the toe
of slope. a
All completed ditch slopes and bottoms not draining towards the wetlontls area
ore to be stabilized within 7 days.
Temporary stabilization will be required in are.. here grading operations are
suspended or ceased for o period of 7 day. or greater.
A rock construction entrance for sediment control is to be provided .t the project
drive..ys.
Street s eeping of the paved surfaces will be required as directed by the
Engineer.
Tracked sediments must be removed from II paved surfaces, adjacent roodwoys,
and other off—site areas within 24 hours of discovery.
TIMING EROSION CONTROL
Silt fence
will be installed prior to construction
Riprop and tiller blanket will be placed at the outlets within 24 hours
of the outlet placement.
The contractor must stabilize the all exposed soil areas
mediately
following construction wherever Construction will not occur for o period
greater than or equal to 7 days.
Stabilization work must be complete within 7 c.lender tloys after the
construction work in that are. hos temporarily or permanently ce.sed.
Arensthat o within 2DD ft o7 o Public Water must be stabilized
within 24 hourrs of completing construction during periods of "Work in
water rest riclions" for time periods declared by the DNR.
The Contractor is esponsible to maintain the disturbed .re. until
vegetation in established.
Once vegetation is established and construction is complete, the silt
fence and any other temporary erosion control that is not
biodegradable shall be removed.
Street sweeping 'Il be provided on as directed by the Owner The City
may require the Owner to provide Street s eeping. If so the Sireet
sweeping must occur within B hours of of notice from the City.
Applying mulch, hydr.mul.h, t.ckifier, p.1y.cryl.mide or similar erosion
prevention practices is not acceptable stabilization in any port of o
temporary or permanent drainage ditch or ...Ie.
INSPECTION AND MAINTENANCE ACTIVITIES
The Contractor isto provide o trained intlivitluol responsible Tor the
implementation, inspection and
maintenance of the eros n ontl setlimenl control
BMP on the project. That individual is to be identified at
the pre—construction
c onterence and listed in the minutes thereof.
The appointed individual is to perform o routine inspection of the entire site .t
least once every seven days during construction operations and within 24 hours
otter o rainfall event greater than 0.5 inches in 24 hours.
A recommended inspection form will be provided to the Contractor of the
pr—construction conference. Any deficiencies in the erosion and sediment control
BMPs are to be noted on the inspection form and corrected by the end of the
next business day.
Perimeter control devices are to be repaired or replaced when they are no longer
effective or when the sediment reaches one—half the height of the device.
POLLUTION PREVENTION
Fertilizers are to be applied only in the amounts as specified and worked into the
soil to minimize exposure to stormwoter runoff.
Onsite refueling operations o e to be conducted with c Any inodvertenl spillage
of to el or chemicals is to be immediately cleaned up, removed from the site ontl
disposed of in accordance to State and Local Regulations. Major spills are to be
reportedto the MPGA 24 Hour Notification network at 800 422 0798. All vehicles
nsite o e to be monitored for leaks and subject to routine preventive
maintenance efforts to reduce the likelihood of leakage and or spills.
Portable sanitary waste facilities are to be provided onsite and emptied on o
bi—weekly basis.
Concrete botch trucks will not be .11—cl to discharge drum
ontl chute ..shout
directly on the ground. A portable ..shout receptacle is to be provitletl by the
Contractor .t the location as provided by the Owner.
FINAL STABILIZATION
Final Stabilization Cc
n o re when 70 percent of the pervious area is covered with
uniform, permanent vegetation.
All temporary erosion and sediment control features are to be removed and
the NPDES Notice of Termination is to be prepared and submitted to the
MPCA.
LOCATION OF SWPPP REQUIREMENTS IN PROJECT PLAN
DESCRIPTION TITLE LOCATION
Erosion Control Details Erosion Control Details Sheet 6
Erosion Control Grading Plan Sheet 5
Locations
24 HOUR MPCA EMERGENCY NOTIFICATION
Telephone Numbers: 651-649-5451
800-422-0798
Z 0,
'3
W W
C �
a
a_
F V "-
cc z
oa
m.6
D J
d Z v
X M O
W N
� � w
� W >
z
J d
W
r J
Q W
W W o
Z Q d
d z d
LLJ
r a
k—
to
H U
s N EEiO. /
7
PRELIMINARY PLAT OF
THE PINES AT ELK RIVER P.U.D.
ZONW Prbpxed Planned Utif
DexloPment
I �
'
'� 4 a . 6 ,
SETBACA'S Bu9din andl be xI bock o
wn o{ 30 bet firm Ne
ach e{ cuI p
V
\
mhin,
�ewaye, guest parev
9-1
and pub/ro rghfa-of-xnx
b
N' el I l f between
rcaidenfibl abuclwes
/�
/�
/--]
may\\ 11 A b
MEAS TetN-329, J/8 eq Jf
Sioye F 9y-Il$J35 aq /f
� �
� �g
'i
+°
vo
99\
�
u
\
OWNER: Waahin9fm Slrxf bxafdra
� '
Bloomin9tm NN 55137
\���r'''
613-611-JJ31
c �s
9
2 /
�\
—s h ENGINEER£
BagarL Pedezan k
2
�
Avacahe
]Ol2 Fwef Street
\ �'
Becker YN 55308
J8J-363-7733
\ \ \ -
\ �•.
PROPERTY OESCR/PITON:\\\��
Ovtbt A, ME P/NES TOWN
PARK RIwO AN
6cF/CE a ] BL
and Gah l THROUGH l$ BLOCK 1,
THE P/NES TOWN OFFlCE PARK
m Sheburne —y
Recardde 0{I e, Sbebume
-•• \
•"•• • • ••- T
9\\\
Cavnfy, Yinnexfa.
\ \
SIRVEYORS NOTES
v Sm' l \\
I) v— Drainage 4 UtiL'fY EnaemenN ae
� a°nM�
.ahban on THE PINES TOWN OFFICE PARK are
-¢'an9 SE Ia/ Outl t A
of /B
xr part o/ Loh 11 k IS
- xr part
- ver Parf aJ Late 6 -II
- ver pare aJ Lat 5
ane p- oNen h be he
zJ Varrova Oro I h U T Eaxmen-
h oa
n ME P/NES TOWN OFi-ICE PARK
THIRD A00/T/ON are fa be weated bdudinq:
-aron9 SE Ione o/ Outlot A
-and P— aNen fa be decida0
REFERENCE BENCHMARK:
NMOT Crodefic Dafobax Shfion
ame LIQUOR NNI4/ RESET,
amped LIOL119 1990 3011
Elewtian. = 9//.819 Jeet (NAND 221
PRO.YCT BENCHNARM
Tcp Nuf Fire Hydrant -I
IXI / f aauNevt a/ eafranm fa
Pbeview 9 CauNW
D—= 91508 het (NANO B8)
La` $Block 1 2070 SF
0 7, Bbd 1 63JJ SF
at $ Bbd I 5958 SF
at 9, Glad I 5]95 SF
of 1, Brock I 510J SF
R, -1I SF
at 1
3, Brock I 91104. SF
Gaf l3, Block 1 ama
-1 Sf
Brod 1 JmsF
at /5, Black I 56/9 SF
lz
at Black 1 5072 SF
Lot /7. Block 1 5272 Sf
L.; $Bbd 3 2999 SF
at
I.-
B/a3 2/30 SF
Lof J, Block 1 7008 SF
of 11 5185 SF
at 9, Bbd 3 53/7 SF
Du7at A 19091] SF
TOTAL ]69117 SF
PEDERSON, & ASSOCIATES, INC
o r wx�iaary Knox
e Ixyna. F.e../x
/a w/e aue reey
aene/u v,.noniv zwmm
�., aena/ea aonoe/e ri,rrue
CaUa/v ,wN�
' / n-nJ-bxe
CITY OF ELK
SHERBURNE COUNT
iver
Ordinance 17 -
An Ordinance Amending the City of Elk River Zoning Map to Rezone Certain
Property from Business Park to Planned Unit Development.
Case No. ZC 17-05
The City Council of the City of Elk River does hereby ordain as follows:
SECTION 1. That the duly adopted Zoning Map of the City of Elk River is hereby amended to
rezone the property described on attached Exhibit A to PUD (Planned Unit Development).
SECTION 2. That the rezoning approved by this Ordinance is based on the following findings:
1. The rezoning is consistent with the City of Elk River Land Use Plan adopted as
part of the City of Elk River Comprehensive Plan.
SECTION 3. That this ordinance shall take effect upon adoption and be published as provided by
law.
Passed and adopted by the City Council of the City of Elk River this 17th day of July, 2017.
John J. Dietz, Mayor
ATTEST:
Tina Allard, City Clerk
p 0 w I R 1 0 0
NATURE
Exhibit A
Oudot A, THE PINES TOWN OFFICE PARK THIRD ADDITION, Sherburne County
Minnesota
Lots 1 to 18 (inclusive), Block 2, THE PINES TOWN OFFICE PARK, Sherburne County Minnesota
p I I I I 1 0 1T
NATURE