Loading...
5.5. LIBSR 08-01-2017 4ftdam-,4- m , Library Zones Report Elk River Public Library Board The Library Board serves in an advisory capacity to City of Elk River for issues related to the Elk River Public Library grounds, the physical building and interior fixtures. The city is responsible.for scheduling and coordinating all work to be completed. Updated:07/31/2017 Im Zone 1 Mary K. Entrance; butterfly garden; windmill, prairie grass; rain garden in parking lot, planter boxes for Master Gardeners summer gardening program Zone 2 Willie Front door, front garden,concrete pathways, patio, flag turnaround Zone .3.................Mary ..E. Rain garden, book drop turnaround, employee _parking lot, being a good neighbor Zone 4 Mick Being a good neighbor, grass & rock areas Zone 5 Rita Rainarden and exterior g , interior building maintenance, interior furniture and shelving IMPROVEMENTS IN PROCESS 1. Kiosk and signage (Rae Ann Gardner) FUTURE IMPROVEMENTS High Priority 1. Permanent patio furniture 2. LED lighting in parking lot Under Consideration Ex loration 1. Sit/stand desks 2. More comfortable chairs in kids area 3. Modify the slatted room dividers by the Info Desk and the Teen area as display areas for collections, services and programs 4. Lounging space vs. table & uncomfortable chairs in teen area 5. Urinals in some or all of the unisex bathrooms 6. Handicap curbing closer to the building (in the drop off area)