Loading...
3.3. SR 08-09-1999 rei ---'\) ( ); ~l}{ **ITEM #3.3.** MEMORANDUM River TO: FROM: Pat Klaers City Administrator ! Bruce A. West D /7 A / / ~~~ g:~:~inator \) IfW DATE: July 23, 1999 SUBJECT: Electrical Wiring of City Hall . Over the course of the past couple of months there has been much discussion in reference to the generator and its' capability to provide electrical power for the furnace system at the city hall complex. After discussion with two electrical companies, it has been decided to install wiring from the HV AC systems within city hall to the electrical generator located in the police department area. This will require extensive installation of additional wiring throughout the city hall complex to ensure that the complex will be provided with heating and ventilation during an emergency situation. Chief Building Official Clifford Skogstad and myself have met and discussed the proposed wiring with Kelly Johnson, owner of Reliance Electric. He has provided a proposal to install the proper wiring for the electrical generator at a cost of approximately $13,000. It is very difficult for Reliance Electric to provide an exact figure regarding the installation of the electrical wires due to the complication of running wires from one end of the city hall complex to the other. The owner, Kelly Johnson, has given us a range between $13,000 and $17,000 to complete the work required to provide power from the generator to the HV AC system. Providing emergency generator power to the heating and ventilation system is a very important step in the protection of city hall at all times during the year. This will ensure heating and ventilation will be supplied to all parts of the Elk River city hall complex, 24 hours a day, 365 days a year. If you have any question in reference to this issue, please feel free to call me at the Elk River Fire Department at 441-4919. . fire \generatr .doc 13065 Orono Parkway · P.O. Box 490. Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425 rll ---'\) ( ); ttflk **Item #3.3.** MEMORANDUM FROM: Mayor & City Council Pat Klaers, City Ad~","or August 9, 1999 if/)) DATE: SUBJECT: Electrical Wiring of City Hall The Y2K coordinator for the city, Bruce West, has been working with Bryan Adams and Glen Sundeen from Elk River Municipal Utilities, the police department, and the building official regarding additional wiring at City Hall in order to provide adequate working conditions during emergency situations. When the Emergency Operations Center (EOC) is open, it is appropriate that City Hall and the EOC have heat in the winter and air circulation and conditioning in the summer. Additionally, the work being proposed for electrical wiring of City Hall will provide complete lighting throughout the facility and not just partial lighting in some areas. . Part of this request from the Bruce is related to the worse case situation with the Y2K issue. On the other hand, part of this request relates to simply having an adequate facility to operate from if we have a natural disaster at any time. The funding source for this expenditure would be the 1999 city council contingency budget or, if at the end of the year funds are not available from this source, staff would recommend using the building reserve. Bruce has attempted to get other quotes for this work and the verbal quotes that have been received have been much higher than the range listed in his memo and also the timing of the work from the other local firms has not been determined. The city has good experience with Kelly Johnson of Reliance Electric as he has done the work for the ice arena and the liquor store. Recommendation It is recommended that the City Council authorize the hiring of Kelly Johnson, Reliance Electric, for the electric wiring work at City Hall for a range between $13,000-$17,000 with funding to come from the city council contingency budget. . 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425