Loading...
04-04-1931 TBM ELK RIVER TOWN BOARD MEETING April 4, 1931 Board of Elk River Twp. met in regular session at Court-house with all members present. Present: \[not listed\] The following bills were allowed and ordered paid. Road & Bridge Fund No 2 E.R. Con. Prod. Co $10.24 No 3 Arnold Engstrom 8.25 No 4 Ben Engstrom 8.25 No 5 R.D. Dobel 14.10 No 6 A.T. Dobel 27.95 No 7 Chester Lockwood 25.85 No 8 John Rotz 7.90 Total R. & B. \[Fund\]: $102.54 Rev. Fund No. 11 Walter S. Booth & Son Inc. $5.15 No. 12 F.E. Sellon 8.20 No. 13 Oscar Engstrom 6.00 No. 14 B.A. Gray 6.00 No. 15 L.G. Lamm 6.00 Total Rev. \[Fund\]: 31.35 Paid out Apr. 4, 1931: $133.89 Bal from last meeting $758.91 Paid out Apr. 4 133.89 Bal: $625.02 On motion a culvert was ordered installed on road large enough for sheep pass by the home of Earl R. Sellon. Earl R. Sellon aggreeing \[sic\] to pay difference of cost of 36 in culvert and 12 in culvert. No other business board adjourned. F.E. Sellon Clerk