4.3. SR 08-21-2017 Eclty1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 4.3
Agenda Section Meeting Date Prepared by
Consent August 21, 2017 Justin Femrite P.E., City Engineer
Item Description Reviewed by
Pay Estimates Lori Ziemer, Finance Director
Reviewed by
Cal Portner, City Administrator
Action Requested
Approve,by motion, the pay estimates as detailed below
Background/Discussion
The following pay estimates have been reviewed and found to be accurate and in accordance with the
approved contract.
Financial Impact
PROJECT PAY EST. # CONTRACTOR AMOUNT
2017 Street Improvements 4 North Valley,Inc. $607,794.66
WWTF Improvements 32 Rice Lake Construction Group $239,078.85
Attachments
■ Pay Estimates
The Elk River Vision
A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By
service, and community engagement that encourages and inspires prosperity INAWRE1
e
d
z
miw_-
u
3
G
0
t
N
C
\
V
❑
_
c
�
v
O
Y
3
O
Z c�
O
�
�
W E
T
Q o.
O
4ad
Z u
s x
a
V
�
❑
W
O
V
N
Q
�
N
N
e
r
O
N
O
a
a
Q
O
C
�. w ❑
F
O
°
a
z
w T
3
0
t
N
C
\
V
❑
_
c
�
v
c
Y
3
Z c�
O
�
W E
T
Q o.
4ad
Z u
s x
V
C
m
z
W
O
PAY ESTIMATE 114
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "A"- S.A.P. 20&113016 - ORONO PARKWAY
REM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.13
LUMPSUM
$80,250,P
10432.60
0.13
S
10432.60
2
CLEARING
1
TREE
$1,5114.M
1564.72
3
4694.16
3
GRUBBING
1
TREE
$586.]8
586.78
3
1760.34
4
REMOVE CURB AND GUTTER
4,730
LIN FT
$3.23 $
15277.90
4,818
$
15562.14
5
REMOVE CONCRETE PAVEMENT
990
SO FT
$2.61 $
2 583.90
1,168
3,048.48
6
REMOVE CONCRETE WALK
750
SO FT
$2.09 $
1,567.50
947
S
1.979.23
]
SAWING CONCRETE PAVEMENT FULL DEPTH
0
1 LIN FT
$3.161$
284.40
90
284.40
8
SAWING BITUMINOUS PAVEMENT FULL DEPTH
103
LIN FT
1.98
203.94
103
$
203.94
9
SALVAGE CHAIN LINK FENCE
50
LIN FT
$16.05
802.50
70
$
1123.50
10
SALVAGE SIGN SUPPORT
3
EACH
$26.75
8025
2
$
53.50
11
SALVAGE CASTING
13
EACH
$110.48
1436.24
13
1436.24
12
SUBGRADE EXCAVATION EV
160
CU YD
$11.73
1876.80
211
2475.03
13
WATER
100
MGAL
27.82
2782.00
$
14
FULL DEPTH RECLAMATION
17388
SO YD
$1.35
23473.80
17388
$
23473.80
15
HAUL FULL DEPTH RECLAMATION LV
2.801
CU YD
S7.14 S
19999.14
2,001
19 999.14
18
HAUL FULL DEPTH RECLAMATION LV
416
CUYD
$7.14
2970.24
344
2456.16
17
MILL BITUMINOUS SURFACE Y
19
SO YD
$26.75
508.25
19
508.25
1S
BITUMINOUS MATERIAL FOR TACK COAT
507
GALLON
$2.51
2025.57
700
1757.00
19
TYPE SP 9.5 WEARING COURSE MIXTURE 28
513
TON
$50.06 $
25680.]8
488
23428.08
20
TYPE SP 12.5 WEARING COURSE MIXTURE 3C
1758
TON
$47.02$
82567.12
1822.62
85893.59
21
TYPE SP 12.5 NON WEARING COURSE MIXTURE 3B
2,194
TON
$0.31 $
90634.14
2106.48
$
87018.69
22
15- RC PIPE SEWER DESIGN 3006 CLASS V
103
LIN FT
$53.03 IS
5462.09
94
S
4984.52
23
CONNECT TO EXISTING STORM SEWER
8
EACH
$119M.61 $
15909.12
8
$
15909.12
24
ADJUST VALVE BOX
5
EACH
$303.82 E
1519.10
6
$
1822.92
25
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
6
LIN FT
1.92
2651.52
10
6419.20
26
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
38
LIN FT
$419.82 $
15911.18
44
111
18472.08
27
CASTING ASSEMBLY
10
EACH
$524.78 $
5247.80
17
1
57/2.58
28
ADJUST FRAME AND RING CASTING
17
EACH
$740.22 $
12583.74
23
17025.08
29
SEAL CATCH BASIN
13
EACH
ISSAS $
2016.95
24
3]23.80
30
4 -CONCRETE WALK
380
SOFT
$6.37
2420.60
515
$
3280.55
31
6-CONCRETEWALK
705
SOFT
$7.46 $
5245.20
536
E
3987.84
32
CONCRETE CURB AND GUTTER DESIGN 6618
4,730
LIN FT
$12.79 $
60496.70
4.818
S
61822.22
33
F CONCRETE DRIVEWAY PAVEMENT
177
SO YD
$57.78 E
10 7.06
142.5
$
8233.65
M
TRUNCATED DOMES
100
SOFT
$48.15 E
4815.00
75
$
3611.25
35
INSTALL SALVAGED FENCE
50
LIN FT
$26.75
1,337.50
70
$
1,872.50
36
TRAFFIC CONTROL
0.13
LUMPSUM
$79859.23 $
10381.70
0.13
$
10381.70
37
INSTALL SIGN SUPPORT
3
EACH
$80.25 $
240.75
2
$
160.50
38
STABILIZED CONSTRUCTION EXIT
0.13
LUMPSUM
$5200.23 $
676.03
E
39
FERTILIZER TYPE I
228
POUND
$1.02 $
232.56
228
$
232.56
40
COMMON TOPSOIL BORROW LV
270
CU YD
$32.12
86]2.40
249
7997.88
41
SEEDING
1.25
ACRE
$374.50S
468.13
1.25
$
468.13
42
SEED MIXTURE 25131
126
POUND
$3.20 $
403.20
126
E
403.20
43
HYDRAULIC NATURAL TACKIFIER
2,760
SO YD
$0.75
2070.00
2,760
$
2070.00
44
EROSION CONTROL
0.13
LUMPSUM
$3210.00 $
417.30
0.13
E
417.30
45
PAVEMENT MESSAGE EPDXY
30
SOFT
$5.73 S
171.90
30
E
171.90
46
4 SOLID LINE EPDXY
5.535
LIN FT
$0.31 $
1715.85
53%
$
18]2.76
47
24" SOLID LINE EPDXY
42
LIN FT
56.88 $
288.96
40
275.20
48
a DOUBLE SOLID LINE EPDXY
345
1
LIN FT
$D621 $
213.90
345
$
213.90
49
CROSSWALK EPDXY
432
SOFT
$3,671S
1585.44 1432
1585.66
Total Bid Schedule 'A" $ 460.720.25 $ 488.182.13
SAMIInici,Il .IIAWAERWMPAY ESTIMATES\ER303 PE PE -1
PAY ESTIMATE #4
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE W - SAP. 2U4-123-001 -JOPI
REM
NO.
REM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.17
LUMPSUM
$80250.80 $
12037.62
0.17
13642.64
2
REMOVE CURB AND GUTTER
5215
LIN FT
$3.23 $
18844.45
5202
16802.46
3
REMOVE CONCRETE PAVEMENT
505
SO FT
$2.61
1,318.05
793
2089.73
4
REMOVE CONCRETE WALK
2927
SOFT
$2.09
6117.43
4,595
9603.55
5
REMOVE BITUMINOUS PAVEMENT
36
SO YO
$26.75 $
983.00
137
$ 3664.75
6
SAWING CONCRETE PAVEMENT FULL DEPTH
58
LIN FT
$3.16 $
18328
58
$ 183.28
]
ISAWING BITUMINOUS PAVEMENT FULL DEPTH
311
LIN FT
$1.981 S
615.78
311
$ 615.78
8
SALVAGE SIGN SUPPORT
12
EACH
$26.75 $
321.00
17
$ 454.75
9
SALVAGE CASTING
9
EACH
$110.48
980.32
12
$ 1325.76
10
SUBGRADE EXCAVATION EV
8ZD
CU YD
$19.56
17017.20
970
17017.20
11
WATER
150
MGAL
$27.82
41]3.00
12
FULL DEPTH RECLAMATION
18,008
Sam
$1.39 $
25031.12
18,008
$ 25031.12
13
HAUL FULL DEPTH RECLAMATION LV
4121
CU YD
$6.49
26745.29
4,121
$ 26]45.29
14
HAUL FULL DEPTH RECLAMATION LV
2608
CU YD
$6.49 $
16925.92
2,608
16925.92
15
MILL BITUMINOUS SURFACE
64
Sam
$9.83 $
616.32
84
$ 616.32
16
MILL BITUMINOUS SURFACE 2.5'
45
SO YD
$9.83
433.35
45
$ 433.35
17
BITUMINOUS MATERIAL FOR TACK COAT
829
GALLON
$2.51
2080.]9
610
1531.10
18
TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)
465
TON
$49.85
23180.25
436.88
21 770.4]
19
TYPE SP 12.5 WEARING COURSE MIXTURE 3C
2051
TON
$48.04 $
94428.04
2181.55
$ 99517.76
20
TYPE SP 12.5 NON WEARING COURSE MIXTURE 38
2250
TON
$40.72
91620.00
2320.24
94480.17
21
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
10
TON
$197.95
1,979.50
16.96
S 3357.23
22
ADJUST VALVE BOX
6
EACH
$513.M $
3001.24
6
$ 3081.24
23
INSTALLCASTING
12
EACH
$110.481S
1325.76
12
$ 1325.76
24
ADJUST FRAME AND RING CASTING
5
EACH
$740.22 $
3701.10
8
$ 5921.76
25
SEAL CATCH BASIN
12
EACH
$155.15 $
1861.80
12
$ 1%1.80
26
4 -CONCRETE WALK
1752
SOFT
S6.37
11160.24
2.201
S 14020.37
27
6' CONCRETE WALK
1175
SQ FT
ST." $
8742.00
2,379
17699.76
28
CONCRETE CURB AND GUTTER DESIGN 8618
215
LIN FT
$12.79 $
WANES
5177
$ 66213.83
29
T CONCRETE DRIVEWAY PAVEMENT
58
SO YD
$77.04 $
4468.32
103.7
S 7989.05
30
TRUNCATED DOMES
220.0
SOFT
WAS $
1059300
292
$ 14059.80
31
ITRAFFIC CONTROL
0.15
LUMPSUM
$n.8slLm
11978.88
0.15
11978.88
32
INSTALL SIGN SUPPORT
9
EACH
$80.25_L
722.25
17
$ 1364.25
33
ADJUST HANDHOLE
2
EACH
$428.00
856.00
i
428.00
34
RIGID PVC LOOP DETECTOR 6110
4
EACH
$909.51 $
3838.04
1
S 909.51
35
STORM DRAIN INLET PROTECTION
13
EACH
$90.95
1 18235
13
1,182.35
36
STABILIZED CONSTRUCTION EXIT
0.15
LUMPSUM
$5,2DD.27
]8004
0.0
37
FERTILIZER TYPE I
300
POUND
$1.02 $
306.00
Is 306.00
38
COMMON TOPSOIL BORROW (LVj
330
CU YD
$34.25 S
11302.50
354
12124.50
39
SEEDING
1
ACRE
$374.51 $
374.51
1
$ 374.51
40
SEED MIXTURE 25131
ISE
POUND
$320 $
528.00
165
$ 52B.00
41
HYDRAULIC NATURAL TACKIFIER
3630
Sam
$0.75 $
2]22.50
3,630
$ 2]22.50
42
EROSION CONTROL
0.15
LUMPSUM
$3210.07 $
481.51
0.15
$ 481.51
43
PAVEMENT MESSAGE EPDXY
99
SO FT
$5.73 $
567.27
99
$ 587.27
44
4' SOLID LINE EPDXY
770
LIN FT
$0.31
238.70
]]0
238.70
45
24' SOLID LINE EPDXY
118
LIN FT
S6.88 $
811.84
156
$ 1,()M.28
46
4'BROKEN LINE EPDXY
960
LIN FT
$0.31
297.60
880
272.80
47
4' DOUBLE SOLID LINE EPDXY
2210
LIN FT
$0.62
1,3M.20
2,183
1,353,46
48
CROSSWALK EPDXY
1872
$0 FT
$3.67 $
8870.24
1602
S 5879.34
Total Bid Schedule "B" $ 500.297.45 $ 529.154.86
S:1MurdclpeKAe8ene0ER303U'AY ESTIMATES\ER303 PE PE -2
PAY ESTIMATE #4
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "C'- SAP. 2041314103
REM
NO.
REM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.17
LUMPSUM
250.82 $
13642.66
0.17
13642.64
2
REMOVE CURB AND GUTTER
3490
LIN FT
$3.23
112]2.70
3,579
11560.17
3
REMOVE CONCRETE PAVEMENT
1016
SOFT
$2.61 $
2651.76
1,318
3439.98
4
REMOVE CONCRETE WALK
2468
SOFT
$2.09
5158.12
3,951
8257.59
5
SAWING CONCRETE PAVEMENT FULL DEPTH
84
LIN FT
$3.16
265.44
84
265.44
6
SAWING BITUMINOUS PAVEMENT FULL DEPTH
125
LIN FT
1.98 $
247.50
125
247.50
]
ISALVAGE SIGN SUPPORT
5
1 EACH
$37.451 $
187.25
14
Is 524.30
8
SALVAGE CASTING
15
EACH
$107.00 $
1805.00
16
$ 1712.00
9
SUBGRADE EXCAVATION EV
2,167
CUYD
$18.54
40176.18
2167
40176.16
10
WATER
150
MGAL
$27.82
41]3.00
E
11
FULL DEPTH RECLAMATION
21725
SO YD
$1.21
28287.25
21]25
26287.25
12
HAUL FULL DEPTH RECLAMATION LV
7,409
CUYD
$6.26
48380.34
7409
46380.34
13
HAUL FULL DEPTH RECLAMATION LV
7024
CUYD
$6.25 S
4 900.00
7024
$ 43900.00
14
MILL BITUMINOUS SURFACE (21
44
SO YD
$9.63 $
623.72
46
423.]2
15
BITUMINOUS MATERIAL FOR TACK COAT
1200
GALLON
$2.51 E
3012.00
1025
$ 2572.75
16
TYPE SP 12.5 WEARING COURSE MIXTURE 3C
2613
TON
$45.99
120171.87
2651.43
$ 121939.27
17
TYPE SP 12.5 NON WEARING COURSE MIXTURE 3B
3,264
TON
$41.2/
134607.36
3095.55
$ 127860.48
18
ADJUST VALVE BOX
15
EACH
$513.51 $
7703.10
18
s 8216.64
19
INSTALL CASTING
15
EACH
$324.48
4867.20
28
9085.44
20
1ADJUST FRAME AND RING CASTING
11
EACH
$740.22 $
8142.42
14
S 10363.08
21
SEAL CATCH BASIN
15
EACH
ISSAS
232225
18
248240
22
4"CONCRETE WALK
2,238
SQ FT
$6.3]
14256.06
3,195
$ 20352.15
23
6'CONCRETEWALK
230
SOFT
$7.44 S
1711.20
756
$ 5624.64
24
CONCRETE CURB AND GUTTER DESIGN 8818
3490
LIN FT
$12.79.$
44637.10
3809
46159.11
25
T CONCRETE DRIVEWAY PAVEMENT
114
SO YD
$77,04
8782.56
150
11556.00
26
e'CONCRETE DRIVEWAY PAVEMENT
40
SO YD
$57.78 S
2,311.20
10
577.80
27
TRUNCATED DOMES
56
SO FT
.15
2696.40
30
1637,10
28
TRAFFIC CONTROL
0.17
LUMP SUM
$79,859.16
13576.06
0.17
$ 13576.06
29
INSTALL SIGN SUPPORT
5
EACH
$80.25 $
401.25
td
1123.50
W
STORM DRAIN INLET PROTECTION
17
EACH
90.95
1,546.15
36
3,274.20
31
ISTABILIZED CONSTRUCTION ENTRANCE
0.17
LUMP SUM
$5200.29 $
884.05
0
$
32
FERTILIZER TYPE I
]2
POUND
$1.02 $
73.44
72
$ 73.44
33
COMMON TOPSOIL BORROW (LVI
130
CUYD
$34.25 $
4452.50
163
5582.76
34
SEEDING
0.25
ACRE
$374,48
93.62
025
93.62
35
SEED MIXTURE 2&131
40
POUND
$3.20 $
128.00
40
S 128.00
W
HYDRAULIC NATURAL TACKIFIER
871
SQ YD
$0.75
65325
871
653.25
37
EROSION CONTROL
0.17
LUMP SUM
$3,210.00
545.70
0.17
$ 545.70
38
PAVEMENT MESSAGE EPDXY
192
SO FT
$5.73 $
1100.16
192
1100.16
39
4" SOLID LINE EPDXY
5912
LIN FT
$0.31
1832.72
8150
1906.50
40
2P SOLID LINE EPDXY
82
LIN FT
56.88 S
564.16
76
$ 522.88
41
4- BROKEN LINE EPO %Y
649
LIN FT
$0.31 $201.19
560
$ 173.50
42
4' DOUBLE SOLID LINE EPDXY
31]0
LIN FT
$0.62
1965.40
42113
S 2605.86
43
CROSSWALK EPDXY
537
SOFT
3.67
19]0.79
612
$ 2246.04
Total Bid Schedule "C" $ 581.585.08 i 599.549.53
SAMUDICIpahAe*dveAERW31PAY ESTIMATES\ER303 PE PE - 3
PAY ESTIMATE #4
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "D'- S.A.P. 204149 -001 -193RD AVENUE
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USEDTO
DATE EXTENSION
1
MOBILIZATION
0.05
LUMP SUM
$60,2W.W
4012.54
$
2
REMOVE CURB AND GUTTER
16
LIN FT
$21.40
342.40
$
3
REMOVE SEWER PIPE STORM
133
LIN FT
$11.05 $
1,469.65
4
REMOVE CONCRETE PAVEMENT
102
SO FT
$2.61 $
26622
5
REMOVE BITUMINOUS PAVEMENT
450
SO YD
$3.69
1680.50
IS
6
REMOVE MANHOLES OR CATCH BASINS
3
EACH
1.92
1,325.76
$
T
ISAWING CONCRETE PAVEMENT FULL DEPTH
17 1
LIN FT
$3.161$
53.72
8
SAWING BITUMINOUS PAVEMENT FULL DEPTH
298
LIN FT
$1.98 $
590.04
$
9
SALVAGE MAILBOX SUPPORT
14
EACH
37.45
524.30
10
SUBGRADE EXCAVATION EV
676
CU
12.53
8470.28
$
11
WATER
70
MGAL
$27.82
1947.40
12
FULL DEPTH RECLAMATION
6007
SO YD
$1.33 111
7989.31
$
13
HAUL FULL DEPTH RECLAMATION LV
17M
CU YD
$6.18
10,]28.48
E
14
HAUL FULL DEPTH RECLAMATION LV
1,736
CU YD
$6.18 $
10 728.48
15
MILL BITUMINOUS SURFACE 1.S
24
SO YD
$26.75 $
642.00
$
16
BITUMINOUS MATERIAL FOR TACK COAT
350
GALLON
$2.51
878.50
$
17
TYPE SP 9.5 WEARING COURSE MIXTURE 2C
529
TON
$47.87 $
25323.23
18
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,S)
882
TON
S40.23 $
35482.86
$
19
TYPE SP 12.5 WEARING COURSE MIXTURE 282.5' THICK
323
SO YD
11.74
3792.02
$
20
is- RC PIPE APRON
1
EACH
$828.60 $
828.60
21
12' RC PIPE SEWER DESIGN 3006 CLASS V
6
LIN FT
$52.48 $
314.88
22
15- RC PIPE SEWER DESIGN 3006 CLASS V
91
LIN FT
$53.031S
482573
$
23
ADJUST VALVE BOX
2
EACH
$303.82 $
607.64
$
24
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
3
LIN FT
$441.92 $
1 325.78
25
lCONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
15
LIN FT
$524.78
]681.]9
$
26
CASTING ASSEMBLY
4
EACH
524.78
2099.12
27
ADJUST FRAME AND RING CASTING
2
EACH
$110.,18 $
220.96
28
SEAL CATCH BASIN
4
EACH
$155.15
620.60
$
29
CONCRETE CURB AND GUTTER DESIGN 8412
3,611
LIN FT
$11.72 $
41148.92
30
6'CONCRETE DRIVEWAY PAVEMENT
144
SO YD
$52.971 S
]62].611
31
INSTALL MAILBOX SUPPORT
14
EACH
$42.80
599.20
32
TRAFFIC CONTROL
0.05
LUMPSUM
$79859.20 $
3992.96
$
33
ISTORM DRAIN INLET PROTECTION
6
EACH
$90.95 $
545.70
$
34
SEDIMENT CONTROL LOG TYPE COMPOST
320
LIN FT
$1.87 S
598.40
$
35
STABILIZED CONSTRUCTION EAT
LUMPSUM
$5200.20 $
260.07
36
CULVERT END CONTROLS
EACH
40.75 $
240.75
37
FERTILIZER TYPE
A261
POUND
1.02
266.22
$
38
COMMON TOPSOIL BORROW LV
CY
$34.25 $
513].50
39
SEEDING
1
ACRE
9374.51 $
370.76
E
40
SEED MIXTURE 2&131
191
POUND
$3.20
611.20
E
41
HYDRAULIC NATURALTACKIFIER
4206
SO YD
SO.75 $
3154.50
42
EROSIONCONTROL
0.05
LUMP SUM
3210.00 S
160.50
$
Total Bid Schedule M' $ 199.447.07 $
S:1MunicIpMe eriER303WAY ESTIMATES\ER303 PE PE -4
PAY ESTIMATE 04
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "E"- S.A.P. 204-1544101 - EVANS STREET
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE EXTENSION
I
MOBILIZATION
0.06
LUMPSUM
$BO 50.83 $
4815.05
E
2
REMOVE CURB AND GUTTER
2160
LIN FT
$5.20 $
11 32.00
3
REMOVE CONCRETE PAVEMENT
1412
SOFT
$1.,16
206L52
$
4
REMOVE CONCRETE WALK
2
SO FT
$1.09 S
2,430.70
5
REMOVE BITUMINOUS PAVEMENT
714
SO YD
$4.84 $
3,746.16
6
SAWING CONCRETE PAVEMENT FULL DEPTH
230
LIN FT
$3.16 S
726.80
$
]
SAWING BITUMINOUS PAVEMENT FULL DEPTH
360
LIN FT
$2.09 $
752.40
$
8
SALVAGE SIGN SUPPORT
6
EACH
$37.45 $
224.70
9
SALVAGE CASTING
11
EACH
107.00
117/.00
10
MILL BITUMINOUS SURFACE 1.5"
1544
SO YD
$1.95
3010.80
$
11
MILL BITUMINOUS SURFACE
8330
SOYD
$0.% $
4914.70
12
BITUMINOUS MATERIAL FOR TACK COAT
883
GALLON
$2.51
2216.33
13
TYPE SP 9.5 WEARING COURSE MIXTURE 3C
1530
TON
$47.8T $
73,261.10
$
14
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
185
TON
$59.82 E
11066.70
15
ADJUSTVALVEBOX
5
EACH
1.92
2209.80&
-
16
INSTALL CASTING
11
EACH
$110.48
1215.28
$
17
ADJUST FRAME AND RING CASTING
2
EACH
$994.n
1988.64
18
SEAL CATCH BASIN
11
EACH
155.15-
19
4'CONCRETE WALK
1,400
SOFT
$6.3] $
891B.DD
$
20
6'CONCRETE WALK
870
SOFT
7.44 $
84]2.80
21
CONCRETE CURB AND GUTTER DESIGN 8618
2,160
LIN FT
$12.79M141
0
$
22
T CONCRETE DRIVEWAY PAVEMENT
157
SO YD
$77.048
23
TRUNCATED DOMES
294
BO FT
.1524
TRAFFIC CONTROL
0.06
LUMPSUM
$79859.175$25
INSTALL SIGN SUPPORT
6
EACH
$80.2526
STORM DRAIN INLET PROTECTION
11
EACH
90.95
$
27
STABILIZED CONSTRUCTION EXIT
0
LUMPSUM
$5200.33
28
COMMON TOPSOIL BORROW LV
30
CUYD
47.060
29
SEEDING
0.15
ACRE
$374.47 S
NAT
30
SEED MIXTURE 26131
25 1
POUND
$3.201 $
80.00
$
31
HYDRAULIC NATURAL TACKIFIER
533
Sam
$0.75
399.75
-
32
EROSION CONTROL
0.06
LUMPSUM
$3210.00
192.60
$
33
PAVEMENT MESSAGE EPDXY
71
SO FT
5.73 $
406.83
34
4' SOLID LINE EPDXY
240
LIN FT
$0.31
74.40
35
24' SOLID LINE EPDXY
70
LIN FT
$6.88 $
401.60
$
36
4' BROKEN LINE EPDXY
1 150
LIN FT
$0.31 $
356.50
37
4' DOUBLE SOLID LINE EPDXY
2,250
LIN FT
$0.62 $
1.395.D0
E
38
CROSSWALK EPDXY
324 1
SO FT 1
$3.67 E
1189.08
$
TOW Bid Schedule 'T' 6 210.633.96 $
8:1Mun1cipe6Ae1kr eAER3031PAY ESTIMATES\ER303 PE PE -5
PAY ESTIMATE #4
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "F"- LOCAL FUNDING
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.44
LUMP SUM
$80,25(1.0)
3531DW
020
$
18050.00
2
CLEARING
0.1
ACRE
$2169!1.20
2169.82
0.1
$
2169.82
3
CLEARING
2
TREE
$183.37 $
366.74
3
$
550.11
4
GRUBBING
0.1
ACRE
$14,363.]0
7436.37
0.1
1436.37
5
GRUBBING
3
TREE
$103.91
311.73
1
$
103.91
6
REMOVE CURB AND GUTTER
2,629
LIN FT
$3.23 E
8491.67
2,422
7823.06
7
REMOVE SEWER PIPE STORM
166
LIN FT
$11.05
1831.30
166
IS
1834.30
8
IREMOVE CONCRETE PAVEMENT
6.942
1 SOFT
S2.611$
18118.62
2.903
S
7576.83
9
REMOVE CONCRETE WALK
990
SOFT
$2.09
2089.10
TOG
1475.54
10
REMOVE BITUMINOUS PAVEMENT
5348
SOYO
$4.43
23691.86
4,925
21817.75
11
REMOVE RIPRAP
27
CU YD
3567 $
1044.09
27
$
1044.09
12
SAWING CONCRETE PAVEMENT FULL DEPTH
728
LIN FT
$316 $
230048
79
$
249.64
13
SAWING BITUMINOUS PAVEMENT FULL DEPTH
4767
LIN FT
$1.98 $
9436.66
4,324
8561.52
14
SALVAGE SIGN SUPPORT
17
EACH
$37.45
636.65
10
374.50
15
SALVAGE CASTING
22
EACH
$110.48 S
2430.56
14
S
1546.72
16
SALVAGE MAILBOX SUPPORT
104
EACH
$37.45 $
3894.80
43
$
1610.35
17
LANDSCAPE ALLOWANCE
1
ALLOWANCE
$20000.00 $
20000.00
$
18
REMOVE MISCELLANEOUS STRUCTURES
1
LUMP SUM
$1.070.01 S
1070.01
19
SALVAGE MISCELLANEOUS STRUCTURES
7
LUMP SUM
$1,070.01
1070.01
20
COMMON EXCAVATION EV
3707
CU YD
$15,0]
55864.49
2,011
30305.77
21
SUBGRADE EXCAVATION EV
6,113
CUYD
$16.60
101475.80
4,660
77356.00
22
WATER
2%
MGAL
7.82
6955.00
23
AGGREGATE BASE CLASS 5
33
TON
$26.]5
862.75
$
24
FULL DEPTH RECLAMATION
44993
SOYD
$I.50
67489.50
20684
$
31026.00
25
HAUL FULL DEPTH RECLAMATION LV
10492
CU YD
$9.00
94426.00
3.322
$
29898.00
26
HAUL FULL DEPTH RECLAMATION LV
10,492
CU YD
$9.D0 $
94428.00
649958497.00
27
SHOULDER BASE AGGREGATE CLASS 2
50
S".94TON S.94 $
2247.00
28
MILL BITUMINOUS SURFACE TT
2,818
SO YD
$1.84 $
5185.12
3,216
E
5 91].dd
29
MILL BITUMINOUS SURFACE
5964$1.
$
8142.92
5774
E
594].22
30
BITUMINOUS MATERIAL FOR TACK COAT
3,988
GALLON
2.51 $
10009.88
2DOD
5020.00
31
TYPE SP 8.5 WEARING COURSE MIXTURE 2C
5,114
TON
.75 $
249307.50
1,775
86531.25
32
TYPE SP 9.5 WEARING COURSE MIXTURE 3C
1,117
TON
50.35
50 40.95
1100.82
55426.29
33
TYPE SP 12.5 NON WEARING COURSE MIXTURE 28
6618
TON
540.58$
268558.4
119296
48410.32
34
TYPE SP 12.5 WEARI NO COURSE MIXTURE 2B 2.5"THICK
1,241
SOYD
$13.14 $
18306.74
773.3
10167.76
35
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
695
TON
792 S
4]204.40
779.40
E
52936.85
36
15'CS PIPE CULVERT
64
LIN FT
50.82
3252.48
64
$
3252.8
37
tT GS PIPE APRON
1
EACH
48. 58
248.58
1
$
248.58
38
15 -GS PIPEAPRON
6
EACH
76.20
1657.20
6
S
1657.20
39
IS- RC PIPE APRON
3
EACH
8.60
2485.80
2
1657.20
40
18' RC PIPE APRON
1
EACH
883.84 $
883.84
2
$
1767.68
41
24'RC PIPE APRON
2
EACH
$1,<I6.2 $
2872.50
$
42
1S RC PIPE CULVERT DESIGN 3006 CUSS V
32
LIN FT
66.29
2121.28
43
12' RC PIPE SEWER DESIGN 3006 CLASS V
12
LIN FT
52.48
629.76
12
$
629.76
dd
15' RC PIPE SEWER DESIGN 3006 CLASS V
73
LIN FT
53.03
3871.19
52
2757.56
45
18- RC PIPE SEWER DESIGN 30)6 CLASS 111
158
LIN FT
58.3/
8901.72
124
$
8986.16
46
24' RC PIPE SEWER DESIGN 3506 CLASS 111
74
LIN FT
.97
4659.]8
$
47
1T HDPE PIPE SEWER- DIRECTIONAL DRILLED
137
LIN FT
154.6]
21189.79
137
21189.79
48
ADJUST VALVE BOX
7
EACH
303.82
2126.74
8
2430.56
49
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
9
LIN FT
$441.92$
6012.63
fi
2651.52
50
CONSTRUCT DRAINAGE STRUCTURE DESIGN dB -6020
0)
LIN FT
386.88 $
11739.60
21.49
8309.75
51
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020
4
LIN FT
$718.12 $
3095.10
4.37
3095.10
52
CASTING ASSEMBLY
9
EACH
524.78
4723.02
6
$
3148.68
53
INSTALL CASTING
22
EACH
110.48
2430.56
14
$
1546.]2
54
ADJUST FRAME AND RING CASTING
7
EACH
$740.22
5181.50
5
3701.10
55
SEAL CATCH BASIN
31
EACH
$155.15
6809.65
20
S
3103.50
56
RANDOMRIPRAPCLASS 111
25
cum
$121.53 $
2989.66
26.8
3257.00
57
GEOTEXTILE FILTER TYPE IV
86
SO YO
.52474
.72
88
474.Y2
58
4 -CONCRETE WALK
25
SOFT
6.37
159.25
88
S
580.58
59
6'CONCRETE WALK
990
SOFT
$7.44l s
7365.60
532
$
3958.08
60
CONCRETE CURB AND GUTTER DESIGN B412
18808
LIN FT
$11.721S
220406.32 1
7637
89505.64
S:WunkipelNeW NePER303TAY ESTIMATES\ER303 PE PE - 6
PAY ESTIMATE #4
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE 'F- - LOCAL FUNDING - CONTINUED
REM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
61
CONCRETE CURB AND GUTTER DESIGN B6IB
2559
LIN FT
12.79 $
32729.61
2401
1 30708.79
62
e' CONCRETE DRIVEWAY PAVEMENT
1,397
SQ YD
$52.97
73999.09
697
36920.09
63
T CONCRETE DRIVEWAY PAVEMENT
106
SO YD
$77.09 $
8166.24
94
7 41.]fi
64
8' CONCRETE DRIVEWAY PAVEMENT
73
SOYD
57.78
4217.94
E
65
CONCRETE DRAINAGE FLUME
61
SO YD
$115.56 $
7,049.16
5
5".80
66
TRUNCATED DOMES
170
SO FT
$48.15 $
B 185.50
BB
4237.20
67
1131TUMINOUS CURB
1.710 1
LIN FT
52.14 $
3659.40
2,461
$ 5268.54
68
MARBOX SUPPORT
15
EACH
$101.65
1524.]5
E
69
INSTALL MAILBOX SUPPORT
104
EACH
S42.80 $
4451.20
M
TRAFFIC CONTROL
0.44
LUMPSUM
$79859.18 $
35138.04
0.15
11978.88
71
INSTALL SIGN SUPPORT
17
EACH
$80.2
1364.25
10
$ 802.50
72
ADJUST HANDHOLE
2
EACH
8.00
856.00
73
RIGID PVC LOOP DETECTOR 6W'
4
EACH
$909.51
3638.04
$
74
SILT FENCE TYPE MS
2,280
LIN FT
$1.87 S
4263.60
4P
E 691.99
75
STORM DRAIN INLET PROTECTION
44
EACH
90.95 $
4001.80
29
$ 2637.55
76
SEDIMENT CONTROL LOG TYPE COMPOST
3450
LIN FT
$1.8] $
6451.50
338
$ 632.06
77
iSTABILIZED CONSTRUCTION EXIT
0.44
LUMP SUM
$5200.25 $
2288.11
$
78
CULVERT END CONTROLS
2
EACH
$2,40,76
481.52
79
FERTILIZER TYPE I
2173
POUND
$I.02
2,216.46
425
433.50
80
COMMON TOPSOIL BORROW fLVI
1,092
CUYD
$35.85 $
39148.20
533
19108.05
81
SEEDING
7
ACRE
$374.50 S
2640.23
1.23
$ 460.64
82
SEED MIXTURE 26131
1,549
POUND
53.20 E
6956.80
270
$ 864.00
83
EROSION CONTROL BLANKETS CATEGORY 3
3,125
SO YD
$1.55 E
4843.75
604
$ 936.20
84
HYDRAULIC NATURAL TACKIFIER
30922
SO YD
$0.]5 $
23191.50
5.311
$ 3983.25
85
EROSION CONTROL
0.40
LUMP SUM
$3210.02 $
1412.41
024
770.40
86
PAVEMENT MESSAGE EPDXY
45
SOFT
$5.73 $
257.85
45
257.85
87
4'SOLIp LINE EPDXY
2959
LIN FT
$0.31
91729
2384
S 739.04
88
24 -SOLID LINE EPDXY
43
LIN FT
$6.88
295.84
89
4 -BROKEN LINE EPDXY
622
LIN FT
10.31
192.82
420
130.20
90
a DOUBLE SOLID LINE EPDXY
1,180
LIN FT
0.62
731.60
91
CROSSWALK EPDXY
270
SO FT
$3.67 $
990.90
lr M Bld S4 edule'F' $ 1.821.%1.43 $ 887.118.94
SCHEDULE G - LOCAL FUNDING FIELD CHANGE DIRECTIVE
REM
NO.
ITEM DESCRIPTION
ESTIMATEDCONTRACT
QUANTITY UNIT
UNITPRICE CONTRACTAMOUNT
USED TO
HATE
I EXTENSION
I
COMMON EXCAVATION
CY
&2TW
me
$ 15268.65
2
STABILIZING AGGREGATE 1.5 -CLEAR ROCK
TON
$36.52
327.78
11970.53
3
4'DRAINTILE
LF
$13.131 1
513
6735.69
4
GEOTEXTILE FABRIC
SY
$2.741 1
2,393
$ 6656.82
S 40.551.69
S1Muri ipaMellvweERWGWAY ESTIMATES\ER303 PE PE -7
PAY ESTIMATE #4
CITY OF ELK RIVER
2017 Street Improvements
REM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
1
LS
$2,396.86
2396.86
0.5
1198.43
2
REMOVE CONCRETE CURB AND GUTTER
70
LF
$17,83
1248.10
$
3
MILL BITUMINOUS SURFACE
7800
BY
$1.90
15444.00
2,022
$ 4003.56
4
TYPE SP 9.5 WEARING COURSE MIXTURE 2C
1320
TON
$52.38
69141.60
352.85
$ 18482.28
5
BITUMINOUS MATERIAL FOR TACK COAT
750
GAL
$3.07
2302.50
230
706.10
6
ADJUST VALVE BOX
12
EACH
$76.46
$ 917.52
]
IADJUST MANHOLE
1 6 1
EACH
SIRSAG
I S 11]2.94 I
$
8
CONCRETE CURB AND GUTTER
70
LF
2169.60
$
9
STORM DRAIN INLET PROTECTION
20
EACH
2 804.6010
TRAFFIC CONTROL
1
LS
K$,31.28
$ 1348.3611
COMMON TOPSOIL BORROW LV
30
CY$
1569.6012
TURF ESTABLISHMENT
1
LS
1156.56
$
SUMMARY OF WORK COMPLETED TO DATE
Bid Schedule "A'
Bid Schedule "B"
Bid Schedule "C"
Bid Schedule "D"
Bid Schedule "E"
Bid Schedule "F"
Schedule "G"
Schedule "H"
TOTAL WORK COMPLETED TO DATE
SAMunidplWeilr eAER303\PAY ESTIMATEMER303 PE PE -8
$ 24.390.37
f
460,720.25
f 468,182.13
$
500,287.45
f 529,754.86
—$
581,685.06
$ 598.649.53
$
199,447.07
f
f
210,633.96
f
f
1,820.961.43
f 867,118.94
$ 40,551.69
$ 24.390.37
f 2.528,647.52
g:\elk river\t21.106811_ramsey\8_construction_phase\pay requests\pay app 32\femrite pay app 32 revised.docx
August 10, 2017
Mr. Justin Femrite, P.E.
City Engineer
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: Elk River WWTF
WWTF Improvements Project
Project No.: T21.106811
Dear Justin:
Please find enclosed Pay Application No. 32 for the above referenced project. Based on our discussions, I
have modified the Pay Application to reflect charging liquidated damages since the facility is not ready
for full use in the amount of $500/day for the 59 day period between pay application 31 and 32. This
reduces the requested amount by $29,500. This pay request also reduces the retainage to 1% which still
leaves $166,073.08 in retainage. I recommend that payment be made in the amount shown. If you agree,
please sign and return one signed copy to the Contractor with payment and one to me for our files.
If you have any questions on the above, please call.
Sincerely,
BOLTON & MENK, INC.
Seth A. Peterson, P.E.
Project Manager
Cc: Tej Bala, Bolton & Menk, Inc.
Matt Perpich, Rice Lake Construction
Enclosures