4.7. SR 08-21-2017 Eclty1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 4.7
Agenda Section Meeting Date Prepared by
Consent August 21, 2017 Tim Sevcik, Park Superintendent
Item Description Reviewed by
Dave Anderson Athletic Complex Irrigation Michael Hecker, Parks and Recreation Director
Contract Reviewed by
Cal Portner, City Administrator
Action Requested
Approve,by motion, contract services with Great Northern Landscapes,Inc. for installation of a new
irrigation system at the Dave Anderson Athletic Complex.
Background/Discussion
The 30-year old irrigation system at the Dave Anderson Athletic Complex has completed its useful life
and is in need of replacement. Staff worked with designer for a new irrigation system and submitted
specifications to vendors for quotes. The following quotes were received:
Great Northern Landscapes $81,750
Care Free Sprinklers $83,265
Peterson Companies $84,690
Installation of the new irrigation system would commence October 22, 2017,with substantial completion
by December 1, 2017. Depending on weather conditions, final project completion may be delayed until
the spring of 2018 to reestablish turf in disturbed areas. No impacts to youth football are anticipated,
though minor impacts to adult softball may occur in late October dependent weather conditions and
rescheduled games.
Financial Impact
General Fund Excess Fund Balance$81,750
Attachments
■ Quotes
The Elk River Vision
A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By
service, and community engagement that encourages and inspires prosperity INAWRE1
:ƵůLJϮϭ͕ϮϬϭϳ
ZĞ͗ĂǀĞŶĚĞƌƐŽŶƚŚůĞƚŝĐŽŵƉůĞdž
ƚƚŶ͗dŝŵ^ĞǀĐŝŬ͕
dŝŵ͗
WůĞĂƐĞĂĐĐĞƉƚŽƵƌďŝĚĨŽƌƚŚĞŝƌƌŝŐĂƚŝŽŶƉŽƌƚŝŽŶŽĨƚŚĞĂďŽǀĞŵĞŶƚŝŽŶĞĚƉƌŽũĞĐƚ͘KƵƌďŝĚŝŶĐůƵĚĞƐĂůů
ŵĂƚĞƌŝĂůƐ͕ůĂďŽƌĂŶĚĂƉƉůŝĐĂďůĞƚĂdžĞƐ͘
/ƌƌŝŐĂƚŝŽŶͲΨϴϭ͕ϳϱϬ
dŚĂŶŬLJŽƵ͕
DŝƚĐŚtĞƚƚƐĐŚƌĞĐŬ
!""#$%& !&
&'& !(& %!
)' %!
!*+'
!,-+.,&+&! /- +&+0
1%
!
"
!
!#
!#
!
!
$%
&
!
#
'''''''''''''''''''(
)*+,*")
-
'''''''''''''''''''. /
!"###
$%&''((#
8326 WYOMING TRAIL
CHISAGO CITY , MN 55013
(P) 651.257.6864
(F) 651.257.3393
PETERSONCOMPANIES.NET
An Affirmative Action, Equal Opportunity Employer
July 24, 2017
Dave Anderson Athletic Complex
City Of Elk River
Tim Sevcik
RE: irrigation proposal
Tom,
The following is what is included to install all landscaping and irrigation project.
Irrigation:
- Mobilization and management to complete the project
- Delivery of all material to the site
- First year winterization and startup of the system
- One-year warranty on all irrigation materials
-
Irrigation Total: $84,690.00
All proposals exclude subcontractor bonds, bond fees, specialty insurance and workforce or business inclusion goals
unless so indicated.
Please feel free to contact me with any questions you may have. We appreciate the opportunity to provide you with
this proposal and look forward to working with you on this project.
Sincerely,
Ryan Potvin
Operation Manager
651-257-0308 (direct)
612-366-7175 (cell)
13065 Orono P
Elk River, MN
763.635.1000
www.ElkRive
The City o
Complex
no longer
Please su
tsevcik@e
City of Elk
Parks and
Att. Tim S
19000 Pro
Elk River,
1.01 GEN
This spec
drawings,
undergrou
Piping, ba
electrical
1.02 WO
1.03 SUB
Parkway
N 55330 Phon
erMN.gov
of Elk River is
located at 13
functional an
ubmit quotes n
elkrivermn.go
k River
d Recreation
Sevcik
octor Road
MN 55330
NERAL
cification is to
the contracto
und irrigation
ackflow preve
connections,
RKMANSHIP
A. The w
profes
standa
B. Bidder
installi
C. Contra
project
BMITTALS
A. Shop D
recom
locatio
ne:
s seeking quo
300 Orono R
nd requires co
no later than
ov or by mail t
Department
be used in co
or is to provid
system includ
ntion device,
connections
P AND QUALI
ork will be do
sional manne
ards of state,
r/Contractor s
ng undergrou
actor and/or s
ts of the spec
Drawings: Th
mended irriga
on of all pipes
otes for the ins
oad NW, Elk
omplete repla
Monday, July
to:
onjunction wit
de material an
ding, but not l
sprinkler hea
to mains, and
IFICATIONS
one by an exp
er in strict com
and local cod
shall submit e
und irrigation
subcontractor
cified type of s
he Irrigation C
ation design b
, fittings, valv
stallation of a
River, MN 55
cement.
y 24, 2017.Q
th the attache
nd installation
limited to, the
ads and nozzl
d all necessar
perienced, qua
mpliance with
des.
vidence of no
systems.
must provide
system. Refe
Contractor sha
based on the
ves, etc. shal
an irrigation sy
5330. The ex
Quotes may b
ed design and
of a complet
e following:
les, valves, co
ry accessorie
alified contrac
safety requir
ot less than fiv
e at least thre
erences must
all be respons
proposed pla
l be indicated
ystem for the
xisting 30 yea
e sent via em
d detail sheet.
te, automatica
ontrollers, co
es.
ctor and will b
rements presc
ve years expe
e (3) referenc
t be of similar
sible for provi
anting design
d based on th
Dave Anders
r old irrigation
mail to
. Where indic
ally controlled
ntrol wiring, fi
be performed
cribed in curre
erience in pro
ces of comple
r size and sco
iding shop dra
. Quantity, ty
e specificatio
son Athletic
n system is
cated on the
d,
ittings,
in a
ent
oviding and
eted
ope of work.
awings of
ype and
ons herein.
B. All materials of every description are to be furnished exactly as specified and shall be new and
of the best quality and grade obtainable. The Irrigation Contractor, before beginning work
herein specified shall submit to the Landscape Architect/Irrigation Designer for approval:
Manufacturer’s technical product data and installation instructions; and Three (3) sets of
material submittals, bound and indexed for all irrigation system materials and products to be
furnished. If the Irrigation Contractor requires more than one (1) copy of submittal returned, the
initial submittal shall be increased by the appropriate number. Material submittals shall include,
but are not limited to, the following:
2.01 ACCEPTABLE MANUFACTURERS
A. Manufacturer
a. Hunter Industries
b. Weathermatic Controls
2.02 MATERIALS
A. Irrigation Controller:
a. The controller shall be an Weathermatic Sl1600 2-Wire controller and decoders.
Irrigation controller must be equipped with cellular communication. ( Contact Central
Turf and Irrigation Supply for questions)
b. The controller shall have the capabilities to function with a flow-meter.
B. Mainline, Lateral Lines & Sleeving:
a. All mainlines shall be PVC Class 200.
i. Mainline 3” and larger shall be manufactured with bell ends and gaskets.
ii. All mainline Class 2” and smaller shall be manufactured with bell ends and will
be solvent welded.
iii. All pipe sizes to be indicated on the drawing.
b. All Laterals shall be PVC Class 160.
i. Laterals 1.25” and smaller may be substituted from Class 200 PVC to 100 psi
rated Poly pipe.
c. All Sleeving shall be PVC Class 200.
d. All electrical sleeving shall be PVC Schedule 40 Grey Electrical Conduit conforming to
ASTM D 2241 and be sized as indicated on the drawings.
C. Pipe Fittings
a. All mainline fittings 4” and larger shall be Ductile Iron manufactured with Gaskets.
b. All mainline fittings from 2.5” to 3” shall be Schedule 40 manufactured with Gaskets.
c. All mainline fittings 2” and smaller shall be Schedule 40 solvent weld.
D. Remote Control Valves:
a. The valves shall be Hunter ICV Series Valves. Reference design for actual part
number, or approved equal as accepted by irrigation designer.
b. All remote control valves are to be connected to the mainline by schedule 80 fittings
consisting of threaded nipples and threaded elbows. No solvent weld fittings or
schedule 40 male adaptors will be allowed.
E. Sprinkler Heads:
a. Pop-up Spray Heads:
i. The sprinklers for all turf areas shall be matched precipitation nozzles; Hunter
Pros spray 4-inch heads with matched precipitation nozzles. Reference design
for actual part number, or approved equal as accepted by irrigation designer.
b. Pop-up Turf Rotor Heads:
i. The sprinkler shall be a Hunter I-25 rotor. Reference design for actual part
number, or approved equal as accepted by irrigation designer.
F. Quick Coupling Valves:
a. Valves:
i. The quick coupling valve shall be a one-piece type, constructed of heavy cast
brass.
ii. The cover shall be a durable, protective self-closing rubber cover.
iii. The quick coupler valve shall be a Hunter HQ-44RC 1” Quick Coupling Valve;
Rainbird 5-RC 1” Quick Coupling Valve. Reference design for actual part
number, or approved equal as accepted by irrigation designer.
b. Keys:
i. The valve shall be opened and closed by a single lug brass key with a
detachable handle of the same manufacturer having a 3/4" inch MNPT.
ii. The quick coupler key shall be a Hunter KH-44; Rainbird 55-K
iii. Provide a minimum of two keys per system.
c. Swivel Hose Ell:
i. The swivel hose ell shall be of heavy bronze construction, connected to the key
for hose connections.
ii. The swivel hose ells shall be 1-inch FIPT x 3/4-inch Male Hose Threads.
iii. The hose swivel shall be as manufactured by the Toro; Hunter; Rainbird.
iv. Provide a minimum of two swivels per system.
G. Control Wire & Grounding:
a. Control wiring for a conventional controller shall be 24 volt solid wire U.L. approved for
direct burial.
i. Control wiring for a two-wire decoder controller shall be a polyethylene double
jacketed two-conductor solid core designed for direct burial with insulation 3/16
inch think, high density, sunlight resistant incased in an outer jacket of
polyethylene.
ii. All wire splices shall be made with 3M DBR or DBY direct bury splice kits.
H. Backflow Prevention Device:
a. The backflow prevention device shall be as specified in this section unless local codes
allow for a double check valve assembly. The backflow prevention device shall:
i. Be a reduced pressure principle type suitable for supply pressure up to 175 psi
and water temperatures up to 180qF.
ii. Have a bronze body construction. It shall utilize silicon rubber for drip tight disc
material in the first and second check valves plus the relief valve.
iii. Be constructed with NPT body connections and have ball type test cocks.
iv. Have quarter run, full port, resilient seated bronze ball valve shut-offs.
v. Consist of a pressure differential relief valve located in a zone between two
positive seating check valves.
vi. Have all access ports covers secured with stainless steel screws which are
bolted to the valve body.
vii. Have suitable connections for an air gap.
viii. Meet all the requirements of ASSE Standard 1013; AWWA Standard C506,
FCCCHR USC Manual, Section 10.
ix. Only RPZ/DCV devices approved by the applicable Health Department will be
acceptable. Plans and installation must conform to the applicable Water
Authority's Cross Connection Control Booklet.
I. Rainfall Sensor:
a. Provide a rainfall sensor to shut the system off during substantial rainfall. The rainfall
sensor shall be a SLW5 Weaterstation or approved equal as accepted by irrigation
designer.
J. Winterization Assembly:
a. If shown on the design, a winterization assembly will be installed downstream of the
backflow prevention device.
i. The winterization assembly shall include an Isolation Valve that is to be brass
or ductile iron that is line-sized with the mainline. Valves can be manufactured
by Matco or Nibco.
ii. A quick coupler shall be used that is downstream of the isolation valve. This is
to be mounted on a schedule 80 or Brass 1x6-inch TBE – Threaded both ends
nipple. Quick coupler is to be a 100 Series 1” Quick Coupling Valve or
approved equal as accepted by irrigation designer.
3.01 INSTALLATION
A. Summary:
a. Stake locations of each sprinkler in accordance with the plans.
b. If discrepancies in the plan become apparent at this time, point out the discrepancy to
the Owner's representative.
c. Do not proceed with the work until the necessary design engineering changes have
been made and approved by the Owner's representative.
d. Install sprinkler system equipment with necessary hardware in accordance with the
drawings and the manufacturer's instructions and as specified herein.
e. Verify system design pressures prior to installation.
B. Pipe Laying:
a. Minimum cover over mains and control valves is 18" below finish grade. Minimum
cover over laterals is 12".
b. Minimum of 3" separation between parallel pipes in the same trench. Hold pipe
securely in place while joint is being made.
c. Rest full length of each pipe section firmly on bedding, excavating recesses to
accommodate joints.
d. Avoid trench heating electric ducts, storm and sanitary sewer lines, existing water and
gas mains, all of which have right-of-way.
e. Maintain a minimum separation of 2' from other utilities parallel to irrigation pipes.
Sprinkler sections shall drain to the manual drain valve placed at the low point in the
section.
f. Sand or fine-grained soils should be used for cover to a sufficient depth to prevent
damage to the pipe from rocks or other debris in backfill during the compacting
operation.
g. Do not cut sidewalk, drives, or curb during trenching for piping.
h. Use PVC sleeves under paved areas where possible; otherwise, auger bore or tunnel.
Repair damaged paved surfaces during guarantee period.
i. Cover and protect open pipe ends, fixtures, and equipment from dirt, water, and
chemical or mechanical damage during installation.
j. AT completion of work, thoroughly clean fixtures, exposed materials, and equipment.
C. Laying Plastic Pipe:
a. Snake in trench at least 1 foot per every 100 feet to allow for thermal expansion.
b. Socket type fittings: Solvent weld by applying PVC primer to both pipe and fitting.
Apply solvent to both pipe and fitting, twisting pipe a minimum of 1/4 turn as pipe is
inserted to fitting to insure a uniform coverage of the solvent.
c. Thread type fittings: Virgin liquid teflon lubricant or teflon tape all male thread
components.
D. Install Sprinkler Heads:
a. Install pop-up spray heads and pop-up rotary heads flush with finish, settled grade.
b. Place part circle heads no closer than 1 inch from edge of paved areas and no further
than 4 inches from edge of paved areas.
c. All sprinkler heads shall be installed with swing joints or Rainbird swing pipe and fittings
or Toro funny pipe and fittings to allow for adjustment of the head and finish grade
settling.
i. A swing pipe assembly shall consist of a minimum of 12 inches of swing pipe
with fitting adapters at each end threaded into the circuit pipe fitting at one end
and into the head at the other end.
ii. A swing joint assembly shall consist of two street ells joined at one end of a
1/2-inch x 12 inch PVC Schedule 80 nipple and one street ell attached to the
other end and threaded into the circuit pipe fitting.
E. Wiring:
a. All wire runs should be installed with no splices between the controller and the remote
control valves. If splices must be utilized, they should be kept to the minimum number
possible.
b. All splices at the control valves shall be installed with appropriate electrical splice
connection protection.
c. All splices at locations other than the control valves shall be installed with appropriate
electrical splice connection protection and installed in a 6 inch round box for ease of
locating.
d. Splices shall be 3M Company, DBR & DBY Connectors for conventional controllers and
DBR-6 & DBY-6 Connectors for Two-wire controllers.
e. Provide 12" expansion loops in wiring at each wire splice (other than the remote control
valve) and at each change of wire direction.
f. Provide a 24" expansion coil for each wire at each remote control valve and where
each wire enters the controller conduit. Each 24" expansion coil shall consist of 6' of
wire coiled around a 1/2" piece of pipe resulting in a 24" long coil.
g. Control wiring shall be run into the controller in a separate conduit from all power
supply wiring and at least 10 inches apart if both are run in the same trench.
F. Setting of Valves:
a. All valves, quick coupler, master and electric remote control shall be located in the
landscaped planter areas. In no case shall a valve be located beneath a paved
surface.
b. Master and electric remote control valves shall be installed in a level position only.
c. Master and electric remote control valves shall be installed in a minimum 11" x 16" or
larger plastic, rectangular, marked valve box. In no case shall more than one electric
remote control valve be installed in one box unless a large, 18" x 24" or larger
rectangular valve box is used.
d. Quick coupler valves shall be installed in a 6" round plastic valve box with the top of the
quick coupler valve as close as possible to finish grade as the valve box installation will
allow.
e. A minimum 2 cubic foot gravel pit shall be installed under each master, electric remote
control valve, and quick coupler valve with the top surface of the gravel pit at least 2"
below the bottom of the valve.
f. A master valve shall be installed immediately after the backflow preventer to allow
pressurization of the irrigation system only when the controller cycles to operation the
irrigation stations. The master valve shall be the same size as the main line as
indicated on the irrigation plans. The master valve shall be energized by the master
valve circuit located in the controller.
G. Sleeving:
a. Furnish and install PVC sleeving where control wires or pipe pass under paved
surfaces as follows:
i. Of adequate size to allow retrieval for repair.
ii. Extend 12" beyond the end of paving at each end.
iii. Have a 4" bed of sand backfill above pipe.
iv. Have a minimum of 30" of cover from finish grade.
v. Install permanent bench mark in curb for reference to all sleeve locations.
3.02 TEST AND FLUSHING
A. Following installation, make final adjustments of lawn irrigation system preparatory to Owner's
representative's final inspection:
a. Flush system completely to remove debris, with nozzle removed.
b. Verify sprinkler operation and alignment for the direction of throw.
c. Check pop-up spray nozzling for proper arc of spray.
d. Determine whether uniform distribution exists over all areas.
B. Following final adjustment, operate the entire installation to demonstrate the complete and
successful operation of all equipment.
3.03 WARRANTY
A. The irrigation system shall be warranted for a period of one year from the time of acceptance,
for parts and labor by the installing contractor. This warranty shall be bonded and written to the
Owner for both the warranty and the maintenance as outlined in the maintenance section.
B. The irrigation system equipment shall be warranted by the manufacturer for a period of three
years from the date of installation, provided the system has been installed with all its equipment
manufactured by one manufacturer. The only exception to this requirement are the electric
remote control valves which shall be warranted for a period of 5 years by the manufacturer.
3.04 OPERATION AND MAINTENANCE
A. Maintenance:
a. Provide one hour operating instructions for Owner's representative prior to final
acceptance.
b. Provide on-job site consultation with Owner's operating personnel for 1 month, not to
exceed 2 hours per month, at no charge to the Owner. Any consultation work beyond
this time limit shall be billed to the Owner on a time and materials basis. This extra
consultation must be approved by the Owner's representative before said consultation
shall begin.
c. A one year maintenance program with the property owner shall be included with the
installation contract. This shall include all labor and materials to perform the following:
i. Spring start-up of the system as soon as weather permits in the spring. Spring
start-up shall include, but is not limited to, setting of the controller for proper
operation, turning on water supply (if it has been turned off), and all the
components that were winterized (backflow valve, etc.), close all the manual
drain valves, check all valves and heads for proper operation and adjustment.
ii. Monthly checks of the system for proper operation and adjustment through the
growing season.
iii. Winterize the system in the fall, after the irrigation season is over and before
the first major freeze. Winterizing includes, but is not limited to, draining
system and/or compressed air blow-out of the system (air pressure not to
exceed the working pressure of the system), setting the controller for winter
operation, checking exposed components (backflow preventer, etc.) for
potential freeze damage, and draining all the manual drain valves. Winterizing
may also include items not included in these specs but are usually included in
winterizing programs in the local area.
B. Record Drawings and Controller Chart:
a. Maintain a complete set of up-to-date as-built drawings.
b. Prepare a controller chart:
i. Showing the location of all sections, valves, lateral lines, and routes of control
wires.
ii. Identify all valves as to size, station number, and type of irrigation head on
each valve.
iii. Showing each station's area of coverage using a color coding, each station
having a different color shading its area of coverage.
iv. Laminated between two pieces of plastic laminate.
v. Complete and receiving approval prior to final inspection of the irrigation
system.
4.01 SITE RESTORATION AND CLEAN-UP
A. Site Restoration
a. Contractor shall be responsible to restore natural grades to athletic field playing
surfaces in all disturbed areas.
i. Restoration of turf areas shall consist of replacing native soils to all disturbed
areas (valve boxes, etc.). Dirt shall be raked and leveled with natural grade
and compacted to existing soil conditions.
ii. Disturbed turf areas shall be overseeded with an athletic field seed mix and
raked to ensure seed to soil contact.
iii. Disturbed ag-lime surfaces shall be restored with a minimum 4 inches of ag-
lime reclaimed from the project site and compacted to existing soil conditions.
B. Site Clean-up
a. Contractor shall clean the working area each day and shall remove all trash and waste
materials, and shall maintain the property in a neat and orderly condition throughout the
work.
b. At the time of completion of the work, the contractor shall remove all waste materials,
rubbish and debris from the premises as well as all tools, construction equipment and
machinery, temporary facilities, and surplus materials. Contractor shall leave the
property clean and ready for occupancy by the city.
5.01 INSURANCE
A. General Liability. Prior to starting the Work, Consultant shall procure, maintain and pay for
such insurance as will protect against claims for bodily injury or death, or for damage to
property, including loss of use, which may arise out of operations by Consultant or by any
subcontractor or by anyone employed by any of them or by anyone for whose acts any of them
may be liable. Such insurance shall include, but not be limited to, minimum coverages and
limits of liability specified in this Paragraph, or required by law. The policy(ies) shall name the
City as an additional insured for the services provided under this Agreement and shall provide
that the Consultant’s coverage shall be primary and noncontributory in the event of a loss.
B. Consultant shall procure and maintain the following minimum insurance coverages and limits of
liability on this Project:
Workers Compensation Statutory Limits
Employer’s Liability $500,000 each accident
$500,000 disease policy limit
$500,000 disease each employee
Comprehensive General Liability $1,500,000 property damage and
bodily injury per occurrence
$2,000,000 general aggregate
$2,000,000 Products – Complete
Operations Aggregate
$100,000 fire legal liability each
occurrence
$5,000 medical expense
Comprehensive Automobile
Liability $1,000,000 combined single limit each
accident (shall include coverage for all
owned, hired and non-owned vehicles.
Umbrella or Excess Liability $1,000,000
C. The Comprehensive General/Commercial General Liability policy(ies) shall be equivalent in
coverage to ISO form CG 0001, and shall include the following:
a. Premises and Operations coverage with no explosions, collapse, or underground
damage exclusion (XCU).
b. Products and Completed Operations coverage. Consultant agrees to maintain this
coverage for a minimum of two (2) years following completion of its work. Said
coverage shall apply to bodily injury and property damage arising out of the products-
completed operations hazard.
c. Personal injury with Employment Exclusion (if any) deleted.
d. Broad Form CG 0001 0196 Contractual Liability coverage, or its equivalent.
e. Broad Form Property Damage coverage, including completed operations, or its
equivalent.
f. Additional Insured Endorsement(s), naming the “City of Elk River” as an Additional
Insured, on ISO form CG 20 10 07 04 or such other endorsement form as is approved
by the City.
g. If the Work to be performed is on an attached community, there shall be no exclusion
for attached or condominium projects.
h. “Stop gap” coverage for work in those states where Workers’ Compensation Insurance
is provided through a state fund if Employer’s liability coverage is not available.
i. Severability of Insureds provision.
D. Professional Liability Insurance. The Consultant agrees to provide to the City a certificate
evidencing that they have in effect, with an insurance company in good standing and
authorized to do business in Minnesota, a professional liability insurance policy. Said policy
shall insure payment of damage for legal liability arising out of the performance of professional
services for the City. Said policy shall provide an aggregate limit of $2,000,000. Said policy
shall not name the City as an insured.
E. Consultant shall maintain in effect all insurance coverages required under this Agreement at
Consultant’s sole expense and with insurance companies licensed to do business in the state
in Minnesota and having a current A.M. Best rating of no less than A-, unless specifically
accepted by City in writing. In addition to the requirements stated above, the following applies
to the insurance policies required under this Paragraph:
a. All policies, except the Professional Liability Insurance policy, shall be written on an
“occurrence” form (“claims made” and “modified occurrence” forms are not acceptable);
b. All policies, except the Professional Liability Insurance policy, shall be applied on a “per
project” basis;
c. All policies, except the Professional Liability Insurance and Worker’s Compensation
Policies, shall contain a waiver of subrogation naming “the City of Elk River”;
d. All policies, except the Professional Liability Insurance and Worker’s Compensation
Policies, shall name “the City of Elk River” as an additional insured;
e. All policies, except the Professional Liability Insurance and Worker’s Compensation
Policies, shall insure the defense and indemnity obligations assumed by Consultant
under this Agreement; and
f. All policies shall contain a provision that coverages afforded thereunder shall not be
canceled or non-renewed, nor shall coverage limits be reduced by endorsement,
without thirty (30) days prior written notice to the City.
F.A copy of the Consultant’s Certificate of Insurance which evidences the compliance with
this Paragraph 20, must be filed with City prior to the start of Consultant’s Work. Upon
request, a copy of the Consultant’s insurance declaration page, Rider and/or Endorsement, as
applicable shall be provided. Such documents evidencing Insurance shall be in a form
acceptable to City and shall provide satisfactory evidence that Consultant has complied with all
insurance requirements. Renewal certificates shall be provided to City prior to the expiration
date of any of the required policies. City will not be obligated, however, to review such
Certificate of Insurance, declaration page, Rider, Endorsement or certificates or other evidence
of insurance, or to advise Consultant of any deficiencies in such documents and receipt thereof
shall not relieve Consultant from, nor be deemed a waiver of, City’s right to enforce the terms of
Consultant’s obligations hereunder. City reserves the right to examine any policy provided for
under this paragraph.
G. Effect of Consultant’s Failure to Provide Insurance. If Consultant fails to provide the specified
insurance, then Consultant will defend, indemnify and hold harmless the City, the City’s
officials, agents and employees from any loss, claim, liability and expense (including
reasonable attorney’s fees and expenses of litigation) to the extent necessary to afford the
same protection as would have been provided by the specified insurance. Except to the extent
prohibited by law, this indemnity applies regardless of any strict liability or negligence
attributable to the City (including sole negligence) and regardless of the extent to which the
underlying occurrence (i.e., the event giving rise to a claim which would have been covered by
the specified insurance) is attributable to the negligent or otherwise wrongful act or omission
(including breach of contract) of Consultant, its subcontractors, agents, employees, or
delegates. Consultant agrees that this indemnity shall be construed and applied in favor of
indemnification. Consultant also agrees that if applicable law limits or precludes any aspect of
this indemnity, then the indemnity will be considered limited only to the extent necessary to
comply with that applicable law. The stated indemnity continues until all applicable statutes of
limitation have run.
If a claim arises within the scope of the stated indemnity, the City may require Consultant to:
a. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing performance
of the indemnity obligation; or
b. Furnish a written acceptance of tender of defense and indemnity from Consultant’s
insurance company.
Consultant will take the action required by the City within fifteen (15) days of receiving notice
from the City.
6.01 EVALUATION OF PROPOSALS
A. All proposals received by the deadline will be evaluated by the City of Elk River staff and
consultants. City staff and consultants will make recommendations to the City Council on the
award of this contract. Factors upon which the proposal will be judged include, but are not
limited to, the following:
a. Total costs of the work to be performed;
b. Qualifications, license, bonding, and insurance of personnel;
c. Timeline of the work;
d. Similar work experience;
e. References.
B. Upon conclusion of the selection, staff will select a contractor to negotiate a contract as follows:
a. The City shall not be liable for any expenses incurred by the Contractor prior to the
signing of a contract including, but not limited to, the Proposal preparation, attendance
at interviews, or final contract negotiations.
b. The Proposal must be signed in ink by an official authorized to bind the Contractor to its
provisions that will be included as part of an eventual contract. The Proposal must
include a statement as to the period during which the Proposal remains valid. This
period must be at least 90 days from the date of the submittal.
c. The City reserves the right to reject any and all Proposals submittals or to request
additional information from any or all of the proposing contractors.
C. This request does not commit the City of Elk River to award a contract, to pay any costs
incurred in the preparation of the proposal to this request, or to enter into a contract for
services. The City is not required to select the lowest bidder, based on other criteria. The City
of Elk River reserves the right to accept or reject any or all proposals received as a result of this
request, to negotiate with any qualified source, or to cancel in part or its entirety this Request
for Quotes if it is in the best interest of the City to do so. The City Council has final approval of
the contractor to complete the proposal. A recommendation from the staff to the City Council
will be made following review of the proposals. The City may require the responder selected to
provide additional information on their proposals as a result of direct negotiations.
1 1/2"1 1/2"2"2"2"2"1 1/2"1 1/2"1 1/2"1 1/2"2"2"2"2"2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"1 1/2"2"2"2"1 1/2"1 1/2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"2"1 1/2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"1 1/2"1 1/2"2"2"2"2"1 1/2"1 1/2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"2"2"2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"2"2"1 1/2"1 1/2"2"1 1/2"1 1/2"1 1/2"2"2"2"1 1/2"1 1/2"2"2 1/2"2 1/2"1 1/2"1 1/2"2"2"2"2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2"2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"2 1/2"1 1/2"2 1/2"2 1/2"1 1/2"1 1/2"1 1/2"1 1/2"