8.1. ICESR 04-18-2017 i�o cityofElkRequest for Action .fiver To Item Number Ice Arena Commission 8.1 Agenda Section Meeting Date Prepared by Community Center Aril 18, 2017 Rich Czech,Arena Manager Item Description Reviewed by Community Center/Arena Update Cal Portner, City Administrator Reviewed by Action Requested Discuss the status of the Community Center/Arena. Background/Discussion In 2018, the school district will be looking at renovating the football stadium as well as the entire athletic field area west of the Arena,including the tennis courts. Because of this, city staff has been meeting with officials from the school district to explore the possibility of expanding the Arena to the west of where the Barn sits now. Discussions have been positive and both sides are motivated to work together for a positive outcome for both sides. Arena Manager Rich Czech,Arena Commissioner Matt Westgaard, and Arena Commissioner Mike Cunningham will give an overview of the discussions that have taken place between school officials and city staff. At the Monday,April 17 City Council work session, Council will be briefed on the progress between school district officials and staff. Financial Impact N/A Attachments • Plans from the 292 Group WERER 0 A -------------------------------------------------------------------------------------------------------------------- LU 0 0 , LU zF �E I < 0 X cn LU �>U) -------------------------- -------- ----------—---——-—------------- Lj,, U, A I RMR z LL LD cn 71 cn LUO LU CD LU CD LU2 z 0 y 0 cn I"71 - TT --------—------------------ ------ ------- Z Lu_ 0 0 Z -------------- Z zF Lul cry Dz cn< fro Offi, ct z z Cl 0 2 0 Luo Luo cr ::)Ir D LU Dy LL,0 Ircr fro affr LLQ LL� III II 0 o F ;. ... } cn W Y � U Oi Z U7 D r LO .n I O D O I O I ZZY J ' H O O O O \ / W Z � — 7 O J ILIUM am i z 0-0 Z , O o o N JY ZE O O LuM Y HZ� 7� LL O O O O QLV i I q�l Y� llllrylrcl lr uPU4/ I r s, r s p��� uu uuuui f - w _ w, o l =i] ( a / l N Uri U5] 101 ¢ J Ali `F Jc! �o J c /I I d lUi uuiimiu�� TV April 12, 2017 Tom Betti Partner 292 Design Group 3533 E Lake St Minneapolis, MN 55406 Re: Elk River Ice Arena Dear Mr. Betti, RIM Construction is pleased to present a preliminary estimate for the Elk River Ice Arena project located in Elk River, Minnesota. Together with The City of Elk River and 292 Design Group, we can work as a team to deliver the project goals of cost, schedule and quality. Our estimate is based upon drawings dated March 27, 2017 and site visit conducted April 10, 2017. Total Base Construction Estimate: $18,768,461 CLARIFICATIONS: No. 1: Value above is the estimated construction value only. Please see the attached estimate summary with additional potential owner cost items. Thank you for the opportunity to provide this estimate. Our team is experienced and competent in your market; this applied knowledge will assist the team in obtaining the best possible project value. Please feel free to contact RIM if you have any questions or need additional information. Sincerely, Eric Sonnenberg Estimator ^ e•M a e OIIN ST III UCTi 11011'4 PRELIMINARY ESTIMATE SUMMARY ESTIMATE DATE: April 12, 2017 PROJECT: Elk River Ice Arena ARCHITECT: 292 Design Group DRAWING DATE: March 27, 2017 Base $/sf DESCRIPTION Notes Estimate 125,606 Construction Costs Selective Demolition Interior Demo at Existing Rink $315,240 $2.51 Concrete $646,727 $5.15 Precast Concrete $2,306,118 $18.36 Masonry $838,049 $6.67 Structural Steel $712,184 $5.67 Metal Fabrications $142,884 $1.14 Rough Carpentry $67,751 $0.54 Millwork $118,830 $0.95 Roofing $622,440 $4.96 Waterproofing At Elevator Pit Only $3,000 $0.02 Joint Sealants $18,343 $0.15 Doors Frames Hardware $110,281 $0.88 Glass&Glazing $268,150 $2.13 Finishes $847,803 $6.75 Specialties $19,884 $0.16 Aluminum Benches Locker Room &Stadia Benches $102,800 $0.82 Aluminum Bleacher Relocation $30,000 $0.24 Site Furnishings $3,500 $0.03 Ice Rink System $3,020,000 $24.04 Elevators $75,000 $0.60 Fire Protection $196,951 $1.57 Plumbing $747,804 $5.95 HVAC $1,353,964 $10.78 Electrical $1,561,632 $12.43 Earthwork Includes Barn demo. $428,470 $3.41 Site Paving $5,250 $0.04 Site Concrete $20,481 $0.16 Site Utilities Allowance $75,000 $0.60 Landscaping $16,058 $0.13 Survey $32,372 $0.26 General Conditions&Reimbursable Ex enses $624,213 $4.97 Temp Heat&Barriers $117,952 $0.94 Daily&Final Clean $57,267 $0.46 General Liability Insurance $155,064 $1.23 Builders Risk Insurance $37,215 $0.30 113uilding Permit 1 $180,181 1 $1.43 Bond 1 1 $113,405 1 $0.90 ESTIMATE DATE: April 12, 2017 PROJECT: Elk River Ice Arena ARCHITECT: 292 Design Group DRAWING DATE: March 27, 2017 Subtotal Construction Costs $15,992,264 $127,32 Escalation 2% - 2018 Bidding Assumed $319,845 $2.55 Design Contingency 5% $799,613 $6.37 Construction Contingency 7% $1,141,848 $9.09 Contractor's Fee 2.95% $514,892 $4.10 Total Construction Estimate $18,768,461 $149,42 Owner Costs SAC/WAC Fees Allowance $50,000 $0.40 Site Survey&Soil Borings Allowance $15,000 $0.12 FF&E Allowance $150,000 $1.19 Owner Equipment Allowance $25,000 $0.20 Low Voltage (Phone, Data &SecurityAllowance $75,000 $0.60 Audio Systems Allowance $100,000 $0.80 Zamboni $0 $0.00 Scoreboard Allowance $100,000 $0.80 Environmental Disposal To be determined $0 $0.00 Soil Corrections To be determined $0 $0.00 Owner Moving Expense $0 $0.00 Owner Artwork and Signage $0 $0.00 Subtotal Owner Costs $515,000 $4,10 Design Fees Architectural &Engineering Design Fees $1,253,425 $9.98 Subtotal Design Fees $1,253,425 $9,98 Contingency Owner Contingency 5% $1,026,844 $8.18 Subtotal Contingency $1,026,844 $8,18 Total Project Estimate 1 $21,563,731 $171.68 i�o cityofElkRequest for Action .fiver To Item Number Arena Commission 8.2 Agenda Section Meeting Date Prepared by Action Items Aril 18, 2017 Rich Czech,Arena Manager Item Description Reviewed by 2017-2018 Ice Rates Cal Portner, City Administrator Reviewed by Action Requested Adopt,by motion,ice rates for the 2017-2018 season. Background/Discussion Regular skating season rates are charged from September through February. Off-season rates are charged from March through August. Rates are higher during the regular season due to higher demand and ice availability. Over the years, the Elk River Arena's ice rates have been moderately priced as compared to neighboring arenas. Last season, the regular seasonal prime time hourly rate was not increased for the 2015-2016 season and remained at$190.00/hr. The non-prime time ice was $145.00/hr. The off-season rates were held at $145.00/hr. for prime time hours and$115.00/hr. for non-prime time hours. Increases have typically occurred every two years and have increased less than 3%. Smaller on-going consistent increases have a smaller impact on our customers and keep us competitive in the market than larger increases over a longer period of time. A number of factors are considered when we are establishing ice rates: competitor rates and their existing agreements, operating expenditures, and scheduled capital replacements or improvements. The Elk River Arena currently does not have a debt payment (i.e. mortgage);however,we do have many expensive capital improvements that need to be made in the very near future. Any remaining balances from ice revenues not tied to operations are maintained for capital repair and replacement. As noted in the finance report, the Arena purchased a new Zamboni in 2015 which was paid out of these funds. Financial Impact N/A Attachments ■ Neighboring Arena Hourly Ice Rates ■ Consumer Usage Stats WERER 0 A Neighboring Ice Arena Rates Ice Rates 2017-18 Season 2016-17 Season 2015-16 Season Rogers A=$200B=$145 A=$195B=$145 A=$190B=$145 Monticello A=$200B=$150 A=$195B=$145 A=$190B=$140 Buffalo A=$205B=$155 A=$200B=$150 A=$195B=$143 Elk River A=TBDB=TBD A=$190B=$145 A=$190B=$140 Waconia A=$210B$145 A=$205B=$140 A=$200B=$130 Delano A=$210B=$160 A=$205B=$150 A=$200 Maple Grove A=$210B=$165 A=$195B=$160 A=$195B=$155 Plymouth A=$220 A=$210 A=$200 Sartell A=$175 A=$170 A=$165 St Cloud MAC A=$170 A=$165 A=$160 Minnetonka A=$215 A=$205 A=$200 Princeton A=$205 A=$200 A=$195 Champlin A=$210 A=$205 A=$200 St Cloud NHC A=$175B=$165 A=$160B=$150 A=$155B=$145 Blaine Super RinkA=$220B=$160 A=$210/$150 A=$205/$145 STMA TBD A=$195B=$180 A=$195B=$180 m v in io n 0 0 0 0 0 N N N N N N f+l V ifl lD N N N N N III 1111111 IIIIIIII IIIIIIII HIM Q � 4, N Y O t N N E `v E LA a m a m c 0 in x 0 un N � � r N O O O O 01 N p^ ci W m O v � N f0 N � j l0 N C i 0 O m a v1Oi m °1 rn o � N U u v1 U cD N .ti C m L(1 W N �y 01 V1 C V1 W N p � 4 N � v N K f0 N o p �n o m o v p Lq o N J a a, `r 4 E o o o o o o o o o o m - o o o o o o o o o > f0 L E N O w lD V N y v � o E Y x° z to v s ~ x .E ? 0 o _ Z ._ o 0 Q Q v LL xs a > �