8.2. PRSR 09-13-2017 / .(II .., Item: 8.2 of Elk .....„. Memorandum River To: Parks and Recreation Commission From: Tim Sevcik,Park Superintendent Date: September 7, 2017 Subject: Staff Report Athletic Complexes Staff conducted demolition of the dugout areas at Oak Knoll Athletic Complex this past week and demolition of the existing dugout areas at the Youth Athletic Complex fields 5 and 6 will begin the third week in September. Installation of the new dugout slabs will be conducted in September and it is anticipated that the dugout kits will be installed sometime in mid-October. Final completion of the dugouts will be in November weather permitting,however an early winter may delay final completion until the spring of 2018. Trail Projects Construction of the trail segment north of the high school was completed in late August. Work has begun on the trail segment at Kliever Lake Fields with the concrete portion between the two storm water basins now complete. Paving of the new trail segment will be conducted in the coming weeks. Barrington Park Playground The Barrington Park playground project is complete and this playground has quickly become the second busiest playground within the city. Several home daycares are located nearby and the feedback from the kids as well as the providers has been positive. An additional light has been added to the park for security purposes in order to try and prevent vandalism to the park. Handke Pit and Lions Park Ice Rinks During the storms in June, the boards at both the Handke Pit and Lions John Weicht Park ice rinks were severely damaged as a result of the high winds. Staff constructed new boards during the course of the summer and the new boards were installed in both locations this past week. Over two thirds of the boards were damaged between the two sites and required building new boards, frames and additional sandbags. Crews will be out to paint the boards in the coming weeks. Trott Brook Tennis Court Resurfacing Resurfacing of the tennis courts at Trott Brook Farms Park was conducted in August. Over 400 feet of structural cracks were repaired and multiple coats of surfacing were applied. Pickleball lines were added to both courts to provide for multipurpose use of the courts. Irritate er N:\Departments\Parks and Recreation\Commission\Packets\2017\09-13-17 PRC Packet\8.2 Park Superintendents NATURE Report.docx