4.3. SR 09-18-2017 EGty1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 4.3
Agenda Section Meeting Date Prepared by
Consent September 18, 2017 Justin Femrite P.E., City Engineer
Item Description Reviewed by
Pay Estimates Lori Ziemer, Finance Director
Reviewed by
Cal Portner, City Administrator
Action Requested
Approve,by motion, the pay estimates detailed below.
Background/Discussion
The following pay estimates have been reviewed and found to be accurate and in accordance with the
approved contracts.
Financial Impact
PROJECT PAY EST. # CONTRACTOR AMOUNT
2017 Street Improvements 5 North Valley,Inc. $671,997.85
2017 Trail Improvements 1 North Valley,Inc. $43,678.97
Attachments
■ Pay Estimates
The Elk River Vision
A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By
service, and community engagement that encourages and inspires prosperity INAWRE1
z
w
M
O
w
O
a
W
z
w
49
N
O
O m C
v
u = va
N
�
o 9 °
v
o
V
0
3
0
G
Q
d'
of 2°>'c3ac
a
.Qp ._.r
N
r
c
u°G"pO3
0
^
�
0 0 .L Y vl y N
9 C
N
.L.
(V
„toy
p
O Q Q u F
UM
y
N
n
O
hl
O
N
O
�
F O
U
O
;sl
C
W
O
w
O
a
W
z
w
49
N
O
O m C
v
u = va
N
o 9 °
v
V
O T O C
G
Cp p p"s s K F
of 2°>'c3ac
a
.Qp ._.r
c
u°G"pO3
L
0 0 .L Y vl y N
9 C
.L.
o aC"voaE^S
„toy
p
O Q Q u F
UM
PAY ESTIMATE #5
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "A" - SA.P. 204113916 - MONO PARKWAY
ITEM
NO.
REM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNITPRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.13
LUMPSUM
$80.250.71
10432.60
0.13
10432.60
2
CLEARING
1
TREE
$1564.]2 S
1564.72
3
4696.16
3
GRUBBING
1
TREE
$586.78 $
586.78
3
$
1760.36
4
REMOVE CURB AND GUTTER
4730
LIN FT
$3.23 $
15 ]7.90
4,818
$
15562.14
5
REMOVE CONCRETE PAVEMENT
990
SOFT
52.61
2583.90
1,168
3048.48
6
REMOVE CONCRETE WALK
750
SOFT
U.09
1567.50
947
S
1979.23
]
SAWING CONCRETE PAVEMENT FULL DEPTH
90
1 LIN FT
S3,161 S
284.0
SO
S
284.40
8
SAWING BITUMINOUS PAVEMENT FULL DEPTH
103
LIN FT
$1.98 s
203.94
103
203.94
9
SALVAGE CHAIN LINK FENCE
W
LIN FT
$16.05 $
802.50
70
$
1123.50
10
SALVAGE SIGN SUPPORT
3
EACH
$26.75
80.25
2
$
53.50
11
SALVAGE CASTI NO
13
EACH
$110.48 $
1438.24
13
$
1438.24
12
SUBGRADE EXCAVATION EV
160
CUYD
$11.73 $
1876.80
211
$
2475.03
13
WATER
100
MGAL
$27.82 $
2782.00
$
14
FULL DEPTH RECLAMATION
17388
SOYD
$1.35 $
234]3.80
17388
$
23473.80
15
HAUL FULL DEPTH RECLAMATION LV
2801
CU YD
$7.14 $
19999.14
2,801
$
19999.14
16
HAUL FULL DEPTH RECLAMATION LV
416
CUYD
$7.14 $
2970.24
344
2456.16
17
MILL BITUMINOUS SURFACE
19
SOYD
526]5
508.25
19
$
508.25
18
BITUMINOUS MATERIAL FOR TACK COAT
807
GALLON
$2.51 $
2025.57
700
1757.00
19
TYPE SP 9.5 WEARING COURSE MIXTURE 2B
513
TON
$50.08 $
25680.78
468
$
23428.08
20
TYPE SP 12.5 WEARING COURSE MIXTURE 3C
1,756
TON
$47.02
82567.12
1822.62
85699.59
21
TYPE SP 12.5 NON WEARING COURSE MIXTURE 3B
2,194
TON
541.31 S
90634.14
2106.48
87018.69
22
15- RC PIPE SEWER DESIGN 3006 CLASS V
103
LIN FT
S53.03 S
5462.09
94
s
4984.82
23
CONNECT TO EXISTING STORM SEWER
8
EACH
$1988.64 $
15909.12
6
15909.12
24
ADJUST VALVE BOX
5
EACH
$303.82 $
1,519.10
6
1,822.92
25
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
6
LIN FT
441.92 $
2651.52
10
4419.20
26
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
38
LIN FT
$419.82 S
15911.18
44S
18472.08
27
CASTING ASSEMBLY
10
EACH
$524.78 $
5247.80
11
5772.58
28
ADJUST FRAME AND RING CASTING
17
EACH
$740.22
12683.74
23
17025.06
29
SEAL CATCH BASIN
13
EACH
$155.15 $
2016.95
24
3723.60
SO
4' CONCRETE WALK
380
SO FT
$6.37
2.420.60
515
$
3.280.55
31
6' CONCRETE WALK
705
SOFT
7.44 S
524520
536
3987.84
32
CONCRETE CURB AND GUTTER DESIGN B618
4.730
LIN FT
$12.79 $
60495.70
4,818
61622.22
33
W CONCRETE DRIVEWAY PAVEMENT
177
SO YD
$57.78 $
10227.06
142.5
8233.65
34
TRUNCATED DOMES
100
SOFT
$48.15 $
4815.00
75
3611.25
35
INSTALL SALVAGED FENCE
50
LIN FT
26.75 $
1337.60
70
1872.50
36
TRAFFIC CONTROL
0.13
LUMPSUM
$79.859.23 $
10381.70
0.13
$
10381.70
37
INSTALL SIGN SUPPORT
3
EACH
$80,25 $
240.75
2
6
160.50
38
STABILIZED CONSTRUCTION EXIT
0.13
LUMPSUM
$5.200.231 $
676.03
39
FERTILIZER TYPE I
228
POUND
$1.02
232.56
228
S
232.56
40
COMMON TOP SOIL 80RROW LV
270
CU YD
$32.12
8672.40
249
$
7987.88
41
SEEDING
1.25
ACRE
$374.50
468.13
1.25
468.13
42
SEED MIXTURE 2&131
126
POUND
$3.20
403.20
126
403.20
43
HYDRAULIC NATURAL TACKIFIER
2760
SO YD
$0.75
2070.00
2,760
2070.00
44
EROSION CONTROL
0.13
LUMPSUM
$3,210.00
417.30
0.13
417.30
45
PAVEMENT MESSAGE EPDXY
30
SO FT
$5.n
171.90
30
$
171.90
46
a SOLID LINE EPDXY
5.536
LIN FT0.31
1715.85
5386
$
1672.76
47
24 -SOLID LINE EPDXY
42
LIN FT
6.88
288.96
40
275.20
48
a DOUBLE SOLID LINE EPDXY
345
LIN FT
0.62 s
213.90
345
213.90
69
CROSSWALK EPDXY
I
SOFT
$3.67
1585.44 1
432
1585.44
Toul Bid Schedule "A" E 460.720.25 S 168.182.13
SAMunIc0aVkeNnverIER303\PAY ESTIMATESIER303 PE PE -1
PAY ESTIMATE #5
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE 'B' - S.A.P. 204129-001- JOPLIN STREET
REM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.17
LUMP SUM
$80250.80
12037.62
0.17
13642.64
2
REMOVE CURB AND GUTTER
5215
LIN FT
$323 $
16844.45
5202
18802.46
3
REMOVE CONCRETE PAVEMENT
505
SOFT
$2.61
1318.05
793
2069.73
4
REMOVE CONCRETE WALK
2927
SOFT
$2.09
6117.43
4,595
9603.55
5
REMOVE BITUMINOUS PAVEMENT
36
SO YD
$26.75
963.00
137
3664.75
6
SAWING CONCRETE PAVEMENT FULL DEPTH
58
LIN FT
$3.16 $
183.28
58
$ 183.28
]
SAWING BITUMINOUS PAVEMENT FULL DEPTH
311
1 LIN FT
$1.981s
615.78
317
$ 615.78
8
SALVAGE SIGN SUPPORT
12
EACH
S26.75
321.00
18
481.50
9
SALVAGE CASTING
9
EACH
$110.48 $
994.32
12
1325.76
10
SUBGRADE EXCAVATION EV
870
CU YD
$19.56 $
17017.20
1,105
21613.80
11
WATER
150
MGAL
27.82
41]3.00
12
FULL DEPTH RECLAMATION
18008
SQ YD
$1.39 $
25031.12
10008
$ 25031.12
13
HAUL FULL DEPTH RECLAMATION LV
4121
CUYD
$6.49 $
28745.29
4,121
$ 26745.29
14
HAUL FULL DEPTH RECLAMATION LV
2608
CU YD
$6.49
16 925.92
2.608
16925.92
15
MILL BITUMINOUS SURFACE (2-)
64
SQYD
$9.63 $
616.32
64
616.32
18
IMILL BITUMINOUS SURFACE (2.5')
45
SO YD
$9.63 $
433.35
45
433.35
17
BITUMINOUS MATERIAL FOR TACK COAT
829
GALLON
$2.51 $
2080.79
610
$ 1531.10
18
TYPE SP 9.5 WEARING COURSE MIXTURE 2B
465
TON
1 $49.85 S
23180.25
436.88
S 21778.47
19
TYPE SP 12.5 WEARING COURSE MIXTURE 3C
2051
TON
$48.04 $
94428.04
2181.55
$ 93517.76
20
TYPE SP 12.5 NON WEARI NO COURSE MIXTURE 3B
2,250
TON
$40.n
91620.00
2320.24
94480.17
21
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
10
TON
$197.95a
1979.50
16.96
3357.23
22
ADJUST VALVE BOX
6
EACH
$513.54 $
3081.24
8
3081.24
23
INSTALL CASTING
12
EACH
$110.48 $
1325.76
12
$ 1325.76
24
ADJUST FRAME AND RING CASTING
5
EACH
$740.22 It
3701.10
B
It 5921.76
25
SEAL CATCH BASIN
12
EACH
$155.15 $
1861.80
12
$ 1881.80
26
4'CONCRETEWALK
1752
SOFT
$6.37
11160.24
2,201
14020.37
27
8'CONCRETEWALK
1.175
SOFT
$7.44
0742.00
2.379
S 17699.76
28
CONCRETE CURB AND GUTTER DESIGN 8618
5.215
LIN FT
$12.79 $
68699.85
5,177
S 66213.63
29
T CONCRETE DRIVEWAY PAVEMENT
58
$0 YD
$77.04
4468.32
103.7
S 7989.05
30
TRUNCATEDDOMES
220.0
SOFT
$48.15
10593.00
292
a 14059.80
31
TRAFFIC CONTROL
0.15
LUMPSUM
$79859.20
11978.88
0.15
$ 11978.88
32
INSTALL SIGN SUPPORT
9
EACH
$8025 $
722.25
18
$ 1444.W
W
ADJUST HANDHOLE
2
EACH
$428.00
856.00
1
s 428.00
34
RIGID PVC LOOP DETECTOR 61£'
4
EACH
$909.51 $
3638.04
1
909.51
35
ISTORM DRAIN INLET PROTECTION
13
EACH
$90.95
1182.35
13
1182.35
36
STABILIZED CONSTRUCTION EXIT
0.15
LUMP SUM
S5.200.27
780.04
0.0
37
FERTILIZER TYPE I
3D0
POUND
$1.02 $
306.00
300
306.00
38
COMMON TOPSOIL BORROW LV
330
CU YD
$34.25
11 302.50
351
12124.50
39
SEEDING
1
ACRE
$374.51 It
374.51
1
$ 374.51
40
SEED MIXTURE 25131
165
POUND
$320 $
528.00
165
$ 528.00
41
HYDRAULIC NATURAL TACKIFIER
3630
SQ YD
$0.75 $
2722.50
3,630
$ 2722.50
42
EROSION CONTROL
0.15
LUMPSUM
$3210.07 $
481.51
0.15
Is 481.51
43
PAVEMENT MESSAGE EPDXY
99
SO FT
$5.73 $
58].2]
99
$ 567.27
44
4' SOLID LINE EPDXY
770
LIN FT
$0.31
238.70
770
238.70
45
24' SOLID LINE EPDXY
118
LIN FT
$6.88 S
811.84
156
1073.28
46
4' BROKEN LINE EPDXY
980
LIN FT
.31
29].80
880
$ 272.80
47
4' DOUBLE SOLID LINE EPDXY
2210
LIN FT
.62
1 370.20
2 183
1 353.46
48
CROSSWALK EPDXY
1872
SOFT
$3.67 $
8870.24
1602
S 5879.34
Tobl Bl6 Sche0ele "B" $ 500.28].45 $ 534.458.46
S:%MunlclPehAeRnveAER3031PAY ESTIMATES%ER303 PE PE - 2
PAY ESTIMATE #5
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "C"- SA.P. 204-1314103. BUSINESS CENTER DRIVE
ITEM
NO.
REM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.17
LUMPSUM
$80,250.82 $
13642.64
0.17
13642.64
2
REMOVE CURB AND GUTTER
3490
LIN FT
$3.23
11272.70
3579
$ 11560.17
3
REMOVE CONCRETE PAVEMENT
1016
SOFT
$2.61
2651.76
1,318
3439.98
4
REMOVE CONCRETE WALK
2 468
SO FT
$2.09
5158.12
951
8,257.59
5
SAWING CONCRETE PAVEMENT FULL DEPTH
m
LIN FT
$3.16 $
265.44
m
$ 265.44
6
SAWING BITUMINOUS PAVEMENT FULL DEPTH
125
LIN FT
$1.98 $
247.50
125
$ 247.50
]
ISALVAGE SIGN SUPPORT
5
1 EACH
$37.451 $
187.25
14
Is 524.30
8
SALVAGE CASTING
15
EACH
107.00 $
1 805.00
16
$ 1,712.W
9
SUBGRADE EXCAVATION EV
2,167
cum
$18.54
40176.18
3,673
68097.42
10
WATER
19)
MGAL
27.82 $
41]3.00
$
11
FULL DEPTH RECLAMATION
21,725
SO YD
$1.21
26287.25
21,725
26287.25
12
HAUL FULL DEPTH RECLAMATION (LVI
7409
CU YD
$6.26 S
46380.34
7479
$ 48818.54
13
HAUL FULL DEPTH RECLAMATION LV
7024
CU YD
$6.25 $
43900.00
7,278
$ 45487.9)
14
MILL BITUMINOUS SURFACE (2-1
SOYD
$9.63
423.]2
44
S 423.72
15
BITUMINOUS MATERIAL FOR TACK COAT
1,200
GALLON
$2.51 $
3012.00
1025
$ 2572.75
16
TYPE SP 12.5 WEARING COURSE MIXTURE (3,C)
2,613
TON
$45.99 $
120171.87
2 fi51.43
$ 121939.27
17
TYPE SP 12.5 NON WEARING COURSE MIXTURE 3B
264
TON
S41.24
134607.36
3095.55
S 127660.48
18
ADJUST VALVE BOX
15
EACH
513.54 E
7703.10
16
5 8216.64
19
INSTALLCASTING
15
EACH
$324.48 $
4867.20
28
$ 9085.44
20
ADJUST FRAME AND RING CASTING
11
EACH
$740.22
8142.42
14
10363.08
21
SEAL CATCH BASIN
15
EACH
$155.15 $
2327.25
16
$ 2482.40
22
eCONCRETE WALK
2238
SOFT
$8.37 $
14256.06
3,195
$ 20352.15
23
6' CONCRETE WALK
230
SOFT
87.44 $
171110
756
5624.64
24
CONCRETE CURB AND GUTTER DESIGN 8618
3490
LIN FT
$12.79 $
44637.10
369)
$ "6159.11
25
Ir CONCRETE DRIVEWAY PAVEMENT
114
BOYD
$77.04 $
8]82.56
19)
$ 11556.00
W
8" CONCRETE DRIVEWAY PAVEMENT
40
SO YD
$57.78 S
2311.20
U)
577.60
27
TRUNCATED DOMES
56
SOFT
WAS
2696.40
34
1637.10
28
TRAFFIC CONTROL
0.17
LUMPSUM
$79859.1B $
13578.06
0.17
$ 13576.06
29
INSTALL SIGN SUPPORT
5
EACH
$80.25
401.25
14
1123.50
W
STORM DRAIN INLET PROTECTION
17
EACH
$90.95 $
1 546.15
36
$ 274.20
31
STABILIZED CONSTRUCTION ENTRANCE
0.17
LUMPSUM
5 .29
884.05
0
S
32
FERTILIZER TYPE I
72
POUND
$1.02S
73.4
72
S 73.44
W
COMMON TOPSOIL BORROW LV
19)
CUYD
$34.25 $
4462.50
163
$ 5582.75
34
iSEEDING
0.25
ACRE
$374.48 $
93.62
0.25
$ 93.62
35
SEED MIXTURE 25131
40
POUND
320
128.00
40
128.00
W
HYDRAULIC NATURAL TACKIFIER
871
SO YO
$0.75 $
653.25
871
$ 653.25
37
EROSION CONTROL
0.17
LUMPSUM
$3210.00 $
50.5.70
0.17
$ 545.70
38
PAVEMENT MESSAGE EPDXY
192
SOFT
$5. TJ
1100.16
192
110D.16
W
4 SOLID LINE EPDXY
5,912
LIN FT
$0.31 $
1832.72
6150
$ 1906.50
40
24' SOLID LINE EPDXY
82
LIN FT
$6.88 $
564.16
76
$ 522.88
41
4 BROKEN LINE EPDXY
649
LIN FT
$0.31 $
201.19
560
E 1]3.60
42
4 DOUBLE SOLID LINE EPDXY
31]0
LIN FT
50.62 $
1965.0
4203
$ 2605.88
43
CROSSWALK EPDXY
537
SOFT
$3.67
19]0.79 1
612 IS
2246.4
Toth Bid Schedule "C" E 681.585.68 $ 628.598.47
SAMunicVaMelW"AERMGkPAY ESTIMATES1ER303 PE PE - 3
PAY ESTIMATE #5
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE M'- SAY. 20414"01 -193RD AVENUE
ITEM
NO.
REM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.05
LUMPSUM
$B0,253.80 $
4012.54
0.05
S 4012.54
2
REMOVE CURB AND GUTTER
16
LIN FT
$21.,10
342.40
16
$ 342.40
3
REMOVE SEWER PIPE STORM
133
LIN FT
$11.05
1469.65
133
$ 1469.65
4
REMOVE CONCRETE PAVEMENT
102
SO FT
$2.61 $
266.22
102
$ 268.22
5
REMOVE BITUMINOUS PAVEMENT
450
SO YD
$3.69
1660.50
355.5
1311.80
6
REMOVE MANHOLES OR CATCH BASINS
3
EACH
$441.92
1325.76
3
$ 1325.76
]
ISAWING CONCRETE PAVEMENT FULL DEPTH
17
1 LIN FT
$3.161 $
53.72
17
$ 53.72
B
SAWING BITUMINOUS PAVEMENT FULL DEPTH
298
LIN FT
$1.98 $
590.04
298
$ 590.04
9
SALVAGE MAILBOX SUPPORT
14
EACH
$37.45S
524.30
14
524.30
10
SUBGRADE EXCAVATION EV
676
CUYD
$12.53
8470.28
316
$ 3959.48
11
WATER
70
MGAL
$27.82 $
194].40
12
FULL DEPTH RECLAMATION
6007
SO YD
$1.33
7989.31
6007
7989.31
13
HAUL FULL DEPTH RECLAMATION LV
1736
CUYD
$6.18
10]28.48
1,660
10258.80
14
HAUL FULL DEPTH RECLAMATION LV
17M
CU YD
$6.18 $
10.]2&,18
1.7W
$ 10691.40
15
MILLSITUMINOUS SURFACE 1.17
24
SO YD
$26.75 $
642.00
$
16
BITUMINOUS MATERIAL FOR TACK COAT
350
GALLON
52.51 $
878.50
70
$ 1]5.]0
17
ITYPE SP 9.5 WEARING COURSE MIXTURE 2C
529
TON
$47.87 S
25323.23
$
18
TYPE SP 12.5 NON WEARI NG COURSE MIXTURE 28
882
TON
$4023 $
35482.86
908.2
36536.89
19
TYPE SP 12.5 WEARING COURSE MIXTURE 2B 2,5` THICK
323
SO YD
$11.74
3792.02
340.7
3999.82
20
IS -RC PIPE APRON
1
EACH
$828.60
828.60
1
$ 828.60
21
1T RC PIPE SEWER DESIGN 3006 CLASS V
6
LIN FT
$52.48
314.88
6
314.88
22
15' RC PIPE SEWER DESIGN 30M CLASS V
91
LIN FT
S53,03 S
4825.73
91
$ 4.825.73
23
ADJUST VALVE BOX
2
EACH
$303.82 $
607.64
$
24
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
3
LIN FT
$441.92 $
1325.76
3
$ 1325.76
25
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
15
LIN FT
$524.78
7661.79
14.6
7661.79
26
CASTING ASSEMBLY
4
EACH
$524]8
2099.12
4
$ 2099.12
27
ADJUST FRAME AND RING CASTING
2
EACH
$110.48 $
220.96
28
SEAL CATCH BASIN
4
EACH
$155.15 $
620.60
4
$ 620.60
29
CONCRETE CURB AND GUTTER DESIGN M12
3,511
LIN FT
$11.72 $
41148.92
3,620
$ 41254.40
30
6- CONCRETE DRIVEWAY PAVEMENT
144
SO YD
52.97
7627.68
147.5
S 7813.08
31
INSTALL MAILBOX SUPPORT
14
EACH
$42.80
599.20
$
32
TRAFFIC CONTROL
0.05
LUMPSUM
$79859.20 $
3992.96
0.05
$ 3992.96
M
STORM DRAIN INLET PROTECTION
6
EACH
$90.95 $
545.70
6
545.70
34
SEDIMENT CONTROL LOG TYPE COMPOST
320
LIN FT
$1.87
598.40
35
STABILIZED CONSTRUCTION EXIT
0.05
LUMPSUM
$5200.20 $
260.01
36
CULVERT END CONTROLS
1
EACH
S2Q.75
240.75
37
FERTILIZER TYPE I
261
POUND
$1.02
26622
$
38
COMMON TOPSOIL BORROW LV
150
Cy
$34.25 $
5137.80
39
SEEDING
1
ACRE
$374.51
370.76
40
SEED MIXTURE 25.131
191
POUND
$3.20 $
611.20
$
41
HYDRAULIC NATURAL TACKIFIER
4,206
SO YD
50.75 $
3154.50
$
42
EROSION CONTROL
0.05
LUMPSUM
$3210.00 $
180.80
0.05
$ i60S0
Total BIB Schedule -D" $ 199.44].0]S 154.950.95
SAMurapaMelLMeAER301PAY ESTIMATES%ER303 PE PE -4
PAY ESTIMATE #5
CITY OF ELK RIVER
2017 Street Improvements
E "E" - SA.P. 204-164001 - EVANS STREET
ITEM
NO.
REM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT USED TO
UNITPRICE CONTRACT AMOUNT DATE
EXTENSION
1
MOBILIZATION
0.06
LUMPSUM
$80,250.83 S
4815.05
2
REMOVE CURB AND GUTTER
2160
LIN FT
$5.20 $
11,232.M
$
3
REMOVE CONCRETE PAVEMENT
1,412
SOFT
$1.46 $
2061.52
4
REMOVE CONCRETE WALK
2230
SOFT
S1.D9
2430.70
5
REMOVE BITUMINOUS PAVEMENT
774
SO VD
S4.84 $
3746.16
$
6
SAWING CONCRETE PAVEMENT FULL DEPTH
230
LIN FT
$3.16 $
726.80
$
]
SAWING BITUMINOUS PAVEMENT FULL DEPTH
360
LIN FT
2.09
752.40
8
SALVAGE SIGN SUPPORT
6
EACH
37.45
224.70
$
9
SALVAGECASTING
11
EACH
$107.00
11]1.00
10
MILL BITUMINOUS SURFACE 1.17
1544
SO YD
1.95
3010.80
11
MILL BITUMINOUS SURFACE
8,330
SO YD
$0.59 $
4914.70
$
12
BITUMINOUS MATERIAL FOR TACK COAT
883
GALLON
$2.51 $
2216.33
13
TYPE SP 9.5 WEARING COURSE MIXTURE 3C
1530
TON
7.87
73241.10
14
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
185
TON
$59.82 $
11066.70
15
1 ADJUST VALVE BOX
5
1 EACH
$441.921 $
2209.W
16
INSTALL CASTING
11
EACH
$110.48
1215.28
17
ADJUST FRAME AND RING CASTING
2
EACH
$994.32 $
1988.64
18
SEAL CATCH BASIN
11
EACH
$lM.i5
1706.65
19
eCONCRETEWALK
1,400
SOFT
$6.37
8918.00
$
20
6"CONCRETEWALK
870
$0 FT
$7.44 $
6472.80
$
21
CONCRETE CURB AND GUTTER DESIGN 8818
2,160
LIN FT
$12.79
27626.40
It
22
T CONCRETE DRIVEWAY PAVEMENT
157
SOYD
$77.04 $
12095.28
$
23
TRUNCATED DOMES
294
SOFT
$48.15 $
14156.10
24
TRAFFIC CONTROL
0.06
LUMPSUM
$79,859.17
4791.55
25
INSTALL SIGN S UPPORT
6
EACH
$80.25 S
481.50
$
26
STORM DRAIN INLET PROTECTION
11
EACH
90.95
1,000.,15
27
STABILIZED CONSTRUCTION EXIT
0
LUMPSUM
$5,200.33
312.02
28
COMMON TOPSOIL BORROW LV
30
CU YD
$47.06 $
1411.80
29
SEEDING
0.15
ACRE
374A7
56.17
30
SEED MIXTURE 26131
25
POUND
$3.2D $
80.00
$
31
HYDRAULIC NATURAL TACKIFIER
533
Sam
$0.75 $
399.75 I
$
32
EROSION CONTROL
0.06
LUMPSUM
$3,210.00
192.60
33
PAVEMENT MESSAGE EPDXY
71
SO FT
$5.73 $
406.83
$
34
4- SOLID LINE EPDXY
240
LIN FT
$0.31
74.40
35
2W SOLID LINE EPDXY
70
LIN FT
$6.88 S
481.60
$
36
4 BROKEN LINE EPDXY
1,150
LIN FT
$0.31 $
356.50
$
37
4 DOUBLE SOLID LINE EPDXY
2250
LIN FT
S0.62
1395.00
38
CROSSWALK EPDXY
324
SOFT
$3.671$
1189.08
$
Total Bid Sehedole"E" $ 210.633.96 E
SAMunicIpaMelkrNer1ER303\PAY ESTIMATES\ER303 PE PE -5
PAY ESTIMATE #5
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE 7 --LOCAL FUNDING
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.44
LUMP SUM
$80,25D.00 $
35310.00
0.44
$
36310.00
2
CLEARING
0.1
ACRE
$21698.20 $
2169.82
0.1
$
2169.82
3
CLEARING
2
TREE
$183.37 $
366.74
5
$
916.85
4
GRUBBING
0.1
ACRE
14W&M $
1436.37
0.1
1436.37
5
GRUBBING
3
TREE
$103.91 S
311.73
5
519.55
6
REMOVE CURB AND GUTTER
2,629
LIN FT
$3.23
8491.67
2,422
$
7823.06
7
REMOVE SEWER PIPE STORM
166
LIN FT
$11.05
1834.30
188
$
i .30
B
IREMOVECONCRETE PAVEMENT
6.942
1 SOFT
S2,611$
18118.62
8340
s
18547.40
9
REMOVE CONCRETE WALK
990
SOFT
$2.09
2069.10
757
$
1582.13
10
REMOVE BITUMINOUS PAVEMENT
5348
Saw
$4.d3
23691.64
5,400
$
23922.00
11
REMOVE RIPRAP
27
CU YD
$38.67 S
1044.09
27
S
1044.09
12
SAWING CONCRETE PAVEMENT FULL DEPTH
728
LIN FT
$3.16 $
2300.48
596
1883.36
13
SAWING BITUMINOUS PAVEMENT FULL DEPTH
4767
LIN FT
$1.98
9438.66
4,324
8561.52
14
SALVAGE SIGN SUPPORT
17
EACH
$37.45
636.65
11
411.95
15
SALVAGE CASTING
22
EACH
$110.48
2430.56
14
1546.72
16
SALVAGE MAILBOX SUPPORT
104
EACH
$37.45 $
3894.80
43
S
1810.35
17
LANDSCAPEALLOWANCE
1
ALLOWANCE
$20000.00 $
20000.00
$
18
REMOVE MISCELLANEOUS STRUCTURES
1
LUMP SUM
$1,0M.01
1070.01
1
1,070.01
19
SALVAGE MISCELLANEOUS STRUCTURES
1
LUMP SUM
$1070.01
1070.01
1
1070.01
20
COMMON EXCAVATION E
3,707
CUYD
$15.07 $
55864.49
2,481
3)388.6]
21
SUBGRADE EXCAVATION EV
6,113
CU YO
$16.60
101475.80
5835
$
96861.00
22
WATER
250
MGAL
$27.82
6955.00
$
23
AGGREGATE BASE CLASS 5
33
TON
526.75 $
88275
$
24
FULL DEPTH RECLAMATION
44993
saw
$1.50 $
67489.50
35,051
52576.50
25
HAUL FULL DEPTH RECLAMATION LV
10.492
CU YD
$9.00 $
94428.00
7351
66159.00
26
HAUL FULL DEPTH RECLAMATION (LVI
10.492
CU YD
$9.00 $
94428.00
10.017
S
90153.00
27
SHOULDER BASE AGGREGATE CLASS 2
50
TON
W.94
2247.07
74.36
7428
MILL BITUMINOUS SURFACE 1.5'
2818
SOw
$1.84
5185.12
3216
4429
MILL BITUMI NOUS SURFACE
5964
$1.03
6142.92
5774
.2230
BITUMINOUS MATERIAL FOR TACK COAT
3988
GALLON
.51 $
10009.88
2550.5031
TYPE SP 9.5 WEARING COURSE MIXTURE 2C
5114
TON
.75 $
24930].50
224)532
ES3.341.74
TYPE SP 9.5 WEARING COURSE MIXTURE 3C
1117
TON
50.35
56240.95
1100.822933
TYPE SP 12.5 NON WEARING COURSE MIXTURE2B
8618
TON
.68
268558.44
4927
6634
TYPE SP 12.5 WEARING COURSE MIXTURE 2B 2.5'THICK
1241
SO YD
13.14
1836.74
12]9
0635
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
695
TON
$67.92 $
47204.40
779.4085
36
15' CS PIPE CULVERT
64
LIN FT
$50.82 $
3252.48
64
3 .48
37
1Y GS PIPE APRON
1
EACH
$248.58 $
248.58
1
S
248.58
38
15' GS PIPE APRON
6
EACH
$276.2D
1657.20
6
1657.20
39
Is -RC PIPE APRON
3
EACH
$828.60
2485.80
2
1657.20
40
18' RC PIPE APRON
1
EACH
$883.84 $
883.84
2
$
1,767.68
41
24'RC PIPE APRON
2
EACH
51438.25 $
287250
$
42
IF RC PIPE CULVERT DESIGN 3006 CLASS V
32
LIN FT
$66.29 $
2121.28
32
2121.28
43
12'RC PIPE SEWER DESIGN 3006 CLASS V
12
LIN FT
$62.48
629.76
12
629.76
44
15' RC PIPE SEWER DESIGN 306 CLASS V
73
LIN FT
$53.6
3871.19
62
$
2,757.56
45
18' RC PIPE SEWER DESIGN 3006 CLASS 111
158
LIN FT
$58.34 S
8901.72
124 1
S
6986.16
46
24' RC PIPE SEWER DESIGN 3006 CLASS III
74
LIN FT
$62.97
4659.78
47
1' HDPE PIPE SEWER -DIRECTIONAL DRILLED
137
LIN FT
$154.67
21189.79
137
21189.79
48
ADJUST VALVE BOX
7
EACH
S303.82 $
2126.74
8
2430.56
49
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
9
LIN FT
1.92 $
4012.63
6
S
2651.52
50
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020
30
LIN FT
$386.68 $
11739.60
21.49
$
8309.75
51
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020
4
LIN FT
$718.12 $
365.10
4.31
$
365.10
52
CASTING ASSEMBLY
9
EACH
$524.78
6723.02
6
3148.68
53
INSTALL CASTING
22
EACH
$110.48 S
2430.56
14
s
1546.72
54
ADJUST FRAME AND RING CASTING
7
EACH
$74022
5181.54
5
$
3701.10
55
SEAL CATCH BASIN
31
EACH
$155.15
4807.65
20
$
3103.6
56
RANDOM RIPRAP CLASS III
25
CUYD121.53
2989.64
26.8
3257.6
57
GEOTEXTILE FILTER TYPE IV
86
SO YD
5.52 $
474.72
66
474.]2
58
4 -CONCRETE WALK
25
SOFT
159
BB
560.56
59
6' CONCRETE WALK
96
SOFT
:§
].44
5.60 736
SIG
433].52
60
CONCRETE CURB AND GLITTER DESIGN 8412
1886
LIN FT
Sl1.72 I S
22046.32
113]0
$
133266.40
SAMunidpaPARrive0ER3D3\PAY ESTIMATES\ER36 PE PE -6
PAY ESTIMATE #5
CITY OF ELK RIVER
2017 Street Improvements
810 SCHEDULE "F' - LOCAL FUNDING - CONTINUED
ITEM
NO.
REM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNITPRICE CONTRACT AMOUNT
USED TO
DATE
1
EXTENSION
61
CONCRETE CURB AND GUTTER DESIGN 8618
2559
LIN FT
$12.]9 $
32729.61
2,401
$36.52
30708.79
52
6'CONCRETE DRIVEWAY PAVEMENT
1397
SO YD
$52.97
73999.09
1437.4
$
]8139.08
63
T CONCRETE DRIVEWAY PAVEMENT
106
Sam
$77.04
8166.24
94
$17.70
]241 J6
64
8' CONCRETE DRIVEWAY PAVEMENT
73
SO YD
$57.78 $
6217.94
It 275.93
$
65
CONCRETE DRAINAGE FLUME
61
SO YD
$115.56
7.N9.16
11
$
1,271.16
66
TRUNCATED DOMES
170
SOFT
$48.15
8185.50
88
$
4237.20
67
IBITUMINOUS CURB
1710
1 LIN FT
$2.141$
3659.40
2.461
$
5266.54
6B
MAILBOXSUPPORT
15
EACH
$101.65 $
1524.75
$
69
INSTALL MAILBOX SUPPORT
104
EACH
$42.W
4451.20
43
$
1840.40
70
TRAFFIC CONTROL
0.44
LUMP SUM
$79859.18
35138.04
0.44
35138.04
71
INSTALL SIGN SUPPORT
17
EACH
$80.25
1384.25
11
$
882.75
72
ADJUST HANDHOLE
2
EACH
$428.0 $
550.00
]3
RIGID PVC LOOP DETECTOR 6W'
4
EACH
$900.61
3638.06
74
SILT FENCE TYPE MS
2,280
LIN FT
$1.87$
4263.60
47]
S
891.99
75
STORM DRAIN INLET PROTECTION
44
EACH
$90.95 $
4001.80
29
$
2637.55
76
SEDIMENT CONTROL LOG TYPE COMPOST
3450
LIN FT
$1.87 $
6451.50
2,606
$
48]3.22
77
STABILIZED CONSTRUCTION EXIT
0.44
LUMP SUM
$5,200.25
2,288.11
78
CULVERT END CONTROLS
2
EACH
$240.76 $
481.52
$
79
FERTILIZER TYPE I
21 ]3
POUND
S1.02 S
2216.46
718
E
732.36
50
COMMON TOPSOIL BORROW LV
1,092
CU YD
$35.85 $
39148.20
7371
$
49150.35
81
SEEDING
7
ACRE
$374.50
2640.23
2.4
$
898.80
82
SEED MIXTURE 25-131
1,549
POUND
$3.20 S
4956.80
511
1635.20
83
EROSION CONTROL BLANKETS CATEGORY 3
3,125
SO YD
$1.55 $
4843.75
604
S
936.20
M
HYDRAULIC NATURAL TACKIFIER
30922
SO VD
$0.75 $
23191.50
10204
$
7653.00
85
EROSION CONTROL
0.40
LUMP SUM
$3210.02
1412.41
0.30
$
963.01
86
PAVEMENT MESSAGE EPDXY
45
50 FT
$5.73 $
257.85
45
25785
87
4'SOLID LINE EPDXY
2959
LIN FT
$0.31 $
91729
5018
$
1555.55
68
24' SOLID LINE EPDXY
43
LIN
S6.88
295.84
04
$
302.72
89
4' BROKEN LINE EPDXY
622LIN
FT
.31
192.82
600
186.00
90
4' DOUBLE SOLID LINE EPDXY
1180
LIN FT
$0.62 $
]31.60
$
91
CROSSWALK EPDXY
270
1 SO FT 1
$3.671S
990.90
Total Bid Schedule "F" $ 1,824.961.43 $ 1.356.192.54
SCHEDULE G - LOCAL FUNDING FIELD CHANGE DIRECTIVE
REM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
COMMON EXCAVATION
CY
$27.35
559
$ 15288.85
2
STABILIZING AGGREGATE 1.Y CLEAR ROCK
TON
$36.52
32].]8
11970.53
3
4'DRAIN TILE
LF
$13.13
513
6735.69
4
GEOTEXTILE FABRIC
BY
$2.74
42]9
$ 11724.46
5
GRANULAR BORROW
CV
$17.70
539
$ 9540.30
6
RECYCLE CLASS 5
TN
$18.31
15.07
It 275.93
5 %.535.%
S:1MuhicyeMe11uWe6ERWMPAY ESTIMATEMER303 PE PE - 7
PAY ESTIMATE #5
CITY OF ELK RIVER
2017 Street Improvements
C1NFnl11 P. . r ... r.F rum.R a1
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
1
LS
$2396.86
2396.86
i
2396.86
2
REMOVE CONCRETE CURB AND GUTTER
70
LF
$17.83
1248.10
173
084.59
3
MILL BITUMINOUS SURFACE
7800
BY
$1.98
$ 15444.00
2,022
$ 4003.56
4
TYPE SP 9.5 WEARING COURSE MIXTURE 2C
1320
TON
$52.38
$ 69141.60
352.85
$ 18482.28
5
BITUMINOUS MATERIAL FOR TACK COAT
750
GAL
S3.07
2302.50
230
S ]06.10
6
ADJUST VALVE BOX
12
EACH
$76.46
917.52
]
ADJUST MANHOLE
8 1
EACH
195.49
1172.94 I
$
8
CONCRETECURBAND GUTTER
70
LF
$31.28
$ 2189.60
173
$ 5411.44
9
STORM DRAIN INLET PROTECTION
20
EACH
14023
2804.60
19
2664.37
10
TRAFFIC CONTROL
1
LS
$1,348.36
1348.36
1
1348.36
11
COMMON TOPSOIL BORROW LV
30
CY
$52.32
$ 1569.60
$
12
TURF ESTABLISHMENT
1
LS
$1,186.56
$ 1186.56
$
SUMMARY OF WORK COMPLETED TO DATE
Bid Schedule"A"
Bid Schedule"B"
Bid Schedule "C'
Bid Schedule "D"
Bid Schedule "E"
Bid Schedule "P
Schedule"G"
Schedule "H'
TOTAL WORK COMPLETED TO DATE
S:1MunkiPaMelkweOER3031PAY ESTIMATEMER303 PE PE - 8
$ 38.097.56
$
460,72025
$ 468,182.13
$
500,287.45
$ 534,458.46
$
581,585.06
$ 628,596.47
$
199,447.07
$ 154,950.95
$
210,633.96
$
$
1,824,961.43
$ 1,356,192.54
$ 55,535.56
$ 38,097.56
$ 3,236,013.67
CITY OF ELK RIVER
13065 Orono Parkway
Elk River, MN 55330
Elk River Trails Project
September 6th, 2017
PAY ESTIMATE NO. 1
FROM: June 1, 2017
TO: August 31, 2017
CONTRACTOR: North Valley Inc.
20015 Iguana St.
Nowthen, MN 55330
ITEM
NO.
DESCRIPTION
UNIT
CONTRACT ITEMS
CITY. UNIT
PRICE
THIS PERIOD
QTY. AMOUNT
1
IMOBELIZATION
LS
1
$1,604.11
1
$1,604.11
2
IREMOVE CURB AND GUTTER
LIN FT
135
$3.85
42
$161.70
3
REMOVE BIT. PAVEMENT
SY
155
$0.01
10
$0.10
4
ICOMMON EXCAVATION P
CY
461
$20.30
198
$4,019.40
5
AGGREGATE BASE, CLASS 5
TON
1 736
$17.47
291
$5,075.04
6
BITUMINOUS PATCH
SY
26
$58.61
5
$293.05
7
IFOG SEAL
GAL
1760
$3.74
$0.00
8
JBIT. WEARING COURSE 2.5" THICK
SY
1792
$11.35
570
$6,469.50
9
4" CONCRETE WALK
SF
1150
$6.36
2371
$15,079.56
10
CONCRETE PEDESTRIAN RAMP
EACH
7
$2,031.86
4
$8,127.44
11
CONCRETE CURB AND GUTTER
LIN FT
135
$21.33
42
$895.86
12
TRAFFIC CONTROL
LS
1
$802.051
1 1
$802.05
13
WI I-2 WITH W16-71? SIGN
EACH
4
$374.29
$0.00
14
W11-2WITHWI6-9P SIGN
EACH
4
$374.29
$0.00
15
SILT FENCE, TYPE HEAVY DUTY
LIN FT
1300
$2.09
230
$480.70
16TOPSOILBORROW
C
Cy
100
$41.44
44
$1,823.36
17
SEED, FERTILIZER, AND BLANKET
SY
2200
$1.91
600
$1,146.00
19 1
ICROSSWALK MARKING
SF
180
$12.05
$0.00
Total
AMOUNT EARNED
AWARDED CONTRACT AMOUNT
AMOUNT RETAINED (5%)
PREVIOUS PAYMENTS
AMOUNT DUE
TOTAL THIS PERIOD
$ 45,977.87
$ 94,232.03
$ 2,298.89
$ 43,678.97
I hereby certify that all items and amounts shown by this pay estimate are correct for the work completed to date.
CONTRACTOR: ENGINEER:
North Valley, Inc. Justin Femrite,
BY: BY:
DATE: `%'- // - / -7 DATE:
Approved by Owner/Commission
CITY OF ELK RIVER, MINNESOTA
$45,977.87