Loading...
3.6. SR 09-27-1999 rei ---'\) ( ); ~ll< **ITEM # 3.6.** MEMORANDUM River TO: Mayor & City Council Pat Klaers, City Adytor September 27, 1999 FROM: DATE: SUBJECT: Award Quotes for Emporium Attached for your information is a memo from Building Official Cliff Skogstad and the quote from Riverside Companies related to the office construction improvements at Emporium. The Community Recreation organization has authorized expenditures up to $10,000 for the office improvements and signage. We may end up slightly above this total, but there are some benefits to the city for as long as these offices are being used and Emporium is in operation. Any cost overage is proposed to come from the 1999 recreation budget. . Cliff has indicated to me that this proposal is really a "work in progress" proposal. In this regard, Cliff and Keith from Riverside Companies will be working together and evaluating cost saving options as the remodeling takes place. Cliff and I are both comfortable working with Keith, especially considering the job he did on the original remodeling of the old liquor store. Recommendation It is recommended that the City Council accept the vote from Riverside Companies for work at Emporium for approximately $10,000. . 13065 Orono Parkway · P.O. Box 490. Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425 rCI ---'\) ( ); ~l~ MEMORANDUM River TO: FROM: Cliff Skogstad, Building Official cP Mayor & City Council DATE: September 22, 1999 SUBJECT: Accepting Quote from Riverside Companies for Emporium Remodel After designing plans for the offices at the Emporium and working with Michelle Berg, the plans were complete to receive quotes. Three companies were asked to provide a quote for the work needed at this facility. They were Riverside Companies, J. Benson Construction Corporation, and Greg Kreuser Construction. Of the three we received one quote; Riverside Companies. The other companies were too busy to do the construction or even bid the project. Riverside Companies did the remodeling a year ago for Youth Bound and did an exceptional job. . Provided for you is a copy ofthe quote. The price came in at $9,970. Other possible expenses associated with this job will be the electrical and the sprinkler system, if changes have to be made to them. Preliminary review shows that the sprinkler system should be in compliance with the code. Riverside Companies also provided unit prices for the electrical. This price will depend on the amount of receptacles needed. At this time I am requesting the council's approval for accepting Riverside Companies quote for the office expansion at the Emporium. If you have any questions, please call me at 441-4903. . s:\b&z\clift\emporium.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330. TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 09/17/1999 12:59 2411399 RIVERSIDE COMPANIES PAGE 01 .' .... .... .... .... .... .... !t COMPANIES RIVERSIDE .... .... .... ........ .... .... .... .... .... September 17, 1999 City of Elk River Cliff Skogstad 13065 Orono Parkway' Elk River, :MN 55330 Re: 'Y outhbound Proposal Dear Clift:, I apologize for being late with tbis proposal, and I'm Still missing electrical, HV AC and fire protection numbers. I will use unit pricing for those items, which will work OK, as we are not sure what we can and cannot use as fixtures. . Riverside Construction of Elk River, Inc., is pleased to quote $9.970,00 as the cos~ to' complete the remodeling work at Y outhbound and as shown on the plan prepared by- ClifT Skogstad, the lluUding Official, for the City of Elk. River. , We have the following section included in our lump sum bid. A. Lump Sum. 1. General Conditions to include supervision; layout, protection of existing. space, general cleanup, and final cleanup. 2. All drywall work to include steel studs (eliminator system in which a track system is clipped and screwed to the existing grid). 3. H.M. windows, doorframes and wood doors with hardware. 4. Wire glazing for windows 5. Overhead shutter door 6. Painting and staining 7. Vinly base as required 8. Remove benched and patch floor 9. Electrical 10. HV AC 11. Fire Protection . FED ID* 41-1790124 Riverside Construction of Elk River, Inc. 19230 Evans Street Elk River, MN 55330 (612)241-1801 Fax (612)241-1399 License # 20060865 . B. . . 09/17/1999 12:59 2411399 Unit Price RIVERSIDE COMPANIES PAGE 02 1. If doors need to be 20.minute rated, add $98.00 each for doors and $150.00 each for closers and smoke seal. 2. Electrical 2x4 troffers 4 bulb Receptacles Switches Computer boxes 3. HVAC add $300.00 per diffuser. 4. .Fire protection add $300.00 for each sprinklers Add $300.00 for relocation of each sprinkler head Thank you for the opportunity to quote this project. 09/17/1999 14:05 2411399 RIVERSIDE COMPANIES PAGE 01 ..... ..... ..... !t 'COMPANIES RIVERSIDE ....................................... September 17, 1999 City of Elk River Cliff Skogstad 13065 Orono Parkway Elk River, MN 55330 Re: Youthbaund Proposal Dear ClitI, Here are the rest of the numbers for the proposal ,previously faxed to your office, for the electrical portion of work. . B Unit Price 2. Electrical New 2x4 troffers 4 bulb ~xistinglRelocation of 2 x 4 troffers Receptacles (homerun) Receptacles (not - homeru--.n) Switches Empty conduit thro ceiling for Computer line == $150.00 each == S100.00 each == Sl10.00 each == $ 75.00 each =' $ 75.00 each = $ 65.00 each This should conclude the pricing needed for the Y outhbound Project. Please let us know if there are any questions. Sincerely~ ~.;JJ" ~ Vice President . FED 10# 41-1790124 Riverside Construction of Elk River, Inc. 19230 Evans Street Elk River, MN 55330 (612)241-1801 Fax (612)241-1399 License # 20060865