Loading...
6.4. SR 09-27-1999 rll ---'\) ( ); ~li( ITEM #6.4. MEMORANDUM River TO: Mayor & City Council Pat Klaers, City ~st!J'tor September 27, 19~ FROM: DATE: SUBJECT: Report from Minnesota Pollution Control Agency (MPCA) Regarding 1999 Annual Evaluation and Planning System for Wastewater Treatment Attached for your review is a report from the MPCA regarding its 1999 annual evaluation and planning system process. This report is based on information provided by the city regarding the Wastewater Treatment Plant (WWTP) operation. In general, this report indicates that the city WWTP is in compliance with standards set forth by MPCA. . WWTP Lead Operator Gary Leirmoe and I have included some notes regarding the score that the city's WWTP received for each category evaluated by MPCA. A scoring change from last year to note is in section 1. This higher (more negative) score is based on the fact that the primary clarifier was broken in 1999. The ranking the city received for section 7, which is better than last year, is related to the debt on the plant expansion project. It should be noted that from a city audit point of view and a city budgeting point of view, the treatment plant is in a very sound financial condition. The City Council is requested to review this report with WWTP Lead Operator Gary Leirmoe. Following this review, City Council action accepting this report is requested. The city will then certify to MPCA that the report has been discussed. Also attached is a 9/17/99 compliance monitoring survey of Elk River's WWTP as conducted by MPCA. The report indicates that no deficiencies at the plant were identified at the time of the inspection. The letter goes on to indicate that retired WWTP Superintendent Darrell Mack did a commendable job of operating and maintaining the city's facility. Action Reauested . Council motion indicating that the report has been reviewed and accepted by the Ci ty Council. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 . TDD & Phone: (612) 441-7420. Fax: (612) 441-7425 . . . SEP 7 1995 Minnesota Pollution Control Agency September 1999 Mr. Darrell Mack Wastewater Superintendent City of Elk River City Hall 13065 Orono Pkwy., Box 490 Elk River, MN 55330 RE: 1999 Annual Evaluation and Planning System Dear Mr. Mack: Thank you for participating in the 1999 Annual Evaluation and Planning System (AEPS) process. Your evaluation was reviewed and enclosed is a report based on your responses. We recommend the report be discussed at an upcoming municipal councillboard meeting. In some cases, items identified in the report may require immediate attention. Comparing this year's data with that of past evaluations may help identify areas of concern for your wastewater system. After the meeting, the mayor/municipal chair should certify that the report has been discussed and submit this certification to the Minnesota Pollution Control Agency. If possible, this should be done within 30 days of your receipt of the report. The certification can be in the form of a letter signed by the mayor/chair. We hope the report information will prove useful in planning for the future of wastewater treatment in your municipality. If you need any assistance or have any questions regarding the AEPS process, would like assistance in implementing suggestions from the report, or would like a copy of the summary report, please feel free to contact me at (651) 296-4555 or 1-800-657-3864. Sincerely, ~OMJ Ron Omann Majors Section Policy and Planning Division RO:jmd Enclosure cc: Hon. Stephanie Klinzing (without enclosures) 520 Lafayette Rd. N.; 81. Paul, MN 55155-4194; (651) 296-6300 (Voice); (651) 282-5332 (TTY) Regional Offices: Duluth. Brainerd. Detroit Lakes · Marshall · Rochester Equal Opportunity Employer. Printed on recycled paper containing at least 20% fibers from paper recycled by consumers. ~- ~ >>> MUNICIPALITY: ELK RIVER This report contains responses to questions you answered in the 1999 Annual Evaluation and Planning System form. Although you answered all the applicable questions in the form, not every answer received a response in this report. We provided a response only when an answer indicated that there is an issue which may need resolution. MPCA staff have assigned a point value to the various questions in this form, with the exception of questions in Section 8, Future Needs. Points are given to responses that indicate that there may be a problem to be addressed. Each section is worth 100 points. If your system received a score greater than 50 in any section, you should carefully review the report responses for this'section to determine if your system is operating effectively and efficiently. If you need assistance in implementing any of the suggestions in this report or have questions concerning the report or survey process, please feel free to contact Ron Omann at 1-800-657-3864. >>> SECTION ONE: TREATMENT SYSTEM PHYSICAL CONDITION ~ Your responses to the questions 2, 4, 7, and/or 12 demonstrate your awareness that major repairs or replacement are needed in the next five years. As you are aware, this requires a great deal of planning, including funding, construction, permit modifications, and choosing of a consultant. If you have questions about our role in this process, please feel free to contact us at 1-800-657-3864. Score for SECTION 1: 20, WHERE 0 IS BEST AND 100 IS THE MAXIMUM. If your score is greater than 50, carefully review the survey you filled out and our report responses for this ,section to determine if your system is operating . efficiently. k'T ye4r -/f,e S"O:~' Wet ~~. 7hi5:<0 5(~Y'e i Yl /qq9 /5 dlAt. +0 f/1e fV'imt:\r~1 C/4rifl-er~:tIt i>eiflfJ ~rob~Yl, The. ~:t1 hitS: Clr"C/trerf c< he,'v c.Javi0er. >>> SECTION THREE: COLLECTION SYSTEM Question 27. Review the influent flows into your treatment system to determine if infiltration and inflow are a problem and establish a plan for correcting any problem identified. Score for SECTION 3: 8, WHERE is greater than 50, carefully responses for this section to efficiently. ~/1'/e "5"t!c1N:' o IS BEST AND 100 IS THE MAXIMUM. If your score review the survey you filled out and our report determine if your system is operating , a 5' /11 ~t+e~d 7 eaY'5 f1'" )JJ tls' t: .f? ~n& j;41J~ af- le4'5T ~ /?tIdeV'" frd)kJri ui'fltfhi3 /S5'!te.. >>> SECTION FOUR: BIOSOLIDS Question 34.6. You indicated that you plan to obtain new landspreading sites. Be aware that the approval process takes one to three months. If you have not completed an application or need information on the application process, please contact Jorja Dufresne at 1-800-657-3864. ~ . . . Score for SECTION 4: 0, WHERE 0 IS BEST AND 100 IS THE MAXIMUM. If your score is greater than 50, carefully review the survey you filled out and our report res~o~ses for this section to determinp if xour sy~tem i~ ope..ra.. ting ~. ~ efhc~ently. ArI/'tJJ(tfP7 lnfeAtcr i11e C;/;;ry.. fuU1e- I~rl 0, i11e- e<l~5' froF~'f1 ~hj(h 'tt~I,H/cJ,etr~ t{ feu.: !eu~ Ci5~) -R: S'1f.l ri, c-. Vjt"stU6SCt I ; S' 1?)(.IJec.jeCf '5oon >>> SECTION FIVE: SEPTAGE CA if . il ~ Score for SECTION 5: 0, WHERE is greater than 50, carefully responses for this section to efficiently. o IS BEST AND 100 IS THE MAXIMUM. If your score review the survey you filled out and our report determine if your system is operating ?tJfJ/C. ?~U 4S"4dle4'V' >>> SECTION SIX: TREATMENT SYSTEM OPERATION AND MAINTENANCE 5C;ITle o IS BEST AND 100 IS THE MAXIMUM. If your score review the survey you filled out and our report determine if your system is operating 5C()re Cl'$ 11t<;t-;ecor- Score for SECTION 6: 0, WHERE is greater than 50, carefully responses for this section to efficiently. >>> SECTION SEVEN: FINANCIAL AND ORDINANCE STATUS The area of sewer service charge systems and sewer use ordinances is complex and confusing. Municipalities which received funding from the federal or state construction grants program or the State Revolving Fund (loan program) face certain requirements in the area of ordinances. We have sample ordinances and charge systems which you can use to create your own documents. If you have questions concerning ordinances, charge systems, rate setting, or whether you must meet the requirements of specific funding programs, please contact Ron Omann at 1-800-657-3864. Question 76.5. Your sewer use ordinance should require annual notification of cost to all users. Users should be notified annually regarding what is encompassed in the user charge. Question 78.1. Since you have individual sewage treatment systems (such as on-site septic tanks), your sewer use ordinance should deal with such systems. As one aspect of municipal wastewater treatment, you should require inspection and maintenance plans for such systems. As of January 1, 1998, all existing ordinances governing individual sewage treatment' systems must comply with Minn. R., ch. 7080 and must be submitted to the Agency for review. Question 78.4. When new homes are constructed in your service area, you should consider what is the optimal approach to treating the resulting wastewater. Any new construction should be consistent with your municipality's long-range development plans. All new construction or replacement of an individual sewage treatment system (such as an on-site septic tank) requires a compliance inspection by a firm licensed to inspect individual sewage treatment systems. Score for SECTION 7: 35, WHERE 0 IS BEST AND 100 IS THE MAXIMUM. If your score is greater than 50, carefully review the survey you filled out and our report responses for this section to determine if your system is operating efficiently. j.l/s! year 1/te <Core WO-5 Lf:J.. .Jh,,;- . tis- ~e: ?/tl,d-E~(tlf15i'#l1 dejr Jrt'oes this .,Nl.,I:';'''5 Jei,?'/ cleet'~~'e:'5 / l1e N;]Jn'/l5 sl1HlICf {ht!roue. . Minnesota Pollution Control Agency September 17, 1999 1"1 1 ~ ~,f;~~ Sh I'" The Honorable Stephanie A. Klinzing Mayor, City of Elk River 13065 Orono Parkway PO Box 490 Elk River, Minnesota 55330-0490 Re: Compliance Monitoring Survey Dear Mayor Klinzing: I recently completed a compliance monitoring survey ofthe city of Elk River's wastewater treatment facility. Mr. Darrell Mack and Mr. Gary Leirmoe accompanied me during the inspection and led a tour of the facility. As you will note in the attached inspection report, I did not find any deficiencies at the . time of the inspection. The day of my inspection was Mr. Mack's last day of employment with the City of Elk River. Mr. Mack did a commendable job of operating and maintaining the city's wastewater plant. He also assisted many times with Agency training events. We appreciate this cooperative effort between the city of Elk River and the Agency and look forward to working with Mr. Leirmoe in the future. Thank you and your staff for providing such excellent service, answering my questions, and taking time to meet regarding the permit reissuance. Sincerely, C~h'~,-,";"d'-~"~i Deb Lindlief North District Majors cc: Mr. Gary Leirmoe, Wastewater Operator, City of Elk River . 520 Lafayette Rd. N.; St. Paul, MN 55155-4194; (651) 296-6300 (Voice); (651) 282-5332 (TTY) Regional Offices: Duluth. Brainerd · Detroit Lakes · Marshall. Rochester Equal Opportunity Employer. Printed on recycled paper containing at least 20% fibers from paper recycled by consumers. Facility: Elk River Wastewater Treatment Facility CITY OF ELK RIVER 249 Railroad Drive Elk River, Minnesota 55330 Stephanie A. Klinzing Darrell Mack Darrell Mack Gary leirmoe Permit Expiration: 12-20-00 Class: ){ B Address: Phone: 612-441-4918 Responsible Official: Operator( s): Title: Mayor Wastewater Superintendent Certifications/Expi ration: A-Type 4/7-02 and B-Type4/4-00 & 2-01 Transaction Code: Inspection Type: N C NPDES/SDS#: MN0020788 Inspector Code: S Inspection Date: Facility Type: 08-24-99 1 acility Rep resentative( s): Inspector(s): Darrell Mack Gary leirmoe Deb Lindlief Title: Wastewater Superintendent Wastewater Operator AREAS EVALUATED DURING INSPECTION Collection System 0 Process Control ~ Records ~ LiftStations 0 Laboratory ~ Reporting ~ Flow Measurement! ~ Maintenance Program ~ Discharge Monitoring 0 Instrumentation Reports Treatment System ~ Sampling ~ Effluent Data ~ Disinfection ~ Pretreatment ~ Compliance Schedule 0 Dechlorination 0 Solids Handling ~ Other 0 I Compliance Status: Compliance . . . INSPECTION SUMMARY A Compliance Monitoring Survey (CMS) was conducted on August 24, 1999 by Deb Lindlief of the Minnesota Pollution Control Agency (MPCA). The CMS was conducted to determine the facility's compliance status with the terms and conditions of its NPDES Permit. Following is a summary of the findings and comments resulting from that inspection: COMMENTS: 1. Darrell Mack, current Wastewater Superintendent as of date of inspection. Gary Leirmoe, Wastewater Operator, will be the MPCA contact. The city is undecided regarding how Mr. Mack's position will be filled. 2. At the time of inspection, the treatment plant was operating efficiently. DEFICIENCIES/CORRECTIVE ACTIONS: Deficiency: None. Corrective Action: None. Signature of Inspector ~.~\\' -~ Date ~ / 11 /1 ~ Comments and questions should be addressed to: Deb Lindlief Minnesota Pollution Control Agency 704 Government Services Building 320 West Second Street Duluth, Minnesota 55802