6.1d ERMUSR 10-10-2017 Elk River .M Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz—Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: October 10, 2017 6.1d SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In September, The Locating department had a total of 454 locate tickets consisting of three emergency tickets, 15 cancellations, 13 meetings, 360 normal tickets and 57 updated tickets. This is a 6%decrease in volume of tickets from the previous month. • Electric Technicians continue with the meter reading,power bill, substation checks, hanging red-tags,meter read-outs, disconnects, reconnects, dealing with meter and off- peak issues, as well as delivering and installing new meters to commercial customers. • On September 19, Staff began changing out meters within Acquisition Areas 3 &4. The change out went smoothly and took three full days to change out 529 meters. Office staff, as well as mapping staff, assisted the metering department by accurately documenting the field data needed for the CIS database. • Staff was present for the energizing of Waco Bank#2 transformer and installed the new substation meter. • Staff continues to perform meter audits throughout the system. We are making plans and preparations for the upcoming transition to multiple billing cycles. Metering department will need to reprogram 500+meters over the next few months. • The power plant staff did the monthly engine run in the last week of September. All engines ran well with no problems. • Mapping department continues to enter GPS points and attribute points for all of our systems assets within the ESRI ArcView GIS system. • Attended the NISC Member Information Conference in St. Louis, MO September 25-28. Found many useful and informative sessions relating to engineering, operations& metering. I will be further investigating the iVue AppSuite over the course of the next year to see how we can benefit from all this product has to offer. Page l of 1 95