9.2. SR 10-16-2017 EOty1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 9.2
Agenda Section Meeting Date Prepared by
Work Session September 18, 2017 Justin Femrite P.E., City Engineer
Item Description Reviewed by
Sherburne County Construction Cost Participation Cal Portner, City Administrator
Policy Reviewed by
Action Requested
Provide input on the draft Sherburne County Construction Cost Participation Policy.
Background/Discussion
After a number of years, Sherburne County is in the process of updating and clarifying their formally
adopted Construction Cost Participation Policy. In summary, Sherburne County compared their existing
policy to the metro counties as well as neighboring counties.
Staff will assemble any comments the Council provides and forward to the county for their consideration
as they finalize this draft policy.
Financial Impact
N/A
Attachments
■ Draft Sherburne County Construction Cost Participation Policy
The Elk River Vision
A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By
service, and community engagement that encourages and inspires prosperity INAMIRE1
SHERBURNE COUNTY
PUBLIC WORKS
Sherburne County
Construction Cost Participation Policy
Purpose: To establish set participation costs for all county highway construction
projects in urban areas within Sherburne County.
County
Construction Item Type Cost Participation %
Bituminous Bike PathsTrails .............New................................................ 0%
..........................................................Replacement................................ ' ;0%
Clearing and Grubbing...................... ..................................................... 100%
Culverts............................................. ..................................................... 100%
Curb & Gutter....................................New................................................ 0%
..........................................................Replacement................................ 100%
DrainTile........................................... ..................................................... 100%
Driveways .........................................New................................................ 0%
..........................................................Replacement................................ 100%
Emergency Vehicle Pre-emption....... ...................................................... 0%
Fencing .............................................New................................................ 0%
..........................................................Replacement................................ 100%
Grading ............................................. ..................................................... 100%
Intersecting Streets...........................New................................................ 0%
..........................................................Replacement................................ 100%
Traffic Signalsu*...............................New............................................. 50%u*
..........................................................Replacement ............................... 50% (1)
Landscaping......................................New................................................ 0%
..........................................................Replacement................................4-90%
Lighting .............................................New................................................ 0%
..........................................................Relocation ...................................... 0%
MailboxSupports .............................. ..................................................... 100%
(must be in compliance with current county standard)
Medians ............................................New............................................... 50%
..........................................................Replacement................................ 100%
Pedestrian Ramps ............................New.............................................. 100%
Removals.......................................... ..................................................... 100%
RetainingWalls................................. ...................................................... 50%
Roundabouts(')..................................New..............................................50%(')
..................... ...................................Replacement ................................50%(1)
SealCoats ........................................ ..................................................... 100%
Seeding/Sodding/Mulching ............... ..................................................... 100%
Shoulders.......................................... ..................................................... 100%
Sidewalks..........................................New................................................ 0%
..........................................................Replacement ................................ 100%
County
Construction Item Type Cost Participation %
Signing/Striping................................. ..................................................... 100%
Storm Sewer
- Main Lines/Manholes/Catch Basins...................................................... 50%
Surfacing - Travel Lanes................... ..................................................... 100%
Surfacing - Parking Lanes................. ....................................................... 0%
Surfacing - Left/Right/CenterTurn Lanes................................................. 100%
Utilities ..............................................
- Sanitary Sewer Modifications......... ....................................................... 0%
- Watermain Modifications................ ....................................................... 0%
- Private Utility Modifications............ ....................................................... 0%
Public Utility Modifications................. ....................................................... 0%
(Other than sanitary sewer and watermain)
Right-of-Way..................................... ....................................................100%u
Federal Cost Sharing ........................All ......................................... Based on the %
.......................................................... ............................................Of Municipal Cost
.......................................................... ............................................. Participationu**
LL*Traffic Signals will be funded only if MnDOT warrants are met and a Signal Justification Report is
approved. Traffic Signals will be funded up to 50%of the local share on County Highways and County
State Aid Highways. Traffic Signals on Trunk Highways will be funded up to 50% of the remaining local
share. The Geunty will nGtCity/Twp shall be responsible for certain maintenance provisions after signal
construction including power costs.
LQ***Federal Cost Sharing Example: If the municipal cost participation items amount to 25% of the project
costs—25% of the Federal Funds may be applied toward the municipal cost participation items that are
eligible for federal funding.
(3) Includes RNV acquisition on road construction projects that contain a bike path or sidewalk. For
standalone trail and sidewalk projects, RNV acquisition would be the responsibility of the agency leading
the project.
County Participation is subject to the availability of funds.
All participation includes construction, preliminary engineering and construction engineering costs.