Loading...
9.2. SR 10-16-2017 EOty1� ,.,�� Request for Action River To Item Number Mayor and City Council 9.2 Agenda Section Meeting Date Prepared by Work Session September 18, 2017 Justin Femrite P.E., City Engineer Item Description Reviewed by Sherburne County Construction Cost Participation Cal Portner, City Administrator Policy Reviewed by Action Requested Provide input on the draft Sherburne County Construction Cost Participation Policy. Background/Discussion After a number of years, Sherburne County is in the process of updating and clarifying their formally adopted Construction Cost Participation Policy. In summary, Sherburne County compared their existing policy to the metro counties as well as neighboring counties. Staff will assemble any comments the Council provides and forward to the county for their consideration as they finalize this draft policy. Financial Impact N/A Attachments ■ Draft Sherburne County Construction Cost Participation Policy The Elk River Vision A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By service, and community engagement that encourages and inspires prosperity INAMIRE1 SHERBURNE COUNTY PUBLIC WORKS Sherburne County Construction Cost Participation Policy Purpose: To establish set participation costs for all county highway construction projects in urban areas within Sherburne County. County Construction Item Type Cost Participation % Bituminous Bike PathsTrails .............New................................................ 0% ..........................................................Replacement................................ ' ;0% Clearing and Grubbing...................... ..................................................... 100% Culverts............................................. ..................................................... 100% Curb & Gutter....................................New................................................ 0% ..........................................................Replacement................................ 100% DrainTile........................................... ..................................................... 100% Driveways .........................................New................................................ 0% ..........................................................Replacement................................ 100% Emergency Vehicle Pre-emption....... ...................................................... 0% Fencing .............................................New................................................ 0% ..........................................................Replacement................................ 100% Grading ............................................. ..................................................... 100% Intersecting Streets...........................New................................................ 0% ..........................................................Replacement................................ 100% Traffic Signalsu*...............................New............................................. 50%u* ..........................................................Replacement ............................... 50% (1) Landscaping......................................New................................................ 0% ..........................................................Replacement................................4-90% Lighting .............................................New................................................ 0% ..........................................................Relocation ...................................... 0% MailboxSupports .............................. ..................................................... 100% (must be in compliance with current county standard) Medians ............................................New............................................... 50% ..........................................................Replacement................................ 100% Pedestrian Ramps ............................New.............................................. 100% Removals.......................................... ..................................................... 100% RetainingWalls................................. ...................................................... 50% Roundabouts(')..................................New..............................................50%(') ..................... ...................................Replacement ................................50%(1) SealCoats ........................................ ..................................................... 100% Seeding/Sodding/Mulching ............... ..................................................... 100% Shoulders.......................................... ..................................................... 100% Sidewalks..........................................New................................................ 0% ..........................................................Replacement ................................ 100% County Construction Item Type Cost Participation % Signing/Striping................................. ..................................................... 100% Storm Sewer - Main Lines/Manholes/Catch Basins...................................................... 50% Surfacing - Travel Lanes................... ..................................................... 100% Surfacing - Parking Lanes................. ....................................................... 0% Surfacing - Left/Right/CenterTurn Lanes................................................. 100% Utilities .............................................. - Sanitary Sewer Modifications......... ....................................................... 0% - Watermain Modifications................ ....................................................... 0% - Private Utility Modifications............ ....................................................... 0% Public Utility Modifications................. ....................................................... 0% (Other than sanitary sewer and watermain) Right-of-Way..................................... ....................................................100%u Federal Cost Sharing ........................All ......................................... Based on the % .......................................................... ............................................Of Municipal Cost .......................................................... ............................................. Participationu** LL*Traffic Signals will be funded only if MnDOT warrants are met and a Signal Justification Report is approved. Traffic Signals will be funded up to 50%of the local share on County Highways and County State Aid Highways. Traffic Signals on Trunk Highways will be funded up to 50% of the remaining local share. The Geunty will nGtCity/Twp shall be responsible for certain maintenance provisions after signal construction including power costs. LQ***Federal Cost Sharing Example: If the municipal cost participation items amount to 25% of the project costs—25% of the Federal Funds may be applied toward the municipal cost participation items that are eligible for federal funding. (3) Includes RNV acquisition on road construction projects that contain a bike path or sidewalk. For standalone trail and sidewalk projects, RNV acquisition would be the responsibility of the agency leading the project. County Participation is subject to the availability of funds. All participation includes construction, preliminary engineering and construction engineering costs.