Loading...
6.7. SR 12-20-1999 rei ---'\J ( ); tli< Item # 6. 7 . River TO: MEMORANDUM FROM: Mayor & City Council Michele MCPherso~ector of Planning DATE: December 14,1999 SUBJECT: Consider Increase in Park Fees for 2000 Request The Park and Recreation Commission requests that the City Council consider an increase in the residential park dedication fee from $1300 total per lot to $1400 total per lot. The Commission also requests that the City Council consider an increase in the trail reimbursement to developers to $14.00 per linear foot. Attachments . . September 8, 1999 Park and Recreation Commission Meeting Minutes . New Trail Specifications . Bid Estimate for Bituminous Trail . Trail Cross-Section Analvsis As an annual task, the Park and Recreation Commission proposes to review the Park Dedication requirements and make a recommendation to the City Council prior to adoption of the fee structure each year. This year, the Commission reviewed the park dedication fees at their September meeting. The Commission voted to make the following recommendations to the City Council: 1. I ncrease the park ded ication fees from $1300 to $1400 per lot for residential developments. Of the $1400, $1,150 would be for park development, the other $250 would be dedicated for trail development. 2. Increase the trail reimbursement to developers to $14.00 per linear foot based on "real life" numbers. It is anticipated that this increase would become effective with the adoption of the 2000 fee structure. . Recommendation Staff recommends that the City Council consider the Commission's recommendation as part of the adoption of the 2000 fee structure. 13065 Orono Parkway. P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 :. . (e ..... Park & Recreation Commission Minutes September 8. 1999 Page 5 9.C. 4. CONCEPT B. COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 7-0. Steve Wensman reviewed the proposed picnic sites for Woodland Trails Parle COMMISSIONER WESTRUM MOVED APPROVAL OF THE PICNIC SITES PROPOSED BY STAFF, WITH THE FOLLOWING CHANGE: - THE TWO PARKING STALLS NEAR SITE #3 ARE REMOVED COMMISSIONER KUESTER SEe'ONDED THE MOTION. THE MOTION CARRIED 7-0. 6. Park Dedication Fees & Trail Reimbursement Policy Michele McPherson reviewed the current park dedication and trail fees and discussed options for increasing the fees on an annual basis in order to continue to cover costs. . COMMISSIONER KUESTER MOVED TO RECOMMEND THAT THE CITY COUNCIL ADOPT AN INCREASE IN PARK DEDICATION FEES TO $1,400, WITH $1,150 FOR PARK DEDICATION AND $250 FOR TRAILS. COMMISSIONER WESTRUM SECONDED THE MOTION. THE MOTION CARRIED 7-0. . COMMISSIONER DANA ANDERSON MOVED TO RECOMMEND THAT THE CITY COUNCIL ADOPT A TRAIL CONSTRUCTION REIMBURSEMENT POLICY OF $14.00 PER LINEAR FOOT, AND THAT NO"EXTRAORDIN~RY" COSTS WILL BE REIMBURSED. COMMISSIONER OLSON SECONDED THE MOTION.: THE MOTION CARRIED 7-0. Community Events 1. Daye Madsen, representing the Minnesota Biathlon, was present to request the Commissioners' support for an event on MEAweekend'.)Li Thursday through Sunday, October 21-24, 1999. Mr. Madsen indicated that the events are scheduled for the mornings and will be over by approximately 1 p.m. on Thursday, and 12 or 12:30 on the remaining days. COMMISSIONER DANA ANDERSON MOVED APPROVAL OF THE REQUEST BY THE MINNESOTA BIATHLON CLUB TO HOLD A FOUR-DAY EVENT AT WOODLAND TRAILS PARK ON OCTOBER 21-24, 1999, WITH JHE FOLLO'N.I~G CONDITIONS: 1. THE EVENT SHALL BE POSTED ON THE BOARD AT WOODLAND TRAILS PARK AT LEAST ONE WEEK PRIOR. 2. CAUTIONARY SIGNAGE SHALL BE POSTED DURING THE EVENT. . . . Trail specification discussion Terry Maurer, Phil Hals, Stephen Wensman, Dave Anderson Preconstruction meeting discussing performance expectations . Surface voids . Smoothness Revise standard specification with: · An additional cross section showing curb cut · Specifying type of mix with smaller rock . Smoothness tolerance of 1/8" per 10' of trail . Finish grading with topsoil, seed, and fertilizer, or wood fiber blanket if on steep slopes. Trail reimbursement discussion Determine costs of required trails for discussion . . .} BID SCHEDULE FOR: BITUMINOUS TRAIL SECTION CITY OF ELK RIVER, MINNESOTA SCHEDULE 1.0 . TRAIL 1 COMMON EXCAVATION CY 23 $15.00 $345.00 2 TYPE 41 WEA 50055Y BITUMINOUS TON 13 $30.00 $390.00 3 AGGREGATE BASE, CLASS 5 TON 30 $12.00 $360.00 4 SEEDING ACRE 0.02 $1,000.00 $20.00 5 SEED MIXTURE 50A LB 1 $19.00 $19.00 6 COMMERCIAL FERTILIZER ANALYSIS 6-24-24 LB 4 $4.75 $19.00 7 MULCH, TYPE 1 TON 0.04 $500.00 $20.00 8 WOOD FIBER BLANKET SY 90 $1.50 $135.00 T SCHEDULE 1.0. COUNTY ROAD 1 SIDEWALK. TOTAL $1,308.00 5% CONTINGENCIES $65.40 BID SUMMARY. TOTAL $1,373.40 THIS ESTIMATE IS FOR A TRAIL 100' LONG X 10' WIDE. COST PER LINEAR FOOT OF TRAIL IS $13.75\;: COMMON EXCAVATION (12' WIDE) TYPE 41 WEA 50055Y BITUMINOUS (10' WIDE) AGGREGATE BASE, CLASS 5 (12'WIDE) SEEDING SEED MIXTURE 50A COMMERCIAL FERTILIZER ANALYSIS 6-24-24 MULCH, TYPE 1 WOOD FIBER BLANKET llrail-est.x1s (100 X 12 X 6/12)/27 (100 X 10 X 2/12)/27 X 1.98 (100X 12 X 4/12)127 X 1.86 (2 SIDES X 4 X 100)/43560 0.2 ACRES X 50 LBS/ACRE 0.2 ACRES X 200 LBS/ACRE 0.2 ACRES X 2 TONS (2 SIDES X 4 X 100)/9 4A