8.2. PRSR 11-08-2017 Item: 8.2 Eof lly Memorandum River To: Parks and Recreation Commission From: Tim Sevcik,Park Superintendent Date: November 8, 2017 Subject: Staff Report Athletic Complexes Installation of the dugout kits was delayed due to contractor scheduling. Installation began on November 2 and will be completed during the winter months. Staff continues to regrade and reshape the infield playing surfaces at YAC and Oak Knoll in order to correct drainage issues on both fields. Dave Anderson Athletic Complex Irrigation Installation of the new irrigation system at the Dave Anderson Athletic Complex was delayed due to adult softball and youth football seasons going longer than anticipated as a result of weather cancelations. With the colder temperatures and frost beginning to form,work on the new irrigation system will not be complete in 2017 and will require work to be conducted in 2018. Staff will be working on scheduling of the irrigation installation with Recreation Staff in the coming weeks. Skating Rinks Staff completed preparations on the outdoor skating rinks to include replacement of damaged boards at Lions Park and Handke Pit as well as grading and rolling the surfaces at these two locations. Staff is prepared to begin flooding rinks once weather conditions permit. Volunteer Efforts Volunteers conducted several projects over the past month to include regrading a section of trail at Woodland Trails Regional Park,installing a stairway to the observation deck at the north end of the Great Northern Trail,removing fence posts,barbwire fence, and debris from the William H. Houlton Conservation area, and pruning trees at the City Hall Campus,in addition to the many other routine tasks they conduct within the parks. POWERED IT N:\Departments\Parks and Recreation\Commission\Packets\2017\11-08-17 PRC Packet\8.2 Park Superintendents NATURE Report.docx