Loading...
04-01-1993 CC MIN . . . MEETING OF THE ELK RIVER CITY COUNCIL ORONO LAKE 3RD ADDITION NEIGHBORHOOD INFORMATIONAL MEETING HELD AT THE ELK RIVER CITY HALL THURSDAY, APRIL 1, 1993 Members Present: Vice Mayor Dietz, Councilmembers Holmgren, Farber, Scheel Members Absent: Mayor Duitsman Staff Present: Terry Maurer, City Engineer; Pat Klaers, City Administrator Vice Mayor Dietz opened the meeting and welcomed attendance. citizens in the Vice Mayor Dietz indicated that the City Council had discussed municipal sewer and water improvements in the area south of County Road 30 at its March 3, 1993 meeting. At this meeting, it was decided that the most appropriate alignment for the extension of utilities into this area was down Fresno Street. At that March 3 meeting, the Council expressed a desire to inform the neighborhood around Fresno Street (Orono Lake 3rd Addition) about activities that would be happening down Fresno Street. Additionally, the Council wanted to get some feedback from the neighborhood on whether or not there was any desire to have municipal sewer and water installed in their neighborhood. In this regard, the City Council directed the City Engineer to set up a neighborhood meeting for April 1, 1993, to discuss the issues reviewed on March 3. City Engineer, Terry Maurer, reviewed the April 1, 1993, handout and made a presentation on the issues discussed at the March 3, 1993, City Council meeting. Terry reviewed the development activity south of County Road 30; the possible alignment of sewer, water, street and storm sewer work in the Orono 3rd Addition; the estimated cost for this project; examples of what the project would cost each individual homeowner; and the process that the City would go through if this project was to move forward. Terry stressed that no project has been ordered and that the purpose of this meeting is to obtain feedback from the citizens on their desires regarding municipal improvements in their neighborhood. Questions and discussion items raised from the neighbors included the following: - The assessment time frame and the cost for the interest on the project - Whether or not the taxes on the homes will go up if the value of the property increases due to the project Whether or not a water tower project is being assessed to the neighborhood with this project - Whether or not street lights are included within this project and the costs presented - Does the assessment amount exceed the benefit to the homeowners . . . City Council/Orono Lake 3rd Addition April 1, 1993 Page 2 - Can the location of the service lines into the households be arranged to the best benefit of the homeowner, especially on corner lots - What is the life span of the old wells and old septic systems and the cost to replace them - Whether or not this proposal goes against past City Council commitments to not do improvement projects in this neighborhood - Whether or not the neighborhood is receiving a price benefit due to the development activity south of County Road 30 - Whether or not the Fresno alignment for extension of sewer and water south of County Road 30 could be changed - If the project does not happen now, then how long before sewer and water will be forced into the neighborhood - Is this improvement project consistent with what happens in other neighborhoods and is the costs for these improvements also consistent. The City Engineer and City Council generally responded to each of the questions raised. The overall responses by the City were: that this neighborhood would be treated identically to other neighborhoods; that a sewer and water project would take place some time in the near future when major street restoration is required; that, at this point, the Fresno street alignment has been accepted by the City Council; that there is some economy of scale benefit to the neighborhood if this project takes place at this time, but no benefit is received by the developers south of county Road 30 if the neighborhood is included in the project; that the service lines could be located in an area that best benefits the homeowner; that street lights are not part of the project as outlined; that this neighborhood is not being charged, in the costs outlined, for a water tower; that the taxes most likely will increase on the homes if the value of the property increases; and that the assessment would be levied and the first payment due in 1994 if this project happens today and that the cost of interest on the project is very reasonable at this time. The overwhelming majority of the citizens in attendance voiced their opposition to this project for the extension of sewer and water into their neighborhood. There are 38 homes in this area. There were 24 citizens present at this meeting plus the developers for the projects south of county Road 30. These 24 citizens represented 14 homeowners. Vice Mayor Dietz indicated that, due to not all of the homeowners being present, the City would send out the 4/1/93 informational packet along with a survey requesting feedback from the citizens on their desire for the project. It was noted that even if all of the citizens do not desire a project, that it is likely that the alignment for the extension of sewer and water will still go down Fresno Street and that the city would have to discuss this part of the project again with the Fresno Street property owners. The issues to discuss with the Fresno Street property owners include the same elements discussed tonight; street, storm sewer, lateral sewer, and lateral water assessments. Vice Mayor Dietz thanked everyone in attendance for their participation and encouraged them to contact City staff or City Councilmembers with any feedback that they may have regarding the proposed proj.ect. . . . City Council/Orono Lake 3rd Addition April 1, 1993 Page 3 The meeting was adjourned at approximately 8:40 p.m. Respectfully submitted, ~fl~L J)-i1~{1S Patrick D. Klaers ~,() City Administrator