04-24-1993 CC MIN - SPECIAL
.
.
.
SPECIAL WORK SESSION OF THE ELK RIVER CITY COUNCIL
HELD AT THE ELK RIVER CITY HALL - CONFERENCE ROOM A
SATURDAY, APRIL 24, 1993
Members Present:
Mayor Duitsman, Councilmembers Dietz, Farber, Holmgren
(8:07 a.m.), and Scheel (8:09 a.m.)
Members Absent:
None
Staff Present:
Pat K1aers, City Administrator; Terry Maurer, City
Engineer; Darrell Mack, WWTS Superintendent (10:25 a.m.)
Also Present:
Earl Hohlen, George Deschenes, and Waddy Schultz
1. Call Meeting To Order
Pursuant to due call and notice thereof, the special Work Session of
the Elk River City Council was called to order at 8:05 p.m. by Mayor
Duitsman.
2.
Consider 4/24/93 Special City Council Work Session Agenda
COUNCILMEMBER DIETZ MOVED TO APPROVE THE 4/24/93 SPECIAL CITY COUNCIL
WORK SESSION AGENDA AS PRESENTED. COUNCILMEMBER FARBER SECONDED THE
MOTION. THE MOTION CARRIED 3-0.
3.
Review and Discuss Comprehensive Storm Drainage Proposal
City Engineer, Terry Maurer, reviewed the Comprehensive Storm Drainage
Plan as outlined in his April 21, 1993, memo to the Mayor and City
Council. Terry indicated that the discussion at this meeting would
concentrate on the specific storm drainage area affecting the George
Deschenes, Waddy Schultz, and Earl Hohlen properties. This area is
going to be discussed as an example of how the City would develop a
plan city wide. This area has been selected as it currently is the
area of most immediate need and additional development is anticipated
in this area. However, components for a plan for this area are
relevant to a city wide proposal.
Terry indicated that the overall plan is to provide a system of pipes
and drainage ditches that ultimately get storm water from this
watershed district into the Mississippi River. Under ideal conditions,
the system would be built from "the bottom on up", but that is not
anticipated to be how development will take place. In this regard, the
City will have to phase in the ultimate drainage system and will have
to use some temporary solutions that are available at a lower cost
until the ultimate system can be constructed. In the long run, the
City may need to work with the County in utilizing the County ditch
system. Additionally, the city may eventually end up taking over part
of the county ditch system that affects this and other storm drainage
areas.
-.
.
.
Special City Council Work Session Minutes
April 24, 1993
Page 2
A number of short term solutions were discussed by Terry that would
help relieve the immediate storm drainage problem in this area. Some
of these solutions included redirecting the existing storm drainage
pipes in the vicinity of 5th Street and installing new storm drainage
pipes underneath County Road 12, the railroad tracks, and the soon to
be reconstructed Highway 101 in order to provide better storm drainage
flow to the river. Additionally, a temporary solution and part of the
ultimate system includes regional storm drainage retention ponds that
can temporarily hold water to provide for a more even flow of storm
drainage water through the system of ditches and pipes. These storm
drainage ponds are going to be needed on a permanent basis in order to
keep the size of the pipes smaller and costs lower.
Discussion took place on how to finance the storm drainage improvements
that are necessary. The City Engineer and City Administrator both
reviewed how other communities have approached this issue. No matter
what approach is taken, it ends up being a charge to all of the
property owners in the City either through a tax or a fee on utility
bills. The Council was in agreement that the city wide storm drainage
system must be financed city wide, but that developers who cause
additional water run-off must be responsible for financing their share
of the solution.
Specific areas discussed in this storm drainage watershed included
Tyler Street, County Road 12, County Road 13, Highway 169, 5th Street,
the culvert underneath the railroad crossing, and future storm drainage
pipe underneath the Highway 101 and Highway 10 intersection. Comments
included the fact that Highway 169 actually splits this watershed into
two different drainage areas and that the area of most concern at this
time is east of Highway 169. Also discussed was the fact that the pipe
underneath County Road 12 is undersized and that this pipe should be
increased at this time as a temporary solution to the water problems.
A larger pipe would have to be installed at a later time when the area
to the north further develops.
The Council was in overall agreement that the City Engineer is moving
in the right direction in formulating a city wide Comprehensive Storm
Drainage Plan and that he should continue his efforts in putting
together the final document.
George Deschenes indicated that he will not be available during the
summer and that, if the City needs easements from him to do work
relating to storm drainage in this vicinity, he should have these
easements available to review in the next few weeks. George indicated
that he was willing to provide the City easements in order to have the
City make storm drainage improvements. The Council discussed the
finances for the project and questioned how much of an assessment, a
fee, or a city wide tax would be necessary in order to generate enough
money to payoff a long term bond to finance some improvement
projects. It was noted that the assessment or tax would most likely be
different for property that is used in different manners. The Council
indicated that they needed more financial information in order to make
a decision on how to generate funds for financing storm drainage
improvements.
.
.
.
Special City Council Work Session Minutes
April 24, 1993
Page 3
COUNCILMEMBER HOLMGREN MOVED TO DIRECT STAFF TO PUT TOGETHER CITY WIDE
TAX FEES OR ASSESSMENT OPTIONS AND PROPOSALS TO FINANCE THE SHORT TERM
AND ULTIMATE STORM DRAINAGE SYSTEM FOR THE ENTIRE CITY. COUNCILMEMBER
FARBER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
4.
Review and Discuss Comprehensive Transportation Plan
City Engineer, Terry Maurer, indicated that the Transportation Plan is
a complex document that includes a lot of statistical information.
Terry indicated that the plan is a long range, 40 years or more,
transportation plan to meet the ultimate needs of the City. The plan
does not discuss specific intersections or work that needs to be done
to improve residential streets, but deals with an overall plan and
major transportation routes and links.
The most important parts of the document include Figure 5, The system
deficiencies and the work that needs to done on the system (page
28-30); Figure 6, Proposed minor arterial additions to the network and
the narrative describing these additions (Page 31-34); and the
narrative on Page 36-41 that discusses the proposed transportation plan
recommendations for improvements and how the transportation plan can be
implemented.
Terry reviewed in detail with the City Council the areas of deficiency
on the system (Figure 5) and the Council was in general agreement that
these areas are, or will be, deficient in the transportation system if
traffic continues to increase in the manner the City has experienced in
the past few years.
In review of Figure 6, proposed additions, the Council asked that the
City Engineer get more site specific with the link identified as C and
also that Terry identify whether or not D or E is more reasonable
before the document is revised and submitted for Council approval.
The Council discussed how the plan would be implemented and how some of
the projects would be financed. It was indicated that an official map
may need to be approved by the City Council, that the City would have
to work with the County in improving roads and maybe exchanging roads,
that the City would have to work with developers to ensure that major
collectors are located in appropriate locations, and that the City
would have to finance some improvements through MSA funds and designate
roads as MSA routes.
The City Council was in general agreement that the City Engineer is
moving in the correct direction in putting together this plan and
directed him to work on Road C, D, and E before the plan is submitted
for final approval.
5.
Discuss and Review Wastewater Treatment Plant Expansion Proposal
City Engineer, Terry Maurer, and WWTS Superintendent, Darrell Mack,
discussed with the City Council the design capacity for plant
expansion, the capacity needs for including the City of Otsego into the
plant expansion, and the project schedule. City Administrator, Pat
.
.
.
Special City Council Work Session Minutes
April 24, 1993
Page 4
Klaers, indicated that one of his concerns that also needs to be
discussed at this meeting is the finances for the plant expansion.
Terry reviewed with the City Council the material included in his April
19, 1993, memo to the City Administrator that was included in the
agenda packet.
After review and discussion of the issues related to the plant
expansion, the Council agreed that the City should pursue the trickling
filter/solids contact system. Additionally, based on available
finances and a concern over the problems caused by low sewage flows,
the City should pursue the plant expansion to the 2.2 million gallons
per day (mgd) capacity. Regarding the City of Otsego, it was indicated
that the figures provided by the City Engineer generally show that the
City of Otsego would be better off financially to construct their own
sewer system (lagoon system). By having the City of Otsego construct
their own system, it would keep the annual operating and maintenance
expenses much lower than what would be charged by the City of Elk
River. Additionally, Otsego would be able to control the use of the
sewer system and not be under any restrictions imposed by the City of
Elk River.
Terry and Darrell reviewed with the City Council the concerns outlined
in the 4/15/93 memo to the City Administrator regarding the Highway 10
lift station. Terry indicated that the improvement of this lift
station was originally planned to take place in conjunction with the
plant expansion, however, it appears that the lift station improvement
should take place now and not wait until the plant expansion
construction takes place in 1995-96.
In review of the 4/15/93 memo, Terry indicated that the total costs of
$350,000 are not in the cost estimates provided in the 4/19/93 memo
that reviews the cost for a plant expansion. Work needed to improve
the lift station includes an upgrade of the lift station, force main,
and trunk line.
COUNCILMEMBER FARBER MOVED TO AUTHORIZE THE IMPROVEMENTS TO THE
STATION, FORCE MAIN, AND TRUNK LINE RELATED TO THE HIGHWAY 10
STATION AS OUTLINED IN THE 4/15/93 MEMO FROM THE CITY ENGINEER TO
CITY ADMINISTRATOR. COUNCILMEMBER HOLMGREN SECONDED THE MOTION.
MOTION CARRIED 5-0.
LIFT
LIFT
THE
THE
The City Engineer was directed to prepare a memo addressed to the City
of Otsego outlining the costs associated with the City of Otsego being
part of the City of Elk River Wastewater Treatment System. The City
Council indicated that it desired to review this letter before it was
sent.
Councilmember Dietz discussed the options outlined in Exhibit 1 for
expansion of the Wastewater Treatment Plant that was included in
4/19/93 memo. He indicated that he preferred Option #5 due to
cost, available finances for the project, and the concern over
sewage flow.
the
the
the
low
.
.
.
Special city Council Work Session Minutes
April 24, 1993
Page 5
COUNCILMEMBER HOLMGREN MOVED TO ACCEPT OPTION #5 AS LISTED IN EXHIBIT 1
IN THE 4/19/93 MEMO FROM THE CITY ENGINEER TO THE CITY ADMINISTRATOR AS
THE PREFERRED WASTEWATER TREATMENT PLANT EXPANSION PROGRAM. THIS
OPTION CALLS FOR EXPANSION OF THE PLANT TO 2.2 MGD, USES THE TRICKLING
FILTER/SOLIDS CONTACT SYSTEM, AND HAS AN ESTIMATED TOTAL COST OF $5.3
MILLION DOLLARS. COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION
CARRIED 5-0.
The City Engineer briefly reviewed the project schedule that calls for
the bids to be opened in September, 1994. This time frame calls for
construction to begin in late 1994 or early 1995. The project takes
about eighteen months to construct.
Discussion took place regarding digester work at the plant and the
analysis of the system. It was indicated that the best time for this
work is in the spring after the sludge has been removed and spread on
the property that the City owns. It was indicated that the cost for
this analysis is included in the total plant expansion estimates and
that this work would not be above the cost estimates or be a
duplication of effort or expenses.
COUNCILMEMBER SCHEEL MOVED TO AUTHORIZE WORK IN MAY, 1993, TO ANALYZE
THE WWTS DIGESTER. COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE
MOTION CARRIED 4-0.
6.
Adjournment
There being no further business, COUNCILMEMBER HOLMGREN MOVED TO
ADJOURN THE 4/24/93 SPECIAL CITY COUNCIL WORK SESSION. COUNCILMEMBER
DIETZ SECONDED THE MOTION. THE MOTION CARRIED 4-0.
The special work session of the Elk River City Council was adjourned at
approximately 11:15 a.m.
Respectfully submitted,
~~~0
Patrick D. Klaers ~
City Administrator