8.1. SR 12-18-2017 Eclty1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 8.1
Agenda Section Meeting Date Prepared by
General Business December 18, 2017 Justin Femrite, P.E., City Engineer
Item Description Reviewed by
Ice Arena Schematic Design Calvin Portner, City Administrator
Reviewed by
Michael Hecker, Park and Recreation Director
Action Requested
Approve,by motion,proceeding to final design with the Council-preferred schematic design option.
Background/Discussion
The Ice Arena Design Committee has continued work in the schematic design phase of the Ice Arena
Project. There remain two separate elements to the project that are of focus, the Ice Arena and the
replacement location for the softball field. We continue to explore options for the softball field
replacement which will come forward for Council discussion at a future meeting.
The Ice Arena Committee will be presenting two schematic design options for consideration. The first
option is a refined layout of the facility as discussed previously (a single new ice sheet with support
spaces, a renovated NHL sized sheet in the Olympic building, and space reserved for a future 3rd sheet
addition). The committee has been referring to this at the "Original" option.
After discussions with the school district, consideration of schedules and effects on user groups and fresh
eyes from our construction management team, a"Revised" option has been developed to better
accommodate some of the challenges that were identified with the "Original" option.
The team will present the two options, their schedules and the estimated project costs of each. We will
be looking for direction from the Council on which option should be moved into final design.
Financial Impact
Overall estimates for each option will be provided in the presentation. Both options keep the total
project costs in the $20.0 and $25.0 million range as previously communicated.
Attachments
■ None
The Elk River Vision
A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By
service, and community engagement that encourages and inspires prosperity INAMIRE1
Ice Arena Schematic
Design Options
Design Team - Thank you
Kevin Bergstrom — Chamber Representative
Dave Williams — Community Resident at Large
Guenther Sagan — Park and Recreation Commission
Harold Gramstad — Lions Club Representative
Matt Westgaard — Council Representative
ISD 728 Partners
City Staff
292 Design Group
RJM Construction
Original Option
Design Elements
■ Remove the Barn & construct 1 new premium indoor ice sheet
■ Renovate Olympic rink into NHL size
■ Reserve space for a future 3rd sheet
■ Provide dryland training space
■ Provide team rooms, varsity locker rooms, and coach rooms
■ Include meeting room space
■ Add turf for single arena floor when ice is removed
■ Office and support area for Lions Club (if needed)
■ Leasable retail space for chiropractic or apparel (if desired)
Anticipated construction schedule - March 2018 to June 2019
Original Option ]
cily
1
I
Elk
River
MW--I-I-L J
4V:R- _jp-
77
fin
'can
Fy 0 0 7
Wl
Trq
0 0
0 F./
0
Q i
-------------
MMN L"EL MAN
Original Option � Lower Level
------------------
I
------JLIrr
I r �
I I
I I
I
I �
I \
L---J
�swuEEa.Em aara ..., O O
i
O O
Pa start�.r7
tm EGnri!}
vL
"01 0 0
O ° on.�E,r
1 r �
II � Lor.
PEq
nar
J CE w_m 14
p aT ai wa.�•
aia+OYy aTl 6 Erns.
A)
O W
ot
sM � � MExETti �) WEEr}O
D7pipi' �)
ecor wr.w 1
/ l
~ — d IIOCf sA01Y
niwn
n+faun UPPER LC'���4 RLav
Ori inal O tion - Upper Level
g p
Original Option Challenges
■ Proposed schedule interferes with multiple school and ice uses
Includes heavy demo work with school in session
■ Long construction schedule with large impacts to user groups
■ Higher management cost for a longer schedule
■ Keeps main entrance of facility close to high school
■ Does not set up well for any future expansion possibilities or
possible sharing of use with ISD stadiums
■ Sets up a complex future building addition for 3rd sheet
■ Limits turf space to off season times (late spring and summer)
s
I'i'204"Imm
a
Revised Option
Design Elements
■ Removes Barn & construct 2 new indoor ice sheets
■ Converts Olympic to dryland and year-round turf space
(building would provide space for the future 3rd sheet)
■ Provides team rooms, varsity locker rooms, and coach rooms
■ Includes meeting room space
■ Includes office and support area for Lions Club (if needed)
■ Leasable retail space for chiropractic or apparel (if desired)
■ Maintains Olympic ice through 2018-19 season
Anticipated construction schedule - June 2018 to April 2019
Revised Option -
_
E URI
Air
i � f
r •
r
Ci-u of
Elly -�-�
River
�— eili•MG
tiff•iEGM�
v vly
i'pAGr R - _- irryr[utq EtCK ' \\
FEIIAMACf .YaAdE
�a I
1 I
�warx r I
cuicE irpFKk L I
AFF i I
rrAr i I I
, I
I
•'a rru. � �,I I
I
• O O I
rurr i I
m.riA AhM O O I
f I
I
Wran -
' I
cw. I
I
..Aa rw.rit I
rGrri :1
I
I
- _ MS I
GDAGr I
� I
O O i I
I
- I
I
I
rrAM r' I
1LAY V � � 11 i
�A1Q Aietc. rA 9 O _-. ___ —__--__—_—
_—
I
I I
1
esr`�E%ww 1
� 1
11 ----------------------
in..r 4d 40 6b 60
I
_ _ I
y-------------- ewcearwF wroFE
oa j
ra"'M
KA�ulrur — I
I
__________________________J
-----------
devised Option - Lower Level
•V V•
.R.a1.
\t
lilt
1
00
o 0,,
a.ruw
nw�ra
Q o o
0 0
rim
w.+
o o
v o
i
1
0
p •, 0.— I U I o o
0 I, I
0
..N+ar.
cud La ass 4.0 ( -.
. .
u.a .P__�.__kg_etria�jfad4le_�
p�,N pq ppqq ..s+f�a
a.c...pw gam.
Y10WM
L:
r
^(C�.CMJRSFI.FVF[.PLAN
Revised -O tion Upper Level
p
Revised With Solutions
r%lw: rwo
,%W 0 0 6 0 Eno Ead Option C.Aha.10 10 e 0 Ono bu e 0 s
■ Proposed schedule interferes with multiple school and ice uses.
Includes heavy demo work with school in session
■ Long construction schedule with large impacts to user groups
■ Higher management cost for a longer schedule
■ Keeps main entrance of facility close to high school
■ Does not set up well for any future expansion possibilities or
possible sharing of usage with ISD stadiums
■ Sets up a complex future building addition for 3rd sheet
■ Limits turf space to off season times (late spring and summer)
Revised With Solutions
r%lw: rwo
,%W 0 0 6 0 Eno Ead Option C.Ah..a,10 10 e.0 Ono bu e.0 sft-W
Begins early June after school year and sport seasons
■ Long construction schedule with large impacts to user groups
■ Higher management cost for a longer schedule
■ Keeps main entrance of facility close to high school
■ Does not set up well for any future expansion possibilities or
possible sharing of usage with ISD stadiums
■ Sets up a complex future building addition for 3rd sheet
■ Limits turf space to off season times (late spring and summer)
Revised With Solutions
8so:-g0-pCa Option C..! h%cA%&"_Mu^c
Begins early June after school year and sport seasons
Reduces the construction schedule to about 10 months
■ Deeps main entrance of facility close to high school
■ Does not set up well for any future expansion possibilities or
possible sharing of usage with ISD stadiums
■ Sets up a complex future building addition for 3rd sheet
■ Limits turf space to off season times (late spring and summer)
t �
Revised With Solutions
8�i-g0-pCa Option C..! h%cA%&"_Mu^c
Begins early June after school year and sport seasons
Reduces the construction schedule to about 10 months
Moves entrance further away from the school
■ Does not set up well for any future expansion possibilities or
possible sharing of usage with ISD stadiums
■ Sets up a complex future building addition for 3rd sheet
■ Limits turf space to off season times (late spring and summer)
t �
Revised With Solutions
r%so: =0 n Ca
,%WE Option C..! EhE%at 10 10 e.0 EnE bu e.0 sft-W
Begins early June after school year and sport seasons
Reduces the construction schedule to about 10 months
Moves entrance further away from the school
Allows for future city/school collaboration for restrooms,
locker rooms and concessions �) -tQj;,,.
■ Sets up a complex future building addition for 3rd sheet
■ Limits turf space to off season times (late spring and summer)
Revised With Solutions
r%so: =0 n Ca
,%WE Option C..! EhE%at 10 10 e.0 EnE bu e.0 sft-W
Begins early June after school year and sport seasons
Reduces the construction schedule to about 10 months
Moves entrance further away from the school
Allows for future city/school collaboration for restrooms,
locker rooms and concessions
. mtai
• shell fo r cet
i
■ Limits turf space to off season times (late spring and summer)
City of
`
Revised With Solutions
r%so: =0 n Ca
Option C..! EhE%at 10 10 e.0 EnE bu e.0 sft-W
Begins early June after school year and sport seasons
Reduces the construction schedule to about 10 months
Moves entrance further away from the school
Allows for future city/school collaboration for restrooms,
locker rooms and concessions, -�,, .a,,,,.,�
aintains r vide ells . aft a rd s^
HOW&for r rYlan f
v k-1"iY
Revised Option
The revised option further allows:
■ No phased ice system or temporary tie overs
■ Expanded revenue with additional year-round space
■ Reuse of existing asset
■ Ability to keep 2-sheets of ice longer into spring to increase
revenue
■ More expansion opportunities for retail or community space
■ Dryland/turf indoor amenity in Elk River that expands to more
users
Estimate of Project Cost
Original Option
Ice Arena Building (incl. CM) $19.0 M
Soft Costs (Arch, Legal, FFE, Testing) $ 2.1 M
Total Ice Arena $21.1 M
Softball Field Relocation/Park Changes $ TBD
Revised Option
Ice Arena Building (incl. CM) $20.8 M
Soft Costs (Arch, Legal, FFE, Testing) $ 2.1 M
Total Ice Arena $22.9 M