Loading...
6.1d ERMUSR 01-09-2018 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz—Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: January 9, 2018 6.1d SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In December, The Locating department had a total of 99 locate tickets consisting of seven emergency tickets, 3 cancellations, 3 meetings, 67 normal tickets and 14 updated tickets. This is a 62%decrease in volume of tickets from the previous month. The locators have successfully transitioned to gathering GPS points daily since the middle of December. • Electric Technicians continue with updating power bill, substation checks, disconnects, reconnects, dealing with meter and off-peak issues, as well as installing new meters for commercial customers. Staff also assisted SPX personnel with the installation of the load tap changer(LTC) filter assembly on Waco Bank#2 during the last week of December. • I attended the Minnesota Municipal Utilities Association (MMUA)Technical & Operations Conference December 6-8 in St. Cloud, MN. The conference was very informative and I learned a great deal about Cyber Attacks and Active Threats in the Workplace. I truly appreciate the opportunity to attend. • Staff began weekly meter reading the last week of December and continues to perform meter audits around the system as time allows. Metering department staff has completed the reprogramming of demand meters with the appropriate billing cycle. I anticipate the completion of reprogramming non-demand meters by the 3`d week of January. • The power plant staff did the monthly engine run on December 21St. All engines were run with the exception of engine #4. There appears to be a malfunction of the governor on this unit. Staff will investigate this further as time permits. • Mapping department continues to enter GPS points and attribute points for all of our systems assets within the ESRI ArcView GIS system. CAD maps have also been recently updated for field staff use. Staff evaluated two GPS units in December and recommended the purchase of the Trimble units. Page 1 of 2 81 • The testing of the MV-90 software has been completed and will be used the first week of 2018. After we have used it for a couple of months,we will decommission the outdated legacy software/hardware that is no longer supported by Itron. Page 2 of 2 82